CN220317275U CN202322050255.6U CN202322050255U CN220317275U CN 220317275 U CN220317275 U CN 220317275U CN 202322050255 U CN202322050255 U CN 202322050255U CN 220317275 U CN220317275 U CN 220317275U
Authority
CN
China
Prior art keywords
fixedly connected
lifting plate
assembled integral
fixed
spacing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322050255.6U
Other languages
Chinese (zh)
Inventor
陈�峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202322050255.6U priority Critical patent/CN220317275U/en
Application granted granted Critical
Publication of CN220317275U publication Critical patent/CN220317275U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an assembled integral installation device for building electromechanical engineering, which belongs to the technical field of building electromechanical engineering and comprises a movable base, wherein the upper end of the movable base is fixedly connected with four hydraulic cylinders, the hydraulic cylinders are arranged at the upper end of the movable base in a rectangular manner, and when a construction pipeline is required to be limited and fixed, people only need to operate by controlling a motor to drive the driving gear to rotate, and the driving gear and two racks are respectively meshed so as to push the two limiting blocks to respectively move towards two sides.

Description

Assembled integral installation device for building electromechanical engineering
Technical Field
The utility model relates to the technical field of building electromechanical engineering, in particular to an assembled integral installation device for the building electromechanical engineering.
Background
The building electromechanical installation refers to installation of equipment, circuits and pipelines of industrial and public and civil construction projects, and is characterized in that the equipment, the circuits and the pipelines are installed in substation engineering with 35 kilovolts or less, non-standard steel members are manufactured and installed, the pipelines are required to be erected in the building electromechanical engineering when the pipelines are assembled and connected, the patent document with the publication number of CN215548219U in the prior art provides an assembled integral installation device for the building electromechanical engineering, the lifting of the lifting platform is realized through threaded connection between the lifting platform and a first threaded rod, manual carrying is avoided, the safety performance of the equipment is improved, a first bevel gear is driven by a first motor to drive a second bevel gear to rotate, the second threaded rod is driven by the first motor to rotate, two clamping plates are driven by the threaded connection to move in opposite directions, the fixing of the pipelines is facilitated, and subsequent installation operation is facilitated.
Although the device can fix the pipeline, the following problems still exist: the device can only carry out fixed transport to the building assembly pipeline of specific length, but because the building assembly pipeline of different models needs to be used in the construction, and the pipeline length dimension of different models is different, above-mentioned transport hoisting device can't carry fixed to the building pipeline of different lengths, leads to the device to be lower in commonality and universality when carrying the building assembly pipeline, has certain defect.
Disclosure of Invention
(1) Technical problem to be solved
Aiming at the defects of the prior art, the utility model aims to provide an assembled type integral installation device for the electromechanical engineering of a building, which has the characteristics of being capable of stably fixing and carrying building assembly pipelines with different lengths and having higher universality.
(2) Technical proposal
In order to achieve the above purpose, the utility model provides an assembled integral installation device for building electromechanical engineering, which comprises a movable base, wherein the upper end of the movable base is fixedly connected with hydraulic cylinders, the hydraulic cylinders are four in number and are arranged at the upper end of the movable base in a rectangular manner, the upper end of the hydraulic cylinders is fixedly connected with a supporting lifting plate, the upper surface of the supporting lifting plate is lapped with a construction pipeline, two ends of the construction pipeline are symmetrically and fixedly connected with flange connectors, the lower surface of the supporting lifting plate is fixedly welded with a fixed shell, the inside of the fixed shell is fixedly connected with a motor, the upper end of an output shaft of the motor is fixedly connected with a rotating shaft, the upper end of the rotating shaft is fixedly connected with a driving gear, two limiting supporting lifting plates are symmetrically arranged at two sides of the supporting lifting plate, the side surfaces of the limiting supporting blocks are fixedly connected with connecting push rods, two groups of the connecting push rods and the racks are respectively and symmetrically arranged at the side surfaces of the two limiting blocks, and the two racks are meshed with the driving gear.
When the assembled integral installation device for the building electromechanical engineering is used, the driving gear is driven to rotate by controlling the motor to operate, the two limiting abutting blocks are pushed to move towards two sides respectively under the meshing of the driving gear and the two racks, and when the two limiting abutting blocks are simultaneously abutted against the surfaces of flange connectors at two ends of a construction pipeline, the construction pipeline can be limited under the joint cooperation of the two limiting abutting blocks.
Further, the side fixedly connected with slide bar of spacing piece that supports, the lower surface fixedly connected with sliding sleeve of removal base, slide bar sliding connection is in the sliding sleeve, the slide bar is total two to symmetrical fixed connection is in the side of two spacing pieces that support respectively, the sliding sleeve is total two to symmetrical fixed welding is at the lower surface of removal base.
Further, the side fixedly connected with slider of connection push rod, the spout has been seted up to the lower surface of removal base, slider sliding connection is in the spout, slider and spout are total two to correspond with the position of two connection push rods respectively.
Further, the lower end of the movable base is provided with four movable wheels which are arranged at the lower end of the movable base in a rectangular arrangement.
Further, the upper surface of the supporting lifting plate is symmetrically and fixedly connected with two groups of fixing rings, and the two groups of fixing rings are respectively arranged on two sides of the construction pipeline.
(3) Advantageous effects
In summary, the utility model has the following beneficial effects:
through setting up driving gear, rack, motor and spacing piece that supports, when needs carry out spacing fixed to the construction pipeline, constructor only need through controlling the motor operation, drive driving gear rotation, under the meshing respectively of driving gear and two racks, promote two spacing pieces that support respectively to both sides and remove, when two spacing piece that support simultaneously butt when construction pipeline both ends, under the joint cooperation of two spacing pieces, can carry out spacing to the construction pipeline, and then provide stable spacing fixed to the construction assembly pipeline, avoid the construction pipeline to roll down from the device because fixed effect is not good when the transport, and because the position that two spacing pieces supported can be adjusted in a flexible way under the transmission cooperation of driving gear and rack, consequently can fix spacing to the pipeline of different length, make the device can be applicable to the transport assembly work of the construction assembly pipeline of different models, the commonality of the device when construction has been improved.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings required for the description of the embodiments or the prior art will be briefly described, and it is apparent that the drawings in the following description are only one embodiment of the present utility model, and other drawings can be obtained according to the drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic elevational view of the present utility model;
FIG. 2 is a schematic side cross-sectional view of the present utility model;
FIG. 3 is a schematic elevational cross-sectional view of the present utility model;
fig. 4 is a schematic top view of a limiting block according to the present utility model.
The marks in the drawings are:
1. a movable base; 2. a hydraulic cylinder; 3. supporting the lifting plate; 4. a fixed housing; 5. a motor; 6. a rotating shaft; 7. a drive gear; 8. constructing a pipeline; 9. a flange connection; 10. limiting abutting blocks; 11. the push rod is connected; 12. a rack; 13. a slide bar; 14. a sliding sleeve; 15. a slide block; 16. a chute; 17. a moving wheel; 18. and a fixing ring.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement of the purpose and the effect of the present utility model easy to understand, the technical solutions in the embodiments of the present utility model are clearly and completely described below to further illustrate the present utility model, and it is obvious that the described embodiments are only some embodiments of the present utility model, not all versions.
Examples:
the utility model is described in further detail below with reference to fig. 1-4.
Referring to fig. 1-4, the present utility model provides a technical solution: the utility model provides a building electromechanical engineering assembled integral installation device, including moving base 1, the upper end fixedly connected with pneumatic cylinder 2 of moving base 1, pneumatic cylinder 2 is four altogether, and be the rectangle and arrange the upper end that sets up at moving base 1, the upper end fixedly connected with of pneumatic cylinder 2 supports lifting plate 3, the upper surface overlap joint of supporting lifting plate 3 has construction pipeline 8, people operate in step through four pneumatic cylinders 2 of control, can drive construction pipeline 8 and upwards move, carry out the promotion to construction pipeline 8, conveniently promote construction pipeline 8 to the assembly installation height, the both ends symmetry fixedly connected with flange joint 9 of construction pipeline 8, the fixed casing 4 of lower surface fixedly welded of supporting lifting plate 3, the inside fixedly connected with motor 5 of fixed casing 4, the output shaft upper end fixedly connected with pivot 6 of motor 5, the upper end fixedly connected with driving gear 7 of pivot 6, the bilateral symmetry of supporting plate 3 is provided with two spacing support blocks 10, the length of supporting lifting plate 3 corresponds with the length of the construction pipeline 8 of shortest length and model just, and can carry out spacing to it, carry out lifting plate 8, carry out lifting plate's both ends symmetry, can carry out the regulation at the two side face-to the rack 11 with the side face of the two and the side face of the rack, the two sets of the rack is connected with at the two side face of the rack 11 respectively, the two sets of push rod 11 can carry out the side-stop block, and the two side face of the rack 11 is connected with the rack 11, the two side-bar 11 is connected with the end-bar 11 respectively, and is fixed, the two side face 11 is connected with the side-mounted, and is connected with the rack 11.
Through adopting above-mentioned technical scheme, when carrying out spacing fixed to construction pipeline 8, people operate through control motor 5, drive driving gear 7 and rotate, under the meshing respectively of driving gear 7 and two racks 12, promote two spacing pieces of supporting 10 respectively to both sides and remove, when two spacing pieces of supporting 10 butt simultaneously at the surface of the flange joint 9 at construction pipeline 8 both ends, under the joint cooperation of two spacing pieces of supporting 10, can carry out spacingly to construction pipeline 8.
Specifically, the side of the limiting support block 10 is fixedly connected with a sliding rod 13, the lower surface of the movable base 1 is fixedly connected with a sliding sleeve 14, the sliding rods 13 are slidably connected in the sliding sleeve 14, the number of the sliding rods 13 is two, the sliding rods 13 are respectively and symmetrically fixedly connected to the side of the two limiting support blocks 10, the number of the sliding sleeves 14 is two, and the sliding sleeves 14 are symmetrically and fixedly welded to the lower surface of the movable base 1.
Through adopting above-mentioned technical scheme, under the cooperation respectively of two sets of slide bars 13 and sliding sleeve 14, can guarantee to connect push rod 11 can keep steady state when removing, and then guarantee the stability of spacing piece 10 when carrying out the left and right sides and remove.
Specifically, the side of connecting push rod 11 fixedly connected with slider 15, the spout 16 has been seted up to the lower surface of moving base 1, and slider 15 sliding connection is in spout 16, and slider 15 and spout 16 are two altogether to correspond with the position of two connecting push rods 11 respectively, under the cooperation of slider 15 and spout 16, play the effect to the spacing direction of connecting push rod 11.
Specifically, the lower extreme of moving base 1 is provided with the removal wheel 17, and the removal wheel 17 is four altogether to be rectangular arrangement and set up in the lower extreme of moving base 1, through removing the movable wheel 17 controllable device and drive construction pipeline 8 and remove the transport.
Specifically, the upper surface symmetry fixedly connected with two sets of solid fixed rings 18 of support lifting plate 3, two sets of solid fixed rings 18 set up in the both sides of construction pipeline 8 respectively, and people can overlap joint the fixed rope at the surface of construction pipeline 8 to fix the fixed rope through solid fixed ring 18, further improve the stability of construction pipeline 8.
The working principle of the utility model is as follows: when carrying and lifting the building assembly pipeline, constructors hoist the construction pipeline 8 to the support lifting plate 3 at first, make the construction pipeline 8 be in the intermediate position on the support lifting plate 3, then control motor 5 operation, drive driving gear 7 and rotate, under the meshing respectively of driving gear 7 and two racks 12, promote two spacing support pieces 10 and remove to both sides respectively, when two spacing support pieces 10 butt at the surface of the flange joint 9 at construction pipeline 8 both ends, limit the construction pipeline 8 under the joint cooperation of two spacing support pieces 10, then constructors overlap joint fixed rope at the surface of construction pipeline 8, and fix fixed rope through solid fixed ring 18, further improve the stability of construction pipeline 8, after construction pipeline 8 is transported to appointed position, constructors operate through controlling four pneumatic cylinders 2 synchronization, drive construction pipeline 8 upwards to wait the installation position, carry out the assembly installation to construction pipeline 8.
The present embodiment is only for explanation of the present utility model and is not to be construed as limiting the present utility model, and modifications to the present embodiment, which may not creatively contribute to the present utility model as required by those skilled in the art after reading the present specification, are all protected by patent laws within the scope of claims of the present utility model.

Claims (5)

1. The utility model provides a building electromechanical engineering assembled integral installation device, includes removal base (1), its characterized in that: the utility model discloses a movable base, including base (1) and fixed casing, fixed casing (4) are fixed to the upper end fixedly connected with pneumatic cylinder (2), four altogether to be the upper end that the rectangle was arranged and set up in movable base (1), the upper end fixedly connected with of pneumatic cylinder (2) supports lifting plate (3), the upper surface overlap joint of supporting lifting plate (3) has construction pipeline (8), the both ends symmetry fixedly connected with flange joint (9) of construction pipeline (8), the fixed casing (4) of lower fixed surface welding of supporting lifting plate (3), the inside fixedly connected with motor (5) of fixed casing (4), the output shaft upper end fixedly connected with pivot (6) of motor (5), the upper end fixedly connected with driving gear (7) of pivot (6), the both sides symmetry of supporting lifting plate (3) is provided with two spacing supporting blocks (10), the side fixedly connected with of spacing supporting blocks (10) are connected with rack (11), the side fixedly connected with rack (12) of connecting push rod (11), connect push rod (12) and each two sets of two racks (7) and two sets of two sides are all engaged with each other at two driving gear (12).
2. The building electro-mechanical engineering assembled integral mounting arrangement of claim 1, wherein: the side fixedly connected with slide bar (13) of spacing piece (10), the lower surface fixedly connected with sliding sleeve (14) of removal base (1), slide bar (13) sliding connection is in sliding sleeve (14), slide bar (13) are total two to respectively symmetrical fixed connection is in the side of two spacing pieces (10), sliding sleeve (14) are total two to symmetrical fixed welding is at the lower surface of removal base (1).
3. The building electro-mechanical engineering assembled integral mounting arrangement of claim 1, wherein: the side fixedly connected with slider (15) of connection push rod (11), spout (16) have been seted up to the lower surface of moving base (1), slider (15) sliding connection is in spout (16), slider (15) and spout (16) are total two to correspond with the position of two connection push rods (11) respectively.
4. The building electro-mechanical engineering assembled integral mounting arrangement of claim 1, wherein: the lower end of the movable base (1) is provided with four movable wheels (17), and the movable wheels (17) are arranged at the lower end of the movable base (1) in a rectangular arrangement.
5. The building electro-mechanical engineering assembled integral mounting arrangement of claim 1, wherein: the upper surface of the supporting lifting plate (3) is symmetrically and fixedly connected with two groups of fixing rings (18), and the two groups of fixing rings (18) are respectively arranged on two sides of the construction pipeline (8).
CN202322050255.6U 2023-08-01 2023-08-01 Assembled integral installation device for building electromechanical engineering Active CN220317275U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322050255.6U CN220317275U (en) 2023-08-01 2023-08-01 Assembled integral installation device for building electromechanical engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322050255.6U CN220317275U (en) 2023-08-01 2023-08-01 Assembled integral installation device for building electromechanical engineering

Publications (1)

Publication Number Publication Date
CN220317275U true CN220317275U (en) 2024-01-09

Family

ID=89423721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322050255.6U Active CN220317275U (en) 2023-08-01 2023-08-01 Assembled integral installation device for building electromechanical engineering

Country Status (1)

Country Link
CN (1) CN220317275U (en)

Similar Documents

Publication Publication Date Title
CN109396088B (en) PC component die table cleaning device and working method thereof
CN214720980U (en) Cutting device for steel pipe machining
CN108838954A (en) A kind of novel and multifunctional mechanical equipment inspection rack device and its repair method
CN108358096B (en) Pipeline transportation overhead hoist for hydraulic engineering
CN220317275U (en) Assembled integral installation device for building electromechanical engineering
CN103434932A (en) Multifunctional jacklift
CN211398066U (en) Quick assembly disassembly formula dive tubular pump
CN204777713U (en) Rotatory pouring device of chemical industry discharge tube
CN203919045U (en) A kind of stacking machine clamping manipulator
CN110744214B (en) Pipeline rib plate welding device and method
CN110640674B (en) Flexible assembling tool for vibration exciter bearing and assembling method of flexible assembling tool
CN211074096U (en) Possesses form removal machine of automatic form removal
CN203579170U (en) Vertical column cylinder disassembly machine
CN217806830U (en) Electromechanical engineering installation auxiliary assembly
CN202370457U (en) Automatic drill pipe mounting and dismounting machine
CN218778643U (en) Gas turbine generator overhauls device convenient to equipment removes
CN219469469U (en) Novel hanging frame for maintenance of fire truck
CN220296998U (en) Coating machine roll body installation device
CN219864162U (en) Lifting type cantilever building part mounting device
CN216807786U (en) A concrete pipe piece hoisting accessory for construction
CN219194291U (en) Water conservancy pile foundation handling device
CN109573635A (en) A kind of construction channel steel profile automatic docking device
CN114955480A (en) Wall body upset loader
CN218254106U (en) Steering device for beam casting production line
CN218114892U (en) Transportation device for low-voltage sleeve of transformer

Legal Events

Date Code Title Description
GR01 Patent grant