CN220286638U - Assembled piping lane support - Google Patents

Assembled piping lane support Download PDF

Info

Publication number
CN220286638U
CN220286638U CN202321564584.6U CN202321564584U CN220286638U CN 220286638 U CN220286638 U CN 220286638U CN 202321564584 U CN202321564584 U CN 202321564584U CN 220286638 U CN220286638 U CN 220286638U
Authority
CN
China
Prior art keywords
sliding plate
plate
inserted bar
mounting
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321564584.6U
Other languages
Chinese (zh)
Inventor
刘珊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Yuzexing Construction Engineering Co ltd
Original Assignee
Ningxia Yuzexing Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia Yuzexing Construction Engineering Co ltd filed Critical Ningxia Yuzexing Construction Engineering Co ltd
Priority to CN202321564584.6U priority Critical patent/CN220286638U/en
Application granted granted Critical
Publication of CN220286638U publication Critical patent/CN220286638U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to the technical field of pipe rack supports, in particular to an assembled pipe rack support which comprises a connecting plate and a sliding plate, wherein mounting holes are formed in the surface of the connecting plate, and one side of the sliding plate is fixedly connected with a mounting frame. The utility model has the advantages that: through connecting plate, the mounting hole, the sliding plate, the mounting bracket, the inserted bar, the handle, first spring, first locating hole, cooperation between second locating hole and the fixing device, can be more quick fix the operation to the position of sliding plate, thereby the operation is more simple convenient can improve speed and the efficiency of adjusting piping lane mounting height greatly, can reduce the friction between locating lever and the inserted bar at the gliding in-process of inserted bar through the cooperation between rotating groove and the ball, enable to adjust simpler convenient, can make first locating hole and locating lever dislocation more convenient carry out the adjustment operation when dismantling the operation through the cooperation between fixed slot, dislocation spring and the jacking board.

Description

Assembled piping lane support
Technical Field
The utility model relates to the technical field of pipe gallery brackets, in particular to an assembled pipe gallery bracket.
Background
The pipe gallery support is a municipal pipeline engineering support for intensively paving electric power, communication, water supply, water discharge, heat, fuel gas and the like under the city, can carry out intensive management on pipelines, and is an important component for building the underground comprehensive pipe gallery.
Chinese utility model application number CN202223382883.6 discloses an assembled piping lane support, including the U type seat, the upside of U type seat is equipped with the piping lane, the inner wall fixedly connected with of U type seat has two hollow posts, run through on the U type seat be equipped with its rotation two threaded rods that are connected, the right side the outer wall fixedly connected with handle of threaded rod, be equipped with in the U type seat rather than rotation the rotary rod of being connected, every the outer wall of threaded rod all overlaps with the outer wall of rotary rod jointly and is equipped with the belt, every the threaded rod all overlaps and is equipped with rather than threaded connection's slip post, two slip posts run through the hollow post respectively and rather than sliding connection, but the device still has some shortcoming in the in-process of using: the device is connected through bolt and nut when changing the installation height of piping lane makes the operation comparatively troublesome not simple and convenient enough to influence construction operation's speed and efficiency.
Disclosure of Invention
The object of the present utility model is to solve at least one of the technical drawbacks.
Therefore, an object of the present utility model is to provide an assembled piping lane support, which solves the problems mentioned in the background art, and overcomes the disadvantages of the prior art.
In order to achieve the above object, an embodiment of an aspect of the present utility model provides an assembled pipe rack, including a connecting plate and a sliding plate, wherein a mounting hole is provided on a surface of the connecting plate, one side of the sliding plate is fixedly connected with a mounting rack, a middle part of the mounting rack is slidably connected with a plug rod, one end of the plug rod is fixedly connected with a handle, a first spring is fixedly installed on a side, close to the handle and the mounting rack, of the plug rod, a first positioning hole and a second positioning hole are provided on a surface of the plug rod, and a fixing device is provided on one side of the sliding plate, the technical effects achieved by adopting the above scheme are that: when the installation height of the pipe gallery is adjusted, the pull plate is pulled first to enable the positioning rod to be separated from the interiors of the first positioning holes of the two inserting rods, then the two handles are pulled to enable the two inserting rods to be separated from the interiors of the installation holes, when the positioning rod is located on one side of the second positioning hole, the positioning rod is enabled to position the inserting rods under the rebound of the second spring, at the moment, the sliding plate can be enabled to slide on the surface of the connecting plate to adjust the installation height of the pipe gallery, after adjustment is completed, the positioning rod is enabled to be enabled to relax the fixing of the inserting rods through pulling the pull plate, the inserting rods are enabled to be inserted into the interiors of the installation holes under the rebound of the first spring, accordingly the position of the sliding plate is adjusted, meanwhile, the positioning rod is enabled to be inserted into the interiors of the first positioning holes to be fixed, and the pipe gallery can be adjusted more simply and conveniently through operation, and speed and efficiency of adjusting the pipe installation height can be greatly improved.
By the preferred of above-mentioned arbitrary scheme, fixing device includes locating lever, arm-tie and second spring, the inside sliding connection of sliding plate has the locating lever, the one end fixedly connected with arm-tie of locating lever, one side fixed mounting of arm-tie has the second spring, the one end that the arm-tie was kept away from to the second spring is connected with one side of sliding plate, adopts the technical effect that above-mentioned scheme reached to be: the pulling plate can drive the two positioning plates to move, so that the inserting rod can be fixed and loosened, and the adjustment operation is convenient.
By the above-mentioned arbitrary scheme preferred, the quantity of second spring is three, and three the second spring equidistance distributes in one side of arm-tie, the quantity of locating lever is two, two the locating lever symmetric distribution is in one side of arm-tie, the diameter of locating lever is the same with the diameter of first locating hole and second locating hole, adopts the technical effect that above-mentioned scheme reached: the pulling plate can drive the two positioning plates to move, so that the inserting rod can be fixed and loosened, and the adjustment operation is convenient.
By the preferred shape of arbitrary scheme above-mentioned, the shape of mounting bracket is the U font, the quantity of mounting bracket and inserted bar is two, two mounting bracket and inserted bar symmetric distribution are in the both sides of sliding plate, the both sides of sliding plate all are provided with the jack the same with the inserted bar diameter, the diameter of inserted bar is the same with the diameter of mounting hole, adopts the technical effect that above-mentioned scheme reached to be: the length of one insert rod can be reduced by inserting two insert rods into the inside of the mounting hole.
By the preferred one end of above-mentioned arbitrary scheme, the one end of locating lever is provided with the rotation groove, the inner wall rotation in rotation groove is connected with the ball, the one end of inserted bar is provided with dislocation device, the surface sliding connection of connecting plate has the sliding plate, the bottom fixedly connected with U type seat of connecting plate, one side of U type seat is provided with the piping lane grip block, adopts the technical effect that above-mentioned scheme reached to be: the ball rolls in the rotating groove, so that friction between the positioning rod and the inserted link can be reduced, and adjustment is easier and more convenient.
By the preferred of above-mentioned arbitrary scheme, dislocation device includes fixed slot, dislocation spring and jacking board, the one end of inserted bar is provided with the fixed slot, the inner wall fixedly connected with dislocation spring of fixed slot, the one end fixedly connected with jacking board of dislocation spring adopts the technical effect that above-mentioned scheme reached to be: when breaking away from the inside of first locating hole through the inserted bar, the resilience of two dislocation springs makes two inserted bars remove through two jacking plates to can carry out slight dislocation with first locating hole and locating lever, thereby make things convenient for subsequent pulling inserted bar to remove.
By the preferred one side fixedly connected with mounting panel of above-mentioned arbitrary scheme, one side fixed mounting of mounting panel has the connecting rod, the fixed surface of connecting rod installs the antiskid cover, adopts the technical effect that above-mentioned scheme reached to be: the sliding plate can be conveniently pulled upwards or downwards by a worker through the connecting rod and the anti-slip sleeve to carry out height adjustment operation.
Compared with the prior art, the utility model has the following advantages and beneficial effects:
1. this assembled piping lane support, through connecting plate, mounting hole, sliding plate, mounting bracket, inserted bar, handle, first spring, cooperation between first locating hole, second locating hole and the fixing device, can be more quick fix the operation to the position of sliding plate, thereby the operation is more simple convenient can improve speed and efficiency of adjusting piping lane mounting height greatly.
2. This assembled piping lane support can reduce the friction between locating lever and the inserted bar at the gliding in-process of inserted bar through the cooperation between rotary groove and the ball to can make to adjust simpler convenient, can make first locating hole and locating lever dislocation when dismantling the operation through the cooperation between fixed slot, dislocation spring and the jacking board, thereby can conveniently adjust the operation more.
Drawings
FIG. 1 is a schematic diagram of a first embodiment of the present utility model;
FIG. 2 is a schematic view of the structure at A according to the first embodiment of the present utility model;
FIG. 3 is a schematic cross-sectional view of a first embodiment of the present utility model;
FIG. 4 is a schematic diagram of a structure at B according to a first embodiment of the present utility model;
FIG. 5 is a schematic view of the structure at C according to the first embodiment of the present utility model;
fig. 6 is a schematic diagram of a structure at D according to a first embodiment of the present utility model.
Wherein: 1-connecting plate, 2-mounting hole, 3-sliding plate, 4-mounting rack, 5-inserting rod, 6-handle, 7-first spring, 8-first locating hole, 9-second locating hole, 10-fixing device, 1001-locating rod, 1002-pulling plate, 1003-second spring, 11-dislocation device, 1101-fixed slot, 1102-dislocation spring, 1103-lifting plate, 12-rotating slot, 13-ball, 14-mounting plate, 15-connecting rod, 16-anti-skid sleeve, 17-U-shaped seat, 18-pipe gallery clamping plate.
Detailed Description
The present utility model will be further described with reference to the accompanying drawings, but the scope of the present utility model is not limited to the following.
Embodiment one: as shown in fig. 1 to 6, an assembled pipe rack comprises a connecting plate 1 and a sliding plate 3, the surface of the connecting plate 1 is provided with a mounting hole 2, one side fixedly connected with mounting bracket 4 of the sliding plate 3, the middle sliding connection of the mounting bracket 4 is provided with a plug rod 5, one end fixedly connected with handle 6 of the plug rod 5, one side fixedly installed close to the handle 6 and the mounting bracket 4 is provided with a first spring 7, the surface of the plug rod 5 is provided with a first locating hole 8 and a second locating hole 9, one side of the sliding plate 3 is provided with a fixing device 10, the pulling plate 1002 is pulled first to enable the locating rod 1001 to be separated from the inside of the first locating holes 8 of two plug rods 5 when the mounting height of the pipe rack is adjusted, then the pulling of the two plug rods 6 is enabled to be separated from the inside of the mounting holes 2 when the locating rod 1001 is located on one side of the second locating hole 9, at this moment, the rebound of the second spring 1003 is enabled to enable the locating rod 1001 to locate the plug rod 5, at this moment, the sliding plate 3 can be enabled to slide the surface of the connecting plate 1 to carry out sliding adjustment of the height adjustment of the pipe rack 9, the sliding plate 3 is enabled to be more easily inserted into the first locating hole 3, the rebound hole 5 can be adjusted to enable the plug rod 1001 to be more easily, and the inside the plug rod 5 can be easily adjusted to be more easily and easily inserted into the inside the mounting hole 3 is increased, and the inside the jack hole is adjusted, and the jack is more easily adjusted.
As an alternative solution of the present utility model, the fixing device 10 includes a positioning rod 1001, a pull plate 1002 and a second spring 1003, where the positioning rod 1001 is slidably connected to the inside of the sliding plate 3, one end of the positioning rod 1001 is fixedly connected to the pull plate 1002, one side of the pull plate 1002 is fixedly provided with the second spring 1003, one end of the second spring 1003 away from the pull plate 1002 is connected to one side of the sliding plate 3, and the two positioning plates 1001 can be driven to move by pulling the pull plate 1002, so that the insert rod 5 can be fixed and loosened, and thus the adjustment operation is convenient.
As an alternative technical scheme of the utility model, the number of the second springs 1003 is three, the three second springs 1003 are equidistantly distributed on one side of the pull plate 1002, the number of the positioning rods 1001 is two, the two positioning rods 1001 are symmetrically distributed on one side of the pull plate 1002, the diameter of the positioning rods 1001 is the same as the diameters of the first positioning holes 8 and the second positioning holes 9, and the two positioning plates 1001 can be driven to move by pulling the pull plate 1002, so that the inserting rod 5 can be fixed and loosened, and the adjustment operation is convenient.
As an alternative technical scheme of the utility model, the mounting frame 4 is U-shaped, the number of the mounting frame 4 and the number of the inserting rods 5 are two, the two mounting frames 4 and the inserting rods 5 are symmetrically distributed on two sides of the sliding plate 3, the two sides of the sliding plate 3 are provided with insertion holes with the same diameter as the inserting rods 5, the diameter of the inserting rods 5 is the same as the diameter of the mounting holes 2, and the length of one inserting rod 5 can be reduced by inserting the two inserting rods 5 into the mounting holes 2.
As an alternative technical scheme of the utility model, one end of the positioning rod 1001 is provided with a rotating groove 12, the inner wall of the rotating groove 12 is rotationally connected with a ball 13, one end of the inserted rod 5 is provided with a dislocation device 11, the surface of the connecting plate 1 is slidably connected with a sliding plate 3, the bottom of the connecting plate 1 is fixedly connected with a U-shaped seat 17, one side of the U-shaped seat 17 is provided with a pipe gallery clamping plate 18, and the ball 13 rolls in the rotating groove 12, so that friction between the positioning rod 1001 and the inserted rod 5 can be reduced, and the adjustment is easier and more convenient.
As an alternative technical solution of the present utility model, the dislocation device 11 includes a fixing groove 1101, a dislocation spring 1102 and a lifting plate 1103, one end of the insert rod 5 is provided with the fixing groove 1101, the inner wall of the fixing groove 1101 is fixedly connected with the dislocation spring 1102, one end of the dislocation spring 1102 is fixedly connected with the lifting plate 1103, when the insert rod 5 is separated from the inside of the first positioning hole 8, the resilience of the two dislocation springs 1102 enables the two insert rods 5 to move through the two lifting plates 1103, so that the first positioning hole 8 and the positioning rod 1001 can be slightly dislocated, and the subsequent movement of the insert rod 5 is facilitated.
As an alternative technical scheme of the utility model, one side of the sliding plate 3 is fixedly connected with the mounting plate 14, one side of the mounting plate 14 is fixedly provided with the connecting rod 15, the surface of the connecting rod 15 is fixedly provided with the anti-skid sleeve 16, and the sliding plate 3 can be conveniently pulled upwards or downwards by a worker to carry out height adjustment operation through the connecting rod 15 and the anti-skid sleeve 16.
An assembled pipe gallery support has the following working principle: when the installation height of the pipe gallery is adjusted, the pull plate 1002 is pulled firstly to enable the positioning rod 1001 to be separated from the interiors of the first positioning holes 8 of the two inserting rods 5, then the two handles 6 are pulled to enable the two inserting rods 5 to be separated from the interiors of the installation holes 2, when the positioning rod 1001 is located on one side of the second positioning hole 9, the positioning rod 1001 is enabled to position the inserting rods 5 under the rebound of the second spring 1003, at this time, the sliding plate 3 can be enabled to slide on the surface of the connecting plate 1 to adjust the installation height of the pipe gallery, after adjustment is completed, the positioning rod 1002 is pulled to enable the positioning rod 1001 to be loosened to fix the inserting rods 5, the inserting rods 5 are enabled to be inserted into the interiors of the installation holes 2 under the rebound of the first spring 7, the positions of the sliding plate 3 are adjusted, meanwhile, the positioning rod 1001 is enabled to be inserted into the interiors of the first positioning holes 8 to be fixed through slight pushing of the handles 6, and the operation is simpler and convenient, and the speed and efficiency of adjusting the installation height of the pipe gallery can be greatly improved.
To sum up, this assembled piping lane support, through connecting plate 1, mounting hole 2, sliding plate 3, mounting bracket 4, inserted bar 5, handle 6, first spring 7, first locating hole 8, cooperation between second locating hole 9 and the fixing device 10, can be more quick fix the operation to the position of sliding plate 3, thereby the operation is more simple convenient can improve speed and the efficiency of adjusting piping lane mounting height greatly, can reduce the friction between locating lever 1001 and the inserted bar 5 at the gliding in-process of inserted bar 5 through the cooperation between pivoted groove 12 and ball 13, thereby can make to adjust more simply convenient, can make first locating hole 8 and locating lever 1001 dislocation when dismantling the operation through the cooperation between fixed slot 1101, dislocation spring 1102 and the jacking board 1103, thereby can more conveniently carry out the adjustment operation.
Embodiment two, an assembled piping lane support, this embodiment is with the fixed mounting stopper of the surface of locating lever 1001 on the basis of above-mentioned embodiment, then the inside of sliding plate 3 is provided with the spout with stopper looks adaptation, can prevent that locating lever 1001 from taking place the condition that breaks away from, makes it can more stable carry out the operation.

Claims (7)

1. The utility model provides an assembled piping lane support, includes connecting plate (1) and sliding plate (3), its characterized in that: the surface of connecting plate (1) is provided with mounting hole (2), one side fixedly connected with mounting bracket (4) of sliding plate (3), the middle part sliding connection of mounting bracket (4) has inserted bar (5), one end fixedly connected with handle (6) of inserted bar (5), one side fixed mounting that handle (6) and mounting bracket (4) are close to has first spring (7), the surface of inserted bar (5) is provided with first locating hole (8) and second locating hole (9), one side of sliding plate (3) is provided with fixing device (10).
2. A fabricated tube rack as claimed in claim 1, wherein: fixing device (10) are including locating lever (1001), arm-tie (1002) and second spring (1003), the inside sliding connection of sliding plate (3) has locating lever (1001), the one end fixedly connected with arm-tie (1002) of locating lever (1001), one side fixed mounting of arm-tie (1002) has second spring (1003), one end that arm-tie (1002) was kept away from to second spring (1003) is connected with one side of sliding plate (3).
3. A fabricated tube rack as claimed in claim 2, wherein: the number of the second springs (1003) is three, the three second springs (1003) are equidistantly distributed on one side of the pull plate (1002), the number of the positioning rods (1001) is two, the two positioning rods (1001) are symmetrically distributed on one side of the pull plate (1002), and the diameter of the positioning rods (1001) is the same as the diameter of the first positioning holes (8) and the diameter of the second positioning holes (9).
4. A fabricated tube rack as claimed in claim 3, wherein: the shape of mounting bracket (4) is the U font, the quantity of mounting bracket (4) and inserted bar (5) is two, two mounting bracket (4) and inserted bar (5) symmetric distribution are in the both sides of sliding plate (3), the both sides of sliding plate (3) all are provided with the jack the same with inserted bar (5) diameter, the diameter of inserted bar (5) is the same with the diameter of mounting hole (2).
5. A fabricated tube rack as claimed in claim 4, wherein: one end of locating lever (1001) is provided with rotates groove (12), the inner wall rotation of rotating groove (12) is connected with ball (13), the one end of inserted bar (5) is provided with dislocation device (11), the surface sliding connection of connecting plate (1) has sliding plate (3), the bottom fixedly connected with U type seat (17) of connecting plate (1), one side of U type seat (17) is provided with piping lane grip block (18).
6. The fabricated tube rack of claim 5, wherein: the dislocation device (11) comprises a fixing groove (1101), a dislocation spring (1102) and a jacking plate (1103), wherein the fixing groove (1101) is formed in one end of the inserting rod (5), the dislocation spring (1102) is fixedly connected to the inner wall of the fixing groove (1101), and the jacking plate (1103) is fixedly connected to one end of the dislocation spring (1102).
7. The fabricated tube rack of claim 6, wherein: one side fixedly connected with mounting panel (14) of sliding plate (3), one side fixed mounting of mounting panel (14) has connecting rod (15), the fixed surface of connecting rod (15) installs antiskid cover (16).
CN202321564584.6U 2023-06-19 2023-06-19 Assembled piping lane support Active CN220286638U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321564584.6U CN220286638U (en) 2023-06-19 2023-06-19 Assembled piping lane support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321564584.6U CN220286638U (en) 2023-06-19 2023-06-19 Assembled piping lane support

Publications (1)

Publication Number Publication Date
CN220286638U true CN220286638U (en) 2024-01-02

Family

ID=89335360

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321564584.6U Active CN220286638U (en) 2023-06-19 2023-06-19 Assembled piping lane support

Country Status (1)

Country Link
CN (1) CN220286638U (en)

Similar Documents

Publication Publication Date Title
CN210326816U (en) Wiring rack for fixing cable
CN220286638U (en) Assembled piping lane support
CN215635349U (en) Inner sleeve pipe jacking traction device
CN212221354U (en) Pipe conveying device for pipeline installation
CN210978755U (en) Heating pipeline installing support
CN112726410B (en) Construction method of waterproof rubber belt for railway bridge expansion joint
CN210877698U (en) Fixing platform for installing top plate drilling support
CN211343877U (en) Spiral tensioner
CN208415113U (en) A kind of bridge avris surface construction hanger
CN109462180B (en) Triangular supporting rod for live working and using method
CN116706776B (en) Cable laying device and cable laying method applicable to wellheads with different diameters
CN218386429U (en) Fixing support for live working operating rod
CN213117762U (en) Outer pipe connecting structure of prefabricated heat preservation pipe
CN217487113U (en) Ecological garden aquatic plant protector
CN220505977U (en) Heat insulation support frame
CN219388830U (en) Novel heat supply engineering heat supply pipeline fixed bolster
CN219603823U (en) Warp stop frame suitable for warp stop rods with different lengths
CN220228100U (en) Cement pipe support
CN215313471U (en) Fountain equipment convenient to adjust
CN219912463U (en) Novel but angle regulation's expense display
CN221075536U (en) Pipeline stabilizing structure for municipal engineering
CN216012923U (en) Automatic bending tester for electrical casing
CN215331882U (en) Building engineering protection network of easy dismounting
CN220152415U (en) Bracket assembly convenient to install
CN117146062A (en) Underground garage pipeline fixing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant