CN220285489U - Integrated pipe gallery and combined unit fixed type construction site fence - Google Patents

Integrated pipe gallery and combined unit fixed type construction site fence Download PDF

Info

Publication number
CN220285489U
CN220285489U CN202322210030.2U CN202322210030U CN220285489U CN 220285489 U CN220285489 U CN 220285489U CN 202322210030 U CN202322210030 U CN 202322210030U CN 220285489 U CN220285489 U CN 220285489U
Authority
CN
China
Prior art keywords
construction site
fence
panel
base
vertical frames
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322210030.2U
Other languages
Chinese (zh)
Inventor
方跃飞
张与林
张烽枫
郭水奎
郭航庆
袁航生
姚秋婷
周科斌
张云芹
郎晨东
张海峰
乔广超
赵婉妍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Sanfeng Construction Group Co ltd
Original Assignee
Zhejiang Sanfeng Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Sanfeng Construction Group Co ltd filed Critical Zhejiang Sanfeng Construction Group Co ltd
Priority to CN202322210030.2U priority Critical patent/CN220285489U/en
Application granted granted Critical
Publication of CN220285489U publication Critical patent/CN220285489U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to the field of building construction, and particularly relates to an integrated pipe rack and combined unit forming type construction site fence, which comprises a base, a framework component and a panel component, wherein the framework component comprises a plurality of cross bars and a plurality of vertical frames which are transversely arranged at intervals and are connected to the base, the vertical frames are connected with all the cross bars and play a role in supporting and installing the cross bars, the vertical frames are provided with fixing buckles for installing pipelines, and the panel component is arranged outside the framework component and is hidden inside the framework component. According to the utility model, the fixed buckle is arranged in the framework component, and the pipeline is arranged through the enclosing block in a mode of installing the pipeline through the fixed buckle, so that the problem of unreasonable pipeline arrangement near the enclosing block is solved, and the pipeline arrangement on the construction site is more well and orderly.

Description

Integrated pipe gallery and combined unit fixed type construction site fence
Technical Field
The utility model belongs to the field of building construction, and particularly relates to an integrated pipe gallery and a combined unit fixed type construction site fence.
Background
The construction site needs to use and encloses fender to separate construction space and external space, encloses fender and generally includes the base, installs the skeleton on the base and arrange in the outside panel of skeleton, and the problem that current fender structure lies in that it can't supply the pipeline to pass through, leads to the job site pipeline to arrange not enough orderliness.
Disclosure of Invention
In order to make up the defects of the prior art, the utility model provides a technical scheme for forming a construction site enclosure by integrating pipe racks and combined units.
An integrated piping lane and combination unit shaping type building site enclosure, comprising:
a base;
the framework assembly comprises a plurality of cross bars and a plurality of vertical frames which are arranged at intervals along the transverse direction and connected to the base, the vertical frames are connected with all the cross bars and play a role in supporting and installing the cross bars, and the vertical frames are provided with fixing buckles for installing pipelines; and
and the panel assembly is arranged outside the framework assembly and is hidden inside the framework assembly.
Further, the panel assembly comprises a first panel, a second panel and a third panel, wherein the first panel is positioned on the front side and the rear side of the construction site fence, the second panel is positioned on the top of the construction site fence, and the third panel is positioned on the left side and the right side of the construction site fence.
Further, the novel building framework comprises a plurality of decorative column assemblies, wherein the decorative column assemblies are covered outside the framework assemblies and are arranged on a construction site fence along the transverse interval to divide the panel assemblies into a plurality of panels.
Further, the vertical frames are connected in the decorative column assembly in a one-to-one correspondence mode.
Further, the decorative column assembly comprises column plates positioned on the front side and the rear side of the construction site fence and column covers positioned on the top of the construction site fence.
Further, the stand is a frame body which is vertically arranged, a plurality of support rods are arranged on the frame body from top to bottom, and fixing buckles are arranged on the support rods.
Further, the base is of a concrete structure, and the framework component is connected with the base through embedded bars.
Compared with the prior art, the utility model has the beneficial effects that:
according to the utility model, the fixed buckle is arranged in the framework component, and the pipeline is arranged through the enclosing block in a mode of installing the pipeline through the fixed buckle, so that the problem of unreasonable pipeline arrangement near the enclosing block is solved, and the pipeline arrangement on the construction site is more well and orderly.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of a portion of the structure of the present utility model with the panel assembly and the pillar assembly removed;
FIG. 3 is a schematic view of the connecting structure of the decorative columns, the vertical frames and the cross bars in the utility model.
In the figure:
1 is a base;
2 is a cross bar;
3 is a vertical frame;
300 is a support bar;
4 is a pipeline
5 is a fixed buckle;
6 is a first panel;
7 is a third panel;
8 is a column plate;
9 is a column cover;
10 is a second panel.
Detailed Description
In the description of the present utility model, it should be understood that the terms "one end," "the other end," "the outer side," "the upper," "the inner side," "the horizontal," "coaxial," "the center," "the end," "the length," "the outer end," and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, merely to facilitate description of the present utility model and simplify the description, and do not indicate or imply that the device or element being referred to must have a specific orientation, be configured and operated in a specific orientation, and therefore should not be construed as limiting the present utility model.
The utility model is further described below with reference to the accompanying drawings.
Referring to fig. 1-3, an integrated pipe rack and combined unit forming type construction site fence comprises a base 1, a framework component and a panel component, wherein the framework component comprises a plurality of cross rods 2 and a plurality of vertical frames 3 which are arranged at intervals transversely and connected to the base 1, the vertical frames 3 are connected with all the cross rods 2, the cross rods 2 are supported and installed, a fixing buckle 5 for installing a pipeline 4 is arranged on the vertical frames 3, the panel component is arranged outside the framework component, and the framework component is hidden.
It can be appreciated that in the above technical scheme, the fixing buckle 5 is arranged in the framework assembly, and the problem that the enclosure cannot pass through the pipeline is solved by installing the pipeline through the fixing buckle 5, so that the pipeline arrangement on the construction site is more reasonable and well-established.
With continued reference to fig. 2, the stand 3 is a vertically arranged frame body, and a plurality of support rods 300 are arranged from top to bottom in the frame body, and each support rod 300 is provided with a plurality of fixing buckles 5, and positions of the fixing buckles 5 in the left-right direction correspond to each other.
Further, the base 1 is of a concrete structure, and the bottom of the vertical frame 3 is connected with the base 1 through embedded bars in a pouring mode.
With continued reference to fig. 1, the panel assembly includes a first panel 6 positioned on either front or rear sides of the worksite fence, a second panel 10 positioned on top of the worksite fence, and a third panel 7 positioned on either left or right sides of the worksite fence.
It should be noted that the panel assembly reserves a hole for the pipeline to pass through.
With continued reference to fig. 1, the utility model further comprises a plurality of decorative column assemblies, the decorative column assemblies play a role in decoration, the plurality of decorative column assemblies are arranged on the construction site fence along the transverse interval to divide the panel assembly into a plurality of decorative column assemblies, the number and the positions of the decorative column assemblies are in one-to-one correspondence with the vertical frames 3 in the framework assemblies, the decorative column assemblies are covered outside the corresponding vertical frames 3,
further, the decorative column assembly comprises column plates 8 positioned on the front side and the rear side of the construction site fence and column covers 9 positioned on the top of the construction site fence.
Finally, it should be noted that: the above embodiments are only for illustrating the technical solution of the present utility model, and not for limiting the same; although the utility model has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical scheme described in the foregoing embodiments can be modified or some or all of the technical features thereof can be replaced by equivalents; such modifications and substitutions do not depart from the spirit of the utility model.

Claims (7)

1. An integrated piping lane and combination unit shaping type building site enclose fender, its characterized in that includes:
a base;
the framework assembly comprises a plurality of cross bars and a plurality of vertical frames which are arranged at intervals along the transverse direction and connected to the base, the vertical frames are connected with all the cross bars and play a role in supporting and installing the cross bars, and the vertical frames are provided with fixing buckles for installing pipelines; and
and the panel assembly is arranged outside the framework assembly and is hidden inside the framework assembly.
2. The utility model of claim 1, wherein the panel assembly comprises a first panel positioned on the front and rear sides of the construction site enclosure, a second panel positioned on the top of the construction site enclosure, and a third panel positioned on the left and right sides of the construction site enclosure.
3. The integrated piping lane and building block of claim 1, further comprising a plurality of pillar assemblies, the pillar assemblies being covered outside the frame assemblies, the pillar assemblies being disposed on the building block at a lateral spacing to divide the panel assembly into a plurality.
4. An integrated pipe gallery and modular unit modular site fence as set forth in claim 3 wherein said stands are connected in a one-to-one correspondence within the decorative column assembly.
5. An integrated pipe rack and combination unit profiled worksite fence as set forth in claim 3 wherein said decorative column assembly comprises column plates on both front and rear sides of the worksite fence and column covers on the top of the worksite fence.
6. The integrated pipe rack and combined unit forming type construction site fence according to claim 1, wherein the vertical frame is a vertically arranged frame body, a plurality of support rods are arranged on the frame body from top to bottom, and fixing buckles are arranged on the support rods.
7. The integrated piping lane and building block of claim 1, wherein the base is a concrete structure, and the framework assembly is connected with the base through embedded bars.
CN202322210030.2U 2023-08-17 2023-08-17 Integrated pipe gallery and combined unit fixed type construction site fence Active CN220285489U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322210030.2U CN220285489U (en) 2023-08-17 2023-08-17 Integrated pipe gallery and combined unit fixed type construction site fence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322210030.2U CN220285489U (en) 2023-08-17 2023-08-17 Integrated pipe gallery and combined unit fixed type construction site fence

Publications (1)

Publication Number Publication Date
CN220285489U true CN220285489U (en) 2024-01-02

Family

ID=89343442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322210030.2U Active CN220285489U (en) 2023-08-17 2023-08-17 Integrated pipe gallery and combined unit fixed type construction site fence

Country Status (1)

Country Link
CN (1) CN220285489U (en)

Similar Documents

Publication Publication Date Title
CN205931799U (en) Mount is used in prefabricated wallboard transportation
CN220285489U (en) Integrated pipe gallery and combined unit fixed type construction site fence
CN111132487A (en) Cabinet base convenient to installation
CN204156445U (en) A kind of adjustable die blocking wiring crane span structure
CN207499219U (en) Large area moulding aluminium grille decorative wall surface connecting system
CN206190666U (en) Cabinet with convenient assembly and disassembly
CN214589912U (en) Quick-release modular direct-current power supply cabinet
CN215660892U (en) Vertical die assembly
CN104466691A (en) Novel 45-degree-wing-angle G sectional material switch cabinet
CN204315919U (en) A kind of novel 45 degree of wing angle G section bar switch cubicles
CN106413333A (en) Reconstructible mechanical frame of rail transit automatic ticket selling machine
CN201762851U (en) Installing structure of stone curtain wall
CN207776108U (en) A kind of dismountable light steel building structure
CN201966028U (en) Transformer cabinet
CN218183780U (en) Mounting bracket for cabinet equipment
CN213626961U (en) Assembling type subway construction enclosure structure
CN201813633U (en) Assembled cabinet structure in array
CN214785103U (en) Connecting structure of curtain wall upright post and main body
CN214227777U (en) 220V intermediate frame
CN205000300U (en) Waters flexible membrane curtain
CN214989534U (en) Split type elevator frame
CN217811776U (en) Assembly type special-shaped cold-bending glass curtain wall unit mounting structure
CN220565825U (en) Protective railing for outdoor curtain wall
CN218351963U (en) Assembled block terminal mounting panel subassembly
CN214786532U (en) Novel fence

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant