CN220284618U - Tie beam template in cylindrical pier - Google Patents
Tie beam template in cylindrical pier Download PDFInfo
- Publication number
- CN220284618U CN220284618U CN202321913109.5U CN202321913109U CN220284618U CN 220284618 U CN220284618 U CN 220284618U CN 202321913109 U CN202321913109 U CN 202321913109U CN 220284618 U CN220284618 U CN 220284618U
- Authority
- CN
- China
- Prior art keywords
- pier
- holes
- template
- support plates
- tie
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000003014 reinforcing effect Effects 0.000 claims description 8
- 238000009434 installation Methods 0.000 abstract description 2
- 238000010030 laminating Methods 0.000 abstract 2
- 229910000831 Steel Inorganic materials 0.000 description 10
- 239000010959 steel Substances 0.000 description 10
- 238000000034 method Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 4
- 230000002708 enhancing effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009440 infrastructure construction Methods 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to the technical field of tie beam templates, in particular to a tie beam template in a cylindrical pier, which is convenient to support, improves the working efficiency and enhances the practicability; including two pier studs, installation mechanism includes template body and two first extension boards, first through-hole has all been seted up on two first extension boards, first screw hole has all been seted up to two first through-hole outer ends, first screw rod has all been screwed into to two first screw holes, splint have all been installed in the rotation of two first screw rod inner, first spout has all been seted up at two first through-hole both ends, two splint both ends respectively with a plurality of first spout sliding connection, arc wall has all been seted up on two splint and the two first through-holes, equal fixed mounting has the hand wheel on two first screw rods, two splint respectively with two pier studs laminating, two first through-holes respectively with two pier studs laminating, equal fixed mounting has the second extension board on two first extension boards, all be provided with electronic jar on two second extension boards.
Description
Technical Field
The utility model relates to the technical field of tie beam templates, in particular to a tie beam template in a cylindrical pier.
Background
Along with the rapid development of expressways in China, at present, highway infrastructure construction in China is advanced from plain areas to hilly and mountainous areas, bridges in the hilly and mountainous areas of China are mostly prefabricated simply supported beams, the key of the prefabricated simply supported beams is the construction of lower structures of the bridges, including pile foundations, pier columns, capping beams and the like, the pier columns are generally concrete cylindrical piers, most of the pier columns of the hilly and mountainous areas of China are very high, one or more tie beams are often required to be arranged between two pier columns to increase the transverse rigidity of the pier columns, the overall stability of the pier columns is improved, the cross section of each tie beam is square or rectangular, the construction of high pier column bridges is more and more, and how high pier column tie beam templates are erected is an urgent problem to be solved;
for example, the utility model patent with the publication number of CN208201664U discloses a bracket type bracket for installing a high pier column tie beam template, wherein a first steel plate is arranged on a high pier column along the height direction, the first steel plate is embedded at the inner side of the high pier column along the length direction, steel brackets are welded on the first steel plate, jacks are arranged on the steel brackets, a plurality of longitudinal beams are arranged on the jacks at intervals, cross beams are vertically erected on the longitudinal beams, and steel templates are paved on the cross beams;
above-mentioned prior art in use discovers that the device erects the template through setting up first steel sheet, second steel sheet as the supporting point to improve the security and the efficiency of construction, but the device need cut out the steel bracket after the construction, and polish first steel sheet, extravagant more time, the cutting surface is easily corroded moreover, has reduced work efficiency, thereby leads to the practicality relatively poor.
Disclosure of Invention
Technical problem to be solved
In order to solve the technical problems, the utility model provides the tie beam template in the cylindrical pier, which is convenient to support, improves the working efficiency and enhances the practicability.
Technical proposal
In order to achieve the above purpose, the present application provides the following technical solutions: the utility model provides a tie beam template in cylinder mound, including two pier studs, installation mechanism includes template body and two first extension boards, first through-hole has all been seted up on two first extension boards, first screw hole has all been seted up to two first through-hole outer ends, first screw rod has all been screwed with to two first screw holes, splint are all rotated to two first screw rod inner, first spout has all been seted up at two first through-hole both ends, arc wall has all been seted up on two splint and the two first through-holes respectively with a plurality of spout sliding connection, equal fixed mounting has the hand wheel on two first screw rods, two splint laminate with two pier studs respectively, two first through-holes laminate with two pier studs respectively, equal fixed mounting has the second extension board on two first extension boards, all be provided with electronic jar on two second extension boards, template body bottom and two electronic jar output are connected, locking mechanism installs on first extension board for locking first screw rod.
Through adopting above-mentioned technical scheme, pass the pier stud with the first through-hole on the first extension board, rotatory hand wheel, the hand wheel drives first screw rod and rotates, first screw rod drives splint to be close to the pier stud, until the arc wall on the splint and the arc wall cooperation on the first extension board grasp the pier stud, make first extension board install on the pier stud, make the second extension board regard as the strong point of template body, and electronic jar can adjust the height of template body, after the work, can take apart first extension board and take off, this process has realized the process of being convenient for support, work efficiency has been improved, thereby the practicality is strengthened.
Preferably, the locking mechanism comprises two bolts, the two first threaded holes are respectively provided with a second threaded hole, the two bolts are respectively screwed with the two second threaded holes, and the two second bolts are respectively attached to the two first threaded rods.
Through adopting above-mentioned technical scheme, with splint top tight pier stud after, rotatory bolt is tight with first screw rod top to the practicality has been strengthened.
Preferably, the two bottom ends of the second support plates are fixedly provided with reinforcing ribs, and the two reinforcing ribs are fixedly connected with the two first support plates respectively.
Through adopting above-mentioned technical scheme, the strengthening rib can strengthen the connection between second extension board and the first extension board to stability has been strengthened.
Preferably, a plurality of the arc grooves are provided with anti-slip pads.
By adopting the technical scheme, the anti-slip pad can increase friction between the arc-shaped groove and the short column, thereby enhancing practicability.
Preferably, the two first threaded holes are all communicated with each other and provided with threaded sleeves, and the two first screws are respectively screwed with the two threaded sleeves.
By adopting the technical scheme, the threaded sleeve can enable the first screw to be more stable when rotating, so that the stability is enhanced.
Preferably, the plurality of anti-slip pads are made of rubber.
By adopting the technical scheme, the rubber has good anti-skid performance, so that the practicability is enhanced.
Advantageous effects
Compared with the prior art, the application provides a tie beam template in cylindrical pier, possesses following beneficial effect:
the pier column is penetrated through the first through hole on the first support plate, the hand wheel is rotated, the hand wheel drives the first screw rod to rotate, the first screw rod drives the clamping plate to approach the pier column until the arc groove on the clamping plate is matched with the arc groove on the first support plate to clamp the pier column, the first support plate is arranged on the pier column, the second support plate is used as a supporting point of the template body, the electric cylinder can adjust the height of the template body, after the work is finished, the first support plate can be detached and taken down, the process is convenient to support, the work efficiency is improved, and the practicability is enhanced.
Drawings
FIG. 1 is a schematic cross-sectional view of the present utility model;
FIG. 2 is a schematic diagram of the front view of the present utility model;
FIG. 3 is an enlarged schematic view of the structure of FIG. 1A according to the present utility model;
fig. 4 is a schematic top sectional partial structure of the present utility model.
The reference numerals in the drawings: 1. pier column; 2. a template body; 3. a first support plate; 4. a first screw; 5. a clamping plate; 6. a hand wheel; 7. a second support plate; 8. an electric cylinder; 9. a bolt; 10. reinforcing ribs; 11. an anti-slip pad; 12. and (5) a threaded sleeve.
Detailed Description
Examples
Referring to fig. 1-4, a tie beam template in a cylindrical pier comprises two pier columns 1, a mounting mechanism comprises a template body 2 and two first support plates 3, wherein first through holes are respectively formed in the two first support plates 3, first threaded holes are respectively formed in the outer ends of the two first through holes, first screw rods 4 are respectively screwed in the two first threaded holes, clamping plates 5 are respectively rotatably mounted in the inner ends of the two first screw rods 4, first sliding grooves are respectively formed in the two ends of the two first through holes, two ends of the two clamping plates 5 are respectively in sliding connection with the first sliding grooves, arc-shaped grooves are respectively formed in the two clamping plates 5 and the two first through holes, hand wheels 6 are fixedly mounted on the two first screw rods 4, the two clamping plates 5 are respectively attached to the two pier columns 1, second support plates 7 are respectively fixedly mounted on the two first support plates 3, the two second support plates 7 are respectively provided with an electric cylinder 8, the bottom end of the template body 2 is connected with the output ends of the two electric cylinders 8, the locking mechanism comprises two bolts 9, the two first threaded holes are respectively provided with a second threaded hole, the two bolts 9 are respectively screwed with the two second threaded holes, the two second bolts 9 are respectively attached to the two first screw rods 4, the first through holes on the first support plates 3 penetrate through the pier column 1, the hand wheel 6 is rotated, the hand wheel 6 drives the first screw rods 4 to rotate, the first screw rods 4 drive the clamping plates 5 to approach the pier column 1 until the arc grooves on the clamping plates 5 and the arc grooves on the first support plates 3 are matched to clamp the pier column 1, the first support plates 3 are arranged on the pier column 1, the second support plates 7 are used as supporting points of the template body 2, after the clamping plates 5 are tightly abutted against the pier column 1, the first screw rods 4 are tightly abutted by the rotating bolts 9, the electric cylinders 8 can adjust the height of the template body 2, after the work is finished, the first support plate 3 can be detached and taken down, the process is convenient to support, the work efficiency is improved, and therefore the practicability is improved.
Referring to fig. 1 and 2, the bottom ends of the two second support plates 7 are fixedly provided with reinforcing ribs 10, the two reinforcing ribs 10 are fixedly connected with the two first support plates 3 respectively, and the reinforcing ribs 10 can strengthen the connection between the second support plates 7 and the first support plates 3, so that the stability is enhanced.
Referring to fig. 1, 2 and 4, the plurality of arc grooves are provided with the anti-slip pads 11, the anti-slip pads 11 can increase friction between the arc grooves and the short columns, the plurality of anti-slip pads 11 are made of rubber, and the rubber has good anti-slip performance, so that practicability is enhanced.
Referring to fig. 1-4, the two first threaded holes are both provided with threaded sleeves 12 in a communicating manner, and the two first screws 4 are respectively screwed with the two threaded sleeves 12, so that the threaded sleeves 12 can make the first screws 4 more stable when rotating, thereby enhancing stability.
According to the tie beam template in the cylindrical pier, when the cylindrical pier works, the first through hole in the first support plate 3 penetrates through the pier column 1, the hand wheel 6 is rotated, the hand wheel 6 drives the first screw 4 to rotate, the first screw 4 drives the clamping plate 5 to approach the pier column 1 until the arc-shaped groove in the clamping plate 5 is matched with the arc-shaped groove in the first support plate 3 to clamp the pier column 1, the first support plate 3 is arranged on the pier column 1, the second support plate 7 is used as a supporting point of the template body 2, after the clamping plate 5 is tightly pressed against the pier column 1, the first screw 4 is tightly pressed by the rotary bolt 9, the height of the template body 2 can be adjusted by the electric cylinder 8, and after the work is finished, the first support plate 3 can be detached and taken down, so that the process is convenient to support.
Claims (6)
1. Tie beam template in the pier, including two pier stud (1), its characterized in that still includes:
the mounting mechanism comprises a template body (2) and two first support plates (3), wherein first through holes are formed in the two first support plates (3), first threaded holes are formed in the outer ends of the two first through holes, first screw rods (4) are screwed in the two first threaded holes, clamping plates (5) are rotatably mounted at the inner ends of the two first screw rods (4), first sliding grooves are formed in the two ends of the two first through holes, the two ends of the two clamping plates (5) are respectively connected with the first sliding grooves in a sliding mode, arc-shaped grooves are formed in the two clamping plates (5) and the two first through holes, hand wheels (6) are fixedly mounted on the two first screw rods (4), the two clamping plates (5) are respectively attached to the two pier columns (1), second support plates (7) are fixedly mounted on the two first support plates (3), electric cylinders (8) are arranged on the two second support plates (7), and the bottom ends of the template body (2) are connected with the two output ends of the electric cylinders (8);
the locking mechanism is arranged on the first support plate (3) and used for locking the first screw rod (4).
2. A beam-tie template in a cylindrical pier as claimed in claim 1, wherein: the locking mechanism comprises two bolts (9), two first threaded holes are respectively provided with a second threaded hole, the two bolts (9) are respectively screwed with the two second threaded holes, and the two second bolts (9) are respectively attached to the two first screw rods (4).
3. A beam-tie template in a cylindrical pier as claimed in claim 1, wherein: the bottom ends of the two second support plates (7) are fixedly provided with reinforcing ribs (10), and the two reinforcing ribs (10) are fixedly connected with the two first support plates (3) respectively.
4. A beam-tie template in a cylindrical pier as claimed in claim 1, wherein: and anti-slip pads (11) are arranged on the arc-shaped grooves.
5. A beam-tie template in a cylindrical pier as claimed in claim 1, wherein: the two first threaded holes are respectively provided with a threaded sleeve (12) in a communicating manner, and the two first screws (4) are respectively screwed with the two threaded sleeves (12).
6. A spar in pier tie beam template in accordance with claim 4, wherein: the plurality of anti-skid pads (11) are made of rubber.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321913109.5U CN220284618U (en) | 2023-07-20 | 2023-07-20 | Tie beam template in cylindrical pier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321913109.5U CN220284618U (en) | 2023-07-20 | 2023-07-20 | Tie beam template in cylindrical pier |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220284618U true CN220284618U (en) | 2024-01-02 |
Family
ID=89336713
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321913109.5U Active CN220284618U (en) | 2023-07-20 | 2023-07-20 | Tie beam template in cylindrical pier |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220284618U (en) |
-
2023
- 2023-07-20 CN CN202321913109.5U patent/CN220284618U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN220284618U (en) | Tie beam template in cylindrical pier | |
CN201546456U (en) | Novel prestress steel plate sleeve hoop device | |
CN210886934U (en) | Support for jacking highway bridge | |
CN215104799U (en) | Town road bridge crack reinforced structure | |
CN221608609U (en) | Main tower crossbeam construction is with preventing bracket that overturns | |
CN208997098U (en) | A kind of H profile steel convenient for connection | |
CN214424630U (en) | Internal reinforcing mechanism device for wind power tower cylinder welding flange plate | |
CN221168840U (en) | Steel construction reinforcing apparatus for architectural design | |
CN202324821U (en) | Lifting mechanism of rotary drilling rig | |
CN216041277U (en) | Bridge pile foundation reinforced structure convenient to construction | |
CN221276263U (en) | Side form supporting component based on asphalt pavement construction | |
CN201428378Y (en) | Drill for recycling tower crane foundation screws | |
CN221741288U (en) | Foundation pit protection structure | |
CN213391329U (en) | Stable component for mounting building steel structure | |
CN219099901U (en) | Assembled anti-collision guardrail | |
CN219931630U (en) | Template diagonal bracing device | |
CN211080121U (en) | Retaining slope protection for hydraulic engineering | |
CN220202465U (en) | Municipal administration road bridge construction reinforced structure | |
CN221531355U (en) | Roof photovoltaic support clamp | |
CN219953441U (en) | Wind, water and electricity arrangement construction structure in tunnel | |
CN220057820U (en) | Supporting structure of template trolley | |
CN214245870U (en) | Highway bridge foundation pile reinforcing apparatus | |
CN220468644U (en) | Supporting device for road bridge construction | |
CN221546371U (en) | Concrete form strutting arrangement | |
CN215256029U (en) | Limiting device for improving precision of steel pipe pile hole site of construction platform for high-pile wharf |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |