CN220269480U - Floor heating pipe distribution device for building construction - Google Patents

Floor heating pipe distribution device for building construction Download PDF

Info

Publication number
CN220269480U
CN220269480U CN202321237251.2U CN202321237251U CN220269480U CN 220269480 U CN220269480 U CN 220269480U CN 202321237251 U CN202321237251 U CN 202321237251U CN 220269480 U CN220269480 U CN 220269480U
Authority
CN
China
Prior art keywords
clamping
floor heating
unit
heating pipe
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321237251.2U
Other languages
Chinese (zh)
Inventor
赵莉
武威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Dadu Construction Engineering Co ltd
Original Assignee
Xinjiang Dadu Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Dadu Construction Engineering Co ltd filed Critical Xinjiang Dadu Construction Engineering Co ltd
Priority to CN202321237251.2U priority Critical patent/CN220269480U/en
Application granted granted Critical
Publication of CN220269480U publication Critical patent/CN220269480U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The utility model provides a floor heating pipe laying device for building construction, and belongs to the technical field of building construction; comprises a pipe clamping unit for fixing the floor heating pipe; the base component is used for limiting the clamping pipe unit and is connected with the clamping pipe unit; the connecting assembly is used for connecting adjacent base assemblies and is connected with the base assemblies. The floor heating pipe is convenient to install by arranging the pipe clamping unit, can be matched with different types of floor heating pipes, is simple and convenient to construct, saves time and labor, improves the installation efficiency, achieves the aim of planning a heating circuit by arranging the connecting unit and connecting the bottom plates into a whole, and saves the laying time.

Description

Floor heating pipe distribution device for building construction
Technical Field
The utility model relates to the technical field of building construction, in particular to a floor heating pipe distribution device for building construction.
Background
In the building construction process, floor heating pipes are required to be arranged on the ground of a house, and when the floor heating pipes are laid on the ground, the following modes are generally adopted: through seting up the cell body in indoor subaerial, then with the water pipe card in the cell body, or, can adopt the arc draw-in groove to be fixed in subaerial with the water pipe, the grooved mode in ground wastes time and energy, can be fixed in subaerial with it through the arc draw-in groove mostly, however, need a large amount of arc draw-in grooves when laying the ground heating coil, it is comparatively inconvenient to construct when needing to support the ground heating coil, waste time and energy, simultaneously, the arc draw-in groove can only carry out fixed mounting to the heating coil of same size specification, need carry the arc draw-in groove of different grade type when the installation, work efficiency is lower, therefore, the application provides a ground heating cloth pipe device for construction is built in room to satisfy the demand.
Disclosure of Invention
The utility model aims to solve the technical problem of providing a floor heating pipe distribution device for building construction, which is used for solving the problems that the existing arc clamping groove is inconvenient to construct, time and labor are wasted, meanwhile, the arc clamping groove can only be used for fixedly mounting a heating pipe with the same size specification, and different types of arc clamping grooves are required to be carried during mounting, so that the working efficiency is low.
In order to solve the technical problems, the utility model provides the following technical scheme:
a warm cloth pipe device for construction is built in room, includes: the pipe clamping unit is used for fixing the floor heating pipe; the base component is used for limiting the clamping pipe unit and is connected with the clamping pipe unit; the connecting assembly is used for connecting adjacent base assemblies and is connected with the base assemblies.
Preferably, the clamping tube unit comprises a clamp, a clamping head and a pair of clamping blocks which are connected, the clamp comprises an arc-shaped installation section, a pair of weakening sections, a pair of arc-shaped clamping plates and a pair of flanging which are connected, the clamping head comprises a column body and a sphere which are connected, the middle section of the arc-shaped installation section is fixedly connected with the column body through a fixing hole, and the clamping blocks are symmetrically arranged.
Preferably, the clamp is provided with two kidney-shaped holes.
Preferably, the base assembly comprises a bottom plate arranged below the clamping tube unit, a first mounting groove and symmetrically arranged clamping grooves are formed in the top of the bottom plate, a first limiting unit is arranged in the first mounting groove, the inner side wall of the first limiting unit is attached to the outer side wall of the sphere, the clamping blocks are inserted into the clamping grooves, and the clamping grooves are matched with the clamping blocks.
Preferably, the first spacing unit comprises a plurality of first elastic clamping plates, a plurality of the bottom fixed connection of first elastic clamping plates, first elastic clamping plates include arc linkage segment, arc spacing section, straight board section, the turn-ups section that are connected.
Preferably, the connecting assembly comprises a plurality of clamping units and a plurality of connecting units, the clamping units comprise second mounting grooves formed in the outer side wall of the bottom plate, second limiting units are mounted in the second mounting grooves, and the connecting units are clamped in the second limiting units.
Preferably, the second limiting unit is composed of a plurality of second elastic clamping plates, the bottom ends of the second elastic clamping plates are fixedly connected, and the second elastic clamping plates comprise arc-shaped sections and arc-shaped flanging sections which are connected.
Preferably, the connecting unit comprises a connecting support rod and a pair of connectors which are connected, the shape of each connector is spherical, and the connectors are clamped in the second limiting unit.
Compared with the prior art, the utility model has at least the following beneficial effects:
in the above-mentioned scheme, through setting up the card pipe unit, when using, can fix the circuit of floor heating pipeline with the bottom plate, after fixing, can be according to the installation requirement, place card pipe unit in first spacing unit through the mode of pressing, the in-process of placing can make the screens head extrude the turn-ups section, can make the opening of first mounting groove expand simultaneously, when the bottom of screens head and first spacing unit bottom contact, the arc spacing section can be inconsistent with screens head top, make the screens head can be spacing, simultaneously, can make the fixture block peg graft in the draw-in groove, make the clamp unable rotate, when installing the floor heating pipe, can directly press the floor heating pipe to the clamp in, the in-process, the arc cardboard can be because of weakening the section deformation, the utility model discloses the floor heating pipe installation of being convenient for, but the floor heating pipe of adaptation different grade type, simple construction is convenient, labour saving and time saving, and efficiency of installation has been improved.
Through setting up connecting element, when using, can select the connecting element of different length according to the distance between two adjacent bottom plates, advance the connector in the spacing unit of second fixed, the in-process of promotion can make the arc deformation, and then can make the opening of second mounting groove enlarge, when the bottom of connector and the spacing unit of second contacts, the connector can be spacing by the spacing unit of second, when adjacent bottom plate needs to form the angle, the bottom plate removal can be broken off with the fingers and thumb directly, at this in-process, the connector can be at the spacing unit internal activity of second, compare current arc draw-in groove, the utility model discloses a connect into whole with the bottom plate and reach warm circuit planning's purpose, practiced thrift laying time.
Drawings
The accompanying drawings, which are incorporated herein and form a part of the specification, illustrate embodiments of the present disclosure and, together with the description, further serve to explain the principles of the disclosure and to enable a person skilled in the pertinent art to make and use the disclosure.
FIG. 1 is a schematic diagram of a three-dimensional structure of a floor heating pipe laying device for building construction;
FIG. 2 is a schematic view of a partially cut-away perspective structure of a floor heating pipe laying device for building construction;
FIG. 3 is a schematic view of a three-dimensional enlarged structure of the pipe clamping unit;
fig. 4 is a schematic view of a three-dimensional enlarged structure of the connection unit;
fig. 5 is a schematic view of a three-dimensional enlarged structure of the first limiting unit;
fig. 6 is a schematic view of a three-dimensional enlarged structure of the second limiting unit;
fig. 7 is an assembled perspective structure schematic diagram of a floor heating pipe laying device for building construction.
[ reference numerals ]
1. A bottom plate; 2. a first mounting groove; 3. a first limit unit; 4. a pipe clamping unit; 41. a clamp; 42. a clamping head; 43. a clamping block; 5. a second mounting groove; 6. a second limit unit; 7. a connection unit; 71. a connecting strut; 72. a connector; 8. a positioning plate; 9. and (5) double-sided adhesive tape.
While particular structures and devices are shown in the drawings to enable a clear implementation of embodiments of the utility model, this is for illustrative purposes only and is not intended to limit the utility model to the particular structures, devices and environments, which may be modified or adapted by those of ordinary skill in the art, as desired, and which remain within the scope of the appended claims.
Detailed Description
The floor heating pipe arrangement device for building construction provided by the utility model is described in detail below with reference to the accompanying drawings and specific embodiments. While the utility model has been described herein in terms of the preferred and preferred embodiments, the following embodiments are intended to be more illustrative, and may be implemented in many alternative ways as will occur to those of skill in the art; and the accompanying drawings are only for the purpose of describing the embodiments more specifically and are not intended to limit the utility model specifically.
It should be noted that references in the specification to "one embodiment," "an example embodiment," "some embodiments," etc., indicate that the embodiment described may include a particular feature, structure, or characteristic, but every embodiment may not necessarily include the particular feature, structure, or characteristic. Further, when a particular feature, structure, or characteristic is described in connection with an embodiment, it is submitted that it is within the knowledge of one skilled in the relevant art to effect such feature, structure, or characteristic in connection with other embodiments whether or not explicitly described.
Generally, the terminology may be understood, at least in part, from the use of context. For example, the term "one or more" as used herein may be used to describe any feature, structure, or characteristic in a singular sense, or may be used to describe a combination of features, structures, or characteristics in a plural sense, depending at least in part on the context. In addition, the term "based on" may be understood as not necessarily intended to convey an exclusive set of factors, but may instead, depending at least in part on the context, allow for other factors that are not necessarily explicitly described.
It will be understood that the meanings of "on … …", "over … …" and "over … …" in this disclosure should be interpreted in the broadest sense so that "on … …" means not only "directly on" but also includes meaning "directly on" something with intervening features or layers therebetween, and "over … …" or "over … …" means not only "on" or "over" something, but also may include its meaning "on" or "over" something without intervening features or layers therebetween.
Furthermore, spatially relative terms such as "under …," "under …," "lower," "above …," "upper," and the like may be used herein for ease of description to describe one element or feature's relationship to another element or feature as illustrated in the figures. Spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the figures. The device may be otherwise oriented and the spatially relative descriptors used herein may similarly be interpreted accordingly.
As shown in fig. 1 to 7, an embodiment of the present utility model provides a floor heating pipe arrangement device for building construction, including: the clamping pipe unit 4 is used for fixing the floor heating pipe; the clamping pipe unit 4 comprises a clamping hoop 41, a clamping head 42 and clamping blocks 43 which are connected, wherein the clamping hoop 41 comprises an arc-shaped mounting section, a pair of weakening sections, a pair of arc-shaped clamping plates and a pair of flanging which are connected, the clamping hoop 41 is provided with two kidney-shaped holes, the clamping head 42 comprises a column body and a sphere which are connected, the middle section of the arc-shaped mounting section is fixedly connected with the column body through a fixing hole, the clamping blocks 43 are symmetrically arranged, a base assembly is used for limiting the clamping pipe unit 4, and the base assembly is connected with the clamping pipe unit 4; the base subassembly is including setting up in the bottom plate 1 of card pipe unit 4 below, the below of bottom plate 1 is provided with locating plate 8, double faced adhesive tape pastes 9, locating plate 8 is fixed through vulcanizing an organic whole with bottom plate 1, bottom plate 1 pastes 9 through the double faced adhesive tape and pastes 9 glue on, through setting up locating plate 8, double faced adhesive tape pastes 9, accessible locating plate 8, double faced adhesive tape pastes 9 cooperation use, set up a plurality of double faced adhesive tape between the adjacent locating plate 8, when fixed, carry out spacing with locating plate 8 and ground through the nail, it is direct with ground adhesion to paste the bottom of double faced adhesive tape 9, this kind of fixed mode comparatively saves operating personnel physical power, first mounting groove 2 has been seted up at the top of bottom plate 1, and the draw-in groove that the symmetry set up, install first spacing unit 3 in the first mounting groove 2, the inside wall of first spacing unit 3 is laminated with spheroidal lateral wall mutually, first spacing unit 3 and spheroid cooperation, first spacing unit 3 comprises a plurality of first elastic clamping plates's bottom fixed connection, first elastic clamping plate includes the linkage segment, straight clamping segment, the arc-shaped section 43, arc-shaped joint block, arc-shaped joint 43.
Through setting up card pipe unit 4, when using, can fix bottom plate 1 according to the circuit of warm up the pipeline, after fixing, can be according to the installation requirement, place card pipe unit 4 in first spacing unit 3 through the mode of pressing, the in-process of placing can make the screens head 42 extrude the turn-ups section, can make the opening of first mounting groove 2 expand simultaneously, when the bottom of screens head 42 and the contact of first spacing unit 3 bottom, the arc spacing section can be inconsistent with screens head 42 top, make screens head 42 can be spacing, simultaneously, can make fixture block 43 peg graft in the draw-in groove, make clamp 41 unable rotation, when installing the warm up of ground, can directly press to clamp 41 in the in-process, the arc cardboard can be because of weakening the section deformation, compare current arc draw-in groove, the utility model discloses the warm up of being convenient for installs, but the warm up of different grade type of ground heating, the construction is simple and convenient, and saving time and labor, installation effectiveness has been improved.
As shown in fig. 2, fig. 4, fig. 6 and fig. 7, the connecting assembly is used for connecting adjacent base assemblies, the connecting assembly is connected with the base assemblies, the connecting assembly comprises a plurality of clamping units and a plurality of connecting units 7, the clamping units comprise second mounting grooves 5 formed in the outer side walls of the base plates 1, second limiting units 6 are mounted in the second mounting grooves 5, the connecting units 7 are clamped in the second limiting units 6, the second limiting units 6 are composed of a plurality of second elastic clamping plates, the bottoms of the second elastic clamping plates are fixedly connected, the second elastic clamping plates comprise connected arc sections and arc flanging sections, the connecting units 7 comprise connecting struts 71 and a pair of connectors 72, the connecting struts 71 can be set to be different lengths as required, the connectors 72 are arranged in a spherical shape, and the connectors 72 are clamped in the second limiting units 6, and the connectors 72 are in interference fit with the second limiting units 6.
Through setting up connecting element 7, when using, can be according to the distance between two adjacent bottom plates 1, select connecting element 7 of different length, advance connector 72 in the spacing unit of second 6 fixed, the in-process of promotion, can make the arc deformation, and then can make the opening of second mounting groove 5 enlarge, when connector 72 contacts with the bottom of spacing unit of second 6, connector 72 can be spacing by spacing unit of second 6, when adjacent bottom plate 1 needs to form the angle, directly break off the bottom plate 1 remove can, at this in-process, connector 72 can be at spacing unit of second 6 internal activity, compare current arc draw-in groove, the utility model discloses a connect into whole with the purpose that reaches warm circuit planning with bottom plate 1, practiced thrift the laying time.
According to the technical scheme, the clamping pipe unit is arranged, when the floor heating pipeline is used, the bottom plate can be fixed according to the circuit of the floor heating pipeline, after the floor heating pipeline is fixed, the clamping pipe unit can be placed in the first limiting unit in a pressing mode according to installation requirements, the clamping head can extrude the flanging section in the placing process, meanwhile, the opening of the first installation groove can be enlarged, when the bottom end of the clamping head is contacted with the bottom of the first limiting unit, the arc limiting section can be abutted against the top of the clamping head, the clamping head can be limited, meanwhile, the clamping block can be inserted into the clamping groove, the clamping band can not rotate, the floor heating pipe can be directly pressed into the clamping band when the floor heating pipe is installed, in-process, the arc clamping plate can be deformed due to the weakening section, compared with the existing arc clamping groove, the floor heating pipe installation is convenient, the floor heating pipe can be adapted to different types, the floor heating pipe installation is simple and convenient, time and labor saving, and the installation efficiency is improved.
Through setting up connecting element, when using, can select the connecting element of different length according to the distance between two adjacent bottom plates, advance the connector in the spacing unit of second fixed, the in-process of promotion can make the arc deformation, and then can make the opening of second mounting groove enlarge, when the bottom of connector and the spacing unit of second contacts, the connector can be spacing by the spacing unit of second, when adjacent bottom plate needs to form the angle, the bottom plate removal can be broken off with the fingers and thumb directly, at this in-process, the connector can be at the spacing unit internal activity of second, compare current arc draw-in groove, the utility model discloses a connect into whole with the bottom plate and reach warm circuit planning's purpose, practiced thrift laying time.
The utility model is intended to cover any alternatives, modifications, equivalents, and variations that fall within the spirit and scope of the utility model. In the above description of the preferred embodiments of the utility model, specific details are set forth in order to provide a thorough understanding of the utility model, and the utility model will fully be understood to those skilled in the art without such details. In other instances, well-known methods, procedures, flows, components, circuits, and the like have not been described in detail so as not to unnecessarily obscure aspects of the present utility model.
Those of ordinary skill in the art will appreciate that all or a portion of the steps in implementing the methods of the embodiments described above may be implemented by a program that instructs associated hardware, and the program may be stored on a computer readable storage medium, such as: R0M/RAM, magnetic disk, optical disk, etc.
The foregoing is merely a preferred embodiment of the present utility model and it should be noted that modifications and adaptations to those skilled in the art may be made without departing from the principles of the present utility model, which are intended to be comprehended within the scope of the present utility model.

Claims (8)

1. A warm cloth pipe device in ground for construction is built in room, its characterized in that includes: the pipe clamping unit is used for fixing the floor heating pipe;
the base component is used for limiting the clamping pipe unit and is connected with the clamping pipe unit;
the connecting assembly is used for connecting adjacent base assemblies and is connected with the base assemblies.
2. The floor heating pipe laying device for building construction according to claim 1, wherein the pipe clamping unit comprises a clamp, a clamping head and a pair of clamping blocks which are connected, the clamp comprises an arc-shaped installation section, a pair of weakening sections, a pair of arc clamping plates and a pair of flanging which are connected, the clamping head comprises a column body and a sphere which are connected, the middle section of the arc-shaped installation section is fixedly connected with the column body through a fixing hole, and the pair of clamping blocks are symmetrically arranged.
3. The floor heating pipe laying device for building construction according to claim 2, wherein the clamp is provided with two kidney-shaped holes.
4. The floor heating pipe arrangement device for building construction according to claim 2, wherein the base assembly comprises a bottom plate arranged below the clamping pipe unit, a first mounting groove and symmetrically arranged clamping grooves are formed in the top of the bottom plate, a first limiting unit is arranged in the first mounting groove, the inner side wall of the first limiting unit is attached to the outer side wall of the sphere, the clamping blocks are inserted into the clamping grooves, and the clamping grooves are matched with the clamping blocks.
5. The floor heating pipe laying device for building construction according to claim 4, wherein the first limiting unit is composed of a plurality of first elastic clamping plates, the bottom ends of the first elastic clamping plates are fixedly connected, and the first elastic clamping plates comprise arc-shaped connecting sections, arc-shaped limiting sections, straight plate sections and flanging sections which are connected.
6. The floor heating pipe laying device for building construction according to claim 4, wherein the connecting assembly comprises a plurality of clamping units and a plurality of connecting units, the clamping units comprise second mounting grooves formed in the outer side wall of the bottom plate, second limiting units are mounted in the second mounting grooves, and the connecting units are clamped in the second limiting units.
7. The floor heating pipe laying device for building construction according to claim 6, wherein the second limiting unit is composed of a plurality of second elastic clamping plates, the bottom ends of the second elastic clamping plates are fixedly connected, and the second elastic clamping plates comprise arc-shaped sections and arc-shaped flanging sections which are connected.
8. The floor heating pipe laying device for building construction according to claim 7, wherein the connecting unit comprises a connecting support rod and a pair of connectors which are connected, the connectors are arranged in a spherical shape, and the connectors are clamped in the second limiting unit.
CN202321237251.2U 2023-05-18 2023-05-18 Floor heating pipe distribution device for building construction Active CN220269480U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321237251.2U CN220269480U (en) 2023-05-18 2023-05-18 Floor heating pipe distribution device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321237251.2U CN220269480U (en) 2023-05-18 2023-05-18 Floor heating pipe distribution device for building construction

Publications (1)

Publication Number Publication Date
CN220269480U true CN220269480U (en) 2023-12-29

Family

ID=89315443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321237251.2U Active CN220269480U (en) 2023-05-18 2023-05-18 Floor heating pipe distribution device for building construction

Country Status (1)

Country Link
CN (1) CN220269480U (en)

Similar Documents

Publication Publication Date Title
CN220269480U (en) Floor heating pipe distribution device for building construction
CN213959066U (en) Battery BMS management system
CN203287206U (en) Mounting rack for air-conditioning test
CN208105500U (en) It can be in wallboard that is more, being applied in high-rise steel structure house and side column connection structure
CN220353202U (en) Suspended ceiling structure with capillary network
CN111424903A (en) Quick installing the system of a kind of wallboard
CN206727293U (en) Modular jack
CN216516539U (en) Fixed subassembly suitable for BIPV photovoltaic structure
CN220417630U (en) Water pan and air conditioner
CN114623534B (en) Control panel for intelligent automatic air humidifier for family life
CN220402085U (en) Anti-falling power supply device
CN211371737U (en) Portable intelligent voice interaction equipment
CN214199203U (en) Air source heat pump water heater
CN213631723U (en) Stainless steel plate for solid heat storage equipment
CN212566253U (en) Central air conditioning unit structure convenient to install
CN219451036U (en) Waterproof effect is strong and conveniently dismantles window structure that wafts of maintaining
CN218863444U (en) Benzene plate for fixing pipeline
CN216239284U (en) Spliced mute room ceiling
CN216431868U (en) Divide water collector suitable for novel earth source heat pump
CN208105501U (en) It can be in wallboard that is more, being applied in high-rise steel structure house and corner post connection structure
CN217770694U (en) Drawer type load box
CN214995182U (en) Thermal insulation wallboard using novel nano thermal insulation material
CN217236018U (en) Energy-saving control device for circulating water pump of central air conditioner
CN217759309U (en) Practical multi-span section bar device
CN220600676U (en) Fire control pipeline fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant