CN220263889U - Building waste retrieves loading bin - Google Patents
Building waste retrieves loading bin Download PDFInfo
- Publication number
- CN220263889U CN220263889U CN202321507857.3U CN202321507857U CN220263889U CN 220263889 U CN220263889 U CN 220263889U CN 202321507857 U CN202321507857 U CN 202321507857U CN 220263889 U CN220263889 U CN 220263889U
- Authority
- CN
- China
- Prior art keywords
- bin
- outer frame
- building waste
- loading bin
- gear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000002699 waste material Substances 0.000 title claims abstract description 69
- 238000004064 recycling Methods 0.000 claims abstract description 29
- 239000000779 smoke Substances 0.000 claims abstract description 15
- 238000002955 isolation Methods 0.000 claims abstract description 12
- 238000010276 construction Methods 0.000 claims description 31
- 230000004888 barrier function Effects 0.000 claims description 3
- 238000000926 separation method Methods 0.000 claims description 2
- 230000000903 blocking effect Effects 0.000 abstract description 10
- 239000000428 dust Substances 0.000 abstract description 5
- 238000000034 method Methods 0.000 abstract description 4
- 238000007599 discharging Methods 0.000 abstract description 3
- 238000005192 partition Methods 0.000 abstract 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000010802 sludge Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Landscapes
- Refuse Receptacles (AREA)
Abstract
The utility model discloses a building waste recycling and loading bin which comprises a loading bin main body, wherein a building waste hopper is movably arranged in the loading bin main body, a smoke isolation net cover is movably arranged on the upper surface of the loading bin main body, a blocking bin door is movably arranged in the loading bin main body at a position close to the front end, and the loading bin main body comprises a bin outer frame, an electric telescopic rod, a sliding rail through hole, a first outer frame, a first electric motor, a first gear, a second outer frame, a second electric motor and a second gear. According to the building waste recycling and loading bin, the discharging and the containing of the building waste are facilitated through the cooperation of the partition bin door and the loading bin main body and the building waste hopper, the process of dumping the building waste is simpler and more convenient, the building waste residue is less after dumping, smoke dust generated by dumping the building waste can be prevented from drifting out of the recycling and loading bin through the smoke partition net cover, and the smoke partition net cover can be automatically closed through cooperation with the loading bin main body.
Description
Technical Field
The utility model relates to the technical field of recycling and loading bin structures, in particular to a building waste recycling and loading bin.
Background
The recycling bin is a temporary storage bin for building waste, is convenient for recycling the building waste, and is also called building waste, wherein the building waste refers to dregs, waste soil, waste materials, sludge and other waste generated in the process of building, construction units or individuals for building, laying or dismantling various buildings, structures, pipe networks and the like.
The existing building waste recycling and loading bin has certain defects when in use, a large amount of smoke dust can float out without a grid filter structure when building waste is poured into the traditional recycling and loading bin, and when the building waste is discharged, the building waste can be remained in the recycling and loading bin, so that manual cleaning is needed.
Disclosure of Invention
The utility model mainly aims to provide a building waste recycling and loading bin which can effectively solve the problems in the background technology.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows:
the utility model provides a building waste retrieves loading bin, includes the loading bin main part, the inside movable mounting of loading bin main part has the building waste hopper, the upper surface movable mounting of loading bin main part has the smoke barrier net lid, the inside position movable mounting that is close to the front end of loading bin main part has the separation bin door.
Preferably, the loading bin main body comprises a bin outer frame, an electric telescopic rod, a sliding rail through hole, a first outer frame, a first electric motor, a first gear, a second outer frame, a second electric motor and a second gear.
Preferably, the electric telescopic rod is fixedly mounted in the position, close to the front end hole, of the side face of the bin outer frame, the sliding rail through hole is formed in the position, close to the front end, of the inner side of the bin outer frame, the position, close to the front end, of the side face of the bin outer frame, the electric motor is fixedly mounted in the position, close to the front end, of the electric motor rotating shaft, the electric motor is fixedly mounted in the position, close to the rear end, of the side face of the bin outer frame, and the electric motor is fixedly mounted in the front end of the electric motor rotating shaft.
Preferably, the building waste hopper comprises a rotating shaft, a hopper bottom plate, a hopper rear plate, a clamping groove, a vibrator, a short slide bar, a slide bar jacket, a movable hinge and an electric hydraulic lifting column.
Preferably, the rotation axis fixed mounting is in the inside of storehouse frame, the outside of rotation axis is located to the hopper bottom plate cover, hopper back plate fixed mounting is in the rear surface of hopper bottom plate, the draw-in groove is seted up in the position that the hopper bottom plate lower surface is close to the front end, vibrator fixed mounting is in the position that the hopper bottom plate lower surface is close to the rear end, short slide bar fixed mounting is in the position that the hopper bottom plate lower surface is close to rear end both angles, the outside of short slide bar is located to the slide bar overcoat cover, living hinge fixed mounting is in the lower surface of slide bar overcoat, electric hydraulic lifting column fixed mounting is in living hinge's lower extreme, electric hydraulic lifting column's lower extreme and the inside fixed connection of storehouse frame, the inside of draw-in groove is gone into to electric telescopic handle's front end card.
Preferably, the smoke-isolation net cover comprises a net cover plate and a first rack, wherein the first rack is fixedly arranged on the side face of the net cover plate, and the first rack is meshed with the second gear.
Preferably, the blocking bin gate comprises a bin gate plate and a second rack, the second rack is fixedly arranged on the side face of the bin gate plate, the first gear penetrates through the inside of the sliding rail through hole, and the second rack is meshed with the first gear.
Compared with the prior art, the utility model has the following beneficial effects:
according to the utility model, the discharging and storing of the construction waste are facilitated by the aid of the arranged charging bin main body, the construction waste hopper and the blocking bin gate, the blocking bin gate is matched with the charging bin main body and the construction waste hopper, the pouring process of the construction waste is simpler and more convenient, the construction waste residue after pouring is less, smoke dust generated by pouring the construction waste can be prevented from drifting out of the recycling charging bin by the aid of the arranged charging bin main body and the smoke isolation net cover, and the smoke isolation net cover is matched with the charging bin main body to be automatically closed.
Drawings
FIG. 1 is a schematic diagram of the overall structure of a construction waste recycling bin according to the present utility model;
FIG. 2 is a schematic view of a partial and blocking door at one end of a main body of a loading bin for recycling construction waste;
FIG. 3 is a schematic view showing an exploded construction of a construction waste hopper of a construction waste recycling bin according to the present utility model;
FIG. 4 is a schematic view of one end of a smoke-isolating net cover of a construction waste recycling and loading bin;
FIG. 5 is an enlarged schematic view of portion B of FIG. 1 of a construction waste recycling bin according to the present utility model;
FIG. 6 is an enlarged schematic view of portion A of FIG. 1 of a construction waste recycling bin according to the present utility model;
FIG. 7 is an enlarged schematic view of portion C of FIG. 3 of a construction waste recycling bin according to the present utility model;
FIG. 8 is an enlarged schematic view of the portion D of FIG. 3 of a construction waste recycling bin according to the present utility model
Fig. 9 is an enlarged schematic view of portion E of fig. 4 of a construction waste recycling bin according to the present utility model.
In the figure: 1. a loading bin main body; 101. a bin outer frame; 102. an electric telescopic rod; 103. a slide rail through hole; 104. a first outer frame; 105. a first electric motor; 106. a first gear; 107. a second outer frame; 108. a second electric motor; 109. a second gear; 2. building waste hoppers; 201. a rotation shaft; 202. a hopper bottom plate; 203. a hopper back plate; 204. a clamping groove; 205. a vibrator; 206. a short slide bar; 207. a slide bar jacket; 208. a living hinge; 209. an electro-hydraulic lifting column; 3. a smoke-isolation net cover; 301. a mesh cover plate; 302. a first rack; 4. a blocking bin gate; 401. a bin gate plate; 402. and a second rack.
Detailed Description
The utility model is further described in connection with the following detailed description, in order to make the technical means, the creation characteristics, the achievement of the purpose and the effect of the utility model easy to understand.
As shown in fig. 1-9, a building waste recycling and loading bin comprises a loading bin main body 1, wherein a building waste hopper 2 is movably installed in the loading bin main body 1, a smoke isolation net cover 3 is movably installed on the upper surface of the loading bin main body 1, a blocking bin door 4 is movably installed at a position, close to the front end, in the loading bin main body 1, of the loading bin main body, the blocking bin door 4 is matched with the loading bin main body 1 and the building waste hopper 2, so that the discharging and the containing of building waste are convenient, the process of dumping the building waste is simpler and more convenient, the building waste residue is less after dumping, the smoke isolation net cover 3 can prevent smoke dust generated by dumping the building waste from drifting out of the recycling and loading bin, and the smoke isolation net cover 3 is matched with the loading bin main body 1 and can be automatically closed;
the charging bin main body 1 comprises a bin outer frame 101, an electric telescopic rod 102, a sliding rail through hole 103, a first outer frame 104, a first electric motor 105, a first gear 106, a second outer frame 107, a second electric motor 108 and a second gear 109; the electric telescopic rod 102 is fixedly arranged in a hole in the side surface of the bin outer frame 101, the sliding rail through hole 103 is formed in the position in the inner side of the bin outer frame 101, which is close to the front end, the first outer frame 104 is fixedly arranged in the position in the side surface of the bin outer frame 101, which is close to the front end, the first electric motor 105 is fixedly arranged in the first outer frame 104, the first gear 106 is fixedly arranged at the front end of a rotating shaft of the first electric motor 105, the second outer frame 107 is fixedly arranged in the position in the side surface of the bin outer frame 101, which is close to the rear end, the second electric motor 108 is fixedly arranged in the second outer frame 107, and the second gear 109 is fixedly arranged at the front end of a rotating shaft of the second electric motor 108; the building waste hopper 2 comprises a rotating shaft 201, a hopper bottom plate 202, a hopper rear plate 203, a clamping groove 204, a vibrator 205, a short slide bar 206, a slide bar jacket 207, a movable hinge 208 and an electro-hydraulic lifting column 209; the rotary shaft 201 is fixedly arranged in the bin outer frame 101, the bin bottom plate 202 is sleeved on the outer side of the rotary shaft 201, the bin rear plate 203 is fixedly arranged on the rear surface of the bin bottom plate 202, the clamping groove 204 is formed in the position, close to the front end, of the lower surface of the bin bottom plate 202, the vibrator 205 is fixedly arranged in the position, close to the rear end, of the lower surface of the bin bottom plate 202, the short slide bar 206 is fixedly arranged in the position, close to the two corners of the rear end, of the lower surface of the bin bottom plate 202, the slide bar jacket 207 is sleeved on the outer side of the short slide bar 206, the movable hinge 208 is fixedly arranged on the lower surface of the slide bar jacket 207, the electric hydraulic lifting column 209 is fixedly arranged at the lower end of the movable hinge 208, the lower end of the electric hydraulic lifting column 209 is fixedly connected with the inner part of the bin outer frame 101, and the front end of the electric telescopic rod 102 is clamped into the clamping groove 204; the smoke-isolating net cover 3 comprises a net cover plate 301 and a first rack 302, wherein the first rack 302 is fixedly arranged on the side surface of the net cover plate 301, and the first rack 302 is meshed with the second gear 109; the blocking door 4 comprises a door plate 401 and a second rack 402, the second rack 402 is fixedly arranged on the side face of the door plate 401, the first gear 106 penetrates through the inside of the sliding rail through hole 103, and the second rack 402 is meshed with the first gear 106.
It should be noted that, when the utility model is used, in the loading bin main body 1, the construction waste hopper 2, the smoke-isolation net cover 3 and the blocking bin door 4, the electric motor 108 in the outer frame 107 drives the gear 106 to rotate, the rack 302 moves along with the gear, the net cover 301 is driven to move away from the upper surface of the outer frame 101, the construction waste is poured into the outer frame 101, the construction waste is piled on the upper surface of the bottom plate 202 of the bin, then the smoke-isolation net cover 3 is covered again, the smoke dust generated by dumping the construction waste can be prevented from drifting out of the loading bin, the smoke-isolation net cover 3 is matched with the loading bin main body 1 to automatically close, when the construction waste is dumped, the electric motor 105 drives the rack 402 to slide upwards along the sliding rail through hole 103, the electric telescopic rod 102 is retracted, the electric telescopic rod 102 is pulled out from the inside the clamping groove 204, the electric hydraulic lifting column 209 is pushed upwards, the rear end of the bottom plate 202 of the bin is jacked, the bottom plate 202 is inclined by the rotating shaft 201, the bottom plate 202 of the bin is driven by the rotating shaft 205, the bin 202 is driven by the electric hydraulic lifting column 205, the bottom plate 206 is driven by the electric telescopic rod 202 to slide upwards, the sliding along the sliding rod 2 is arranged on the bottom surface of the sliding rod of the loading bin main body, and the waste is more convenient to dump the construction waste, and the construction waste is more convenient to dump down along the side of the loading bin, and the waste is more than the sliding bin 2.
The foregoing has shown and described the basic principles and main features of the present utility model and the advantages of the present utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.
Claims (7)
1. The utility model provides a building waste retrieves loading bin which characterized in that: including loading bin main part (1), the inside movable mounting of loading bin main part (1) has building waste hopper (2), the upper surface movable mounting of loading bin main part (1) has smoke barrier net lid (3), the inside position movable mounting that is close to the front end of loading bin main part (1) has barrier door (4).
2. A construction waste recycling bin according to claim 1, wherein: the charging bin main body (1) comprises a bin outer frame (101), an electric telescopic rod (102), a sliding rail through hole (103), a first outer frame (104), a first electric motor (105), a first gear (106), a second outer frame (107), a second electric motor (108) and a second gear (109).
3. A construction waste recycling bin according to claim 2, wherein: the electric telescopic rod (102) is fixedly mounted in the bin outer frame (101) side surface, the sliding rail through hole (103) is formed in the bin outer frame (101) side surface, the first outer frame (104) is fixedly mounted in the bin outer frame (101) side surface, the first electric motor (105) is fixedly mounted in the first outer frame (104), the first gear (106) is fixedly mounted at the front end of the first electric motor (105) rotating shaft, the second outer frame (107) is fixedly mounted in the bin outer frame (101) side surface, the second electric motor (108) is fixedly mounted in the second outer frame (107), and the second gear (109) is fixedly mounted at the front end of the second electric motor (108) rotating shaft.
4. A construction waste recycling bin according to claim 3, wherein: the building waste hopper (2) comprises a rotating shaft (201), a hopper bottom plate (202), a hopper rear plate (203), a clamping groove (204), a vibrator (205), a short slide bar (206), a slide bar jacket (207), a movable hinge (208) and an electric hydraulic lifting column (209).
5. The construction waste recycling bin according to claim 4, wherein: rotation axis (201) fixed mounting is in the inside of storehouse frame (101), the outside of rotation axis (201) is located to storehouse bucket bottom plate (202) cover, storehouse bucket back plate (203) fixed mounting is in the rear surface of storehouse bucket bottom plate (202), draw-in groove (204) are seted up in the position that storehouse bucket bottom plate (202) lower surface is close to the front end, vibrator (205) fixed mounting is in the position that storehouse bucket bottom plate (202) lower surface is close to the rear end, short slide bar (206) fixed mounting is in the position that storehouse bucket bottom plate (202) lower surface is close to rear end both angles, the outside of short slide bar (206) is located in slide bar overcoat (207) cover, movable hinge (208) fixed mounting is in the lower surface of slide bar overcoat (207), electronic hydraulic lifting column (209) fixed mounting is in the lower extreme of movable hinge (208), the lower extreme of electronic hydraulic lifting column (209) and the inside fixed connection of storehouse frame (101), the inside draw-in groove (204) is gone into to the front end card of electronic telescopic link (102).
6. A construction waste recycling bin according to claim 3, wherein: the smoke-isolation net cover (3) comprises a net cover plate (301) and a first rack (302), wherein the first rack (302) is fixedly arranged on the side face of the net cover plate (301), and the first rack (302) is meshed with the second gear (109).
7. A construction waste recycling bin according to claim 3, wherein: the separation bin gate (4) comprises a bin gate plate (401) and a second rack (402), the second rack (402) is fixedly arranged on the side face of the bin gate plate (401), the first gear (106) penetrates through the sliding rail through hole (103), and the second rack (402) is meshed with the first gear (106).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321507857.3U CN220263889U (en) | 2023-06-14 | 2023-06-14 | Building waste retrieves loading bin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321507857.3U CN220263889U (en) | 2023-06-14 | 2023-06-14 | Building waste retrieves loading bin |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220263889U true CN220263889U (en) | 2023-12-29 |
Family
ID=89304707
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321507857.3U Active CN220263889U (en) | 2023-06-14 | 2023-06-14 | Building waste retrieves loading bin |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220263889U (en) |
-
2023
- 2023-06-14 CN CN202321507857.3U patent/CN220263889U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203568280U (en) | Garbage truck with swing-arm hopper | |
CN220263889U (en) | Building waste retrieves loading bin | |
CN107499759A (en) | A kind of garbage recycling bin | |
CN202464599U (en) | House-type garbage compressing and transferring equipment | |
CN110002142A (en) | It is a kind of to lift rubbish complete set of equipments with the ground of spiral and push plate dual compression | |
CN216156528U (en) | Fishing mechanism for hydraulic engineering | |
CN211767969U (en) | Construction waste recovery equipment | |
CN208054163U (en) | A kind of construction site environment-friendly trash can convenient for toppling over | |
CN210010008U (en) | Garbage collection device for green building | |
CN216989043U (en) | Reinforcing bar waste material pond convenient to clear up | |
CN115403233A (en) | Mechanical winding all-glass fiber reinforced plastic septic tank | |
CN212197002U (en) | Environment-friendly municipal administration garbage bin | |
CN214811581U (en) | Building rubbish breaker | |
CN213495619U (en) | Garbage crushing device for building | |
CN219525019U (en) | Dustbin with ejecting function | |
CN211168402U (en) | Self-discharging carriage structure of electric cleaning vehicle | |
CN218260114U (en) | Garbage green treatment equipment | |
CN216510610U (en) | Full-automatic garbage truck | |
CN217050021U (en) | Intelligent garbage can | |
CN211392570U (en) | Heightened carriage of electric cleaning vehicle | |
CN213415080U (en) | Remove disjunctor dustbin with do wet separation function | |
CN212922920U (en) | Buried dustbin with compression function | |
CN213736908U (en) | Energy-saving building rubbish comprehensive collection device | |
CN221190060U (en) | Building rubbish transport vechicle | |
CN109911476A (en) | A kind of scraper plate feeding device and horizontal type garbage compression device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |