CN220260908U - Building site multifunctional hammer - Google Patents

Building site multifunctional hammer Download PDF

Info

Publication number
CN220260908U
CN220260908U CN202321289179.8U CN202321289179U CN220260908U CN 220260908 U CN220260908 U CN 220260908U CN 202321289179 U CN202321289179 U CN 202321289179U CN 220260908 U CN220260908 U CN 220260908U
Authority
CN
China
Prior art keywords
hammer
rod
building
connecting rod
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321289179.8U
Other languages
Chinese (zh)
Inventor
吴强
姚金邦
郭祥程
张飞
李昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202321289179.8U priority Critical patent/CN220260908U/en
Application granted granted Critical
Publication of CN220260908U publication Critical patent/CN220260908U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a multifunctional hammer for a construction site. The multifunctional hammer for the construction site comprises a hammer body for hammering building materials and a hammer rod for supporting a building template, wherein the hammer rod is in threaded connection with the hammer body. The multifunctional hammer for the construction site can not only hammer building materials by holding the pipe by hand and waving the hammer head, but also enable the hammer rod to be rotated to a proper depth in the holding pipe, and enable the flitch to be clung to the building template, and after the ground pin is inserted into the ground, the hammer rod, the holding pipe and the flitch are utilized to support the building template, so that the building template is prevented from toppling or loosening.

Description

Building site multifunctional hammer
Technical Field
The utility model belongs to the technical field of building equipment, and particularly relates to a multifunctional hammer for a building site.
Background
Hammers are tools used to strike objects, and are commonly used to hammer nails or open objects, and are of many types, such as: claw hammers, inspection hammers, octagonal hammers, nail-pulling hammers, etc., which are used in building construction, often require the use of hammers to assist in construction at a building site. When constructing on construction sites, it is often necessary to use a hammer to strike the concrete or brick or other construction materials, which can be used not only to disassemble the building but also to install and build the building from time to time, and is very widely used. When a building is installed and built, a large number of building templates are used, and the building templates are required to be supported by using template supporting tools in the construction process, so that the building templates are prevented from loosening or toppling. The hammer that current building site used does not possess the function that will support the template, needs constructor to additionally use template supporting tool to support the template. When the construction site is constructed, a plurality of tools are needed, the tools are too much to be stored conveniently and are easy to lose, and when the construction site is constructed, a plurality of tools are searched for, so that the construction efficiency is reduced.
Disclosure of Invention
The utility model aims to provide a multifunctional hammer for a construction site, which solves the technical problem that the existing hammer for the construction site does not have a template supporting function.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows: the utility model provides a multi-functional hammer in building site, includes the hammer body that is used for hammering building material and is used for supporting the hammer pole of building templates, the hammer pole with hammer body threaded connection.
Further, an external thread is arranged at one end of the hammer rod connected with the hammer body, and the external thread extends along the length direction of the hammer rod; the hammer body is provided with internal threads, and the hammer rod extends into the hammer body to support the building template.
Further, a flitch for being attached to the building template is hinged to one end, opposite to the hammer body, of the hammer rod.
Further, a plurality of suckers used for being adsorbed on the building templates are arranged on the flitch.
Further, the hammer body comprises a hammer head and a holding tube, and the hammer head is fixedly connected with the holding tube; the holding tube is hollow, and the internal thread is arranged in the holding tube.
Further, a connecting rod is fixedly connected to one end of the hammer head, which is opposite to the holding tube, and a ground pin for being inserted into the ground is connected to the connecting rod so as to fix the hammer body.
Further, a sleeve is fixedly connected to the ground pin, the sleeve is sleeved with the connecting rod, and the inner wall of the sleeve is tightly attached to the outer wall of the connecting rod.
Further, the ground pin is located at an end of the sleeve opposite the connecting rod.
The utility model has the beneficial effects that:
the multifunctional hammer for the construction site can not only hammer building materials by holding the pipe by hand and waving the hammer head, but also enable the hammer rod to rotate to a proper depth in the holding pipe, enable the flitch to be closely attached to the building template, and enable the hammer rod, the holding pipe and the flitch to be used for supporting the building template after the ground pin is inserted into the ground, so that the building template is prevented from toppling or loosening.
Drawings
FIG. 1 is a schematic view of a sleeve and a connecting rod of the multifunctional hammer for construction site in example 1;
fig. 2 is a schematic overall structure of the multifunctional hammer for construction site in example 1.
In the figure: 1. a hammer head; 2. holding the tube; 3. a hammer rod; 4. a hinge; 5. pasting a board; 6. a connecting rod; 7. a sleeve; 8. inserting a ground pin; 9. a hammer body.
Detailed Description
The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model.
An embodiment of the multi-function hammer of the present utility model for a construction site is shown in fig. 1-2.
Example 1
The multifunctional hammer for the construction site comprises a hammer body for hammering building materials and a hammer rod for supporting a building template, wherein the hammer rod is in threaded connection with the hammer body. The hammer body comprises a hammer head and a holding tube, and the hammer head is welded with the holding tube. The holding tube is a cylindrical rod with a hollow inside, and an internal thread is arranged inside the holding tube. The hammer rod is a cylindrical rod, one end of the hammer rod connected with the holding pipe is provided with external threads, and the hammer rod stretches into the holding pipe to be connected with the holding pipe through wires. The external thread extends along the length direction of the hammer rod.
The end of the hammer rod opposite to the holding pipe is hinged with a flat flitch so that the flitch clings to the building template. The hammer rod is connected with the flitch through a hinge, and the flitch is connected with the hammer rod through a screw and the hinge. The flitch is the rubber material, installs a plurality of sucking discs on the flitch to the flitch is closely adsorbed on the building templates.
One end of the hammer head, which is opposite to the holding pipe, is welded with a connecting rod, and the connecting rod is a cylindrical rod. The connecting rod is sleeved with a sleeve, and the inner diameter of the sleeve is consistent with the outer diameter of the connecting rod, so that the inner wall of the sleeve is tightly attached to the outer wall of the connecting rod. The end of the sleeve opposite to the connecting rod is welded with a ground pin for insertion into the ground to fix the hammer body.
When the multifunctional hammer for the construction site is used, the hammer head is held by a hand to swing the hammer head to hammer the construction material when the construction material is required to be hammered. When the building template is required to be supported, the hammer rod is screwed into the holding pipe, the sleeve is sleeved into the connecting rod, the ground inserting nails are inserted into the ground, and the flitch is clung to the building template.
Finally, it should be noted that: in the description of the present utility model, it should be noted that the azimuth or positional relationship indicated by the terms "vertical", "upper", "lower", "horizontal", etc. are based on the azimuth or positional relationship shown in the drawings, and are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the apparatus or element referred to must have a specific azimuth, be constructed and operated in a specific azimuth, and thus should not be construed as limiting the present utility model.
In the description of the present utility model, it should also be noted that, unless explicitly specified and limited otherwise, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art according to the specific circumstances.

Claims (3)

1. A multifunctional hammer for a construction site, which is characterized in that: the hammer comprises a hammer body for hammering building materials and a hammer rod for supporting building templates, wherein the hammer rod is in threaded connection with the hammer body; one end of the hammer rod, which is opposite to the hammer body, is hinged with a flitch for being attached to the building template; the flitch is provided with a plurality of suckers which are used for being adsorbed on the building templates; an external thread is arranged at one end of the hammer rod connected with the hammer body, and the external thread extends along the length direction of the hammer rod; the hammer body is provided with internal threads, and the hammer rod extends into the hammer body to support the building template; the hammer body comprises a hammer head and a holding tube, and the hammer head is fixedly connected with the holding tube; the holding tube is hollow, and the internal thread is arranged in the holding tube; the hammer is characterized in that a connecting rod is fixedly connected to one end of the hammer head, which is opposite to the holding pipe, and a ground pin for being inserted into the ground is connected to the connecting rod so as to fix the hammer body.
2. The construction site multifunctional hammer according to claim 1, characterized in that: the ground pin is fixedly connected with a sleeve, the sleeve is sleeved with the connecting rod, and the inner wall of the sleeve is tightly attached to the outer wall of the connecting rod.
3. The construction site multifunctional hammer according to claim 2, characterized in that: the ground pin is located at an end of the sleeve opposite the connecting rod.
CN202321289179.8U 2023-05-25 2023-05-25 Building site multifunctional hammer Active CN220260908U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321289179.8U CN220260908U (en) 2023-05-25 2023-05-25 Building site multifunctional hammer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321289179.8U CN220260908U (en) 2023-05-25 2023-05-25 Building site multifunctional hammer

Publications (1)

Publication Number Publication Date
CN220260908U true CN220260908U (en) 2023-12-29

Family

ID=89298641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321289179.8U Active CN220260908U (en) 2023-05-25 2023-05-25 Building site multifunctional hammer

Country Status (1)

Country Link
CN (1) CN220260908U (en)

Similar Documents

Publication Publication Date Title
CN220260908U (en) Building site multifunctional hammer
CN210616411U (en) Electronic crab-bolt strikes hammer
CN105674820A (en) Blasting engineering air spacing device
CN211114800U (en) Socket type steel pipe scaffold for cast-in-situ reinforced concrete slab construction
CN201535071U (en) Retractor for quickly adjusting verticality of steel column
CN205009159U (en) Portable extra long formula expansion bolts installs sleeve
CN210923252U (en) Auxiliary supporting device for detecting resiliometer
CN219434064U (en) Portable pile point positioning device
CN207960492U (en) A kind of portable manual is at well equipment
CN201730538U (en) Low-gravity-center three-shaft spiral drilling machine
CN106378476B (en) A kind of stock puncher and Multifunction long rod
CN220228439U (en) Water and soil conservation monitoring devices convenient to support and fix
CN212296266U (en) Telescopic CFG long spiral drill rod
CN210104775U (en) Ground fixing system and nail puller
CN213448432U (en) Novel energy-saving thin-wall pipe pile
CN217812382U (en) Wall formwork positioning device
CN212044553U (en) Multipurpose portable bridge mounting tool
CN217000816U (en) Outer frame is wall device even
CN215572933U (en) On-spot mapping device of building engineering cost
CN211891463U (en) Decorative wall material drilling equipment for building
CN215414445U (en) Soil sampling device for environmental protection engineering
CN216612359U (en) Bearing pipe suitable for building buckle
CN212803086U (en) High-efficiency spiral drill rod
CN210255986U (en) Auxiliary module type tool for screw rod installation
CN218521790U (en) Clamp for fixing anti-floating anchor rod

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant