CN220247559U - Socket type disc buckle type steel pipe scaffold adjustable component quick installing and dismantling tool - Google Patents

Socket type disc buckle type steel pipe scaffold adjustable component quick installing and dismantling tool Download PDF

Info

Publication number
CN220247559U
CN220247559U CN202321936412.7U CN202321936412U CN220247559U CN 220247559 U CN220247559 U CN 220247559U CN 202321936412 U CN202321936412 U CN 202321936412U CN 220247559 U CN220247559 U CN 220247559U
Authority
CN
China
Prior art keywords
steel pipe
steel
steel bar
sleeve
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321936412.7U
Other languages
Chinese (zh)
Inventor
谢康敏
蒋鹏
李凯亚
王涛
张振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 11 Co Ltd
PowerChina 11th Bureau Engineering Co Ltd
Original Assignee
Sinohydro Bureau 11 Co Ltd
PowerChina 11th Bureau Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 11 Co Ltd, PowerChina 11th Bureau Engineering Co Ltd filed Critical Sinohydro Bureau 11 Co Ltd
Priority to CN202321936412.7U priority Critical patent/CN220247559U/en
Application granted granted Critical
Publication of CN220247559U publication Critical patent/CN220247559U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a socket-and-spigot type disc buckle type steel pipe scaffold adjustable component quick mounting and dismounting tool, belonging to the field of scaffolds; comprises a sleeve, a steel pipe and a steel bar; the sleeve is arranged at the upper end of the steel pipe, the steel bars are arranged at two sides of the steel pipe, and each side of the steel pipe is provided with two steel bars, namely a first steel bar and a second steel bar; the first steel bar is fixed on one side of the steel pipe, and the second steel bar is fixed on one side of the first steel bar. The beneficial effects are that: the tool is mainly applied to the adjustment construction of the adjustable base and the jacking of the socket type disc buckle type steel pipe scaffold. The tool is used for adjusting the height of the adjustable base and the adjustable towing support, can be used for large-area disc buckle type steel pipe scaffold erection operation, is convenient for on-site rapid adjustment of notification of the supporting sheet, saves the construction rate which is only manually adjusted, and quickens the construction progress of the disc buckle type steel pipe scaffold erection.

Description

Socket type disc buckle type steel pipe scaffold adjustable component quick installing and dismantling tool
Technical Field
The utility model relates to a socket-and-spigot type quick assembling and disassembling tool for an adjustable component of a disc-buckling steel pipe scaffold, belongs to the field of scaffolds, and is a quick construction device for the disc-buckling steel pipe scaffold.
Background
The installation of the adjustable component of the conventional disc buckle type steel pipe scaffold is manually adjusted, the operation can only roughly judge and adjust the height according to construction experience, the construction rate is reduced, and the adjustable component is not suitable for large-area scaffold erection construction
There is a kind of disc buckle type scaffold adjustable base quick assembling and disassembling auxiliary tool, which declares the utility model patent in 2020. Patent number: CN210798258U, patentee: the first navigation engineering office limited company is handed in. The tool drives the connecting part, the reinforcing steel bars and the stirring support piece through starting the electric wrench, adjusts the height of the adjustable base, and improves the installation rate of the scaffold. However, when the tool is operated in the field, the electric wrench must be located right above the base, personnel are required to cooperate and fix the lower part of the base, and the height of the adjustable base cannot be accurately controlled.
Disclosure of Invention
The utility model aims to provide a socket type disc buckle type steel pipe scaffold adjustable component quick assembly and disassembly tool which can effectively solve the problems.
In order to solve the technical problems, the utility model is realized by the following technical scheme:
comprises a sleeve, a steel pipe and a steel bar; the sleeve is arranged at the upper end of the steel pipe, the steel bars are arranged at two sides of the steel pipe, and each side of the steel pipe is provided with two steel bars, namely a first steel bar and a second steel bar; the first steel bar is fixed on one side of the steel pipe, and the second steel bar is fixed on one side of the first steel bar.
Further: the welding mode is adopted between the first steel bars and the steel pipes and between the second steel bars, and the welding surfaces of the first steel bars and the steel pipes and the welding surfaces of the first steel bars and the second steel bars are symmetrically arranged on the first steel bars.
Further: the first steel bars and the second steel bars are arranged in a staggered mode, and the upper half parts of the second steel bars are welded to the lower half parts of the first steel bars.
Further: the diameter of the steel pipe is larger than that of the sleeve, the upper edge of the steel pipe and the lower edge of the sleeve are welded together, and the diameter of the upper port of the steel pipe is contracted inwards to be consistent with the diameter of the sleeve.
Further: the sleeve and the steel pipe are made of screw thread steel.
The beneficial effects are as follows:
the tool is mainly applied to the adjustment construction of the adjustable base and the jacking of the socket type disc buckle type steel pipe scaffold.
The tool is used for adjusting the height of the adjustable base and the adjustable towing support, can be used for large-area disc buckle type steel pipe scaffold erection operation, is convenient for on-site rapid adjustment of notification of the supporting sheet, saves the construction rate which is only manually adjusted, and quickens the construction progress of the disc buckle type steel pipe scaffold erection.
Drawings
For ease of illustration, the utility model is described in detail by the following detailed description and the accompanying drawings.
Fig. 1 is a schematic structural view of the present utility model.
Reference numerals illustrate:
1. a sleeve; 2. a steel pipe; 3. reinforcing steel bars; 31. a first reinforcing bar; 32. and a second reinforcing bar.
Detailed Description
Reference will now be made in detail to embodiments of the present utility model, examples of which are illustrated in the accompanying drawings. The embodiments described below by referring to the drawings are illustrative and intended to explain the present utility model and should not be construed as limiting the utility model.
Referring to figure 1, an embodiment of a quick release tool for a socket type disc buckle type steel pipe scaffold adjustable member according to the present utility model,
the dish knot type scaffold is a novel scaffold and is an upgrading product after the bowl knot type scaffold. Also known as chrysanthemum disc type scaffold, plug disc type scaffold, wheel disc type scaffold and buckling disc type scaffold. With the development of civil engineering in China, large-span and large-scale buildings are continuously derived, the coiled steel pipe 2 scaffold is used as a novel building support system, has the advantages of large bearing capacity, high installation speed, high stability, easiness in site management and the like, and by comparing with the construction site of the coiled steel pipe 2 scaffold, the coiled steel pipe 2 scaffold has no attention points such as a lap joint mode, lap joint length and exposure length due to the fact that the modules of all the rods are determined, the rods themselves adopt a hot galvanizing process, the overall appearance effect of the scaffold is good, the site safety civilized construction is guaranteed to meet the standard operation requirement, and the coiled steel pipe 2 scaffold occupies the main market in the future construction of the scaffold by virtue of the advantages of the scaffold.
The scaffold is erected fast and is one of the advantages of the steel pipe 2 of the disc buckle, upper portion horizontal pole and diagonal bar are standard modulus, can reach quick installation effect according to conventional practice, but the adjustable base of steel pipe 2 scaffold of the disc buckle and adjustable support length are 55cm generally, adjustable base lower part is 6mm thick steel plate, for the construction of being convenient for, the steel plate is arranged in scaffold foundation top surface with same elevation generally, the high adjustment of base and support influences the progress of erection when installing in a large scale, how fast adjustment and make the backing sheet lie in same elevation is important.
The tool is mainly a device for fixing an electric wrench with a steel pipe 2 through a sleeve 1, and externally adding a first steel bar 31 and a second steel bar 32 to the steel pipe 2.
(1) Sleeve 1 and steel pipe 2 fixing device
The sleeve 1 is of the type A24, the steel tube 2 is of the conventional type A48, the wall thickness of the steel tube 2 is 3mm, the length of the steel tube 2 is determined according to the length of the base to be adjusted, and therefore the height of each adjustable base can be accurately controlled through the height of the fixed steel tube 2, base supporting pieces are located at the same height, and the overall height of the scaffold is controlled.
The steel pipe 2 and the sleeve 1 are firmly connected through hammering and welding, the electric spanner is started, and the rotary downward power support of the steel pipe 2 is provided through the connecting area of the sleeve 1 and the steel pipe 2.
(2) Device for adding reinforcing steel bars 3 to steel pipes 2
The steel bars 3 can be combined with the site situation, two A8-A14 screw thread steel/smooth round steel bars 3 are selected, and the steel bars 3 at the moment are the combination of a first steel bar 31 and a second steel bar 32; the fixed positions are arranged on two sides of the center of the steel pipe 2, so that the exposed length of the steel bar 3 is reduced, the safety risk is reduced, and the length of the steel bar 3 is preferably within 15 cm. The steel bar 3 is fixed on the outer side of the steel pipe 2 through a welding mode, a stop lever is placed on two sides of a supporting plate during operation, and an electric wrench is started to adjust the base.
(3) In situ operation
The adjustable base is vertically placed on the flat ground, an operation worker places two steel bars 3 on the side of the supporting piece, the operation worker is started through an electric wrench, the steel tube 2 connected to the sleeve 1 is driven, and the effect of stirring the supporting piece to move is achieved through the steel bars 3 fixed outside the steel tube 2. In the moving process of the supporting piece, the shoe screw rod is sleeved into the steel pipe 2, so that the stability of tool operation is improved, when the top in the steel pipe 2 is contacted with the top of the shoe, the electric wrench is stopped, the tool can be pulled out to enter the next shoe for adjustment, and the adjustable base is positioned at the same height by sequential operation.
The technology is put into operation in the engineering construction of the power distribution building and the comprehensive building of the Guangxi Lingchuan marine No. 1 second-phase booster station, the construction speed is fast improved in the construction process of the disc buckle type scaffold, and the effect is good. The field specific implementation mode is as follows:
(1) Material parameters
The tool is mainly made of the following materials: sleeve 1, steel pipe 2 and screw-thread steel.
The sleeve is A24 type, the steel pipe 2 is national standard 48 mm with the length of 350mm, and the steel bars are 2 steel bars with the length of 150mm/300mm of A10 steel bars. Because the scaffold of the disc buckle type steel pipe 2 is made of galvanized materials, the materials are painted by adopting silver paint in order to keep the appearance aesthetic property and corrosion resistance of tool operation.
(2) Material requirements
1) Sleeve 1, steel pipe 2, reinforcing bar 3 need purchase national standard model.
2) The adjustable base and the adjustable support to be adjusted are standard components with uniform types, and the height of the steel pipe 2 is determined according to the adjustment height of the adjustable framework after on-site actual measurement.
3) The adjustable base and the adjustable support are both provided with supporting pieces for adjusting the height, and the adjustable support is used for adjusting the length of the steel pipe 2 by considering the action height of the support.
(3) Practical application
In the actual field application process, firstly, the adjustable component is stably placed on the ground, an operator holds the electric wrench and the tool to be perpendicular to the upper part of the framework, and after the steel bar 3 is clamped to the position of the supporting piece, the electric wrench is started to adjust the height of the supporting piece.
The above embodiments are merely illustrative embodiments of the present utility model, but the technical features of the present utility model are not limited thereto, and any changes or modifications made by those skilled in the art within the scope of the present utility model are included in the scope of the present utility model.

Claims (5)

1. A socket joint formula dish knot formula steel pipe scaffold adjustable component installs and removes instrument fast which characterized in that: comprises a sleeve (1), a steel pipe (2) and a steel bar (3); the sleeve (1) is arranged at the upper end of the steel pipe (2), the steel bars (3) are arranged at two sides of the steel pipe (2), and each side of the steel pipe (2) is provided with two steel bars (3), namely a first steel bar (31) and a second steel bar (32); the first steel bar (31) is fixed on one side of the steel pipe (2), and the second steel bar (32) is fixed on one side of the first steel bar (31).
2. The socket type disc buckle type steel pipe scaffold adjustable member quick assembling and disassembling tool according to claim 1, wherein the tool is characterized in that: the welding mode is adopted between the first steel bar (31) and the steel pipe (2) and between the second steel bar (32), and the welding surface of the first steel bar (31) and the steel pipe (2) and the welding surface of the first steel bar (31) and the second steel bar (32) are symmetrically arranged on the first steel bar (31).
3. The socket type disc buckle type steel pipe scaffold adjustable member quick assembling and disassembling tool according to claim 2, wherein: the first steel bars (31) and the second steel bars (32) are arranged in a staggered mode, and the upper half parts of the second steel bars (32) are welded to the lower half parts of the first steel bars (31).
4. The socket type disc buckle type steel pipe scaffold adjustable member quick assembling and disassembling tool according to claim 1, wherein the tool is characterized in that: the diameter of the steel pipe (2) is larger than that of the sleeve (1), the upper edge of the steel pipe (2) is welded with the lower edge of the sleeve (1), and the diameter of the upper port of the steel pipe (2) is contracted inwards to be consistent with the diameter of the sleeve (1).
5. The socket type disc buckle type steel pipe scaffold adjustable member quick assembling and disassembling tool according to claim 1, wherein the tool is characterized in that: the sleeve (1) and the steel pipe (2) are made of screw-thread steel.
CN202321936412.7U 2023-07-22 2023-07-22 Socket type disc buckle type steel pipe scaffold adjustable component quick installing and dismantling tool Active CN220247559U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321936412.7U CN220247559U (en) 2023-07-22 2023-07-22 Socket type disc buckle type steel pipe scaffold adjustable component quick installing and dismantling tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321936412.7U CN220247559U (en) 2023-07-22 2023-07-22 Socket type disc buckle type steel pipe scaffold adjustable component quick installing and dismantling tool

Publications (1)

Publication Number Publication Date
CN220247559U true CN220247559U (en) 2023-12-26

Family

ID=89228558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321936412.7U Active CN220247559U (en) 2023-07-22 2023-07-22 Socket type disc buckle type steel pipe scaffold adjustable component quick installing and dismantling tool

Country Status (1)

Country Link
CN (1) CN220247559U (en)

Similar Documents

Publication Publication Date Title
AU2019100147B4 (en) Fast Moving Installation Supporting System
CN110805257B (en) Flower basket overhanging type section steel bearing beam structure and construction method
CN107558723A (en) A kind of method that Sloping roof is made and installed with hanging basket suspension frame
CN111472535A (en) Steel pipe movable positioning pile for building external scaffold of building engineering and using method thereof
CN220247559U (en) Socket type disc buckle type steel pipe scaffold adjustable component quick installing and dismantling tool
CN109057189B (en) Flashing construction method and carrying device
CN217759861U (en) Adjustable platform for pipeline construction under platform beam
CN216865483U (en) Quick positioning and fixing joint device for steel members of light steel structure factory building
CN216239838U (en) Embedded box pre-positioning fixing device
CN210067407U (en) Scaffold wall connecting piece
CN113794430A (en) Photovoltaic support stand column and prestressed pipe pile connecting system and working method thereof
CN207959911U (en) A kind of builder's jack gusseted
CN202055146U (en) Connecting structure for screed board accessories
CN201620592U (en) Scaffold double-steel-pipe welding base
CN217631491U (en) Support for steel structure overhanging floor bearing plate
CN220978950U (en) Basement roof supporting structure adopting square pipe upright post
CN219158230U (en) Assembled guardrail for assembled steel construction building
CN110700593A (en) Building ground elevation control adjustment tool
CN212298225U (en) Measuring instrument fixing support for high-rise frame steel structure
CN219973885U (en) Hyperboloid roofing template braced system
CN210828396U (en) Supporting system for installing prefabricated wallboard
CN218149858U (en) Turnover portable hopper
CN215368631U (en) Super high-rise core section of thick bamboo construction multifunctional measuring tool carries on platform
CN221073037U (en) Aluminum grid switching device
CN220539173U (en) High and large daylighting roof construction platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant