CN220247273U - Assembled building wall structure - Google Patents

Assembled building wall structure Download PDF

Info

Publication number
CN220247273U
CN220247273U CN202321491850.7U CN202321491850U CN220247273U CN 220247273 U CN220247273 U CN 220247273U CN 202321491850 U CN202321491850 U CN 202321491850U CN 220247273 U CN220247273 U CN 220247273U
Authority
CN
China
Prior art keywords
wall body
wall
block
sliding
building wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321491850.7U
Other languages
Chinese (zh)
Inventor
蒋聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202321491850.7U priority Critical patent/CN220247273U/en
Application granted granted Critical
Publication of CN220247273U publication Critical patent/CN220247273U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses an assembled building wall structure, which relates to the technical field of building construction, and comprises a wall body, wherein the bottom of the wall body is connected with an inserting block, the top of the wall body is provided with a slot which is in inserting fit with the inserting block, the center of the left side of the wall body is connected with a clamping block, the center of the right side of the wall body is connected with a clamping groove which is in inserting fit with the clamping block, a locking component is arranged on the surface of the wall body and comprises a first locking member, the first locking member is arranged on one side, close to the inserting block, of the surface of the wall body, and a second locking member is arranged on one side, close to the clamping groove, of the surface of the wall body. According to the utility model, the first locking piece is arranged to play a clamping role on the insert block, so that the insert block is more fastened when connected with the slot, the insert block is prevented from being separated from the inner cavity of the slot as much as possible, and the advantage of good fixing effect on the assembled building wall is achieved.

Description

Assembled building wall structure
Technical Field
The utility model relates to the technical field of building construction, in particular to an assembled building wall structure.
Background
The fabricated building wall is usually characterized in that the wall building work in the traditional building mode is transferred to a factory, the wall is manufactured in the factory, then the wall is transported to a building construction site, and the wall is assembled and installed on site, so that the fabricated building has the advantages of high building speed, small constraint on climatic conditions, labor saving and capability of improving building quality, and the fabricated building gradually replaces the traditional building.
The utility model discloses an assembled building wall, which comprises a base block and a wall block, wherein the wall block is positioned on the outer surface of the upper end of the base block, rectangular blocks are arranged on the upper parts of the base block and the wall block, hanging rings are arranged on the tops of the rectangular blocks, T-shaped inserting blocks are arranged on one sides of the base block and the wall block, T-shaped slots which are clamped with the T-shaped inserting blocks are arranged on the other sides of the base block and the wall block, rectangular clamping grooves and cambered surface-shaped clamping grooves which are clamped with the rectangular blocks and the hanging rings are arranged on the bottoms of the wall blocks, and a waterproof plate, a sound-absorbing plate, a longitudinal fixing framework and a fireproof plate are sequentially arranged on the wall block from front to back.
Disclosure of Invention
This section is intended to outline some aspects of embodiments of the utility model and to briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section as well as in the description of the utility model and in the title of the utility model, which may not be used to limit the scope of the utility model.
Therefore, the utility model aims to provide an assembled building wall structure, which can solve the problems that the existing assembled building wall is easy to fall off after being assembled due to poor fixing effect of a foundation connection structure of the assembled building wall, and workers are required to carry out secondary assembly, so that the labor capacity of the workers is increased.
In order to solve the technical problems, the utility model provides an assembled building wall structure, which adopts the following technical scheme: the wall body assembly comprises a wall body, wherein the bottom of the wall body is connected with an inserting block, the top of the wall body is provided with a slot which is in inserting fit with the inserting block, the center of the left side of the wall body is connected with a clamping block, and the center of the right side of the wall body is connected with a clamping groove which is in inserting fit with the clamping block;
the locking assembly is arranged on the surface of the wall body and comprises a first locking piece, the first locking piece is arranged on one side, close to the insertion block, of the surface of the wall body, and a second locking piece is arranged on one side, close to the clamping groove, of the surface of the wall body.
Through adopting above-mentioned technical scheme, this scheme plays the effect of chucking through the setting of first retaining member to the inserted block for it is more firm when inserted block and slot connection, avoid the inner chamber that the inserted block breaks away from the slot as far as possible, reached the fixed effectual advantage to the assembled building wall, through the setting of second retaining member, play the effect of chucking to the fixture block, make assembled building wall when the equipment, can effectually fix building wall, make fixture block and draw-in groove more firm when connecting, reached the fixed effectual advantage to the assembled building wall, prevent to drop between the building wall, the amount of labour of workman has been lightened.
Optionally, the top and the bottom of wall body left side all are connected with the reservation post, the top and the bottom on wall body right side all set up with reservation post grafting complex reservation groove.
By adopting the technical scheme, the splicing speed between adjacent wall bodies is greatly improved, and the splicing efficiency of the wall bodies is improved.
Optionally, the inside of wall body is connected with pitch waterproof layer.
Through adopting above-mentioned technical scheme, improve wall structure's water proofness, prevent indoor damp moisture to the inside infiltration of wall body.
Optionally, the first retaining member includes the support body, the support body is installed the wall body surface is close to one side of slot, the slide is installed to the inner chamber of support body, the bottom of slide with equidistant between the inner wall of support body is connected with reset spring, the slide is kept away from reset spring's one end equidistant is connected with first gag lever post, the inserted block is close to the equidistant one end of support body set up with first gag lever post grafting complex first spacing hole, the both sides of slide all are provided with the slider, the slide is close to reset spring's one end is connected with the pull rod.
Through adopting above-mentioned technical scheme, outwards pulling pull rod drives the slide outwards and removes, drives first gag lever post outwards and extrudees reset spring when the slide removes, when the inserted block pegged graft in the inner chamber of slot, unclamp the slider, under reset spring's elasticity effect, the slide removes and drives first gag lever post and peg graft to first spacing downthehole to can be with the inserted block chucking, make more firm when inserted block and slot connection.
Optionally, one end of the pull rod, which is far away from the sliding plate, extends out of the frame body and is provided with a pull plate.
Through adopting above-mentioned technical scheme, make things convenient for the staff to remove through arm-tie pulling pull rod, and then can stimulate the slide to slide.
Optionally, the slider includes the pulley, the pulley rotates to be installed the both sides of slide, the spout has all been seted up to the both sides of support body inner chamber, the pulley with roll between the spout and be connected.
Through adopting above-mentioned technical scheme, can drive the pulley and roll in the spout when the slide is removing for the slide is more smooth and easy at the in-process that removes, avoids appearing the condition of card as far as possible.
Optionally, the second retaining member includes the mounting groove, the mounting groove is installed the top of draw-in groove, the both sides of mounting groove inner chamber all are connected with the dead lever, the outer wall of dead lever overlaps respectively and is equipped with positioning spring and sliding sleeve, positioning spring is located the top of sliding sleeve with between the interior roof of support body, be connected with the fly leaf between the sliding sleeve, the surface connection of fly leaf has the driving lever, equidistant second gag lever post that is connected with in bottom of fly leaf, equidistant the offer in top of fixture block with second gag lever post grafting complex second spacing hole.
Through adopting above-mentioned technical scheme, dial-up driving lever drives the fly leaf upward movement, and the fly leaf is passed through the sliding sleeve and is slided along the dead lever and extrude positioning spring this moment to can drive second gag lever post upward movement, when the fixture block is pegged graft to the inner chamber of draw-in groove, unclamp the driving lever, under positioning spring's elasticity effect, the fly leaf moves down, drives the second gag lever post and peg graft in the second spacing downthehole, thereby can be with the fixture block chucking, make more firm when fixture block and draw-in groove are connected.
Optionally, the driving lever is kept away from the one end of fly leaf stretches out the wall body, the preformed hole has been seted up on the surface of wall body, the diameter of preformed hole is greater than the diameter of driving lever.
By adopting the technical scheme, the shifting rod is convenient for a worker to shift to drive the movable plate to move.
In summary, the present utility model includes at least one of the following beneficial effects:
through the setting of first retaining member, play the effect of chucking to the inserted block for it is more firm when inserted block and slot connection, avoid the inserted block to break away from the inner chamber of slot as far as possible, reached the fixed effectual advantage to the assembled building wall body.
Through the setting of second retaining member, play the effect of chucking to the fixture block, make assembled building wall body when the equipment, can effectually fix building wall body for it is more firm when fixture block and draw-in groove are connected, prevent to drop between the building wall body, alleviateed workman's the amount of labour.
(3) Through the cooperation setting of reserving post and reservation groove to can peg graft the reservation post to the reservation inslot, thereby very big improvement the concatenation speed between the adjacent wall body, improved the concatenation efficiency of wall body.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic cross-sectional view of the present utility model;
FIG. 2 is a schematic view of a wall connection structure according to the present utility model;
FIG. 3 is a schematic elevational view of the present utility model;
FIG. 4 is a schematic top view of the present utility model;
fig. 5 is a schematic diagram of the structure of fig. 2 a according to the present utility model.
In the figure:
1. a wall assembly; 101. a wall body; 1011. a reserved column; 1012. a reserved groove; 1013. a preformed hole; 1014. an asphalt waterproof layer; 102. inserting blocks; 103. a slot; 104. a clamping block; 105. a clamping groove;
2. a locking assembly; 201. a first locking member; 2011. a frame body; 2012. a slide plate; 2013. a return spring; 2014. a first stop lever; 2015. a first limiting hole; 2016. a slider; 20161. a pulley; 20162. a chute; 2017. a pull rod; 20171. pulling a plate; 202. a second locking member; 2021. a mounting groove; 2022. a fixed rod; 2023. a positioning spring; 2024. a sliding sleeve; 2025. a movable plate; 2026. a deflector rod; 2027. a second limit rod; 2028. and the second limiting hole.
Description of the embodiments
The utility model is described in further detail below with reference to fig. 1-5.
Referring to fig. 1 and 3, in this embodiment, in order to solve the problem that the existing foundation connection structure of an assembled wall body is poor in fixing effect, so that the assembled building wall body is easy to fall off after assembly, and needs to be assembled by workers for a second time, and the labor capacity of the workers is increased, the utility model discloses an assembled building wall body structure, which comprises a wall body assembly 1, wherein an inserting block 102 is fixedly connected to the bottom of the wall body assembly 101, an inserting slot 103 in inserting fit with the inserting block 102 is formed in the top of the wall body assembly 101, a clamping block 104 is fixedly connected to the center of the left side of the wall body assembly 101, and a clamping groove 105 in inserting fit with the clamping block 104 is connected to the center of the right side of the wall body assembly 101.
The locking component 2, the locking component 2 is arranged on the surface of the wall body 101, and comprises a first locking piece 201, the first locking piece 201 is arranged on one side, close to the insertion block 102, of the surface of the wall body 101, and a second locking piece 202 is arranged on one side, close to the clamping groove 105, of the surface of the wall body 101.
Referring to fig. 4, an asphalt waterproof layer 1014 is fixedly attached to the inside of the wall body 101. The water tightness of the wall structure is improved, and indoor damp and moisture is prevented from penetrating into the wall body 101.
Referring to fig. 3 and 4, the first locking member 201 includes a frame 2011, the frame 2011 is fixedly installed on one side of the surface of the wall body 101 near the slot 103, a sliding plate 2012 is slidably installed in an inner cavity of the frame 2011, a plurality of return springs 2013 are connected between the bottom of the sliding plate 2012 and the inner wall of the frame 2011 at equal intervals, a plurality of first limiting rods 2014 are connected to one end of the sliding plate 2012 far away from the return springs 2013 at equal intervals, a plurality of first limiting holes 2015 which are in plug connection with the first limiting rods 2014 are formed in one end of the plug 102 near the frame 2011 at equal intervals, sliding members 2016 are arranged on two sides of the sliding plate 2012, and a pull rod 2017 is fixedly connected to one end of the sliding plate 2012 near the return springs 2013.
Referring to fig. 4, the end of the pull rod 2017 remote from the slip plate 2012 extends out of the frame 2011 and is fixedly mounted with a pull plate 20171. The staff member can conveniently pull the pull rod 2017 to move through the pull plate 20171, and then the sliding plate 2012 can be pulled to slide.
Referring to fig. 4, the sliding member 2016 includes a pulley 20161, the pulley 20161 is rotatably mounted on two sides of the sliding plate 2012, two sides of an inner cavity of the frame 2011 are provided with sliding grooves 20162, and the pulley 20161 is in rolling connection with the sliding grooves 20162. When the sliding plate 2012 moves, the pulley 20161 can be driven to roll in the sliding groove 20162, so that the sliding plate 2012 is smoother in the moving process, and the situation of jamming is avoided as much as possible.
The specific implementation principle is as follows: when the wall body 101 needs to be longitudinally connected, a worker holds the pull plate 20171 by hand, pulls the pull plate 20171 outwards to drive the pull rod 2017 to move outwards, further drives the sliding plate 2012 to move outwards, drives the first limiting rod 2014 to move outwards and extrude the return spring 2013 when the sliding plate 2012 moves, plugs the plug block 102 into the inner cavity of the slot 103 at this time, then loosens the sliding piece 2016, and under the action of the elasticity of the return spring 2013, the sliding plate 2012 moves towards the direction of the wall body 101 and drives the first limiting rod 2014 to plug into the first limiting hole 2015, so that the plug block 102 can be clamped, the plug block 102 and the slot 103 are connected more firmly, falling off between building walls is prevented, and the labor capacity of workers is reduced.
Referring to fig. 3 and 5, in this embodiment, based on the same concept as that of the first embodiment, the assembled building wall structure further includes that the second locking member 202 includes a mounting groove 2021, the mounting groove 2021 is mounted at the top of the clamping groove 105, two sides of an inner cavity of the mounting groove 2021 are fixedly connected with fixing rods 2022, positioning springs 2023 and sliding sleeves 2024 are respectively sleeved on outer walls of the fixing rods 2022, the positioning springs 2023 are located between the top of the sliding sleeves 2024 and an inner top wall of the frame 2011, a movable plate 2025 is connected between the sliding sleeves 2024, a deflector rod 2026 is fixedly connected to a surface of the movable plate 2025, a plurality of second limiting rods 2027 are equidistantly connected to the bottom of the movable plate 2025, and a plurality of second limiting holes 2028 in plug-in fit with the second limiting rods 2027 are formed at equal intervals on the top of the clamping blocks 104.
Referring to fig. 3 and 5, the end of the lever 2026 remote from the movable plate 2025 protrudes out of the wall body 101, and a preformed hole 1013 is formed in the surface of the wall body 101, and the diameter of the preformed hole 1013 is larger than that of the lever 2026. Thereby facilitating the staff to toggle the shift lever 2026 to drive the movable plate 2025 to move.
The specific implementation principle is as follows: when the wall body 101 needs to be transversely connected, a worker dials the deflector rod 2026 upwards firstly, the deflector rod 2026 drives the movable plate 2025 to move upwards when moving, at the moment, the movable plate 2025 slides along the fixed rod 2022 through the sliding sleeve 2024 to extrude the positioning spring 2023, so that the second limiting rod 2027 can be driven to move upwards, the clamping block 104 is spliced into the inner cavity of the clamping groove 105, then the deflector rod 2026 is loosened, under the action of the elastic force of the positioning spring 2023, the movable plate 2025 moves downwards, the second limiting rod 2027 is driven to be spliced into the second limiting hole 2028, and therefore the clamping block 104 can be clamped, the connection between the clamping block 104 and the clamping groove 105 is firmer, the clamping block 104 is prevented from being separated from the inner cavity of the clamping groove 105 as much as possible, and the advantage of good fixing effect on the assembled building wall body is achieved.
Referring to fig. 1 and 2, in this embodiment, based on the same concept as that of the first embodiment, the fabricated building wall structure further includes a reserved column 1011 fixedly connected to the top and the bottom of the left side of the wall body 101, and a reserved slot 1012 in plug-in fit with the reserved column 1011 is formed in the top and the bottom of the right side of the wall body 101.
The specific implementation principle is as follows: the reserved columns 1011 are spliced into the corresponding reserved grooves 1012, so that the adjacent wall bodies 101 can be spliced quickly, and the splicing efficiency of the wall bodies 101 is greatly improved.
The above embodiments are not intended to limit the scope of the present utility model, so: all equivalent changes in structure, shape and principle of the utility model should be covered in the scope of protection of the utility model.

Claims (8)

1. An assembled building wall structure, its characterized in that: comprising the steps of (a) a step of,
the wall body assembly (1) comprises a wall body (101), wherein an inserting block (102) is connected to the bottom of the wall body (101), a slot (103) which is in plug-in fit with the inserting block (102) is formed in the top of the wall body (101), a clamping block (104) is connected to the center of the left side of the wall body (101), and a clamping groove (105) which is in plug-in fit with the clamping block (104) is connected to the center of the right side of the wall body (101);
locking subassembly (2), locking subassembly (2) set up in the surface of wall body (101), it includes first retaining member (201), first retaining member (201) are installed wall body (101) surface is close to one side of inserted block (102), wall body (101) surface is close to one side of draw-in groove (105) is provided with second retaining member (202).
2. A fabricated building wall structure according to claim 1, wherein: the top and the bottom on the left side of the wall body (101) are both connected with reserved columns (1011), and the top and the bottom on the right side of the wall body (101) are both provided with reserved grooves (1012) which are in plug-in fit with the reserved columns (1011).
3. A fabricated building wall structure according to claim 1, wherein: an asphalt waterproof layer (1014) is connected to the inner side of the wall body (101).
4. A fabricated building wall structure according to claim 1, wherein: the first locking piece (201) comprises a frame body (2011), the frame body (2011) is installed on the surface of the wall body (101) and is close to one side of the slot (103), a sliding plate (2012) is installed in an inner cavity of the frame body (2011), return springs (2013) are connected between the bottom of the sliding plate (2012) and the inner wall of the frame body (2011) at equal intervals, one end, far away from the return springs (2013), of the sliding plate (2012) is connected with first limiting rods (2014) at equal intervals, one end, close to the frame body (2011), of the inserting block (102) is provided with first limiting holes (2015) in plug-in fit with the first limiting rods (2014) at equal intervals, sliding pieces (2016) are arranged on two sides of the sliding plate (2012), and one end, close to the return springs (2013), of the sliding plate (2012) is connected with pull rods (2017).
5. The fabricated building wall structure according to claim 4, wherein: one end of the pull rod (2017) far away from the sliding plate (2012) extends out of the frame body (2011) and is provided with a pull plate (20171).
6. The fabricated building wall structure according to claim 4, wherein: the sliding piece (2016) comprises a pulley (20161), the pulley (20161) is rotatably arranged on two sides of the sliding plate (2012), sliding grooves (20162) are formed in two sides of an inner cavity of the frame body (2011), and the pulley (20161) is in rolling connection with the sliding grooves (20162).
7. The fabricated building wall structure according to claim 4, wherein: the second locking piece (202) comprises a mounting groove (2021), the top of draw-in groove (105) is installed in mounting groove (2021), both sides of mounting groove (2021) inner chamber all are connected with dead lever (2022), the outer wall of dead lever (2022) is overlapped respectively and is equipped with positioning spring (2023) and sliding sleeve (2024), positioning spring (2023) are located between the top of sliding sleeve (2024) and the interior roof of support body (2011), be connected with fly leaf (2025) between sliding sleeve (2024), the surface connection of fly leaf (2025) has driving lever (2026), the equidistant second gag lever post (2027) that is connected with in bottom of fly leaf (2025), the top equidistant second spacing hole (2028) of pegging graft complex with second gag lever post (2027) of fixture block (104) have been seted up.
8. A fabricated building wall structure according to claim 7, wherein: one end of the deflector rod (2026) far away from the movable plate (2025) extends out of the wall body (101), a preformed hole (1013) is formed in the surface of the wall body (101), and the diameter of the preformed hole (1013) is larger than that of the deflector rod (2026).
CN202321491850.7U 2023-06-13 2023-06-13 Assembled building wall structure Active CN220247273U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321491850.7U CN220247273U (en) 2023-06-13 2023-06-13 Assembled building wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321491850.7U CN220247273U (en) 2023-06-13 2023-06-13 Assembled building wall structure

Publications (1)

Publication Number Publication Date
CN220247273U true CN220247273U (en) 2023-12-26

Family

ID=89262710

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321491850.7U Active CN220247273U (en) 2023-06-13 2023-06-13 Assembled building wall structure

Country Status (1)

Country Link
CN (1) CN220247273U (en)

Similar Documents

Publication Publication Date Title
CN111287219B (en) Prefabricated assembled cable working well and construction method thereof
CN214462060U (en) Green assembled wallboard subassembly for building
CN220247273U (en) Assembled building wall structure
CN215211764U (en) Decorate curtain mounting structure
CN112081310B (en) Inverted flat roof composite waterproof and heat-insulating structure and construction method thereof
CN216441686U (en) Punching equipment for processing fireproof door
CN214423665U (en) Prefabricated wallboard of assembled for basic station
CN112963022B (en) Energy-saving house main body structure, wall body structure and integral construction method thereof
CN115538648A (en) Assembly type structure for building and use method
CN214329415U (en) Unit type super-large scale indoor assembly type decorative wall
CN213508947U (en) Embedded part for electromechanical pipeline bracket installation based on BIM
CN114753373A (en) Construction method of water-stopping enclosure structure of soft soil foundation building foundation pit
CN113550523A (en) Assembled ceramic tile wall surface and construction method thereof
CN210342337U (en) Assembled wall body
CN215166589U (en) Connecting device for assembly type building structure
CN219605003U (en) Outdoor sunshade awning tent
CN214498007U (en) Interlayer unit curtain wall structure
CN214941304U (en) Building envelope economizer system and building roof
CN220469529U (en) Tarpaulin with spliced extension structure
CN220814355U (en) Adjustable construction prefabricated wallboard
CN220377298U (en) Foundation pit soil retaining structure
CN114737728B (en) Building structure of large-area air duct well of factory building
CN217027017U (en) A precast tubular pile for soft soil foundation handles
CN211850335U (en) Assembly type building component structure based on BIM
CN218513001U (en) A placer for attaching to lift scaffold lease