CN220238135U - Novel dust fall device - Google Patents

Novel dust fall device Download PDF

Info

Publication number
CN220238135U
CN220238135U CN202321409990.5U CN202321409990U CN220238135U CN 220238135 U CN220238135 U CN 220238135U CN 202321409990 U CN202321409990 U CN 202321409990U CN 220238135 U CN220238135 U CN 220238135U
Authority
CN
China
Prior art keywords
dust
pipe
dust fall
plate
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321409990.5U
Other languages
Chinese (zh)
Inventor
王赫文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321409990.5U priority Critical patent/CN220238135U/en
Application granted granted Critical
Publication of CN220238135U publication Critical patent/CN220238135U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Nozzles (AREA)

Abstract

The utility model discloses a novel dust falling device, which comprises: the dust settling pipes are multiple in number, two ends of the dust settling pipes are communicated through water delivery pipes, and control valves are arranged at two ends of the water delivery pipes; the first atomization spray nozzle component is arranged at the lower part of the top end of the dust fall pipe; the second atomization spray nozzle assemblies are arranged on the inner sides of the lower parts of the two ends of the dust fall pipe; and the drainage groove is arranged at the middle part below the dust fall pipe. According to the novel dust settling device, the water pipe, the dust settling pipe, the first atomization spray head assembly, the second atomization spray head assembly, the drainage groove and the control valve are designed in a structural fit mode, so that the device can meet the basic dust settling effect, meanwhile, the second atomization spray head assembly can flush the ground, sewage on the ground can flush the inside of the drainage groove, sewage is drained through the drainage groove, and the ground is kept clean; the device has fewer pipelines, and can reduce dust and keep the ground clean.

Description

Novel dust fall device
Technical Field
The utility model relates to the technical field of dust fall, in particular to a novel dust fall device.
Background
Because the dust of the concrete raw material bin flies upward, particularly when engineering vehicles such as earthmoving vehicles pass through the raw material bin, the dust is increased, serious environmental pollution is easy to cause, great harm is caused to human health, and even safety accidents can be caused.
Spray dust suppression systems are disclosed in chinese patent (CN 209556383U), in which: "through setting up annular spraying dish downwards on horizontal push pipe, annular spraying dish is radial connection rice font water pipe of annular water pipe, and the water inlet is at rice font water pipe center, is equipped with vertical shower head on the annular spraying dish, makes the shower head in the certain limit concentrate in same part, has solved with high costs and has maintained and overhaul extremely inconvenient problem", has still recorded: the spray heads are arranged in a scattered way, so that the spray head has the technical problems of high cost and extremely inconvenient maintenance and overhaul.
In summary, the following technical problems exist in the prior art: the pipeline is various complicacy, and the shower head disperses the setting, and is with high costs and maintenance extremely inconvenient, and for this reason, this application provides a novel dust fall device, for solving the technical problem mentioned in above-mentioned patent, provides a new technical scheme.
Disclosure of Invention
Based on the above, it is necessary to provide a novel dust settling device, which is designed by matching the structures of a water pipe, a dust settling pipe, a first atomizer assembly, a second atomizer assembly, a drainage groove and a control valve, so that the device can meet the basic dust settling effect, and meanwhile, the second atomizer assembly can flush the ground, so that the sewage on the ground is flushed into the drainage groove, and the sewage is drained through the drainage groove, so that the ground is kept clean; and the device has fewer pipelines, can keep the cleaning of the ground while reducing dust, and is simple and convenient to maintain.
In order to solve the technical problems, the utility model adopts the following technical scheme:
a novel dust fall device is applied to construction dust fall.
The novel dust device specifically comprises:
the dust settling pipes are multiple in number, two ends of the dust settling pipes are communicated through water conveying pipes, and control valves are arranged at two ends of the water conveying pipes;
the first atomization spray nozzle component is arranged at the lower part of the top end of the dust fall pipe;
the second atomization spray nozzle assemblies are arranged on the inner sides of the lower parts of the two ends of the dust fall pipe;
the drainage groove is arranged at the position of the middle part below the dust fall pipe;
the support frame group is arranged at the positions of the two ends of the dust fall pipe.
As a preferred embodiment of the novel dust settling device provided by the utility model, the second atomization spray nozzle assembly comprises an atomization spray nozzle and a high-pressure spray nozzle, wherein the high-pressure spray nozzle is positioned at the position of the lowest end, and the output end of the high-pressure spray nozzle faces the ground.
As a preferred embodiment of the novel dust settling device provided by the utility model, the support frame group comprises a support plate and a protection plate, the support plate is positioned at the inner side of the end part of the dust settling pipe, the lower end of the support plate is provided with a through groove I, the second atomization spray nozzle component extends to the outside of one side of the support plate far away from the dust settling pipe through the through groove I, the protection plate is positioned at the outer side of the end part of the dust settling pipe, a buckling groove is formed in one side of the protection plate close to the dust settling pipe, the end part of the dust settling pipe is positioned in the buckling groove, the protection plate is connected with the dust settling pipe in a buckling manner through the buckling groove, the bottom of the protection plate is provided with a through groove II, the through groove II is communicated with the bottom of the buckling groove, and the water pipe is positioned in the through groove II.
As an optimal implementation mode of the novel dust falling device provided by the utility model, a protection pad is fixed in the buckling groove, and the dust falling pipe is positioned at the inner side of the protection pad.
As a preferred implementation mode of the novel dust fall device provided by the utility model, the support frame group further comprises a triangular stabilizing frame, wherein a connecting plate is fixed at the upper end of the triangular stabilizing frame, and two ends of the connecting plate are fixedly connected with the support plate and the protection plate through screws respectively; the lower extreme of triangle steady rest is fixed with the right angle plate, the both ends of right angle plate pass through screw fixed connection in backup pad and guard plate respectively.
As a preferred implementation mode of the novel dust fall device provided by the utility model, the bottom of the triangular stabilizing frame is provided with the protection base, the bottom end of the rectangular plate is fixedly connected with the protection base through screws, the bottom of the protection base is provided with the through groove III, and the water pipe is positioned in the through groove III.
Compared with the prior art, the utility model has the following beneficial effects:
according to the novel dust settling device, the water pipe, the dust settling pipe, the first atomization spray head assembly, the second atomization spray head assembly, the drainage groove and the control valve are matched in structure, so that the device can meet the basic dust settling effect, meanwhile, the second atomization spray head assembly can flush the ground, sewage on the ground is flushed into the drainage groove, and the sewage is drained through the drainage groove, so that the ground is kept clean; and the device has fewer pipelines, can keep the cleaning of the ground while reducing dust, and is simple and convenient to maintain.
According to the novel dust falling device, the dust falling pipe can be supported through the structural design of the support frame group, the end part of the dust falling pipe and the part of the water conveying pipe can be effectively protected, the practical service life of the device is effectively prolonged, and the support frame group can be detached and reused through the connection structural design of the support frame group.
Drawings
In order to more clearly illustrate the solution of the present utility model, a brief description will be given below of the drawings required for the description of the embodiments, it being obvious that the drawings in the following description are some embodiments of the present utility model, and that other drawings may be obtained from these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of the overall structure of the novel dust-settling device provided by the utility model;
FIG. 2 is a schematic structural view of a water pipe, a dust fall pipe, a first atomizer assembly and a second atomizer assembly of the novel dust fall device;
FIG. 3 is a schematic structural view of a novel dust-settling device support frame set provided by the utility model;
FIG. 4 is a schematic structural view of a support plate and a protection plate of the novel dust settling device provided by the utility model;
FIG. 5 is a schematic diagram of a first through slot and a second through slot of the novel dust settling device;
FIG. 6 is a top view of the structure of the support plate and the protection plate of the novel dust fall device provided by the utility model;
FIG. 7 is a schematic diagram of the structure of the novel dust settling device triangular stabilizer provided by the utility model;
FIG. 8 is a schematic diagram of the top of the triangular stabilizer of the novel dust-settling device;
FIG. 9 is a schematic diagram of the bottom of the triangular stabilizer of the novel dust settling device.
The labels in the figures are illustrated below:
1. a water pipe; 2. a dust fall pipe; 3. a first atomizer assembly; 4. a second atomizer assembly; 5. drainage grooves; 6. a control valve; 7. a support frame group; 8. a support plate; 9. a protection plate; 10. a triangular stabilizing frame; 11. a first through groove; 12. a buckling groove; 13. a second through groove; 14. a protective base; 15. a connecting plate; 16. a right angle plate; 17. a third through groove; 18. and a protective pad.
Detailed Description
In order that those skilled in the art will better understand the present utility model, a technical solution in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in which it is apparent that the described embodiments are only some embodiments of the present utility model, not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the present utility model without making any inventive effort, shall fall within the scope of the present utility model.
As described in the background art, the pipelines are complex, the spray heads are arranged in a scattered manner, the cost is high, and the maintenance and overhaul are extremely inconvenient.
In order to solve the technical problem, the utility model provides a novel dust falling device which is applied to construction dust falling.
Specifically, referring to fig. 1 to 3, the novel dust suppression device specifically includes:
the dust settling pipes 2 are multiple in number, two ends of the dust settling pipes 2 are communicated through a water pipe 1, and control valves 6 are arranged at two ends of the water pipe 1;
a first atomizer assembly 3 disposed at a lower portion of the top end of the dust fall pipe 2;
a second atomizer assembly 4 arranged on the inner side of the lower part of the two ends of the dust fall pipe 2;
a drainage groove 5 arranged at the position of the middle part below the dust fall pipe 2;
and a supporting frame group 7 which is arranged at the two ends of the dust fall pipe 2.
According to the novel dust settling device provided by the utility model, the structure of the water pipe 1, the dust settling pipe 2, the first atomization spray head assembly 3, the second atomization spray head assembly 4, the drainage groove 5 and the control valve 6 is matched, so that the device can meet the basic dust settling effect, and meanwhile, the second atomization spray head assembly 4 can flush the ground, so that the sewage on the ground is flushed into the drainage groove 5, and the sewage is drained through the drainage groove 5, so that the ground is kept clean; and the device has fewer pipelines, can keep the cleaning of the ground while reducing dust, and is simple and convenient to maintain.
In order to make the person skilled in the art better understand the solution of the present utility model, the technical solution of the embodiment of the present utility model will be clearly and completely described below with reference to the accompanying drawings.
Example 1:
referring to fig. 1-6, a novel dust settling device includes:
the dust settling pipes 2 are multiple in number, two ends of the dust settling pipes 2 are communicated through a water pipe 1, and control valves 6 are arranged at two ends of the water pipe 1; the water pipe 1 is connected with an external water source, so that the external water source can be introduced into the dust fall pipes 2, and the opening and closing of the water pipe 1 can be conveniently controlled through the control valve 6.
A first atomizer assembly 3 disposed at a lower portion of the top end of the dust fall pipe 2 for dust fall;
the second atomization spray nozzle component 4 is arranged on the inner side of the lower parts of the two ends of the dust fall pipe 2 and is used for dust fall and ground flushing and keeping the ground clean; specifically, the second atomizer assembly 4 includes atomizer and high-pressure nozzle, and high-pressure nozzle is located the position department of lower extreme, and high-pressure nozzle's output is towards ground, realizes the scouring effect to ground through high-pressure nozzle.
The drainage groove 5 is arranged at the position of the middle part below the dust fall pipe 2 and is used for receiving the sewage flushed by the second atomizing nozzle assembly 4 and guiding the sewage;
and the supporting frame groups 7 are arranged at the two end positions of the dust fall pipe 2 and are used for supporting and protecting the dust fall pipe 2. Specifically, support frame group 7 includes backup pad 8 and guard plate 9, backup pad 8 is located the inboard of dust fall pipe 2 tip, logical groove one 11 has been seted up to the lower extreme of backup pad 8, second atomizer subassembly 4 extends to the backup pad 8 outside of one side of keeping away from dust fall pipe 2 through logical groove one 11, guard plate 9 is located the outside of dust fall pipe 2 tip, buckle groove 12 has been seted up to one side that guard plate 9 is close to dust fall pipe 2, the tip of dust fall pipe 2 is located buckle groove 12 inside, guard plate 9 passes through buckle groove 12 and is connected with dust fall pipe 2 lock, logical groove two 13 has been seted up to the bottom of guard plate 9, logical groove two 13 is linked together with the bottom of buckle groove 12, raceway 1 is located logical groove two 13 inside. Wherein, in order to reduce the abrasion of the protection plate 9 to the dust fall pipe 2 and further protect the dust fall pipe 2, a protection pad 18 is fixed in the buckling groove 12, and the dust fall pipe 2 is positioned at the inner side of the protection pad 18.
It can be seen that, when in use, an external water source is led to the inside of the dust fall pipe 2 through the water pipe 1, and the water in the dust fall pipe 2 is led out and atomized through the first atomizing nozzle assembly 3 and the second atomizing nozzle assembly 4, so that dust is reduced to the surrounding space through the atomized water, and sewage generated by dust reduction on the ground is flushed through the high-pressure nozzle in the second atomizing nozzle assembly 4, so that the sewage is flushed into the drainage groove 5, and the sewage can be drained through the drainage groove 5.
When the support frame group 7 is installed, the support plate 8 is attached to the inner side of the dust fall pipe 2, the bottom of the support plate 8 is fixed to the ground, and protection and support of the end part of the dust fall pipe 2 are achieved through the buckling of the protection plate 9 and the dust fall pipe 2.
Example 2:
the novel dust settling device provided in the embodiment 1 is further optimized, specifically, as shown in fig. 7-9, the supporting frame set 7 further comprises a triangular stabilizer 10, a connecting plate 15 is fixed at the upper end of the triangular stabilizer 10, and two ends of the connecting plate 15 are fixedly connected with the supporting plate 8 and the protection plate 9 through screws respectively; the lower extreme of triangle stabilizing frame 10 is fixed with right angle plate 16, and the both ends of right angle plate 16 pass through screw fixed connection in backup pad 8 and guard plate 9 respectively, and the bottom of triangle stabilizing frame 10 is provided with protection base 14, and the bottom of right angle plate 16 passes through screw fixed connection with protection base 14, and protection base 14's bottom begins to have logical groove III 17, and raceway 1 is located logical inslot III 17.
It can be known that the top and the bottom of the triangular stabilizer 10 are respectively fixed with the supporting plate 8 and the protecting plate 9, so that the triangular stabilizer 10 can support the supporting plate 8 and the protecting plate 9 and simultaneously play a role in fixing the supporting plate 8 and the protecting plate 9, and the protecting base 14 can protect the joint of the water pipe 1 and the dust fall pipe 2; through the structural design of support frame group 7, can support dust fall pipe 2, and can carry out effectual protection to dust fall pipe 2 tip and raceway 1 part position, ensure effectively that the practical life of device has been promoted to through the connection structural design of support frame group 7, make support frame group 7 can demolish reuse.

Claims (6)

1. Novel dust fall device, characterized by comprising:
the dust settling pipes (2) are multiple in number, two ends of the dust settling pipes (2) are communicated through a water pipe (1), and control valves (6) are arranged at two ends of the water pipe (1);
a first atomizer assembly (3) arranged at the lower part of the top end of the dust fall pipe (2);
the second atomization spray nozzle assemblies (4) are arranged on the inner sides of the lower parts of the two ends of the dust fall pipe (2);
the drainage groove (5) is arranged at the position of the middle part below the dust fall pipe (2);
and the supporting frame groups (7) are arranged at the two ends of the dust fall pipe (2).
2. The novel dust suppression device according to claim 1, characterized in that the second atomizer assembly (4) comprises an atomizer and a high pressure nozzle, the high pressure nozzle being located at the lowest position, the output of the high pressure nozzle being directed towards the ground.
3. The novel dust device according to claim 1, wherein the support frame group (7) comprises a support plate (8) and a protection plate (9), the support plate (8) is located the inboard of dust fall pipe (2) tip, logical groove one (11) has been seted up to the lower extreme of support plate (8), second atomizer subassembly (4) extend to one side outside that dust fall pipe (2) was kept away from to support plate (8) through logical groove one (11), protection plate (9) are located the outside of dust fall pipe (2) tip, the catching groove (12) has been seted up to one side that dust fall pipe (2) was close to protection plate (9), the tip of dust fall pipe (2) is located inside catching groove (12), logical groove two (13) have been seted up to the bottom of protection plate (9) with the bottom of catching groove (12), water pipe (1) are located logical groove two (13) inside.
4. A novel dust device according to claim 3, characterized in that a protective pad (18) is fixed inside the buckling groove (12), and the dust falling pipe (2) is positioned inside the protective pad (18).
5. The novel dust fall device according to claim 1, wherein the support frame group (7) further comprises a triangular stabilizer (10), a connecting plate (15) is fixed at the upper end of the triangular stabilizer (10), and two ends of the connecting plate (15) are fixedly connected with the supporting plate (8) and the protecting plate (9) through screws respectively; the lower end of the triangular stabilizing frame (10) is fixedly provided with a right angle plate (16), and two ends of the right angle plate (16) are fixedly connected with the supporting plate (8) and the protecting plate (9) through screws respectively.
6. The novel dust device according to claim 5, wherein a protection base (14) is arranged at the bottom of the triangular stabilizer (10), the bottom end of the right angle plate (16) is fixedly connected with the protection base (14) through a screw, a through groove III (17) is formed at the bottom of the protection base (14), and the water pipe (1) is positioned in the through groove III (17).
CN202321409990.5U 2023-06-05 2023-06-05 Novel dust fall device Active CN220238135U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321409990.5U CN220238135U (en) 2023-06-05 2023-06-05 Novel dust fall device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321409990.5U CN220238135U (en) 2023-06-05 2023-06-05 Novel dust fall device

Publications (1)

Publication Number Publication Date
CN220238135U true CN220238135U (en) 2023-12-26

Family

ID=89229076

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321409990.5U Active CN220238135U (en) 2023-06-05 2023-06-05 Novel dust fall device

Country Status (1)

Country Link
CN (1) CN220238135U (en)

Similar Documents

Publication Publication Date Title
CN220238135U (en) Novel dust fall device
KR20210058359A (en) Road stud with liquid spraing apparatus
CN114570142B (en) Energy-saving type dust removing device and dust removing method for building engineering
CN209973557U (en) Belt wet dust collector
CN211922472U (en) Large-scale subway station foundation ditch construction sprays dust device
CN208816091U (en) A kind of shock-absorbing support pulley bracket for oil drill rocker internal washing spray head
CN221310999U (en) Ore crushing equipment
CN207454016U (en) A kind of mine dedusting device for reducing dust
CN220521200U (en) Dust-reducing and dust-reducing watering cart
CN216194386U (en) Environment-friendly watering device for municipal works
CN112554882A (en) Spraying dust-settling device for excavating machinery
CN112640765A (en) All-round sprinkling irrigation equipment for hydraulic engineering
CN213790179U (en) Valve with filter
CN211210863U (en) Environment-friendly watering device
CN2208665Y (en) Water-jet dust remover
CN219663254U (en) Spraying dust suppression device for scrap steel loading and unloading vehicle
CN221703394U (en) A enclose fender for dust fall
CN221255286U (en) Road construction reflection of light awl with dust fall effect
CN206376592U (en) A kind of theme park arc pool with fountain
CN212492109U (en) Dust fall flow tube for building construction
CN217190247U (en) Dustproof anti-blocking atomizing nozzle
CN219003320U (en) Ore crushing line dust pelletizing system
CN219637791U (en) Highway construction cement roadbed maintenance device
CN212039595U (en) Water jet equipment is used to building decoration
KR200176335Y1 (en) Water purifier of shower

Legal Events