CN220168741U - Underground pipeline laying device - Google Patents
Underground pipeline laying device Download PDFInfo
- Publication number
- CN220168741U CN220168741U CN202321657002.9U CN202321657002U CN220168741U CN 220168741 U CN220168741 U CN 220168741U CN 202321657002 U CN202321657002 U CN 202321657002U CN 220168741 U CN220168741 U CN 220168741U
- Authority
- CN
- China
- Prior art keywords
- limiting
- fixedly connected
- plate
- threaded rod
- sides
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Sewage (AREA)
Abstract
Description
技术领域Technical field
本实用新型涉及管道铺设领域,尤其涉及一种地下管道铺设装置。The utility model relates to the field of pipeline laying, and in particular to an underground pipeline laying device.
背景技术Background technique
地下管道是敷设在地下用于输送液体、气体或松散固体的管道,管道线路工程是用管子、管件、阀门等连接管道起点站、中间站和终点站,构成管道运输线路的工程。是管道工程的主体部分,现代的地下管道种类繁多,有圆形、椭圆形、半椭圆形等各种断面形式,采用钢、铸铁、混凝土、钢筋混凝土、预应力混凝土、砖、石、石棉水泥、陶土等材料建造,在对地下管道进行铺设安装时,需要用到管道铺设装置。Underground pipelines are pipelines laid underground for transporting liquids, gases or loose solids. Pipeline engineering is a project that uses pipes, pipe fittings, valves, etc. to connect the starting station, intermediate station and terminal station of the pipeline to form a pipeline transportation line. It is the main part of the pipeline project. There are many types of modern underground pipelines, including circular, oval, semi-oval and other cross-section forms. They are made of steel, cast iron, concrete, reinforced concrete, prestressed concrete, brick, stone, asbestos cement It is constructed of materials such as clay and clay. When laying and installing underground pipelines, a pipeline laying device is required.
中国专利申请号为CN202222280047.0的实用新型公开了一种管道铺设装置,该实用新型,通过将底板倾斜,拉动两根抵紧杆,将管道放置在两个抵紧杆之间,驱动抵紧杆运动,抵紧杆抵紧在管道外壁上,向上滑动夹紧杆,通过安装孔和夹杆的作用,抵紧杆始终抵紧在管道外壁上,通过这样的设置,结构简单,操作方便,方便了操作者在大型吊装设备无法使用的情况下对管道进行吊装搬运。The utility model with Chinese patent application number CN202222280047.0 discloses a pipe laying device. This utility model tilts the bottom plate and pulls two compression rods to place the pipe between the two compression rods and drive the compression When the rod moves, the resisting rod is pressed against the outer wall of the pipe, and the clamping rod is slid upward. Through the action of the mounting hole and the clamping rod, the resisting rod is always pressed against the outer wall of the pipe. With this arrangement, the structure is simple and the operation is convenient. It facilitates operators to hoist and transport pipelines when large hoisting equipment cannot be used.
但是在实际使用时,现有的铺设装置大多采用人工吊装将管道吊起并移动到管道铺设的沟渠内部,然后人工调节管道位置并进行连接,完成铺设,但是在铺设过程中通过人工对管道进行吊装连接,耗时耗力,效率低,且容易产生连接倾斜,从而影响连接的使用效果。However, in actual use, most of the existing laying devices use manual hoisting to lift and move the pipes to the trench where the pipes are laid, and then manually adjust the position of the pipes and connect them to complete the laying. However, during the laying process, the pipes are manually Hoisting connections are time-consuming, labor-intensive, inefficient, and prone to tilting of the connections, which affects the use of the connections.
实用新型内容Utility model content
本实用新型所要解决的技术问题是克服现有技术中存在的不足,提供一种地下管道铺设装置。The technical problem to be solved by this utility model is to overcome the deficiencies existing in the prior art and provide an underground pipeline laying device.
本实用新型是通过以下技术方案予以实现:The utility model is realized through the following technical solutions:
一种地下管道铺设装置,包括支撑板,所述支撑板的顶部固定连接有支撑架,所述支撑架的中部设置有升降板,所述支撑架的顶部固定连接有第一电动推杆,所述升降板的底部开设有第一限位滑槽,所述第一限位滑槽的中部设置有限位滑板,所述限位滑板的底部两侧和支撑板的底部一侧均固定连接有固定条,所述固定条的底部设置有夹持机构。An underground pipeline laying device includes a support plate, a support frame is fixedly connected to the top of the support plate, a lifting plate is provided in the middle of the support frame, and a first electric push rod is fixedly connected to the top of the support frame, so A first limit chute is provided at the bottom of the lifting plate, and a limit slide plate is provided in the middle of the first limit chute. Both sides of the bottom of the limit slide plate and one side of the bottom of the support plate are fixedly connected with fixed strip, and a clamping mechanism is provided at the bottom of the fixed strip.
可以看出,上述技术方案中,通过支撑架对升降板进行支撑,并通过启动第一电动推杆可以控制升降板在支撑架的中部上下移动,方便将管道送入沟渠内部,方便铺设,提高使用效果。It can be seen that in the above technical solution, the lifting plate is supported by the supporting frame, and the lifting plate can be controlled to move up and down in the middle part of the supporting frame by activating the first electric push rod, which facilitates the delivery of the pipe into the ditch, facilitates laying, and improves Effect.
所述支撑板的底部一侧设置有移动支撑板,所述移动支撑板远离固定条的一侧设置有第二电动推杆,所述支撑板的顶部四周固定连接有液压推杆,所述液压推杆的输出端贯穿支撑板并固定连接有滚轮,所述支撑板的顶部一侧设置有控制箱,所述支撑板的顶部位于移动支撑板的一侧设置有多个滚球。A movable support plate is provided on one side of the bottom of the support plate, and a second electric push rod is provided on the side of the movable support plate away from the fixed strip. A hydraulic push rod is fixedly connected around the top of the support plate. The hydraulic push rod The output end of the push rod penetrates the support plate and is fixedly connected with a roller. A control box is provided on the top side of the support plate. A plurality of rolling balls are provided on the top side of the support plate on the side of the moving support plate.
可以看出,上述技术方案中,可以通过启动第二电动推杆控制移动支撑板移动到升降板的底部,使管道从支撑板的顶部移动到升降板的正下方时,可以对管道进行支撑,提高使用效果,并通过启动液压推杆控制滚轮向下移动,方便通过滚轮低于夹板的底端壁体,方便对支撑板进行移动,提高使用效果,并通过设置的滚球,可以避免管道与支撑板的壁体产生摩擦,方便对管道进行移动。It can be seen that in the above technical solution, the movable support plate can be controlled to move to the bottom of the lifting plate by activating the second electric push rod, so that when the pipe moves from the top of the support plate to directly below the lifting plate, the pipe can be supported. Improve the use effect, and control the downward movement of the roller by starting the hydraulic push rod, so that the roller can be lower than the bottom wall of the splint to facilitate the movement of the support plate, improve the use effect, and through the set of rolling balls, you can avoid the pipe and the The wall of the support plate creates friction to facilitate movement of the pipe.
可选的,所述升降板的两侧对称固定连接有第一限位滑块,所述支撑架的内腔两侧与第一限位滑块相对应的位置开设有第二限位滑槽所述第一限位滑块设置在第二限位滑槽的内部。Optionally, first limit slide blocks are symmetrically and fixedly connected to both sides of the lifting plate, and second limit slide grooves are provided on both sides of the inner cavity of the support frame at positions corresponding to the first limit slide blocks. The first limiting slide block is arranged inside the second limiting slide groove.
可以看出,上述技术方案中,以便于通过设置的第一限位滑块和第二限位滑槽可以对升降板的上下移动进行限位,从而提高升降板上下移动的稳定性。It can be seen that in the above technical solution, the up and down movement of the lifting plate can be limited by the first limiting slide block and the second limiting chute, thereby improving the stability of the up and down movement of the lifting plate.
可选的,所述升降板的顶部两侧对称固定连接有固定杆,所述固定杆的顶端贯穿支撑架的顶部壁体并固定连接有限位圆盘。Optionally, fixed rods are symmetrically and fixedly connected to both sides of the top of the lifting plate. The top end of the fixed rod penetrates the top wall of the support frame and is fixedly connected to the limiting disk.
可以看出,上述技术方案中,通过设置的固定杆,可以进一步提高升降板上下移动的稳定性,对升降板的移动进行限位,提高使用效果。It can be seen that in the above technical solution, through the fixed rod provided, the stability of the up and down movement of the lifting plate can be further improved, the movement of the lifting plate is limited, and the use effect is improved.
可选的,所述第一限位滑槽的中部设置有第一螺纹杆,所述第一螺纹杆的两侧对称设置有稳定杆,所述第一螺纹杆的一端连接有第一电机,所述稳定杆和第一螺纹杆均贯穿限位滑板的中部。Optionally, a first threaded rod is provided in the middle of the first limiting chute, stabilizing rods are provided symmetrically on both sides of the first threaded rod, and a first motor is connected to one end of the first threaded rod. The stabilizer rod and the first threaded rod both pass through the middle of the limiting slide plate.
可以看出,上述技术方案中,通过启动第一电机控制第一螺纹杆转动,可以控制限位滑板在第一限位滑槽的内部滑动,从而将移动到沟渠内部的管道水平移动,从而将两个管道进行连接,提高使用效果,并通过设置的稳定杆,可以提高限位滑板移动的稳定性,提高使用效果。It can be seen that in the above technical solution, by starting the first motor to control the rotation of the first threaded rod, the limit slide can be controlled to slide inside the first limit chute, thereby moving the pipe moved inside the ditch horizontally, thereby moving the pipe horizontally. The two pipes are connected to improve the use effect, and through the set stabilizer bar, the stability of the limit slide movement can be improved and the use effect is improved.
可选的,所述移动支撑板的顶部两侧对称固定连接有限位滑条,所述支撑板的底部与限位滑条相对应的位置开设有第三限位滑槽,所述限位滑条的截面形状设置为“T”形,所述第三限位滑槽与限位滑条相适配,所述限位滑条设置在第三限位滑槽的内部。Optionally, the top of the mobile support plate is symmetrically and fixedly connected with limit slide bars on both sides, and a third limit chute is provided at the bottom of the support plate corresponding to the limit slide bar. The cross-sectional shape of the strip is set to a "T" shape, the third limiting slide groove is adapted to the limiting slide bar, and the limiting slide bar is arranged inside the third limiting slide groove.
可以看出,上述技术方案中,通过设置的限位滑条在第三限位滑槽的内部滑动,可以提高移动支撑板水平移动的稳定性同时可以使移动支撑板与支撑板的底部壁体始终贴合,从而提高移动支撑板对管道支撑的稳定性,提高使用效果。It can be seen that in the above technical solution, by sliding the limit slide bar inside the third limit chute, the stability of the horizontal movement of the movable support plate can be improved and the bottom wall of the movable support plate and the support plate can be aligned Always fit, thereby improving the stability of the pipe support provided by the mobile support plate and improving the use effect.
可选的,所述夹持机构包括开设在固定条底部的限位槽,所述限位槽的中部设置有第二螺纹杆,所述第二螺纹杆的一端连接有第二电机,所述限位槽的内腔两侧对称设置有第二限位滑块,所述第二螺纹杆贯穿第二限位滑块的中部并与第二限位滑块的壁体螺纹连接,所述第二螺纹杆的两端螺纹相对称,所述第二限位滑块的底部固定连接有夹板。Optionally, the clamping mechanism includes a limiting groove opened at the bottom of the fixing bar, a second threaded rod is provided in the middle of the limiting groove, and a second motor is connected to one end of the second threaded rod. Second limit slide blocks are symmetrically arranged on both sides of the inner cavity of the limit groove. The second threaded rod penetrates through the middle of the second limit slide block and is threadedly connected to the wall of the second limit slide block. The threads at both ends of the two threaded rods are symmetrical, and a splint is fixedly connected to the bottom of the second limiting slide block.
可以看出,上述技术方案中,通过启动第二电机控制第二螺纹杆转动,可以控制第二限位滑块在限位槽的内部移动,从而可以控制两个夹板向相对的一侧移动,从而通过夹板对管道进行夹持固定,提高使用效果。It can be seen that in the above technical solution, by starting the second motor to control the rotation of the second threaded rod, the second limit slider can be controlled to move inside the limit groove, thereby controlling the two clamping plates to move to the opposite side. In this way, the pipe is clamped and fixed through the splint to improve the use effect.
本实用新型的有益效果是:The beneficial effects of this utility model are:
(1)通过设置的夹持机构可以对沟渠内部的管道一端和需要铺设的管道进行夹持固定,方便对管道进行铺设连接,并提高连接的稳定性,同时通过启动第一电动推杆和第一电机可以控制升降板带动升降板底部的夹持机构上下移动和水平移动,方便对管道进行铺设和连接,提高工作效率;(1) The clamping mechanism can be used to clamp and fix one end of the pipe inside the trench and the pipe to be laid, which facilitates the laying and connection of the pipes and improves the stability of the connection. At the same time, by starting the first electric push rod and the third A motor can control the lifting plate to drive the clamping mechanism at the bottom of the lifting plate to move up and down and horizontally, which facilitates the laying and connection of pipelines and improves work efficiency;
(2)通过启动第二电动推杆控制移动支撑板移动,可以对升降板的底部开口进行封堵,从而方便将支撑板顶部一侧的管道移动到升降板的正下方,方便对管道进行移动铺设,提高使用效果,并通过设置的限位滑条和第三限位滑槽的配合,可以提高移动支撑板移动的稳定性;(2) By activating the second electric push rod to control the movement of the movable support plate, the bottom opening of the lifting plate can be blocked, thereby facilitating the movement of the pipe on the top side of the support plate to directly below the lifting plate, making it easier to move the pipe laying, improve the use effect, and through the cooperation of the set limit slide bar and the third limit chute, the stability of the movement of the mobile support plate can be improved;
(3)通过设置的第一限位滑块和第二限位滑槽的配合,可以提高升降板上下移动的稳定性,并通过设置的固定杆可以进一步提高升降板上下移动的稳定性,并通过设置的稳定杆可以提高限位滑板在第一限位滑槽内部移动的稳定性,提高使用效果。(3) Through the cooperation of the first limit slide block and the second limit chute, the stability of the up and down movement of the lifting plate can be improved, and the stability of the up and down movement of the lifting plate can be further improved through the set fixed rod, and The provided stabilizing bar can improve the stability of the limit slide plate moving inside the first limit chute and improve the use effect.
附图说明Description of drawings
图1是本实用新型的主视结构示意图;Figure 1 is a schematic view of the front structure of the utility model;
图2是本实用新型图1中A处的局部放大结构示意图;Figure 2 is a partial enlarged structural diagram of position A in Figure 1 of the utility model;
图3是本实用新型支撑架的侧视剖面结构示意图;Figure 3 is a schematic side view of the support frame of the present invention;
图4是本实用新型限位滑板的结构示意图;Figure 4 is a schematic structural diagram of the limit sliding plate of the present invention;
附图标记说明:Explanation of reference symbols:
1、支撑板;2、支撑架;3、升降板;4、第一电动推杆;5、第一限位滑槽;6、限位滑板;7、固定条;8、移动支撑板;9、第二电动推杆;10、液压推杆;11、滚轮;12、控制箱;13、滚球;14、第一限位滑块;15、第二限位滑槽;16、固定杆;17、第一螺纹杆;18、第一电机;19、稳定杆;20、限位滑条;21、第三限位滑槽;22、限位槽;23、第二螺纹杆;24、第二电机;25、第二限位滑块;26、夹板。1. Support plate; 2. Support frame; 3. Lifting plate; 4. First electric push rod; 5. First limit chute; 6. Limit slide plate; 7. Fixed bar; 8. Mobile support plate; 9 , second electric push rod; 10. hydraulic push rod; 11. roller; 12. control box; 13. rolling ball; 14. first limit slider; 15. second limit chute; 16. fixed rod; 17. The first threaded rod; 18. The first motor; 19. Stabilizer rod; 20. Limit slider; 21. The third limit slide; 22. Limiting groove; 23. The second threaded rod; 24. The third Two motors; 25, second limit slide block; 26, splint.
具体实施方式Detailed ways
为了使本技术领域的技术人员更好地理解本实用新型的技术方案,下面结合附图和最佳实施例对本实用新型作进一步的详细说明。基于实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于实用新型保护的范围。In order to enable those skilled in the art to better understand the technical solutions of the present utility model, the present utility model will be further described in detail below in conjunction with the accompanying drawings and best embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of utility model protection.
在实用新型的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对实用新型的限制。In the description of the utility model, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. The indicated orientation or positional relationship is based on the orientation or positional relationship shown in the drawings. It is only for the convenience of describing the utility model and simplifying the description. It does not indicate or imply that the device or component referred to must have a specific orientation or be in a specific orientation. construction and operation, and therefore cannot be construed as limitations on the utility model.
此外,还需要说明的是,在本实用新型的描述中,除非另有明确的规定和限定,术语“安装”、“设置”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是直接相连,也可以通过中间媒介间接相连,还可以是两个元件内部的连通。对于本领域技术人员而言,可根据具体情况理解上述术语在本发明中的具体含义。In addition, it should be noted that in the description of the present utility model, unless otherwise explicitly stipulated and limited, the terms "installation", "setting" and "connection" should be understood in a broad sense. For example, it can be a fixed connection or a fixed connection. It can be a detachable connection or an integral connection; it can be a direct connection, an indirect connection through an intermediate medium, or an internal connection between two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
如图1-4所示,本实用新型提供了一种地下管道铺设装置,包括支撑板1,支撑板1的顶部固定连接有支撑架2,支撑架2的中部设置有升降板3,支撑架2的顶部固定连接有第一电动推杆4,升降板3的底部开设有第一限位滑槽5,第一限位滑槽5的中部设置有限位滑板6,限位滑板6的底部两侧和支撑板1的底部一侧均固定连接有固定条7,固定条7的底部设置有夹持机构,支撑板1的底部一侧设置有移动支撑板8,移动支撑板8远离固定条7的一侧设置有第二电动推杆9,支撑板1的顶部四周固定连接有液压推杆10,液压推杆10的输出端贯穿支撑板1并固定连接有滚轮11,支撑板1的顶部一侧设置有控制箱12,支撑板1的顶部位于移动支撑板8的一侧设置有多个滚球13,升降板3的两侧对称固定连接有第一限位滑块14,支撑架2的内腔两侧与第一限位滑块14相对应的位置开设有第二限位滑槽15第一限位滑块14设置在第二限位滑槽15的内部,升降板3的顶部两侧对称固定连接有固定杆16,固定杆16的顶端贯穿支撑架2的顶部壁体并固定连接有限位圆盘,第一限位滑槽5的中部设置有第一螺纹杆17,第一螺纹杆17的两侧对称设置有稳定杆19,第一螺纹杆17的一端连接有第一电机18,稳定杆19和第一螺纹杆17均贯穿限位滑板6的中部,移动支撑板8的顶部两侧对称固定连接有限位滑条20,支撑板1的底部与限位滑条20相对应的位置开设有第三限位滑槽21,限位滑条20的截面形状设置为“T”形,第三限位滑槽21与限位滑条20相适配,限位滑条20设置在第三限位滑槽21的内部,夹持机构包括开设在固定条7底部的限位槽22,限位槽22的中部设置有第二螺纹杆23,第二螺纹杆23的一端连接有第二电机24,限位槽22的内腔两侧对称设置有第二限位滑块25,第二螺纹杆23贯穿第二限位滑块25的中部并与第二限位滑块25的壁体螺纹连接,第二螺纹杆23的两端螺纹相对称,第二限位滑块25的底部固定连接有夹板26。As shown in Figures 1-4, the utility model provides an underground pipeline laying device, which includes a support plate 1. The top of the support plate 1 is fixedly connected with a support frame 2. The middle part of the support frame 2 is provided with a lifting plate 3. The support frame The top of 2 is fixedly connected with the first electric push rod 4. The bottom of the lifting plate 3 is provided with a first limiting chute 5. A limiting slide 6 is provided in the middle of the first limiting chute 5. The two bottom sides of the limiting slide 6 are The side and the bottom side of the support plate 1 are both fixedly connected to a fixed bar 7. The bottom of the fixed bar 7 is provided with a clamping mechanism. The bottom side of the support plate 1 is provided with a movable support plate 8. The movable support plate 8 is away from the fixed bar 7. A second electric push rod 9 is provided on one side of the support plate 1. A hydraulic push rod 10 is fixedly connected around the top of the support plate 1. The output end of the hydraulic push rod 10 penetrates the support plate 1 and is fixedly connected with a roller 11. The top of the support plate 1 is A control box 12 is provided on the side of the support plate 1. A plurality of rolling balls 13 are provided on the top of the support plate 1 on one side of the movable support plate 8. A first limit slider 14 is symmetrically fixed on both sides of the lifting plate 3. The support frame 2 There are second limiting slides 15 on both sides of the inner cavity at positions corresponding to the first limiting slides 14. The first limiting slides 14 are arranged inside the second limiting slides 15. The top two sides of the lifting plate 3 are A fixed rod 16 is fixedly connected to the sides symmetrically. The top of the fixed rod 16 penetrates the top wall of the support frame 2 and is fixedly connected to the limiting disc. A first threaded rod 17 is provided in the middle of the first limiting chute 5. Stabilizer rods 19 are symmetrically arranged on both sides of the rod 17. One end of the first threaded rod 17 is connected to the first motor 18. Both the stabilizer rod 19 and the first threaded rod 17 penetrate the middle of the limiting slide 6 and move the top of the support plate 8. The limit slide bars 20 are symmetrically fixed on both sides. The bottom of the support plate 1 is provided with a third limit chute 21 at a position corresponding to the limit slide bar 20. The cross-sectional shape of the limit slide bar 20 is set to a "T" shape. , the third limiting chute 21 is adapted to the limiting slide bar 20 , the limiting slide bar 20 is arranged inside the third limiting chute 21 , and the clamping mechanism includes a limiting groove 22 opened at the bottom of the fixing bar 7 , a second threaded rod 23 is provided in the middle of the limiting groove 22, one end of the second threaded rod 23 is connected to a second motor 24, and a second limiting slider 25 is symmetrically provided on both sides of the inner cavity of the limiting groove 22. The two threaded rods 23 pass through the middle of the second limiting slider 25 and are threadedly connected to the wall of the second limiting slider 25. The threads at both ends of the second threaded rod 23 are symmetrical, and the bottom of the second limiting slider 25 A splint 26 is fixedly connected.
可以看出,上述技术方案中,通过设置的滚球13可以方便将需要铺设的管道放置在支撑板1的顶部一侧,并方便推动管道移动到升降板3的正下方,然后通过控制箱12启动升降板3底部两侧夹持机构可以通过启动相对应的第二电机24控制第二螺纹杆23转动,从而通过第二限位滑块25控制夹板26对管道进行夹持固定,方便对管道进行铺设连接;It can be seen that in the above technical solution, the installed rolling ball 13 can conveniently place the pipe to be laid on the top side of the support plate 1, and facilitate the push of the pipe to move directly below the lifting plate 3, and then through the control box 12 Starting the clamping mechanism on both sides of the bottom of the lifting plate 3 can control the rotation of the second threaded rod 23 by starting the corresponding second motor 24, thereby controlling the clamping plate 26 to clamp and fix the pipeline through the second limit slider 25, which facilitates the pipeline. Make laying connections;
并通过启动第二电动推杆9控制移动支撑板8从升降板3的底部移开,并通过限位滑条20和第三限位滑槽21的配合,可以提高移动支撑板8移动的稳定性;And by starting the second electric push rod 9, the mobile support plate 8 is controlled to move away from the bottom of the lifting plate 3, and through the cooperation of the limit slide bar 20 and the third limit chute 21, the stability of the movement of the mobile support plate 8 can be improved. sex;
还通过启动第一电动推杆4控制升降板3带动限位滑板6和固定条7向下移动,可以控制管道移动到支撑板1的底部,使管道与沟渠内部的一侧管道相对应方便铺设连接,并通过第二限位滑槽15与第一限位滑块14的配合以及设置的固定杆16,可以提高升降板3上下移动的稳定性,提高使用效果;By starting the first electric push rod 4 to control the lifting plate 3 to drive the limit slide 6 and the fixing bar 7 to move downward, the pipe can be controlled to move to the bottom of the support plate 1 so that the pipe corresponds to one side of the pipe inside the trench for easy laying. connection, and through the cooperation between the second limit chute 15 and the first limit slide 14 and the fixed rod 16 provided, the stability of the up and down movement of the lifting plate 3 can be improved and the use effect can be improved;
并通过启动支撑板1底部的夹持机构依次控制夹板26对沟渠内部的管道一端进行夹持固定,然后启动第一电机18控制第一螺纹杆17转动,从而使限位滑板6在第一限位滑槽5的内部移动,从而通过限位滑板6底部的夹持机构控制管道水平移动,从而将两个管道相连接,提高铺设使用效果,同时通过设置的稳定杆19可以提高限位滑板6水平移动的稳定性,提高使用效果;And by starting the clamping mechanism at the bottom of the support plate 1, the clamping plate 26 is sequentially controlled to clamp and fix one end of the pipe inside the trench, and then the first motor 18 is started to control the rotation of the first threaded rod 17, so that the limit slide 6 is at the first limit. The internal movement of the chute 5 controls the horizontal movement of the pipe through the clamping mechanism at the bottom of the limit slide 6, thereby connecting the two pipes and improving the laying effect. At the same time, the limit slide 6 can be raised by the stabilizer bar 19 provided. The stability of horizontal movement improves the use effect;
并通过设置的控制箱12方便控制启动,并通过启动液压推杆10控制滚轮11向下移动,从而使支撑板1带动支撑板1底部的夹持机构向上移动,直至支撑板1底部的夹持机构高于地面,即可方便对支撑板1在地面移动,提高使用效果The control box 12 is provided to facilitate control and start, and the hydraulic push rod 10 is started to control the downward movement of the roller 11, so that the support plate 1 drives the clamping mechanism at the bottom of the support plate 1 to move upward until the clamping mechanism at the bottom of the support plate 1 is The mechanism is higher than the ground, which can facilitate the movement of the support plate 1 on the ground and improve the use effect.
使用过程:将支撑板1移动到铺设管道的沟渠正上方,然后启动液压推杆10控制滚轮11向支撑板1的一侧移动,此时会使支撑板1带动支撑板1底部的夹持机构向下移动,直至支撑板1底部的夹持机构移动到需要铺设管道的沟渠内部;Usage process: Move the support plate 1 directly above the trench where the pipeline is laid, and then start the hydraulic push rod 10 to control the roller 11 to move to one side of the support plate 1. At this time, the support plate 1 will drive the clamping mechanism at the bottom of the support plate 1 Move downward until the clamping mechanism at the bottom of the support plate 1 moves inside the trench where the pipe needs to be laid;
然后将需要铺设的管道放置在支撑板1的顶部位置与滚球13的位置,然后推动管道使管道移动到升降板3的正下方,此时通过移动支撑板8对管道进行支撑;Then place the pipe to be laid at the top of the support plate 1 and the position of the rolling ball 13, and then push the pipe to move it directly below the lifting plate 3. At this time, the pipe is supported by moving the support plate 8;
然后启动第一电动推杆4依次控制升降板3底部的夹板26移动到管道的两侧,然后启动限位滑板6底部两侧的夹持机构控制夹板26对管道进行夹持,然后启动第二电动推杆9控制移动支撑板8从升降板3的正下方移开;Then start the first electric push rod 4 to sequentially control the clamping plates 26 at the bottom of the lifting plate 3 to move to both sides of the pipe, then start the clamping mechanism on both sides of the bottom of the limit slide 6 to control the clamping plates 26 to clamp the pipe, and then start the second The electric push rod 9 controls the mobile support plate 8 to move away from directly below the lifting plate 3;
然后启动第一电动推杆4控制升降板3带动升降板3底部的夹持机构移动到底部沟渠内部,并使管道移动到沟渠内部,使该管道与沟渠内部的铺设好的管道相对应;Then start the first electric push rod 4 to control the lifting plate 3 to drive the clamping mechanism at the bottom of the lifting plate 3 to move to the inside of the bottom ditch, and move the pipe to the inside of the ditch, so that the pipe corresponds to the laid pipe inside the ditch;
然后启动支撑板1底部的夹持机构对沟渠内部铺设好的管道进行夹持固定,然后启动第一电机18控制限位滑板6在第一限位滑槽5的内部移动,使限位滑板6底部的夹持机构带动管道水平移动,直至两个管道相连接,从而完成对管道的铺设连接,提高使用效果。Then start the clamping mechanism at the bottom of the support plate 1 to clamp and fix the pipe laid inside the trench, and then start the first motor 18 to control the limit slide 6 to move inside the first limit chute 5 so that the limit slide 6 The clamping mechanism at the bottom drives the pipe to move horizontally until the two pipes are connected, thereby completing the laying and connection of the pipes and improving the use effect.
以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。The above are only the preferred embodiments of the present invention. It should be pointed out that those skilled in the art can make several improvements and modifications without departing from the principles of the present invention. These improvements and Retouching should also be considered as the protection scope of this utility model.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321657002.9U CN220168741U (en) | 2023-06-27 | 2023-06-27 | Underground pipeline laying device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202321657002.9U CN220168741U (en) | 2023-06-27 | 2023-06-27 | Underground pipeline laying device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN220168741U true CN220168741U (en) | 2023-12-12 |
Family
ID=89059381
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202321657002.9U Active CN220168741U (en) | 2023-06-27 | 2023-06-27 | Underground pipeline laying device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN220168741U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118705443A (en) * | 2024-07-19 | 2024-09-27 | 中国能源建设集团江苏省电力建设第一工程有限公司 | Thermal power plant thermal pipeline hoisting structure with dynamic adjustment function |
-
2023
- 2023-06-27 CN CN202321657002.9U patent/CN220168741U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118705443A (en) * | 2024-07-19 | 2024-09-27 | 中国能源建设集团江苏省电力建设第一工程有限公司 | Thermal power plant thermal pipeline hoisting structure with dynamic adjustment function |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN220168741U (en) | Underground pipeline laying device | |
| CN113027493B (en) | Support structure for treating collapse and construction method | |
| CN211817720U (en) | A device for plastering mortar on the roof of a building | |
| CN114482575A (en) | Prefabricated shear wall positioning device and installation and use method thereof | |
| CN222207370U (en) | Auxiliary support beam for strengthening building structure | |
| CN204844450U (en) | III template formula ballastless track self -compaction concrete perfusion device of CRTS | |
| CN217834044U (en) | Prefabricated wall formwork device | |
| CN219196726U (en) | A formwork clamping device for concrete pouring of horizontal tie beams in masonry filled walls | |
| CN217530603U (en) | Supporting device for multi-degree-of-freedom adjustment for auxiliary installation of water heating pipeline | |
| CN114482463B (en) | A prefabricated component and a sealing method for assembling a flue hanging hole | |
| CN217080488U (en) | A hydraulic plugging device for grouting holes of tunnel lining trolley | |
| CN206319892U (en) | New hydraulic tunnel loads and unloads construction trolley | |
| CN211666728U (en) | Tunnel secondary lining arch anti-void longitudinal withdrawal pipe type belt mold grouting equipment | |
| CN117090404A (en) | Shear wall mounting device and construction process | |
| CN208618446U (en) | New city pipe gallery mobile formwork | |
| CN216810976U (en) | Reinforced structure of unilateral template | |
| CN211395728U (en) | A water stop system for concrete foundation construction | |
| CN221402031U (en) | Pipeline construction is interlude scaffold in advance convenient to increase bottom space | |
| CN205875750U (en) | T style of calligraphy harrow | |
| CN221256198U (en) | A water-stop steel plate fixing device for horizontal construction joints of wall | |
| CN216370633U (en) | Concrete pipe jacking steel reinforcement cage machining device | |
| CN220337663U (en) | Support frame for water supply and drainage pipeline | |
| CN208347328U (en) | A kind of paving slurry bucket | |
| CN207436520U (en) | A kind of fixture and its bricklaying robot for building top skin brick | |
| CN208009909U (en) | A kind of built with ribbed bricks wall construction reinforced bar guide device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250530 Address after: Room 701, building 7, Dongfang Square, Qujiang District, Quzhou City, Zhejiang Province Patentee after: Zhejiang Bo Rui Garden Construction Co.,Ltd. Country or region after: China Address before: 300451 Tianjin Binhai New Area Free Trade Zone (Airport Economic Zone) Central Avenue and East Fifth Road intersection northeast side Yijing Apartment 2-4-402 Patentee before: Zhongtian Weiye (Tianjin) Mechanical and Electrical Equipment Installation Co.,Ltd. Country or region before: China |