CN220167445U - Double-layer anchor ear concrete formwork supporting system considering operation platform - Google Patents

Double-layer anchor ear concrete formwork supporting system considering operation platform Download PDF

Info

Publication number
CN220167445U
CN220167445U CN202320634435.6U CN202320634435U CN220167445U CN 220167445 U CN220167445 U CN 220167445U CN 202320634435 U CN202320634435 U CN 202320634435U CN 220167445 U CN220167445 U CN 220167445U
Authority
CN
China
Prior art keywords
platform
support
anchor ear
concrete
compression
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320634435.6U
Other languages
Chinese (zh)
Inventor
史晓涛
戴鹏程
朱奇
庞号充
卫春安
李伟
顾永根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Construction Engineering Ecological Environment Technology Co ltd
Anhui Construction Engineering Transportation And Navigation Group Co ltd
Original Assignee
Anhui Construction Engineering Ecological Environment Technology Co ltd
Anhui Construction Engineering Transportation And Navigation Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Construction Engineering Ecological Environment Technology Co ltd, Anhui Construction Engineering Transportation And Navigation Group Co ltd filed Critical Anhui Construction Engineering Ecological Environment Technology Co ltd
Priority to CN202320634435.6U priority Critical patent/CN220167445U/en
Application granted granted Critical
Publication of CN220167445U publication Critical patent/CN220167445U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a double-layer anchor ear concrete formwork support system taking an operation platform into consideration, which comprises a lower support anchor ear device and an upper support anchor ear device which are arranged on the outer wall of a prestressed concrete pipe pile in a side-by-side manner, wherein an inner platform and a concrete support formwork are respectively arranged, an outer platform is arranged on the outer side of the inner platform, the inner platform and the outer platform are fixedly extruded on the outer wall of the prestressed concrete pipe pile through a compression device, and a plurality of support connecting rods are arranged between the concrete support formwork and the inner platform or the outer platform. The double-layer anchor ear concrete formwork supporting system with the operating platform is compact in structure, capable of providing a stable supporting device for reinforced concrete needed by pile splicing, also capable of providing a stable operating platform for pile splicing operation, high in efficiency, good in stability, high in supporting strength and simple and convenient to construct or disassemble.

Description

Double-layer anchor ear concrete formwork supporting system considering operation platform
Technical Field
The utility model relates to the technical field of building tools, in particular to a double-layer anchor ear concrete formwork support system with an operation platform.
Background
The prestressed concrete pipe pile is a hollow cylinder type concrete prefabricated part manufactured by adopting a pretensioning prestressing centrifugal forming process and performing high-pressure high-temperature steam curing, and the standard section length is 10m. The prestressed concrete pipe pile has the advantages of high single pile bearing capacity, good bending resistance and pulling resistance and low manufacturing cost, and is widely applied to the technical fields of industrial and civil high-rise buildings, railways, highways, bridges, ports, wharfs, water conservancy projects, municipal engineering and other engineering buildings.
At present, for pile splicing operation of prestressed concrete piles, pile splicing installation of two piles is generally realized through an independent pile splicer and bolts, and although pile splicing speed is high, the pile splicer and the bolts can corrode and rust in the process of immersing the prestressed concrete piles in wet sludge for a long time, so that stability of the upper layer prestressed concrete piles is affected, and great potential safety hazards are brought to buildings on the prestressed concrete piles. The joint of the two prestressed concrete pipe piles is reinforced by reinforced concrete, and the pile splicing speed is low, but the phenomenon of corrosion and rust can be effectively avoided, so that the stability of the building is improved. However, at present, a double-layer anchor ear concrete formwork support system which is required for reinforced concrete reinforcement pile extension operation of prestressed concrete pipe piles and is compatible with an operation platform is not common. Therefore, it is necessary to develop a double-layer anchor ear concrete formwork support system which is required by the reinforced concrete reinforcement pile extension operation of the prestressed concrete pipe pile and gives consideration to an operation platform.
Disclosure of Invention
The utility model aims at: the double-layer anchor ear concrete formwork support system with the operating platform is provided, so that the defects are overcome.
In order to achieve the above object, the present utility model provides the following technical solutions:
the utility model provides a compromise operation platform's double-deck staple bolt concrete form braced system, includes by the side support staple bolt device, the upper support staple bolt device on prestressed concrete tubular pile outer wall, install interior platform and concrete support form respectively on lower support staple bolt device, the upper support staple bolt device, prestressed concrete tubular pile all sets up in the stake hole that platform and concrete support form central authorities set up including, interior platform outside is provided with outer platform, interior platform, outer platform pass through the extrusion of sticiss device and fix on prestressed concrete tubular pile outer wall, be provided with a plurality of support connecting rod between concrete support form and interior platform or the outer platform.
Preferably, the lower support hoop device and the upper support hoop device are formed by relatively transversely arranging two circular arc stirrups and fixing the circular arc stirrups through fastening bolts, and a plurality of hoop embedded nuts are arranged on the outer end faces of the circular arc stirrups and cantilever support steel bars are arranged on the circular arc stirrups.
Preferably, the plurality of cantilever support steel bars are arranged in a radial shape by taking the center of a central hole formed by two circular arc stirrups as a central point, and the plurality of anchor ear embedded nuts and the cantilever support steel bars are all arranged in the same horizontal plane.
Preferably, the inner platform and the outer platform are positioned on the same plane, a plurality of compression nut holes penetrating through the outer platform and the inner platform are formed in the end face of the outer platform, the compression device comprises compression screws and compression ends, compression internal threads are arranged in the compression nut holes, compression external threads which are matched with the compression internal threads are arranged on the compression screws, the compression screws are arranged in the compression nut holes in a threaded engagement mode, and the compression ends are suspended in pile holes in the center of the inner platform and are fixed at the front ends of the compression screws; the plurality of compression screws are uniformly distributed in a radioactive form by taking the center of the pile hole as a center point.
Preferably, the compacting end consists of a steel member at the rear end and a rubber member at the front end, and the rubber member is extruded on the outer wall of the prestressed concrete pipe pile.
Preferably, the inner platform and the outer platform are all integrally formed or formed by splicing and fixing a plurality of parts, and are plate-type platforms with round or square metal structures or plastic structures; the center of the outer platform is provided with an outer platform center hole, and the hole wall of the outer platform center hole of the outer platform is attached to the outer peripheral wall of the inner platform.
Preferably, the front end of the cantilever support steel bar is provided with external threads matched with the internal threads of the anchor ear embedded nuts, a plurality of cantilever support steel bars and a plurality of anchor ear embedded nuts are in one-to-one correspondence, and the front ends of the cantilever support steel bars are inserted and screwed into the anchor ear embedded nuts.
Preferably, one ends of the two arc stirrups are fixed together through hinging, and the other ends of the arc stirrups are fixed through fastening bolts; or two ends of the two circular arc stirrups are fixed through fastening bolts.
Preferably, the inner platform and the concrete support templates are respectively arranged on a plurality of overhanging support steel bars in the lower support hoop device and the upper support hoop device.
The utility model has the beneficial effects that:
the double-layer anchor ear concrete formwork supporting system taking the operating platform into consideration is compact in structure, and a lower support anchor ear device is arranged on the outer wall of the prestressed concrete pipe pile in sequence, an inner platform and an outer platform fixed through a compacting device are installed, so that a stable operating platform is provided for pile splicing operation of the prestressed concrete pipe pile; the hoop supporting device is arranged on the outer wall of the prestressed concrete pipe pile above the inner platform, and the concrete supporting template is installed, so that a stable supporting device is provided for reinforced concrete required by pile extension of the prestressed concrete pipe pile, and the stability of casting of the reinforced concrete of the pile extension is improved. The double-layer anchor ear concrete formwork support system with the operation platform is compact in structure, capable of providing a stable support device for reinforced concrete required by pile splicing of prestressed concrete pipe piles, and also capable of providing a stable operation platform for pile splicing operation, high in efficiency, good in stability, high in support strength and simple and convenient to construct or disassemble.
Drawings
Fig. 1: the structure of the utility model is schematically shown;
fig. 2: the structure of the support hoop device is schematically shown.
Detailed Description
The following description of embodiments of the present utility model is provided with reference to fig. 1-2:
as shown in fig. 1-2, a double-layer anchor ear concrete formwork support system with an operation platform comprises a lower support anchor ear device 1 and an upper support anchor ear device 5 which are arranged on the outer wall of a prestressed concrete pipe pile 100 in a side-by-side manner, an inner platform 2 and a concrete support formwork 6 are respectively sleeved on the lower support anchor ear device 1 and the upper support anchor ear device 5, and the prestressed concrete pipe pile 100 is arranged in pile holes 21 arranged in the centers of the inner platform 2 and the concrete support formwork 6.
The lower support hoop device 1 and the upper support hoop device 5 are formed by oppositely and transversely arranging two circular arc stirrups 11 and fixing the circular arc stirrups through fastening bolts 12. One end of each of the two circular arc stirrups 11 is hinged and fixed together, and the other end of each of the two circular arc stirrups is fixed through a fastening bolt 12; or both ends of the two circular arc stirrups 11 are fixed by fastening bolts 12. The prestressed concrete pipe pile 100 is arranged in a pile hole 21 in the center of the inner platform 2 and a center hole formed by two circular arc stirrups 11 of the lower support hoop device 1 and the upper support hoop device 5. Tightness adjustment of the outer walls of the lower support hoop device 1, the upper support hoop device 5 and the prestressed concrete pipe pile 100 can be achieved through tightness adjustment of the fastening bolts 12, so that the lower support hoop device 1 and the upper support hoop device 5 can be conveniently installed.
The circular arc stirrups 11 of the lower support hoop device 1 and the upper support hoop device 5 are provided with a plurality of hoop embedded nuts 13 on the annular outer end surfaces and cantilever support steel bars 14. The front ends of the overhanging supporting steel bars 14 are provided with external threads matched with the internal threads of the anchor ear embedded nuts 13, the overhanging supporting steel bars 14 and the anchor ear embedded nuts 13 are in one-to-one correspondence, and the front ends of the overhanging supporting steel bars 14 are inserted and screwed into the anchor ear embedded nuts 13. The plurality of overhanging supporting steel bars 14 are arranged in a radial shape by taking the center of a central hole formed by the two circular arc stirrups 11 as a central point, and the plurality of anchor ear embedded nuts 13 and the overhanging supporting steel bars 14 are all arranged in the same horizontal plane. The inner platform 2 and the concrete supporting template 6 are respectively pressed on a plurality of overhanging supporting steel bars 14 in the lower supporting hoop device 1 and the upper supporting hoop device 5 by utilizing the self gravity of the inner platform and the concrete supporting template.
An outer platform 3 is arranged on the outer side of the inner platform 2, and the inner platform 2 and the outer platform 3 are fixedly extruded on the outer wall of the prestressed concrete pipe pile 100 through a compression device 4. The inner platform 2 and the outer platform 3 are positioned on the same plane, a plurality of compression nut holes 22 penetrating through the end faces of the outer platform 3 and the inner platform 2 are formed in the end face of the outer platform 3, the compression device 4 comprises compression screws 41 and compression ends 42, compression internal threads are formed in the compression nut holes 22, compression external threads matched with the compression internal threads are formed in the compression screws 41, the compression screws 41 are sequentially screwed into the compression nut holes 22 of the outer platform 3 and the inner platform 2 in a threaded engagement mode, the compression ends 42 are finally suspended in a pile hole 21 in the center of the inner platform 2 and are fixed at the front ends of the compression screws 41, and the compression screws 41 are uniformly arranged in a radioactive mode by taking the center of the pile hole 21 as a center point. The compression end 42 is composed of a steel member at the rear end and a rubber member at the front end, which is pressed against the outer wall of the prestressed concrete pipe pile 100. By means of rotation adjustment of the compression screw 41, the rubber component of the compression end 42 at the front end of the compression screw 41 can be extruded on the outer wall of the prestressed concrete pipe pile 100, and the compression screw 41 can be continuously screwed in, so that the extrusion force between the compression device 4 and the outer wall of the prestressed concrete pipe pile 100 can be adjusted. The supporting hoop device 1 fixed through the fastening bolts 12, the compression device 4 arranged on the inner platform 2 and the outer platform 3 form pile-side extrusion with the prestressed concrete pipe pile 100, and the stability of auxiliary supporting of the platform is realized by utilizing friction force generated by extrusion.
The inner platform 2 and the outer platform 3 are all integrally formed or formed by splicing and fixing a plurality of parts, and are plate-type platforms with round or square metal structures or plastic structures; an outer platform center hole is formed in the center of the outer platform 3, and the hole wall of the outer platform center hole of the outer platform 3 is attached to the outer peripheral wall of the inner platform 2.
A plurality of support connecting rods 7 are arranged between the concrete support templates 6 and the inner platform 2 or the outer platform 3. The connection between the upper concrete support template 6 and the lower inner platform 2 or the outer platform 3 can be enhanced through the support connecting rods 7, and the support stability of the upper concrete support template 6 and the lower inner platform 2 or the outer platform 3 is improved.
According to the double-layer anchor ear concrete formwork support system with the operation platform, the anchor ear device 1 is supported on the outer wall of the prestressed concrete pipe pile 100 in a surrounding manner, the inner platform 2 and the outer platform 3 fixed through the compression device 4 are installed, so that a stable operation platform is provided for pile splicing operation of the prestressed concrete pipe pile 100; the anchor ear device 5 is supported on the outer wall of the prestressed concrete pipe pile 100 above the inner platform 3, and the concrete supporting template 6 is installed, so that a stable supporting device is provided for reinforced concrete required by pile extension of the prestressed concrete pipe pile, and the stability of casting of the reinforced concrete of the pile extension is improved.
The double-layer anchor ear concrete formwork support system with the operation platform is compact in structure, capable of providing a stable support device for reinforced concrete required by pile splicing of prestressed concrete pipe piles, and also capable of providing a stable operation platform for pile splicing operation, high in efficiency, good in stability, high in support strength and simple and convenient to construct or disassemble.
While the utility model has been described above with reference to the accompanying drawings, it will be apparent that the utility model is not limited to the above embodiments, but is also within the scope of the utility model if the inventive concept and technical scheme is not substantially modified or applied directly to other occasions without modification.

Claims (9)

1. Double-deck staple bolt concrete form braced system of compromise operation platform, a serial communication port, including by the side according to lower support staple bolt device (1) on prestressed concrete tubular pile (100) outer wall, go up support staple bolt device (5), install interior platform (2) and concrete support template (6) on lower support staple bolt device (1), the last staple bolt device (5) respectively, prestressed concrete tubular pile (100) all set up in stake hole (21) that interior platform (2) and concrete support template (6) central authorities set up, interior platform (2) outside is provided with outer platform (3), interior platform (2), outer platform (3) are fixed on prestressed concrete tubular pile (100) outer wall through sticiss device (4) extrusion, be provided with a plurality of support connecting rod (7) between concrete support template (6) and interior platform (2) or outer platform (3).
2. The double-layer hoop concrete formwork support system for the operation platform according to claim 1, wherein the lower support hoop device (1) and the upper support hoop device (5) are formed by fixing two circular arc stirrups (11) in a relatively transverse mode through fastening bolts (12), and a plurality of hoop embedded nuts (13) are arranged on the annular outer end faces of the circular arc stirrups (11) and cantilever support steel bars (14) are arranged on the circular arc stirrups.
3. The double-layer anchor ear concrete formwork support system for the operation platform according to claim 2, wherein the plurality of cantilever support steel bars (14) are radially arranged by taking the center of a center hole formed by two circular arc stirrups (11) as a center point, and the plurality of anchor ear embedded nuts (13) and the cantilever support steel bars (14) are all arranged in the same horizontal plane.
4. The double-layer anchor ear concrete formwork support system considering the operation platform as claimed in claim 1, wherein the inner platform (2) and the outer platform (3) are positioned on the same plane, a plurality of compression nut holes (22) penetrating through the outer platform (3) and the end face of the inner platform (2) are arranged on the end face of the outer platform (3), the compression device (4) comprises compression screws (41) and compression ends (42), compression internal threads are arranged in the compression nut holes (22), compression external threads which are matched with the compression internal threads are arranged on the compression screws (41), the compression screws (41) are installed in the compression nut holes (22) in a threaded engagement mode, and the compression ends (42) are suspended in pile holes (21) in the center of the inner platform (2) and are fixed at the front ends of the compression screws (41); the plurality of compression screws (41) are uniformly distributed in a radioactive form by taking the center of the pile hole (21) as a center point.
5. The double-layer hoop concrete form supporting system with compatible operating platform according to claim 4, wherein the compacting end (42) is composed of a steel member at the rear end and a rubber member at the front end, and the rubber member is extruded on the outer wall of the prestressed concrete pipe pile (100).
6. The double-layer anchor ear concrete formwork support system with the operating platform as claimed in claim 1, wherein the inner platform (2) and the outer platform (3) are all integrally formed or are formed by splicing and fixing a plurality of parts, and are integrally plate-type platforms with round or square metal structures or plastic structures; an outer platform center hole is formed in the center of the outer platform (3), and the hole wall of the outer platform center hole of the outer platform (3) is attached to the outer peripheral wall of the inner platform (2).
7. The double-layer anchor ear concrete formwork support system with the operation platform according to claim 2, wherein the front ends of the overhanging support steel bars (14) are provided with external threads matched with the internal threads of the anchor ear embedded nuts (13), a plurality of overhanging support steel bars (14) are in one-to-one correspondence with a plurality of anchor ear embedded nuts (13), and the front ends of the overhanging support steel bars (14) are inserted and screwed into the anchor ear embedded nuts (13).
8. The double-layer hoop concrete formwork support system with the operating platform as claimed in claim 2, wherein one ends of the two circular arc stirrups (11) are hinged and fixed together, and the other ends are fixed through fastening bolts (12); or both ends of the two circular arc stirrups (11) are fixed through fastening bolts (12).
9. A double-layer anchor ear concrete formwork support system with an operation platform according to claim 2 or 3, characterized in that the inner platform (2) and the concrete support formwork (6) are respectively arranged on a plurality of overhanging support steel bars (14) in the lower support anchor ear device (1) and the upper support anchor ear device (5).
CN202320634435.6U 2023-03-28 2023-03-28 Double-layer anchor ear concrete formwork supporting system considering operation platform Active CN220167445U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320634435.6U CN220167445U (en) 2023-03-28 2023-03-28 Double-layer anchor ear concrete formwork supporting system considering operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320634435.6U CN220167445U (en) 2023-03-28 2023-03-28 Double-layer anchor ear concrete formwork supporting system considering operation platform

Publications (1)

Publication Number Publication Date
CN220167445U true CN220167445U (en) 2023-12-12

Family

ID=89060039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320634435.6U Active CN220167445U (en) 2023-03-28 2023-03-28 Double-layer anchor ear concrete formwork supporting system considering operation platform

Country Status (1)

Country Link
CN (1) CN220167445U (en)

Similar Documents

Publication Publication Date Title
KR100713692B1 (en) A prestresed connection set bridge post using unit filled concrete with internally confined hollow and a method for construction
CN112554337B (en) Self-reset type rigidity self-adaptive control assembly type beam-column node
CN113175091B (en) Fully assembled prestressed frame cable system combined structure
CN220167445U (en) Double-layer anchor ear concrete formwork supporting system considering operation platform
KR100274141B1 (en) Manufacturing method of preplex composite beem by divisional method
CN112832415A (en) Partially-coated steel-concrete combined shear wall member
CN108678164B (en) Connecting beam type assembled building structure
CN109467014B (en) Wall-attached structure for large-tonnage tower crane super-large load in large wind environment
CN115142602B (en) Fully assembled prestress string building cover system
CN220167446U (en) Auxiliary supporting system for friction type operation platform for pile-side extrusion
CN212801942U (en) Assembled prestressed column-beam joint structure
CN111705622A (en) Self-resetting assembly type precast concrete arch bridge
CN116427409A (en) Construction method of double-layer anchor ear concrete formwork support system
CN210507799U (en) Connector of semi-prefabricated section steel concrete column-section steel concrete beam node unit and section steel concrete beam
CN109235640B (en) Pin type connecting structure between modularized steel structural members for building
CN112942364A (en) Self-balancing large-span deep foundation pit prestressed beam system
CN215053883U (en) Precast concrete beam column connection structure
CN220035397U (en) Pile core concrete reinforcement cage system of self-bottom-sealing type pipe pile for pile extension
CN116240891A (en) Construction method of auxiliary supporting system of pile-side extrusion friction type operation platform
CN215760796U (en) Supporting structure of assembled prestressed concrete silo component
CN218894194U (en) Precast column and superposed beam connection structure based on prestressed reinforcement
CN220247212U (en) Connection structure of prefabricated floor exempts from to support construction
CN220768393U (en) Assembled beam column connection structure
CN217105130U (en) Precast concrete bearing structure for foundation pit
CN220814406U (en) Prefabricated assembled formwork shear wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant