CN220167245U - Combined building curtain wall for building decoration engineering - Google Patents

Combined building curtain wall for building decoration engineering Download PDF

Info

Publication number
CN220167245U
CN220167245U CN202320619761.XU CN202320619761U CN220167245U CN 220167245 U CN220167245 U CN 220167245U CN 202320619761 U CN202320619761 U CN 202320619761U CN 220167245 U CN220167245 U CN 220167245U
Authority
CN
China
Prior art keywords
curtain wall
wall
curtain
building
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320619761.XU
Other languages
Chinese (zh)
Inventor
田润林
戚伟伟
田锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Yulonghe Construction Engineering Co ltd
Original Assignee
Xinjiang Yulonghe Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Yulonghe Construction Engineering Co ltd filed Critical Xinjiang Yulonghe Construction Engineering Co ltd
Priority to CN202320619761.XU priority Critical patent/CN220167245U/en
Application granted granted Critical
Publication of CN220167245U publication Critical patent/CN220167245U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Abstract

The utility model discloses a combined building curtain wall for building decoration engineering, which belongs to the technical field of curtain walls, and aims to solve the problems that an outer curtain wall can be replaced only by gradually disassembling an inner curtain wall when the inner curtain wall is damaged, and the curtain wall is difficult to disassemble; according to the utility model, the connecting rod is pressed to the rear side when part of curtain wall boards are damaged, the extrusion block moves to the rear side in the clamping groove in the process of moving to the rear side, and the clamping block moves to the outside in the clamping groove after the extrusion block moves to the rear, so that the curtain wall boards are detached from the front side of the vertical rod after the clamping block is separated from the clamping groove, and compared with the traditional combined curtain wall, the curtain wall has the advantages that the detachment difficulty of the curtain wall is reduced, and the replacement efficiency of the curtain wall is improved.

Description

Combined building curtain wall for building decoration engineering
Technical Field
The utility model belongs to the technical field of curtain walls, and particularly relates to a combined building curtain wall for building decoration engineering.
Background
The curtain wall is a building exterior wall enclosure, is not load-bearing, is hung like a curtain, is a light wall body with decorative effect commonly used in modern large-scale and high-rise buildings, is composed of a panel and a supporting structure system, can have certain displacement capacity relative to a main structure or certain deformation capacity, does not bear a building peripheral protection structure or a decorative structure acted by the main structure, is an exterior wall construction method for replacing the traditional masonry or window wall combination by various strong, light and attractive building materials, is an exterior wall construction method for surrounding the periphery of the main structure to ensure that the whole building is attractive, has sound and safe use functions, is a beautiful coat to wear the building, mainly comprises the exterior wall, a lighting roof and a awning of the building, and is widely applied to the curtain wall along with the increasing demands on the diversification of the appearance of the building in recent years.
The combined building curtain wall in the prior art is formed by splicing an independent curtain wall, when a certain curtain wall is damaged and needs to be replaced, the curtain wall needs to be detached from the nearest side until the damaged curtain wall is detached, and the combined building curtain wall can reduce the replacement and maintenance cost when the curtain wall is damaged, but the replacement steps when the curtain wall is damaged on the inner side are still too complicated, so that the replacement and maintenance efficiency of the curtain wall is reduced.
Therefore, a combined building curtain wall for building decoration engineering is needed, and the problem that the outer curtain wall can be replaced only by gradually disassembling the outer curtain wall when the inner curtain wall is damaged in the prior art is solved, so that the curtain wall disassembling difficulty is improved.
Disclosure of Invention
The utility model aims to provide a combined building curtain wall for building decoration engineering, which aims to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the combined building curtain wall for the building decoration engineering comprises vertical rods, wherein a plurality of groups of uniformly distributed cross rods are fixed between the left vertical rod and the right vertical rod, and a quick dismounting mechanism is arranged inside the vertical rods;
quick assembly disassembly mechanism includes the constant head tank, the constant head tank sets up respectively in pole setting front wall left and right sides and evenly distributed, control two sets of all be provided with the mounting groove between the constant head tank, roof middle part all is fixed with the dead lever in the mounting groove, the equal fixedly connected with gag lever post in dead lever bottom, both ends are all sliding connection in the spout inboard about the gag lever post, the spout all sets up and is close to a lateral wall middle part about two sets of fixture blocks mutually, both ends are sliding connection respectively in the inside left and right sides of guide rail around the fixture block, the guide rail is fixed at the mounting groove front and back lateral wall respectively.
In the scheme, the outer Zhou Jun sliding connection of gag lever post has the spring, both ends are all fixed respectively in the left and right sides two sets of fixture blocks and are close to a side wall spout periphery mutually about the spring.
It is further worth to say that the mounting groove all runs through two sets of constant head tank lateral walls about, constant head tank inboard all sliding connection has the inserted block.
It should be further noted that the insert blocks are respectively fixed at four corners of the rear wall of the curtain wall board, and a side wall of the insert block far away from the middle part of the curtain wall board is provided with a clamping groove.
As a preferable implementation mode, the left and right sides of the rear wall of the curtain wall plate are respectively fixed with positioning blocks, and the front side wall of the clamping groove is respectively and slidably connected with an extrusion block.
As a preferred implementation mode, the extrusion blocks are all fixed at the rear ends of connecting rods, and the connecting rods penetrate through and are connected with four corners of the front wall of the curtain wall plate in a sliding mode.
Compared with the prior art, the combined building curtain wall for the building decoration project provided by the utility model at least has the following beneficial effects:
through pressing the connecting rod to the rear side when partial curtain wall board damages, the connecting rod makes the extrusion piece remove to the rear side at the draw-in groove inside in the rear side removal in-process, and the extrusion piece moves backward and makes the inside fixture block of draw-in groove outside remove to make the fixture block dismantle curtain wall board from pole setting front side after separating with the draw-in groove, compare with traditional combination formula curtain, need not dismantle other intact curtain walls, reduced the curtain and dismantled the degree of difficulty, improved curtain replacement efficiency.
Drawings
FIG. 1 is a schematic front perspective view of the present utility model;
FIG. 2 is a schematic view of a partial rear perspective view of the present utility model;
FIG. 3 is a schematic top view of a portion of the internal structure of the present utility model.
In the figure: 1. a vertical rod; 2. a quick assembly disassembly mechanism; 3. a cross bar; 4. curtain wall plates; 5. a connecting rod; 6. a positioning groove; 7. a mounting groove; 8. a limit rod; 9. a spring; 10. a guide rail; 11. a clamping block; 12. a chute; 13. inserting blocks; 14. a clamping groove; 15. extruding a block; 16. a positioning block; 17. and a fixing rod.
Detailed Description
The utility model is further described below with reference to examples.
Referring to fig. 1-3, the utility model provides a combined building curtain wall for building decoration engineering, which comprises upright posts 1, wherein a plurality of groups of cross bars 3 which are uniformly distributed are fixed between a left upright post 1 and a right upright post 1, and a quick dismounting mechanism 2 is arranged in the upright posts 1;
the quick assembly disassembly mechanism 2 includes constant head tank 6, constant head tank 6 all sets up in pole setting 1 front wall left and right sides and evenly distributed, constant head tank 6 can confirm the inserted block 13 position, thereby can confirm curtain wall panel 4 position, all be provided with mounting groove 7 between two sets of constant head tanks 6 about, the roof middle part all is fixed with dead lever 17 in the mounting groove 7, mounting groove 7 is used for installing dead lever 17 and gag lever post 8 fixedly connected with gag lever post 8, both ends all sliding connection is inboard at spout 12 about gag lever post 8, gag lever post 8 and spout 12 cooperation can confirm fixture block 11 position, avoid its skew, spout 12 all sets up and is close to a side wall middle part about two sets of fixture blocks 11 mutually, both ends are equal sliding connection in the inside left and right sides of guide rail 10 about fixture block 11, guide rail 10 all is fixed at the lateral wall around mounting groove 7 respectively, guide rail 10 plays restriction fixture block 11 and makes fixture block 11 can carry out the effect of sliding in its inside.
Further, as shown in fig. 1, 2 and 3, it is worth specifically explaining that the outer Zhou Jun of the stop lever 8 is slidably connected with a spring 9, the left and right ends of the spring 9 are respectively fixed on the outer circumferences of the left and right groups of clamping blocks 11 close to a side wall chute 12, and the spring 9 can push the clamping blocks 11 into the clamping grooves 14 in the process of inserting the inserting blocks 13 into the inner sides of the positioning grooves 6, so that curtain wall installation is completed.
Further, as shown in fig. 3, it is worth specifically explaining that the installation grooves 7 penetrate through the side walls of the left and right groups of positioning grooves 6, the inner sides of the positioning grooves 6 are slidably connected with the insertion blocks 13, the insertion blocks 13 are in clearance fit with the positioning grooves 6, and the installation of the curtain wall board 4 can be realized by inserting and fixing the insertion blocks 13 inside the positioning grooves 6.
The scheme comprises the following working processes: when damage appears in the part curtain wallboard 4 when using this building curtain in-process, the accessible is to the connecting rod 5 of the broken building curtain four corners department of rear side pressing, connecting rod 5 moves the in-process to the rear side and makes extrusion piece 15 at inside back side removal of draw-in groove 14, extrusion piece 15 moves backward and makes the inside fixture block 11 of draw-in groove 14 outside removal, thereby make fixture block 11 and draw-in groove 14 dismantlement behind the separation with curtain board 4 follow pole setting 1 front side, realize the accurate broken curtain of dismantling, aim at the back of constant head tank 6 respectively with the curtain wallboard 4 rear side inserted block 13 that will change and push down curtain wallboard 4 backward, make curtain wallboard 4 backward in-process fixture block 11 insert the draw-in groove 14 inboard, accomplish the change of curtain wallboard 4.
The working process can be as follows: the connecting rod 5 at the four corners of the broken building curtain wall is pressed, the extrusion block 15 is moved to the rear side in the clamping groove 14 in the moving process of the connecting rod 5 to the rear side, the extrusion block 15 is moved to the rear side to enable the clamping block 11 in the clamping groove 14 to move to the outer side, so that the curtain wall plate 4 is detached from the front side of the vertical rod 1 after the clamping block 11 is separated from the clamping groove 14, other good curtain walls do not need to be detached, the curtain wall detachment difficulty is reduced, and the curtain wall replacement efficiency is improved.
Further, as shown in fig. 1, 2 and 3, it is worth specifically explaining that the inserting blocks 13 are respectively fixed at four corners of the rear wall of the curtain wall board 4, a side wall of the inserting block 13 far away from the middle part of the curtain wall board 4 is provided with a clamping groove 14, and the clamping groove 14 and the clamping block 11 cooperate to fix the inserting block 13 at the inner side of the positioning groove 6 so as to realize the installation and fixation of the curtain wall board 4.
Further, as shown in fig. 1, it is worth specifically explaining that the upper and lower sides of the left and right parts of the rear wall of the curtain wall plate 4 are both fixed with positioning blocks 16, the front side wall of the clamping groove 14 is both slidably connected with an extrusion block 15, and the extrusion block 15 can extrude the clamping block 11 from the inside of the clamping groove 14 in the backward moving process, so that the curtain wall plate 4 can be disassembled.
Further, as shown in fig. 1, it is worth specifically describing that the extrusion blocks 15 are all fixed at the rear ends of the connecting rods 5, and the connecting rods 5 penetrate and are slidably connected to four corners of the front wall of the curtain wall panel 4, so that the connecting rods 5 can move in the front-rear direction.
To sum up: the connecting rod 5 moves the in-process to the rear and makes extrusion piece 15 at draw-in groove 14 inside back side removal, extrusion piece 15 moves backward and makes the inside fixture block 11 of draw-in groove 14 outside remove to make fixture block 11 and draw-in groove 14 dismantle curtain board 4 from pole setting 1 front side after separating, draw-in groove 14 and fixture block 11 cooperation can be fixed inserting piece 13 in the constant head tank 6 inboard with this realization is fixed to the installation of curtain board 4, extrusion piece 15 can be at the in-process of moving backward with fixture block 11 from the inside extrusion of draw-in groove 14, thereby can dismantle curtain board 4, make connecting rod 5 can move in the fore-and-aft direction.

Claims (2)

1. The utility model provides a building decoration is combination formula building curtain for engineering, includes pole setting (1), its characterized in that: a plurality of groups of cross bars (3) which are uniformly distributed are fixed between the left and right groups of upright posts (1), and a quick dismounting mechanism (2) is arranged inside the upright posts (1);
the quick assembly disassembly mechanism (2) comprises positioning grooves (6), wherein the positioning grooves (6) are respectively arranged on the left side and the right side of the front wall of the vertical rod (1) and are uniformly distributed, mounting grooves (7) are respectively arranged between the left side and the right side of the front wall of the vertical rod (1), fixing rods (17) are respectively fixed in the middle of the inner top wall of the mounting grooves (7), limiting rods (8) are respectively fixedly connected to the bottom ends of the fixing rods (17), the left ends and the right ends of the limiting rods (8) are respectively and slidably connected to the inner sides of sliding grooves (12), the sliding grooves (12) are respectively arranged on the left side and the right side of the front wall of each clamping block (11) close to the middle of one side wall, the front end and the rear end of each clamping block (11) are respectively and slidably connected to the left side and the right side of the inside of each guide rail (10), and the guide rails (10) are respectively fixed on the front side and the rear side walls of each mounting groove (7).
The mounting groove (7) all runs through two sets of constant head tank (6) lateral walls about, equal sliding connection in constant head tank (6) inboard has inserted block (13), inserted block (13) all are fixed in curtain wallboard (4) back wall four corners department respectively, inserted block (13) are kept away from curtain wallboard (4) middle part lateral wall and all are provided with draw-in groove (14), both sides all are fixed with locating piece (16) about curtain wallboard (4) back wall, equal sliding connection of lateral wall has extrusion piece (15) before draw-in groove (14), extrusion piece (15) all are fixed in connecting rod (5) rear end, connecting rod (5) all run through and sliding connection in curtain wallboard (4) front wall four corners.
2. The modular building curtain wall for a building finishing work according to claim 1, wherein: the outer Zhou Jun of gag lever post (8) sliding connection has spring (9), both ends are fixed respectively in two sets of fixture blocks (11) about controlling and are close to a side wall spout (12) periphery about spring (9).
CN202320619761.XU 2023-03-27 2023-03-27 Combined building curtain wall for building decoration engineering Active CN220167245U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320619761.XU CN220167245U (en) 2023-03-27 2023-03-27 Combined building curtain wall for building decoration engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320619761.XU CN220167245U (en) 2023-03-27 2023-03-27 Combined building curtain wall for building decoration engineering

Publications (1)

Publication Number Publication Date
CN220167245U true CN220167245U (en) 2023-12-12

Family

ID=89060854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320619761.XU Active CN220167245U (en) 2023-03-27 2023-03-27 Combined building curtain wall for building decoration engineering

Country Status (1)

Country Link
CN (1) CN220167245U (en)

Similar Documents

Publication Publication Date Title
CN210194982U (en) Dry-hanging stone structure
CN201148669Y (en) Sliding chute positioning link bar
CN220167245U (en) Combined building curtain wall for building decoration engineering
CN210622188U (en) Device capable of being disassembled and quickly installed
CN112123522B (en) V-shaped groove mold for light partition board
CN215920833U (en) Prefabricated planking wall combination mould
CN213062944U (en) Assembled construction formwork of assembled building
CN213710198U (en) Combined wallboard for green house
CN210342405U (en) Assembled partition wall furred ceiling structure
CN214246247U (en) Stone curtain wall system without cross beam
CN214658455U (en) Mounting structure of indoor environmental protection stone decorative panel
CN214117139U (en) Architectural decoration curtain quick connecting device
CN220486857U (en) Suspension type curtain wall plate
CN217353335U (en) Curtain wall grating system
CN115573499B (en) High-precision control installation mechanism for special-shaped aluminum veneer and construction method
CN219274960U (en) Welding processing auxiliary fixtures
CN215858457U (en) Exhibition hall curtain of easily buildding fast and dismantling
CN219081081U (en) Old building outer elevation transformation structure
KR20090025485A (en) Construction structure of wall decorating- panel
CN213014874U (en) Decorative strip structure for curtain wall decoration
CN219808567U (en) Quick mosaic structure of alloy fossil fragments frame
CN220620613U (en) Curtain decorative board mounting structure
CN220336244U (en) Assembled hyperbolic plate
CN220889089U (en) Effectual glass curtain wall gives sound insulation
CN214531727U (en) Novel elevator well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant