CN220152048U - Pipeline construction supporting device - Google Patents

Pipeline construction supporting device Download PDF

Info

Publication number
CN220152048U
CN220152048U CN202321508715.9U CN202321508715U CN220152048U CN 220152048 U CN220152048 U CN 220152048U CN 202321508715 U CN202321508715 U CN 202321508715U CN 220152048 U CN220152048 U CN 220152048U
Authority
CN
China
Prior art keywords
pipe clamp
hydraulic rod
base
utility
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321508715.9U
Other languages
Chinese (zh)
Inventor
杨毅
何春华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Junkai Construction Engineering Co ltd
Original Assignee
Guangdong Junkai Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Junkai Construction Engineering Co ltd filed Critical Guangdong Junkai Construction Engineering Co ltd
Priority to CN202321508715.9U priority Critical patent/CN220152048U/en
Application granted granted Critical
Publication of CN220152048U publication Critical patent/CN220152048U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline construction supporting device, which comprises: a bracket assembly; the bracket component comprises a base, a first hydraulic rod and a stabilizing frame, wherein the base is arranged, the first hydraulic rod is arranged on the base, and the stabilizing frame is connected with the first hydraulic rod; a pipe clamp assembly; the pipe clamp assembly comprises a lower pipe clamp connected with the hydraulic rod, a clamping groove formed in one end of the lower pipe clamp, a first slotted hole formed in the clamping groove, a groove formed in the other end of the lower pipe clamp, a rotating shaft arranged in the groove, an upper pipe clamp connected with the rotating shaft, a buckle arranged at one end of the upper pipe clamp, a second slotted hole formed in the buckle and a fixing rod connected with the first slotted hole. According to the utility model, through the mutual matching of the support structure and the mounting structure, pipelines with different heights are supported and fixed in the construction process, the pipe clamp is very easy to mount, screws and nuts are not needed for fixing, the time is greatly saved, and the construction efficiency is improved.

Description

Pipeline construction supporting device
Technical Field
The utility model relates to the technical field of supporting devices, in particular to a   pipeline construction supporting device.
Background
Pipeline construction generally refers to pipeline engineering construction, in the pipeline construction process, a supporting device is needed to support and fix a pipeline, the existing supporting device needs to be fixedly installed by using screws and nuts, but the screw and nut loosening is caused by insufficient biting force, vibration, large pulling force, and the like, so that the supporting device is not attached to the pipeline enough, the installation of the screw and the nut is not convenient enough, and the problem is solved by arranging the   pipeline construction supporting device.
Disclosure of Invention
Therefore, the utility model aims to provide the   pipeline construction supporting device, which realizes the supporting and fixing of pipelines with different heights in the construction process through the mutual matching of the arranged bracket structure and the mounting structure, and the pipe clamp is very easy to mount without screw and nut for fixing, thereby greatly saving time and improving the construction efficiency.
In order to solve the technical problems, according to one aspect of the present utility model, the following technical solutions are provided:
pipeline construction strutting arrangement includes:
a bracket assembly;
the bracket component comprises a base, a first hydraulic rod and a stabilizing frame, wherein the base is arranged, the first hydraulic rod is arranged on the base, and the stabilizing frame is connected with the first hydraulic rod;
a pipe clamp assembly;
the pipe clamp assembly comprises a lower pipe clamp connected with the hydraulic rod, a clamping groove formed in one end of the lower pipe clamp, a first slotted hole formed in the clamping groove, a groove formed in the other end of the lower pipe clamp, a rotating shaft arranged in the groove, an upper pipe clamp connected with the rotating shaft, a buckle arranged at one end of the upper pipe clamp, a second slotted hole formed in the buckle and a fixing rod connected with the first slotted hole.
As a preferable scheme of the   pipeline construction supporting device, four stabilizing frames are arranged and connected with the base, so that the stability of the supporting device is improved.
As a preferable scheme of the   pipeline construction supporting device, the upper pipe clamp is connected with the lower pipe clamp through the rotating shaft, and the upper pipe clamp rotates on the rotating shaft, so that the clamp buckle and the clamping groove can be clamped and fixed on the pipeline.
As a preferable scheme of the   pipeline construction supporting device, the length, width and height of the clamping groove are larger than those of the buckle, and the clamping groove is just clamped with the buckle.
The   pipeline construction supporting device comprises a base, a connecting box, a motor, a rolling shaft, a roller, a track, a second hydraulic rod and a support frame, wherein the connecting box is arranged on the bottom surface of the base, the motor is connected with the connecting box, the rolling shaft is connected to the side surface of the connecting box, the roller is connected with the rolling shaft, the track is arranged on the outer side of the roller, and the second hydraulic rod is arranged on the bottom surface of the base.
As a preferable scheme of the   pipeline construction supporting device, the crawler belt is arranged on two sides of the connecting box, the second hydraulic rods are four, and the stability of the fixing device is enhanced by the crawler belt and the second hydraulic rods.
Compared with the prior art, the utility model has the advantages that:
1. according to the utility model, through the mutual matching of the first hydraulic rod, the stabilizing frame, the lower pipe clamp, the upper pipe clamp, the clamping groove, the first slotted hole, the groove, the rotating shaft, the upper pipe clamp, the buckle, the second slotted hole, the fixing rod, the motor, the rolling shaft, the rolling wheels and the crawler belt, pipelines with different heights are supported and fixed in the construction process, the pipe clamp is easy to install, the screw and the nut are not needed for fixing, the time is greatly saved, and the construction efficiency is improved.
2. Based on beneficial effect one, the motor drives the gyro wheel and rotates, and the gyro wheel drives the track and rolls, and strutting arrangement can remove, and the track also can stably remove on uneven ground, need not the manual work and carries, stops after removing certain position, and the second hydraulic stem pushes down, further stabilizes strutting arrangement.
When specifically using, first hydraulic stem goes up and down, satisfy the pipeline support demand of not co-altitude, four stabilizing racks are connected with base and first hydraulic stem, play further stabilization effect, go up the pipe clamp and be connected with lower pipe clamp through the axis of rotation, rotate in the axis of rotation, rotate to certain position buckle and draw-in groove block, the dead lever passes first slotted hole and second slotted hole and fixes the pipe clamp on lower pipe clamp, can fix the pipeline, it is very convenient to install, the motor drives the gyro wheel rotatory, the gyro wheel drives the track roll, strutting arrangement can remove, the track also can stabilize the removal on uneven ground, need not the manual work and carries, stop after moving to certain position, the second hydraulic stem compresses tightly downwards, further stabilize strutting arrangement.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the following detailed description of the embodiments of the present utility model will be given with reference to the accompanying drawings, which are to be understood as merely some embodiments of the present utility model, and from which other drawings can be obtained by those skilled in the art without inventive faculty. Wherein:
FIG. 1 is a block diagram of the present utility model;
FIG. 2 is a block diagram of a pipe clamp assembly of the present utility model;
FIG. 3 is a block diagram of a pipe clamp assembly of the present utility model
Fig. 4 is a block diagram of a mobile assembly according to the present utility model.
In the figure: 100. a bracket assembly; 110. a base; 120. a first hydraulic lever; 130. a stabilizing rack; 200. a pipe clamp assembly; 210. a lower pipe clamp; 220. a clamping groove; 230. a first slot; 240. a groove; 250. a rotating shaft; 260. a pipe clamp is arranged; 270. a buckle; 280. a second slot; 290. a fixed rod; 300. a moving assembly; 310. a connection box; 320. a motor; 330. a roller; 340. a roller; 350. a track; 360. and a second hydraulic rod.
Description of the embodiments
In order that the above objects, features and advantages of the utility model will be readily understood, a more particular description of the utility model will be rendered by reference to the appended drawings.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present utility model, but the present utility model may be practiced in other ways other than those described herein, and persons skilled in the art will readily appreciate that the present utility model is not limited to the specific embodiments disclosed below.
In the following detailed description of the embodiments of the present utility model, the cross-sectional view of the device structure is not partially enlarged to a general scale for the convenience of description, and the schematic is merely an example, which should not limit the scope of the present utility model. In addition, the three-dimensional dimensions of length, width and depth should be included in actual fabrication.
For the purpose of making the objects, technical solutions and advantages of the present utility model more apparent, embodiments of the present utility model will be described in further detail below with reference to the accompanying drawings.
The   pipeline construction supporting device provided by the utility model has the advantages that the pipelines with different heights are supported and fixed in the construction process through the mutual matching of the arranged bracket structure and the mounting structure, the pipe clamp is very easy to mount, the screw and the nut are not needed for fixing, the time is greatly saved, and the construction efficiency is improved.
Examples
Fig. 1, 2 and 3 are schematic views showing the overall structure of an embodiment of the   pipe construction supporting device according to the present utility model, referring to fig. 1, 2 and 3, the main structure of the embodiment includes: a bracket assembly 100 and a pipe clamp assembly 200.
The bracket assembly 100 is used to support a pipe clamp;
specifically, the bracket assembly 100 includes a base 110, a first hydraulic rod 120 installed on the base 110, and a stabilizing frame 130 connected with the first hydraulic rod 120, when the bracket assembly is specifically used, the first hydraulic rod 120 is lifted, so as to meet the pipeline supporting requirements of different heights, and four stabilizing frames 130 are connected with the base 110 and the first hydraulic rod 120 to play a further stabilizing role.
The pipe clamp assembly 200 is used to secure a pipe;
specifically, the pipe clamp assembly 200 includes a lower pipe clamp 210 connected to the first hydraulic rod 120, a clamping groove 220 formed at one end of the lower pipe clamp 210, a first slot 230 formed in the clamping groove 220, a groove 240 formed at the other end of the lower pipe clamp 210, a rotating shaft 250 formed inside the groove 240, an upper pipe clamp 260 connected to the rotating shaft 250, a buckle 270 formed at one end of the upper pipe clamp 260, a second slot 280 formed on the buckle 270, and a fixing rod 290 connected to the first slot 230, when the pipe clamp assembly is used, the upper pipe clamp 260 is connected to the lower pipe clamp 210 through the rotating shaft 250, rotates on the rotating shaft 250, rotates to a certain position to be clamped with the clamping groove 220, and the fixing rod 290 passes through the first slot 230 and the second slot 280 to fix the upper pipe clamp 260 on the lower pipe clamp 210, so that the pipe can be fixed and the pipe clamp assembly is very convenient.
Examples
Referring to fig. 4, the present embodiment further includes a moving assembly 300 on the basis of embodiment 1, where the moving assembly 300 includes a connection box 310 installed on the bottom surface of the base 110, a motor 320 connected to the connection box 310, a roller 330 connected to the side surface of the connection box 310, a roller 340 connected to the roller 330, a track 350 disposed on the outer side of the roller 340, and a second hydraulic rod 360 installed on the bottom surface of the base 110, and when the apparatus is specifically used, the motor 320 drives the roller 340 to rotate, the roller 340 drives the track 350 to roll, the supporting device can move, the track 350 can also move stably on uneven ground, without manual handling, stop after moving to a certain position, and the second hydraulic rod 360 presses downward, so as to further stabilize the supporting device.
Although the utility model has been described hereinabove with reference to embodiments, various modifications thereof may be made and equivalents may be substituted for elements thereof without departing from the scope of the utility model. In particular, the features of the disclosed embodiments may be combined with each other in any manner as long as there is no structural conflict, and the exhaustive description of these combinations is not given in this specification merely for the sake of omitting the descriptions and saving resources. Therefore, it is intended that the utility model not be limited to the particular embodiment disclosed, but that the utility model will include all embodiments falling within the scope of the appended claims.

Claims (6)

1.  pipeline construction strutting arrangement, its characterized in that includes:
a bracket assembly (100);
the bracket assembly (100) comprises a base (110), a first hydraulic rod (120) arranged on the base (110) and a stabilizing frame (130) connected with the first hydraulic rod (120);
a pipe clamp assembly (200);
the pipe clamp assembly (200) comprises a lower pipe clamp (210) connected with the first hydraulic rod (120), a clamping groove (220) formed in one end of the lower pipe clamp (210), a first slotted hole (230) formed in the clamping groove (220), a groove (240) formed in the other end of the lower pipe clamp (210), a rotating shaft (250) arranged in the groove (240), an upper pipe clamp (260) connected with the rotating shaft (250), a buckle (270) arranged at one end of the upper pipe clamp (260), a second slotted hole (280) formed in the buckle (270) and a fixing rod (290) connected with the first slotted hole (230).
2. The   pipe construction support device according to claim 1, wherein the stabilizer (130) is provided with four and is connected with the base (110).
3. The   pipe construction support device according to claim 1, wherein the upper pipe clamp (260) is connected to the lower pipe clamp (210) by the rotation shaft (250).
4. The   pipe construction support device of claim 1, wherein the length, width and height of the clip groove (220) is greater than the length, width and height of the clip (270).
5. The   pipe construction supporting apparatus according to claim 1, further comprising a moving assembly (300), the moving assembly (300) comprising a connection box (310) installed at the bottom surface of the base (110), a motor (320) connected to the connection box (310), a roller (330) connected to the side of the connection box (310), a roller (340) connected to the roller (330), a track (350) provided at the outer side of the roller (340), and a second hydraulic rod (360) installed at the bottom surface of the base (110).
6. The   pipe construction supporting apparatus according to claim 5, wherein the crawler (350) is provided at both sides of the connection box (310), and the second hydraulic rod (360) is provided with four.
CN202321508715.9U 2023-06-14 2023-06-14 Pipeline construction supporting device Active CN220152048U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321508715.9U CN220152048U (en) 2023-06-14 2023-06-14 Pipeline construction supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321508715.9U CN220152048U (en) 2023-06-14 2023-06-14 Pipeline construction supporting device

Publications (1)

Publication Number Publication Date
CN220152048U true CN220152048U (en) 2023-12-08

Family

ID=89021567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321508715.9U Active CN220152048U (en) 2023-06-14 2023-06-14 Pipeline construction supporting device

Country Status (1)

Country Link
CN (1) CN220152048U (en)

Similar Documents

Publication Publication Date Title
CN111379953A (en) Bridge construction supporting equipment in field of bridge engineering
CN220152048U (en) Pipeline construction supporting device
CN201954224U (en) Clamping groove fixed camera support
CN214663190U (en) Micro-vibration prevention support
WO2021243496A1 (en) Stable 5g base station support for monitoring
CN208966071U (en) A kind of architectural engineering combined type support shuttering
CN212376321U (en) Building structure reinforcing apparatus
CN215318234U (en) Steel pipe positioning tool
CN220725704U (en) Scaffold for installation of large-size photovoltaic module
CN219102654U (en) Lateral supporting device for engineering machinery assistance
CN219282603U (en) Pipeline bracket
CN221629025U (en) Pipeline fixing device for building engineering
CN211670702U (en) Support for aviation motor
CN219929581U (en) Easily-operated well lid construction and extraction device
CN211257903U (en) Building engineering frame roof beam reinforcing apparatus
CN221369949U (en) Cable winding device
CN220337630U (en) Pipeline bracket
CN221000635U (en) Bracket convenient beam for cast-in-situ beam construction
CN210175544U (en) Door and window preparation rack
CN220771355U (en) Mounting frame of fresh air system outer machine case
CN203660740U (en) Motor installation structure
CN220725862U (en) Building structure reinforcing device
CN219263400U (en) Pipeline support and hanger with spring buffer structure
CN220622434U (en) Anti-drop structure is used in hydraulic engineering equipment installation
CN220743745U (en) Support transfer bracket for turntable chamber end cover of sediment abrasion test bed

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant