CN220150513U - Green building frame structure - Google Patents

Green building frame structure Download PDF

Info

Publication number
CN220150513U
CN220150513U CN202321162136.3U CN202321162136U CN220150513U CN 220150513 U CN220150513 U CN 220150513U CN 202321162136 U CN202321162136 U CN 202321162136U CN 220150513 U CN220150513 U CN 220150513U
Authority
CN
China
Prior art keywords
frame structure
green building
building frame
mounting
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321162136.3U
Other languages
Chinese (zh)
Inventor
陈树龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Tengyue Rui Construction Engineering Co ltd
Original Assignee
Xinjiang Tengyue Rui Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Tengyue Rui Construction Engineering Co ltd filed Critical Xinjiang Tengyue Rui Construction Engineering Co ltd
Priority to CN202321162136.3U priority Critical patent/CN220150513U/en
Application granted granted Critical
Publication of CN220150513U publication Critical patent/CN220150513U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to the technical field of building engineering, in particular to a green building frame structure, which comprises a mounting block, wherein a fixed seat is arranged at the rear end of the mounting block, mounting sleeves are arranged on all sides of the mounting block, a plurality of mounting sleeves are respectively matched with a beam and a column, a plurality of fixing holes are formed in the mounting sleeves, fixing support blocks are arranged on the periphery of the fixed seat, a plurality of fixing holes are formed in the fixing support blocks, the beam is fixed on the mounting sleeves and the fixing support blocks through a plurality of metal rods or long bolts after being inserted into the mounting sleeves, so that the beam is more firmly fixed, the stability of the frame is further improved, and the fixing holes are easier to align when the frame is assembled by adopting a mounting mode of being inserted into the mounting sleeves and then fixed.

Description

Green building frame structure
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to a green building frame structure.
Background
As is known, the green building is a high-quality building which saves resources, protects the environment, reduces pollution, provides healthy, applicable and efficient use space for people, maximally realizes the harmony and symbiosis of people and nature in the whole life cycle, and is rapidly developed in China. The frame structure is also developed to green building in the building and is widely applied.
The existing frame is basically composed of beams and columns, when the beams and the columns are connected, the beams and the columns are usually connected and fixed through lifting, and at the moment, the fixing holes are difficult to align, so that the installation is troublesome, and if the frame can be directly and quickly installed, the construction time is effectively shortened.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the utility model provides a green building frame structure.
(II) technical scheme
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a green building frame structure, includes the installation piece, the rear end of installation piece is provided with the fixing base, each face of installation piece all is provided with the installation cover, and the several the installation cover matches with roof beam and post respectively, the installation is sheathe in and is provided with the several fixed orifices, all be provided with fixed die pad around the fixing base, be provided with the several fixed orifices on the fixed die pad.
Further, one surface of the plurality of fixed supporting blocks, which is close to the beam and the column, is respectively tightly attached to the beam and the column.
Further, a plurality of fixing holes on the fixing support block are arranged on one side far away from the mounting sleeve.
Further, one side of the inside of the installation sleeve, which is far away from the installation block, is provided with a chamfer.
Further, the axial length of the mounting sleeve must not be less than 10 cm.
Further, the tolerance between the groove in the mounting sleeve and the beam and shaft must not be greater than 0.8 mm.
(III) beneficial effects
Compared with the prior art, the utility model provides a green building frame structure, which comprises the following components
The beneficial effects are that:
this green building frame structure is fixed in the roof beam on installation cover and the fixed bracket through adopting to insert the roof beam installation cover rethread several metal pole or long bolt to make the fixed of roof beam more firm, further promoted the stability of this frame, thereby make the frame of the green building that adopts this structure have higher life-span and stability, through adopting the mounting means that carries out the fixation again after inserting the installation cover, make this frame align more easily at the time of the frame dress fixed orifices, it is more convenient to install.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic cross-sectional view at A1-A2 of the present utility model;
fig. 3 is a schematic view showing the appearance of the mounting block, the fixing base, and a partial bottom view between the mounting sleeves and the fixing brackets at the left and right parts of the present utility model.
In the figure: 1. a mounting block; 2. a fixing seat; 3. a mounting sleeve; 4. a fixing hole; 5. and fixing the supporting blocks.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, the green building frame structure of the utility model comprises a mounting block 1, wherein a fixing seat 2 is arranged at the rear end of the mounting block 1, mounting sleeves 3 are arranged on all sides of the mounting block 1, the mounting sleeves 3 are respectively matched with a beam and a column on one side of the mounting block 1, a plurality of fixing holes 4 are arranged on the mounting sleeves 3, the fixing holes 4 on the mounting sleeves 3 are not close to one side of the mounting block 3 far away from the mounting block 1, the fixing holes 4 are arranged close to one side of the mounting block 1 or are arranged in the middle, during fixing, a metal rod can pass through the fixing holes 4, then the metal rod stretches out of the fixing holes 4 to be subjected to hammer bending, so that a riveting effect is formed, the fixing can also be directly realized by the cooperation of long bolts and nuts, a beam or column suitable for the frame structure is needed to be customized before fixing, or the fixing holes 4 on the mounting sleeves 3 can be respectively four groups, different firmness is realized, fixing blocks 5 are respectively arranged on the periphery of the fixing sleeve 2, and a plurality of fixing support blocks 5 are arranged on one side of the fixing support blocks 4 far away from the beam and the beam 4, and the fixing support blocks 5 are further fixed on one side of the fixing support blocks 4, and the fixing support blocks can be fixed by the fixing blocks 5.
During production, the mounting block 1, the fixing seat 2, the mounting sleeve 3 and the fixing support block 5 can be integrally formed, for example, can be directly cast integrally.
This green building frame structure, when using, firstly be fixed in suitable position through fixing base 2, then take the roof beam on fixed die block 5, promote the roof beam, let the roof beam insert in the installation cover 3, and in order to let the roof beam insert in the installation cover 3 more easily, need set up the chamfer in the one side that installation piece 1 was kept away from to the inside of installation cover 3, the chamfer setting also makes the roof beam insert in the installation cover 3 more easily, and in order to let installation cover 3 have better limiting effect, the axial length of installation cover 3 must be less than 10 centimetres, and the tolerance between groove in the installation cover 3 and roof beam and the axle must not be greater than 0.8 millimeter, thereby just can make the roof beam insert in the installation cover 3 after, the installation cover 3 has better limiting effect to the roof beam, can also prevent shaking simultaneously, the fixed with the roof beam that just can firmly fix through fixed die block 5.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A green building frame structure, characterized in that: including installation piece (1), the rear end of installation piece (1) is provided with fixing base (2), each face of installation piece (1) all is provided with installation cover (3), and the several installation cover (3) match with roof beam and post respectively, be provided with several fixed orifices (4) on installation cover (3), all be provided with fixed support piece (5) around fixing base (2), be provided with several fixed orifices (4) on fixed support piece (5).
2. A green building frame structure according to claim 1, wherein: one surface of each fixed supporting block (5) close to the beam and the column is respectively tightly attached to the beam and the column.
3. A green building frame structure according to claim 1, wherein: the fixing holes (4) on the fixing support blocks (5) are arranged on one side far away from the mounting sleeve (3).
4. A green building frame structure according to claim 1, wherein: one side of the inside of the installation sleeve (3) far away from the installation block (1) is provided with a chamfer.
5. A green building frame structure according to claim 1, wherein: the axial length of the mounting sleeve (3) is not less than 10 cm.
6. A green building frame structure according to claim 1, wherein: the tolerance between the groove in the mounting sleeve (3) and the beam and shaft must not be greater than 0.8 mm.
CN202321162136.3U 2023-05-15 2023-05-15 Green building frame structure Active CN220150513U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321162136.3U CN220150513U (en) 2023-05-15 2023-05-15 Green building frame structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321162136.3U CN220150513U (en) 2023-05-15 2023-05-15 Green building frame structure

Publications (1)

Publication Number Publication Date
CN220150513U true CN220150513U (en) 2023-12-08

Family

ID=89015796

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321162136.3U Active CN220150513U (en) 2023-05-15 2023-05-15 Green building frame structure

Country Status (1)

Country Link
CN (1) CN220150513U (en)

Similar Documents

Publication Publication Date Title
CN220150513U (en) Green building frame structure
CN212453413U (en) Aluminum alloy framework decorative wall convenient to disassemble and assemble
CN213634372U (en) Computer case convenient to disassemble and assemble in combined mode
CN214013961U (en) Stator core convenient to dismouting
CN213233925U (en) Assembled building curtain
CN212984266U (en) Assembled wall surface mounting structure
CN219175594U (en) Assembled aluminum plate curtain wall
CN219710697U (en) Unit type curtain wall structure
CN219196694U (en) Building construction support
CN218346931U (en) Unloading device for structure reinforcement of salt production workshop
CN211395999U (en) Prefabricated end wall connected node structure of assembled roof boarding and building
CN214995005U (en) Glass curtain wall combined splicing structure
CN221120553U (en) Metal arm structure convenient to dismouting
CN215043365U (en) Novel bicycle frame
CN215484270U (en) High strength architectural decoration is with link plate that gives sound insulation convenient to installation
CN109695323A (en) A kind of large cylindrical aluminum veneer package decoration splicing structure
CN220400199U (en) Billboard connecting structure for commercial curtain wall
CN217949379U (en) Freezer heated board sectional fixture
CN220686593U (en) Prefabricated wall installation fixed bolster
CN211840128U (en) Neodymium iron boron magnetism nature material forming die structure
CN220014131U (en) Large plate aluminum plate mounting member convenient to fix
CN212641856U (en) Curtain wall fixing structure
CN211704167U (en) Double-layer three-dimensional frame assembled type hollowed-out screen
CN218715385U (en) Ancient building rammed earth wall reinforced structure
CN211143639U (en) Door lintel mounting structure of light steel structure house

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant