CN220117282U - Assembled cable trench - Google Patents

Assembled cable trench Download PDF

Info

Publication number
CN220117282U
CN220117282U CN202321696285.8U CN202321696285U CN220117282U CN 220117282 U CN220117282 U CN 220117282U CN 202321696285 U CN202321696285 U CN 202321696285U CN 220117282 U CN220117282 U CN 220117282U
Authority
CN
China
Prior art keywords
main body
connecting plate
buckle
plate
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321696285.8U
Other languages
Chinese (zh)
Inventor
徐晓飞
倪玉龙
徐海洋
刘焓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Quekou Information Technology Consulting Service Co ltd
Hainan Zilang Construction Technology Co ltd
Original Assignee
Jiangxi Quekou Information Technology Consulting Service Co ltd
Hainan Zilang Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Quekou Information Technology Consulting Service Co ltd, Hainan Zilang Construction Technology Co ltd filed Critical Jiangxi Quekou Information Technology Consulting Service Co ltd
Priority to CN202321696285.8U priority Critical patent/CN220117282U/en
Application granted granted Critical
Publication of CN220117282U publication Critical patent/CN220117282U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model provides an assembled cable trench, which relates to the technical field of cable laying and comprises a main body, wherein a cable support is fixedly arranged on the inner surface of the main body, a top cover plate is arranged at the upper end of the main body, a connecting groove is formed in the inner surface of the main body, a connecting plate is arranged at the lower end of the main body, a threaded hole is formed in the upper surface of the connecting plate, a buckle plate is arranged at the upper end of the connecting plate, bolts are arranged at the upper end of the buckle plate, two groups of main bodies can be contacted together, the connecting grooves on the two groups of main bodies can be gradually closed, a U-shaped connecting plate is utilized to buckle the two groups of connecting grooves from the bottom, the two groups of main bodies can be initially connected, then the buckle plate is buckled on the connecting plate from the inner side of the main body, finally, the bolts penetrate through the buckle plate and are screwed into the threaded hole, so that the two groups of main bodies can be fixed together, people can directly assemble the main bodies according to the size of the main bodies after ditching, the assembled main bodies are more convenient and quick to construct, and the construction period is greatly shortened.

Description

Assembled cable trench
Technical Field
The utility model relates to the technical field of cable laying, in particular to an assembled cable trench.
Background
The cable trench is an underground pipeline for laying and replacing electric power or telecommunication cable facilities, is also an enclosure structure of the laid cable facilities, has rectangular, circular, arched and other pipeline structural forms, at present, most of the cable trench is excavated according to design requirements, and a template is arranged in the excavated trench and concrete is poured for forming, so that the construction process of the cable trench is complicated, the construction period is longer, and concrete pouring cannot be completed in rainy days, therefore, the assembled cable trench is required to shorten the construction period, and the construction steps of the cable trench are reduced.
Disclosure of Invention
The present utility model is directed to solving the technical problems set forth in the background art.
The utility model adopts the following technical scheme: the utility model provides an assembled cable pit, includes the main part, the internal surface fixed mounting of main part has the cable support, the upper end of main part is provided with the lamina tecti, the linking groove has been seted up to the internal surface of main part, the lower extreme of main part is provided with the connecting plate, threaded hole has been seted up to the upper surface of connecting plate, the upper end of connecting plate is provided with the buckle, the upper end of buckle is provided with the bolt, the water drainage tank has been seted up to the internal surface of main part.
Preferably, the lower end of the top cover plate is provided with a protrusion, and the upper surface of the main body is provided with a groove. Here, when the protrusion is fitted to the groove, the tightness of the top cover plate and the main body can be further increased.
Preferably, the upper surface of the top cover plate is provided with a hook hole, and the side surface of the main body is fixedly provided with a rubber pad. Here, offer the hook hole on the lamina tecti, make things convenient for people to take off lamina tecti with the help of the instrument.
Preferably, the bolt is matched with the threaded hole, and the shape of the connecting plate is U-shaped. Here, two sets of bodies can be connected together using a U-shaped connection plate.
Preferably, the upper end of water drainage tank is provided with complementary unit, complementary unit includes the screen cloth, the screen cloth sets up the upper end at the water drainage tank, the draw-in groove has been seted up to the side surface of screen cloth. Here, the screen can block stones carried in the standing water.
Preferably, the upper surface of the drainage tank is fixedly provided with a clamping block, and the clamping block is smaller than the width of the clamping tank. Here, after the clip block is inserted into the clip groove, the screen is installed in the drain groove.
Compared with the prior art, the utility model has the advantages and positive effects that,
1. according to the utility model, in actual use, through arranging the main bodies, the cable support, the top cover plate, the connecting grooves, the connecting plates, the threaded holes, the buckle plates, the bolts and the drainage grooves, at the moment, two groups of main bodies can be contacted together, so that the connecting grooves on the two groups of main bodies can be gradually closed, then the U-shaped connecting plates are utilized to buckle the two groups of connecting grooves from the bottom, so that the two groups of main bodies can be preliminarily connected, then the buckle plates are buckled on the connecting plates from the inner sides of the main bodies, finally the bolts penetrate through the buckle plates and are screwed into the threaded holes, so that the two groups of main bodies can be fixed together, people can make ditching according to the sizes of the main bodies, and the main bodies can be directly assembled after ditching, so that the construction is more convenient and rapid by utilizing the assembled main bodies, and the construction period is also greatly shortened.
2. In the utility model, in actual use, the auxiliary mechanism is arranged, the drainage groove can drain accumulated water on the inner side of the main body, the screen can be arranged in the drainage groove after the clamping block is clamped in the clamping groove, the screen can prevent stones in the accumulated water from flowing into the drainage groove, so that the drainage groove is prevented from being blocked by stones, and as the screen is clamped by the clamping block, people can quickly detach the screen, so that stones or foreign matters on the screen can be cleaned.
Drawings
Fig. 1 is a schematic diagram of an overall structure of an assembled cable trench according to the present utility model;
FIG. 2 is a bottom view of a fabricated cable trough according to the present utility model;
FIG. 3 is a top exploded view of a fabricated cable trench according to the present utility model;
fig. 4 is an exploded view of a roof and a main body of an assembled cable trench according to the present utility model.
Legend description:
1. a main body; 2. a cable support; 3. a top cover plate; 4. a connection groove; 5. a connecting plate; 6. a threaded hole; 7. a buckle plate; 8. a bolt; 9. a drainage channel; 10. a protrusion; 11. a groove; 12. a hook hole; 13. a rubber pad; 14. a screen; 15. a clamping groove; 16. and (5) clamping blocks.
Detailed Description
In order that the above objects, features and advantages of the utility model will be more clearly understood, a further description of the utility model will be rendered by reference to the appended drawings and examples. It should be noted that, without conflict, the embodiments of the present utility model and features in the embodiments may be combined with each other.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present utility model, however, the present utility model may be practiced otherwise than as described herein, and therefore the present utility model is not limited to the specific embodiments of the disclosure that follow.
Examples
Referring to fig. 1-4, the present utility model provides a technical solution: the utility model provides an assembled cable pit, including main part 1, the internal surface fixed mounting of main part 1 has cable support 2, the upper end of main part 1 is provided with lamina tecti 3, through be provided with lamina tecti 3 at the upper end of main part 1, be used for the top of sealed main part 1, the linking groove 4 has been seted up to the internal surface of main part 1, the lower extreme of main part 1 is provided with connecting plate 5, through setting up the internal surface of main part 1 and having seted up linking groove 4, be provided with connecting plate 5 at the lower extreme of main part 1 simultaneously, after connecting plate 5 inserts linking groove 4, can link together two sets of main parts 1 preliminarily, threaded hole 6 has been seted up to the upper surface of connecting plate 5, the upper end of connecting plate 5 is provided with buckle 7, the upper end of buckle 7 is provided with bolt 8, through being provided with buckle 7 at the upper end of buckle 7 simultaneously, and buckle 7 is on connecting plate 5, and make bolt 8 pass buckle 7 then screw hole 6, can make two sets of main parts 1 fix together completely like this, drain tank 9 has been seted up through setting up the internal surface of main part 1, drain tank 9 has been used for discharging in the setting up main part 1.
Referring to fig. 1-4, a protrusion 10 is provided at the lower end of the top cover plate 3, a groove 11 is provided at the upper surface of the main body 1, the protrusion 10 is provided at the lower end of the top cover plate 3, the groove 11 is provided at the upper surface of the main body 1, the top cover plate 3 can be tightly attached to the main body 1 by using the protrusion 10 and the groove 11, a hook hole 12 is provided at the upper surface of the top cover plate 3, people can open the top cover plate 3 by means of a tool and using the hook hole 12, a rubber pad 13 is fixedly mounted at the side surface of the main body 1, the attachment performance of the two groups of main bodies 1 can be increased by using the rubber pad 13, a bolt 8 is matched with a threaded hole 6, the bolt 8 can be screwed into the threaded hole 6 by setting the bolt 8, the shape of the connecting plate 5 is U-shaped, and the connecting plate 5 can be buckled and connected with two groups of connecting grooves 4 by setting the connecting plate 5.
Examples
Referring to fig. 3, an auxiliary mechanism is disposed at an upper end of the drainage tank 9, the auxiliary mechanism includes a screen 14, the screen 14 is disposed at an upper end of the drainage tank 9, the screen 14 can block stones or foreign matters carried in the water by disposing the screen 14 at an upper end of the drainage tank 9 to prevent the stones or foreign matters from blocking the drainage tank 9, a clamping groove 15 is provided on a side surface of the screen 14, a clamping block 16 is fixedly mounted on an upper surface of the drainage tank 9, a clamping groove 15 is provided on a side surface of the screen 14, and a clamping block 16 is fixedly mounted on an upper surface of the drainage tank 9.
Working principle: through setting up main part 1, cable support 2, lamina tecti 3, connect groove 4, connecting plate 5, screw hole 6, buckle 7, bolt 8 and water drainage tank 9, firstly utilize U-shaped connecting plate 5, insert it in the linking groove 4 of one of them main part 1, then in removing second main part 1, connect groove 4 on the second main part 1 aligns the other end of U-shaped connecting plate 5, and make it insert on U-shaped connecting plate 5, so, two main parts 1 are initially connected together, then remove buckle 7, buckle 7 on connecting plate 5, take bolt 8, pass buckle 7 and screw in screw hole 6 with bolt 8, connecting plate 5 and buckle 7 are fixed, two main parts 1 are also fixed completely simultaneously, make main part 1 can assemble together, then utilize cable support 2 to lay the cable towards main part 1 inboard, remove lamina tecti 3 after the cable is laid, make protruding 10 and recess 11 align, then cover lamina tecti 3 in main part 1 upper end can, people also can put into the ditch according to main part 1 after having dug the ditch size earlier, then put main part 1 into the ditch again, through setting up complementary mechanism, 14, install the clip 14 in the water drainage tank 9, prevent that the water drainage tank 9 from getting into the screen 14 is blocked up in the water drainage tank 9, the screen 14 is blocked up in the water drainage tank 14 when the jack 9 is moved to the screen 14, the screen 14 is blocked up in the water drainage tank is 9, the screen 14 is blocked.
The present utility model is not limited to the above-mentioned embodiments, and any equivalent embodiments which can be changed or modified by the technical content disclosed above can be applied to other fields, but any simple modification, equivalent changes and modification made to the above-mentioned embodiments according to the technical substance of the present utility model without departing from the technical content of the present utility model still belong to the protection scope of the technical solution of the present utility model.

Claims (6)

1. Assembled cable trench, comprising a main body (1), characterized in that: the cable rack is characterized in that a cable support (2) is fixedly arranged on the inner surface of the main body (1), a top cover plate (3) is arranged at the upper end of the main body (1), a connecting groove (4) is formed in the inner surface of the main body (1), a connecting plate (5) is arranged at the lower end of the main body (1), a threaded hole (6) is formed in the upper surface of the connecting plate (5), a buckle plate (7) is arranged at the upper end of the connecting plate (5), a bolt (8) is arranged at the upper end of the buckle plate (7), and a drainage groove (9) is formed in the inner surface of the main body (1).
2. The fabricated cable trench of claim 1, wherein: the lower extreme of lamina tecti (3) is provided with protruding (10), recess (11) are seted up to the upper surface of main part (1).
3. The fabricated cable trench of claim 1, wherein: the upper surface of lamina tecti (3) has seted up hook hole (12), the side fixed mounting of main part (1) has rubber pad (13).
4. The fabricated cable trench of claim 1, wherein: the bolt (8) is matched with the threaded hole (6), and the shape of the connecting plate (5) is U-shaped.
5. The fabricated cable trench of claim 1, wherein: the upper end of water drainage tank (9) is provided with complementary unit, complementary unit includes screen cloth (14), screen cloth (14) set up the upper end in water drainage tank (9), draw-in groove (15) have been seted up to the side surface of screen cloth (14).
6. The fabricated cable trench of claim 5, wherein: the upper surface of water drainage tank (9) is fixed mounting has fixture block (16), fixture block (16) are less than the width of draw-in groove (15).
CN202321696285.8U 2023-06-30 2023-06-30 Assembled cable trench Active CN220117282U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321696285.8U CN220117282U (en) 2023-06-30 2023-06-30 Assembled cable trench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321696285.8U CN220117282U (en) 2023-06-30 2023-06-30 Assembled cable trench

Publications (1)

Publication Number Publication Date
CN220117282U true CN220117282U (en) 2023-12-01

Family

ID=88895507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321696285.8U Active CN220117282U (en) 2023-06-30 2023-06-30 Assembled cable trench

Country Status (1)

Country Link
CN (1) CN220117282U (en)

Similar Documents

Publication Publication Date Title
CN211948449U (en) Foundation pit supporting structure with special-shaped reinforced concrete precast pile
CN211063244U (en) Power cable protection pipe convenient for threading
CN220117282U (en) Assembled cable trench
CN215948216U (en) A foundation ditch retaining structure for housing construction
CN209099168U (en) A kind of box beam expansion joint guarded drainage device
CN212582856U (en) Assembled escape canal convenient to installation
CN215565997U (en) Prefabricated assembled arch wall structure of railway tunnel
CN212336281U (en) Prefabricated lifting pump station with integrated automatic deodorization function
CN214994278U (en) Prefabricated yard water cyclic utilization system
CN214362904U (en) Prestressed anchorage utensil is used in public road bridge roof beam construction
CN210315661U (en) Underground pipe gallery is faced in building site
CN220058273U (en) Municipal road design drainage structures
CN213233723U (en) Appurtenance is used in installation of municipal drainage pipe
CN211285924U (en) Road side ditch convenient to installation is fixed
CN217135131U (en) Novel clamping groove type cable trench cover plate
CN216973176U (en) Blind drain water filtering pipe protection device
CN219527694U (en) Expansive soil cutting side slope supporting structure for preventing landslide
CN219410404U (en) Semicircular cement culvert pipe side ditch structure
CN216075452U (en) Prefabricated inlet for stom water of assembled
CN217460824U (en) Building underground drainage bearing structure
CN218374328U (en) Prefabricated assembled interim escape canal
CN216552352U (en) Flexible cut-off device
CN220704224U (en) Soft soil roadbed drainage structure
CN214461892U (en) Roof drainage pipe installation structure
CN217870845U (en) Novel drainage channel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant