CN220102302U - Combined type melt pipeline bracket - Google Patents

Combined type melt pipeline bracket Download PDF

Info

Publication number
CN220102302U
CN220102302U CN202321249899.1U CN202321249899U CN220102302U CN 220102302 U CN220102302 U CN 220102302U CN 202321249899 U CN202321249899 U CN 202321249899U CN 220102302 U CN220102302 U CN 220102302U
Authority
CN
China
Prior art keywords
groove
pipeline
support
block
sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321249899.1U
Other languages
Chinese (zh)
Inventor
阮凯洁
姚元海
胡国标
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BANGKAI HOLDING GROUP CO LTD
Original Assignee
BANGKAI HOLDING GROUP CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BANGKAI HOLDING GROUP CO LTD filed Critical BANGKAI HOLDING GROUP CO LTD
Priority to CN202321249899.1U priority Critical patent/CN220102302U/en
Application granted granted Critical
Publication of CN220102302U publication Critical patent/CN220102302U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a combined type melt pipeline bracket, which relates to the technical field of melt pipeline brackets and comprises a mounting plate, wherein first telescopic rods are fixedly arranged at two ends of the top of the mounting plate, supports are fixedly arranged at the tops of the two first telescopic rods together, first anchor clamps are fixedly arranged at the tops of the supports, transverse plates are fixedly arranged at two sides of the first anchor clamps, connecting holes are formed in the transverse plates, inserting plates are inserted into the connecting holes, second anchor clamps are fixedly arranged at the tops of the two inserting plates together, and grooves are formed in the inner side walls of the connecting holes. According to the support, the first anchor ear, the transverse plate, the plugboard, the second anchor ear and the compression positioning mechanism, when the pipeline is arranged in the first anchor ear, the second anchor ear can be longitudinally moved, so that the first anchor ear and the second anchor ear can tightly wrap the pipeline, and longitudinal jumping of the pipeline in the supporting and using processes is avoided as much as possible.

Description

Combined type melt pipeline bracket
Technical Field
The utility model relates to the technical field of melt pipeline brackets, in particular to a combined type melt pipeline bracket.
Background
The melt pipeline is a system for conveying high-temperature melted materials through the pipeline, and the pipeline is generally used in the fields of metallurgy, chemical industry, glass industry and the like, and the pipeline needs to be stably supported in the use process of the pipeline, so that the conveying stability of the melt in the pipeline is ensured.
Through searching, patent number CN204267886U discloses an electrodeless adjustable combined type melt pipeline bracket, and the pipeline bracket adjusts the position of a stud tray through a sheet-shaped adjusting device to coarsely adjust the height of the bracket, namely: the longer end of the height adjusting piece can extend out of the sleeve through the rectangular hole, the longer end of the height adjusting piece can also rotate into the sleeve to be overlapped to play a role of a base plate, and the height positions of the stud tray are raised or lowered by selecting different numbers of the height adjusting pieces; the height of the support is finely adjusted through the rotary adjusting stud, and the height of the pipeline is accurately positioned.
But the chucking space between the two anchor clamps in the support is fixed, and when the external diameter specification of pipeline is less, then anchor clamps can not carry out close contact with the pipeline for the pipeline can take place to beat in supporting the use, influences pipeline support stability.
Disclosure of Invention
The present utility model has been made in view of the above-mentioned problems with the prior art combined melt conduit brackets.
Therefore, the utility model aims to provide a combined type melt pipeline bracket, which solves the problem that when the outer diameter specification of a pipeline is smaller, the anchor ear cannot be in close contact with the pipeline, so that the pipeline can jump in the supporting and using process.
In order to achieve the above object, the present utility model provides the following technical solutions:
the utility model provides a combination formula fuse-element pipeline support, includes the mounting panel, the top both ends of mounting panel are all fixed and are equipped with first telescopic link, two the top of first telescopic link is fixed jointly and is equipped with the support, the top of support is fixed and is equipped with first staple bolt, the both sides of first staple bolt are all fixed and are equipped with the diaphragm, the connecting hole has been seted up to the inside of diaphragm, the picture peg has been inserted in the connecting hole, two the top of picture peg is fixed jointly and is equipped with the second staple bolt, the inside wall of connecting hole has seted up flutedly, be equipped with compression positioning mechanism between diaphragm and the picture peg, through the connection of first staple bolt and second staple bolt, can wrap up the support to the fuse-element pipeline;
the outer side wall of the support is provided with an operation groove, the inner wall of the operation groove is provided with a sliding groove, and the inside of the operation groove is provided with an upward pushing separation mechanism.
Preferably, the compressing and positioning mechanism comprises an inserting block, the inserting block is arranged in the groove, a plurality of positioning holes are formed in the inserting plate at intervals, the inserting block is fixedly connected with the inner wall of the groove through a second telescopic rod sleeved with a first spring, the end part of the inserting block is inserted into the positioning hole, the longitudinal section of the inserting block is in a wedge-shaped structure, and the inserting block and the positioning holes at different positions are inserted, so that the second anchor ear can be longitudinally moved according to the specification of the pipeline, the first anchor ear and the second anchor ear can be in close contact with the pipeline, and longitudinal jumping of the pipeline is avoided as much as possible when the pipeline is used.
Preferably, the push-up separating mechanism comprises a sliding block, the sliding block is slidably arranged in the sliding groove and is fixedly connected with the inner wall of the sliding groove through a second spring, a pushing plate is slidably arranged on the side wall of the operation groove in a penetrating mode, the upper end of the pushing plate is inserted into a groove and is fixedly connected with an inserting block, a connecting plate is rotatably arranged between the pushing plate and the sliding block in a common mode, a sliding hole matched with the sliding plate to be slidably arranged is formed in the bottom of the groove, two inserting blocks can slide out of the positioning hole conveniently, the second anchor ear and the first anchor ear are separated, and a pipeline can enter the support and is stably supported.
Preferably, the cross section of the sliding block is T-shaped.
Further, the top rotation of mounting panel is equipped with the screw rod, the upper end screw thread of screw rod wears to locate the inside of support, the fixed cover in lower extreme of screw rod is equipped with the turning block, through the screw rod and the screw thread fit of support, can adjust the supporting height of support, improves the supporting effect to the pipeline.
Preferably, a plurality of mounting bolts are arranged in the mounting plate in a threaded manner, so that the bracket can be fixed at a designated position, and the support stability of the bracket is ensured.
In the technical scheme, the utility model has the technical effects and advantages that:
according to the utility model, the support, the first anchor ear, the transverse plate, the plugboard, the second anchor ear and the compression positioning mechanism are arranged, so that when the pipeline is arranged in the first anchor ear, the first anchor ear and the second anchor ear can be tightly wrapped by longitudinally moving the second anchor ear, and the pipeline is prevented from longitudinally jumping in the supporting and using process as much as possible.
According to the utility model, the wrapping supporting heights of the first anchor ear and the second anchor ear can be adjusted through the mounting plate, the mounting bolt, the first telescopic rod, the screw rod and the rotating block, so that the supporting and using versatility of the bracket can be improved.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings required for the embodiments will be briefly described below, and it is apparent that the drawings in the following description are only some embodiments described in the present utility model, and other drawings may be obtained according to these drawings for a person having ordinary skill in the art.
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is an enlarged schematic view of portion A of FIG. 1 in accordance with the present utility model;
fig. 3 is an enlarged schematic view of the portion B of fig. 1 according to the present utility model.
Reference numerals illustrate:
1. a mounting plate; 2. a first telescopic rod; 3. a support; 4. the first hoop; 5. a cross plate; 6. inserting plate; 7. the second hoop; 8. inserting blocks; 9. a first spring; 10. a second telescopic rod; 11. a slide block; 12. a second spring; 13. a push plate; 14. a connecting plate; 15. a screw; 16. a rotating block; 17. and (5) installing a bolt.
Description of the embodiments
In order to make the technical scheme of the present utility model better understood by those skilled in the art, the present utility model will be further described in detail with reference to the accompanying drawings.
The embodiment of the utility model discloses a combined type melt pipeline bracket.
The utility model provides a combined type melt pipeline bracket as shown in figures 1-3, which comprises a mounting plate 1, wherein two ends of the top of the mounting plate 1 are fixedly provided with first telescopic rods 2, the tops of the two first telescopic rods 2 are fixedly provided with supports 3 together, the tops of the supports 3 are fixedly provided with first anchor clamps 4, two sides of each first anchor clamp 4 are fixedly provided with transverse plates 5, the interiors of the transverse plates 5 are provided with connecting holes, inserting plates 6 are inserted into the connecting holes, the tops of the two inserting plates 6 are fixedly provided with second anchor clamps 7 together, and the inner side walls of the connecting holes are provided with grooves;
be equipped with the hold-down positioning mechanism between diaphragm 5 and picture peg 6, hold-down positioning mechanism includes inserted block 8, in the recess was located to inserted block 8, the locating hole that a plurality of intervals set up has been seted up to the inside of picture peg 6, and inserted block 8 is through the second telescopic link 10 that the cover was equipped with first spring 9 and the inner wall fixed connection of recess, and in the locating hole was inserted to the tip of inserted block 8, the longitudinal section of inserted block 8 was the wedge setting.
When the pipeline needs to be supported, the support integrally moves to the lower part of the pipeline, the first anchor ear 4 and the second anchor ear 7 are separated before the support integrally moves, the bottom of the inner wall of the first anchor ear 4 can be contacted with the bottom of the pipeline, then the first anchor ear 4 and the second anchor ear 7 can be connected through the matching of the inserting plate 6 and the transverse plate 5 internal connecting hole, the inserting plate 6 is contacted with the inclined surface of the inserting block 8 in the inserting process, the inserting block 8 is pushed to extrude the second telescopic rod 10 and the first spring 9, when the top of the inner wall of the second anchor ear 7 is contacted with the bottom of the pipeline, the inserting block 8 is inserted into the positioning hole at the corresponding position, the elasticity of the first spring 9 is limited, the second anchor ear 7 cannot move upwards, and therefore the pipeline can be clamped and positioned by matching with the first anchor ear 4, and longitudinal jumping of the pipeline is avoided as much as possible when the pipeline is used.
In order to enable a pipeline to stably enter the first anchor ear 4, the first anchor ear 4 and the second anchor ear 7 are separated, an operation groove is formed in the outer side wall of the support 3, a sliding groove is formed in the inner wall of the operation groove, an upward pushing separation mechanism is arranged in the operation groove and comprises a sliding block 11, the cross section of the sliding block 11 is in a T-shaped structure, the sliding block 11 is slidably arranged in the sliding groove and fixedly connected with the inner wall of the sliding groove through a second spring 12, a push plate 13 is slidably arranged on the side wall of the operation groove in a penetrating mode, the upper end of the push plate 13 is inserted into a groove and fixedly connected with the insertion block 8, a connecting plate 14 is arranged between the push plate 13 and the sliding block 11 in a rotating mode, and a sliding hole matched with the sliding plate 13 in a sliding mode is formed in the bottom of the groove.
When the pipeline needs to be wrapped and supported, the sliding block 11 is moved upwards in advance, the second spring 12 is extruded, the sliding block 11, the connecting plate 14 and the pushing plate 13 relatively rotate in the process, the pushing plate 13 can slide in the sliding hole and drive the inserting block 9 to be separated from the positioning hole, and the first hoop 4 and the second hoop 7 can be separated by directly lifting the second hoop 7, so that the pipeline is supported conveniently.
In order to conveniently adjust the supporting height of the bracket according to the position of the pipeline, as shown in fig. 1, a plurality of mounting bolts 17 are arranged in a threaded manner in the mounting plate 1, a screw 15 is arranged on the top of the mounting plate 1 in a rotating manner, the upper end thread of the screw 15 is arranged in the support 3 in a threaded manner, and a rotating block 16 is fixedly sleeved at the lower end of the screw 15.
Before the pipeline is supported, the support is moved to a supporting position, the rotating block 16 is rotated, the screw rod 15 is rotated, the support 1 longitudinally moves under the supporting limit of the two first telescopic rods 2, the bottom of the inner wall of the first anchor ear 4 can be in contact with the bottom of the pipeline, the supporting height of the support is determined at the moment, and the mounting plate 1 and the whole support are subjected to position determination through the mounting bolts 17.
While certain exemplary embodiments of the present utility model have been described above by way of illustration only, it will be apparent to those of ordinary skill in the art that modifications may be made to the described embodiments in various different ways without departing from the spirit and scope of the utility model. Accordingly, the drawings and description are to be regarded as illustrative in nature and not as restrictive of the scope of the utility model, which is defined by the appended claims.

Claims (6)

1. The utility model provides a combination formula fuse-element pipeline support, includes mounting panel (1), its characterized in that, the top both ends of mounting panel (1) are all fixed and are equipped with first telescopic link (2), two the top of first telescopic link (2) is fixed jointly and is equipped with support (3), the top of support (3) is fixed and is equipped with first staple bolt (4), the both sides of first staple bolt (4) are all fixed and are equipped with diaphragm (5), the connecting hole has been seted up to the inside of diaphragm (5), insert in the connecting hole has picture peg (6), two the top of picture peg (6) is fixed jointly and is equipped with second staple bolt (7), the recess has been seted up to the inside wall of connecting hole, be equipped with between diaphragm (5) and picture peg (6) and compress tightly positioning mechanism;
an operation groove is formed in the outer side wall of the support (3), a sliding groove is formed in the inner wall of the operation groove, and an upward pushing separation mechanism is arranged in the operation groove.
2. The combined type melt pipe bracket according to claim 1, wherein the pressing and positioning mechanism comprises an insert block (8), the insert block (8) is arranged in the groove, a plurality of positioning holes arranged at intervals are formed in the insert plate (6), the insert block (8) is fixedly connected with the inner wall of the groove through a second telescopic rod (10) sleeved with a first spring (9), the end part of the insert block (8) is inserted into the positioning hole, and the longitudinal section of the insert block (8) is in a wedge-shaped arrangement.
3. The combined type melt pipe bracket according to claim 1, wherein the push-up separating mechanism comprises a sliding block (11), the sliding block (11) is slidably arranged in the sliding groove and is fixedly connected with the inner wall of the sliding groove through a second spring (12), a push plate (13) is slidably arranged on the side wall of the operation groove in a penetrating manner, the upper end of the push plate (13) is inserted into a groove and is fixedly connected with the insert block (8), a connecting plate (14) is rotatably arranged between the push plate (13) and the sliding block (11), and a sliding hole matched with the push plate (13) in a sliding manner is formed in the bottom of the groove.
4. A combined melt duct bracket according to claim 3, characterized in that the slide (11) is T-shaped in cross section.
5. The combined type melt pipe bracket according to claim 1, wherein a screw rod (15) is rotatably arranged at the top of the mounting plate (1), the upper end of the screw rod (15) is threaded through the support (3), and a rotating block (16) is fixedly sleeved at the lower end of the screw rod (15).
6. The combined melt pipe bracket according to claim 1, characterized in that the mounting plate (1) is internally threaded with a plurality of mounting bolts (17).
CN202321249899.1U 2023-05-23 2023-05-23 Combined type melt pipeline bracket Active CN220102302U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321249899.1U CN220102302U (en) 2023-05-23 2023-05-23 Combined type melt pipeline bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321249899.1U CN220102302U (en) 2023-05-23 2023-05-23 Combined type melt pipeline bracket

Publications (1)

Publication Number Publication Date
CN220102302U true CN220102302U (en) 2023-11-28

Family

ID=88867580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321249899.1U Active CN220102302U (en) 2023-05-23 2023-05-23 Combined type melt pipeline bracket

Country Status (1)

Country Link
CN (1) CN220102302U (en)

Similar Documents

Publication Publication Date Title
CN209052005U (en) A kind of processing bearing supporting frame automatic pushing mechanism
CN107813003B (en) A kind of tubular pile cutting device
CN109530750B (en) Five metals tubular product trompil device
CN220102302U (en) Combined type melt pipeline bracket
CN109629431B (en) Bridge construction supporting frame device convenient to operate
CN210789951U (en) Pipe fitting spinning mechanism
CN111157923A (en) Plug test fixture
CN108098040B (en) A kind of cutter device for metal tube
CN215854577U (en) Angle modulation type hoisting device for installation and construction of high-steep-slope double-row pressure steel pipe
CN115961990A (en) Automatic bottom detection device for anchor rod machine and using method thereof
CN211786044U (en) Plug test fixture
CN113732690A (en) Magnetic steel sheet feeding mechanism
CN113601429A (en) Tool clamp capable of limiting at multiple angles for processing PCBA (printed circuit board assembly) board
CN217458765U (en) Material pipe fixing mechanism and automatic plug device
CN214489386U (en) Sliding positioning stable welding clamping device
CN216359318U (en) Diversified drilling equipment of machine part
CN215766766U (en) Automobile body stamping workpiece detection device convenient to adjustment
CN217142963U (en) Integrated fixing tool for testing cable joint
CN217497797U (en) Automatic plug device
CN220718112U (en) Panel fixing device for laser cutting
CN219684523U (en) Automatic pin pressing machine for gears
CN217596505U (en) Shoe tree special fixture and drilling machine
CN211540388U (en) Clamping device for metal plate transverse cutting equipment
CN114798937B (en) Automatic closing-in device for spring rod steel pipe assembly
CN210819997U (en) Wood carving machine clamp movable end positioning mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant