CN220101194U - Slope anchor rod drilling construction platform - Google Patents

Slope anchor rod drilling construction platform Download PDF

Info

Publication number
CN220101194U
CN220101194U CN202320707467.4U CN202320707467U CN220101194U CN 220101194 U CN220101194 U CN 220101194U CN 202320707467 U CN202320707467 U CN 202320707467U CN 220101194 U CN220101194 U CN 220101194U
Authority
CN
China
Prior art keywords
bottom plate
slope
rod
guide assembly
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320707467.4U
Other languages
Chinese (zh)
Inventor
李贵
颜子一
刘威
史志阳
霍正
秦璐遥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN202320707467.4U priority Critical patent/CN220101194U/en
Application granted granted Critical
Publication of CN220101194U publication Critical patent/CN220101194U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to the technical field of slope construction auxiliary equipment, in particular to a slope anchor rod drilling construction platform which comprises a bottom plate, a top support, a horizontal support, a fixing assembly and a winch, wherein wheels are arranged on the left side and the right side of the bottom plate, the top support comprises two top support rods which are arranged in parallel and one end of each top support rod is hinged to the rear side of the top surface of the bottom plate, a plurality of first positioning holes are formed in the top support rods at intervals along the extending direction, the horizontal support comprises two support rods which are arranged in parallel and one end of each top support rod is hinged to the front side of the top surface of the bottom plate, a plurality of second positioning holes are formed in the support rods at intervals along the extending direction, the fixing assembly is arranged corresponding to the first positioning holes and the second positioning holes and is used for fixing the top support rods together, the winch is arranged at the top of the side slope, a steel wire rope is wound on the winch, and the other end of the steel wire rope is connected with the bottom plate. The slope anchor rod drilling construction platform has a simple structure, can be suitable for slopes with different slopes, and is convenient to adjust and use.

Description

Slope anchor rod drilling construction platform
Technical Field
The utility model relates to the technical field of slope construction auxiliary equipment, in particular to a slope anchor rod drilling construction platform.
Background
In modern engineering construction, the anchor rod is widely applied to highway engineering slope protection and tunnel construction at present due to the economic characteristics of simple process and low cost. The anchor bolt support is a reinforcing support mode adopted in the construction of surface engineering such as side slopes, rock and soil deep foundation pits and underground chambers such as tunnels and stopes. The rod column is made of metal pieces, wood pieces, polymer pieces or other materials, is driven into a pre-drilled hole of a rock mass on the earth surface or around a chamber, and utilizes the special structures of the head and the rod body and a tail supporting plate (not needed) or combines surrounding rock and stable rock mass together by means of bonding to generate a suspension effect, a combined beam effect and a reinforcing effect, so as to achieve the aim of supporting.
The anchor rod drilling construction in the traditional high slope protection requires constructors to hang on the slope through suspension ropes. Under the working condition of the traditional suspension cable, long-time overhead operation cannot be effectively rested, the safety of constructors cannot be guaranteed, and potential safety hazards are greatly increased. And as no effective acting point exists on the side slope, the quality of the anchor rod drilling is difficult to control, and the quality problem is very easy to exist.
Aiming at the situation, the Chinese patent application with the authority of the publication number of CN112302534B discloses a slope anchor rod construction device and a rapid construction method, the slope anchor rod construction device comprises a movable bearing trolley, the movable bearing trolley is provided with an operation table and a movable device connected with the operation table, the movable device comprises a supporting mechanism, the supporting mechanism is positioned below the operation table, and an adjusting mechanism is arranged below the supporting mechanism.
The slope anchor rod construction device solves the problems that an auxiliary support is needed during slope anchor rod construction, the fixing is troublesome, the slope anchor rod construction device is affected by slope topography, a drilling machine is easy to shift, drilling quality is unstable and construction safety is low, but the slope anchor rod construction device is complex in structure, inconvenient to operate and low in maintenance and repair efficiency, and the construction device is only capable of drilling a slope and poor in universality, so that the technical problem of low construction efficiency is solved.
Disclosure of Invention
In view of the above, the utility model aims to provide a slope anchor rod drilling construction platform so as to solve the technical problem that a construction device in the prior art is poor in applicability to slopes with different slopes.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows:
a slope anchor drilling construction platform, comprising:
the bottom plate is defined as a front-back direction, the width direction of the bottom plate is a left-right direction, wheels are correspondingly arranged on the left side and the right side of the bottom plate, and the wheels are arranged at intervals along the front-back direction;
the top support comprises two top support rods arranged in parallel and a transverse connecting rod arranged between the two top support rods, one end of each top support rod is hinged with the rear side of the top surface of the bottom plate, and a plurality of first positioning holes are formed in a rod section, far away from the hinged end, of each top support rod at intervals along the extending direction of the top support rod;
the horizontal bracket comprises two support rods arranged in parallel and a horizontal connecting rod arranged between the two support rods, one end of each support rod is hinged with the front side of the top surface of the bottom plate, a plurality of second positioning holes are formed in a rod section, far away from the hinged end, of each support rod at intervals along the extending direction of the support rod, and support plates for personnel to work are arranged at the tops of the support rods and the horizontal connecting rod;
the fixing assembly is arranged corresponding to the first positioning hole and the second positioning hole and is used for fixing the top support rod and the support rod together;
the winch is arranged at the top of the side slope, a steel wire rope is wound on the winch, and the other end of the steel wire rope is connected with the bottom plate.
Preferably, the fixing component is a fastening bolt and a fastening nut, and the fastening bolt is used for simultaneously penetrating through the first positioning hole and the second positioning hole.
Preferably, a stop plate is arranged on one side, away from the top support rod, of the support rod at intervals corresponding to the second positioning holes, and the stop plate is used for being in stop fit with the fastening bolt in the circumferential direction of the fastening bolt.
Preferably, the top of bottom plate is close to the position of front side and is provided with first direction subassembly, and first direction subassembly includes the mount of U-shaped and rotates the leading wheel that has the recess that sets up on the mount, be provided with the second direction subassembly on the side slope top surface, the second direction subassembly is the same with first direction subassembly's structure, and first direction subassembly and second direction subassembly are used for providing the direction for wire rope.
Preferably, the end part of the steel wire rope is connected to the position, close to the rear side, of the top of the bottom plate, and the steel wire rope is erected on the guide wheels on the second guide assembly and the first guide assembly.
Preferably, the fixing frame is provided with two guide wheels in a rotating manner along the vertical direction at intervals, the steel wire rope is arranged on the guide wheel above the second guide assembly and the first guide assembly in a building manner, the safety rope is wound on the winch, the other end of the safety rope is connected with the position, close to the front side, of the top of the bottom plate, and the safety rope is arranged on the guide wheel below the second guide assembly and the first guide assembly in a building manner.
Preferably, the fixing frame in the second guiding component is fixedly connected with the winch.
Preferably, two winders are arranged, and the winding drums of the two winders are fixedly connected through coaxially arranged connecting shafts.
Preferably, a guardrail is arranged on the supporting plate.
The beneficial effects of the technical scheme are as follows: according to the slope anchor rod drilling construction platform, the supporting rods and the top supporting rods are hinged to the left side and the right side of the top surface of the bottom plate respectively, the top supporting frames and the horizontal supports are fixed through the fastening bolts and the fastening nuts, a stable operation platform is provided for personnel operation, meanwhile, the guard rails are arranged on the supporting plates, the bottom plate is connected with the safety ropes, construction safety is effectively guaranteed, and the included angles between the horizontal supports and the bottom plate are adjusted through selecting the first positioning holes at different positions on the top supporting rods and the second positioning holes at different positions on the supporting rods, so that the construction platform can be suitable for slopes with different gradients. The slope anchor rod drilling construction platform is simple in structure, the included angle between the horizontal support and the bottom plate is adjusted by selecting the first locating holes at different positions on the top support rod and the second locating holes at different positions on the support rod, so that slopes with different slopes are suitable, adjustment is convenient, and use is convenient.
Drawings
FIG. 1 is a schematic diagram of a construction of a slope anchor drilling platform of the present utility model in use;
FIG. 2 is a schematic diagram of the connection of a bottom plate, a top support bracket and a horizontal bracket in the slope anchor rod drilling construction platform of the utility model;
fig. 3 is a schematic structural view of a hoist in the slope anchor drilling platform of the present utility model.
Reference numerals illustrate: 1-bottom plate, 2-wheels, 3-first mount, 4-first leading wheel, 5-top support, 6-top support pole, 7-first locating hole, 8-horizontal support, 9-bracing piece, 10-second locating hole, 11-backup pad, 12-guardrail, 13-fastening bolt, 14-fastening nut, 15-stop plate, 16-hoist engine, 17-connecting axle, 18-connecting plate, 19-wire rope, 20-safety rope, 21-side slope, 22-second mount, 23-second leading wheel.
Detailed Description
The utility model is described in further detail below with reference to the drawings and detailed description.
The concrete embodiment of the slope anchor rod drilling construction platform is as follows:
as shown in fig. 1, 2 and 3, the slope anchor rod drilling construction platform of the present utility model comprises a base plate 1, a top support bracket 5, a horizontal bracket 8, a fixing assembly and a winch 16.
As shown in fig. 1 and 2, the longitudinal direction of the base plate 1 is defined as the front-rear direction, and the width direction of the base plate 1 is defined as the left-right direction. Wheels 2 are correspondingly arranged on the left side and the right side of the bottom plate 1, and the wheels 2 are arranged at intervals along the front-back direction. The top of bottom plate 1 is provided with first guide assembly near the position of front side, and first guide assembly is provided with two sets of along controlling the direction interval, and first guide assembly includes U-shaped first mount 3 and rotates the first leading wheel 4 that sets up the groove on first mount 3, and first leading wheel 4 rotates along upper and lower direction interval on first mount 3 and is provided with two.
As shown in fig. 1 and 2, the top support 5 includes two top support rods 6 and two transverse connection rods, and the transverse connection rods are fixedly arranged between the two top support rods 6. One end of the top stay bar 6 is hinged with the bottom plate 1, and the hinged position is positioned at the rear side of the top surface of the bottom plate 1. A plurality of first positioning holes 7 are formed in the rod section, far away from the hinged end, of the top stay 6 at intervals along the extending direction of the top stay 6.
As shown in fig. 1 and 2, the horizontal bracket 8 includes two support rods 9 and two horizontal connecting rods, and the horizontal connecting rods are disposed between the two support rods 9. One end of the support rod 9 is hinged with the bottom plate 1, and the hinged position is positioned on the front side of the top surface of the bottom plate 1. A plurality of second positioning holes 10 are arranged on the rod section of the support rod 9 far away from the hinged end at intervals along the extending direction of the support rod 9. The supporting rods 9 and the tops of the horizontal connecting rods are provided with supporting plates 11 for personnel to work, and the supporting plates 11 are provided with guardrails 12.
As shown in fig. 2, the fixing assembly includes a fastening bolt 13 and a fastening nut 14, the fastening bolt 13 being used to pass through the first positioning hole 7 and the second positioning hole 10 at the same time, and fix the top stay 6 and the support rod 9 together by the fastening nut 14.
As shown in fig. 2, in the present embodiment, a stop plate 15 is disposed on the side of the support rod 9 facing away from the top stay 6 and corresponding to the second positioning hole 10 at intervals, and the stop plate 15 is used for being in stop fit with the fastening bolt 13 in the circumferential direction of the fastening bolt 13, so that when the fastening nut 14 is installed, the rotation of the fastening bolt 13 can be limited by the stop plate 15, and the installation is facilitated.
As shown in fig. 1 and 3, the windlass 16 is arranged at the top of the side slope 21, two windlass 16 are arranged, and the reels of the two windlass 16 are fixedly connected through a coaxially arranged connecting shaft 17. The top of the side slope 21 is provided with a second guide assembly corresponding to the first guide assembly, the second guide assembly comprises a U-shaped second fixing frame 22 and second guide wheels 23 with grooves, the second guide wheels 23 are rotatably arranged on the second fixing frame 22, and two second guide wheels 23 are rotatably arranged on the second fixing frame 22 along the up-down direction at intervals. The bottom of the second fixing frame 22 in the second guiding assembly is fixedly connected with a connecting plate 18, and the other end of the connecting plate 18 is fixedly connected with the winch 16, so that the second guiding assembly is fixedly connected with the winch 16, and the second guiding assembly is convenient to fix.
As shown in fig. 1 and 3, a wire rope 19 and a safety rope 20 are wound around the hoist 16. The other end of the wire rope 19 is connected with the top of the bottom plate 1 near the rear side, and the wire rope 19 is erected on the second guide wheel 23 above in the second guide assembly and on the first guide wheel 4 above in the first guide assembly. The other end of the safety rope 20 is connected with the position near the front side of the top of the bottom plate 1, and the safety rope 20 is arranged on a second guide wheel 23 positioned below in the second guide assembly and on a first guide wheel 4 positioned below in the first guide assembly.
The concrete application method of the slope anchor rod drilling construction platform comprises the following steps: according to the gradient of a side slope 21 to be constructed, rotating the horizontal support 8 through the support rod 9 to enable the included angle between the horizontal support 8 and the bottom plate 1 to be equal to the gradient of the side slope 21, rotating the top support rod 6 again to enable one of the first positioning holes 7 on the top support rod 6 to be aligned with one of the second positioning holes 10 on the support rod 9, penetrating the fastening bolt 13, enabling the fastening bolt 13 to sequentially penetrate through the second positioning holes 10 and the first positioning holes 7, enabling the fastening bolt 13 to be in stop fit with the stop plate 15 in the axial direction of the fastening bolt 13, installing the fastening nut 14, and fixing the support rod 9 and the top support rod 6; the hoist 16 is fixed, and the safety rope 20 and the wire rope 19 are sequentially connected, the other end of the safety rope 20 is connected with the position, close to the front side, of the top of the bottom plate 1, the safety rope 20 is erected on the second guide wheel 23, which is positioned below, in the second guide assembly and the first guide wheel 4, which is positioned below, in the first guide assembly, the other end of the wire rope 19 is connected with the position, close to the rear side, of the top of the bottom plate 1, the wire rope 19 is erected on the second guide wheel 23, which is positioned above, in the second guide assembly and the first guide wheel 4, which is positioned above, in the first guide assembly, the bottom plate 1 is placed on the side slope 21, and the hoist 16 releases and bundles the wire rope 19 and the safety rope 20, so that the height of the bottom plate 1 can be adjusted.
The slope anchor rod drilling construction platform is simple in structure, the included angle between the horizontal support and the bottom plate is adjusted by selecting the first locating holes at different positions on the top support rod and the second locating holes at different positions on the support rod, so that slopes with different slopes are suitable, adjustment is convenient, and use is convenient.
In other embodiments, the fixing component may also adopt a flat head pin and a hairpin pin, the pin of the flat head pin is inserted into the corresponding first positioning hole and second positioning hole, the head diameter of the flat head pin is larger than the diameters of the first positioning hole and the second positioning hole so as to be in stop fit with the top brace or the supporting rod, the end, far away from the head, of the flat head pin is radially provided with a perforation, and the hairpin pin is used for being arranged in the perforation so as to be in stop fit with the supporting rod or the top brace, so that the flat head pin cannot slip from the inside of the first positioning hole and the second positioning hole, and the fixing of the top brace and the supporting rod is realized.
The embodiments of the present utility model described above do not limit the scope of the present utility model. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present utility model should be included in the scope of the present utility model as set forth in the appended claims.

Claims (9)

1. The utility model provides a slope stock drilling construction platform which characterized in that includes:
the bottom plate is defined as a front-back direction, the width direction of the bottom plate is a left-right direction, wheels are correspondingly arranged on the left side and the right side of the bottom plate, and the wheels are arranged at intervals along the front-back direction;
the top support comprises two top support rods arranged in parallel and a transverse connecting rod arranged between the two top support rods, one end of each top support rod is hinged with the rear side of the top surface of the bottom plate, and a plurality of first positioning holes are formed in a rod section, far away from the hinged end, of each top support rod at intervals along the extending direction of the top support rod;
the horizontal bracket comprises two support rods arranged in parallel and a horizontal connecting rod arranged between the two support rods, one end of each support rod is hinged with the front side of the top surface of the bottom plate, a plurality of second positioning holes are formed in a rod section, far away from the hinged end, of each support rod at intervals along the extending direction of the support rod, and support plates for personnel to work are arranged at the tops of the support rods and the horizontal connecting rod;
the fixing assembly is arranged corresponding to the first positioning hole and the second positioning hole and is used for fixing the top support rod and the support rod together;
the winch is arranged at the top of the side slope, a steel wire rope is wound on the winch, and the other end of the steel wire rope is connected with the bottom plate.
2. The slope anchor drilling platform of claim 1, wherein: the fixing component is a fastening bolt and a fastening nut, and the fastening bolt is used for simultaneously penetrating through the first positioning hole and the second positioning hole.
3. A slope anchor drilling platform as in claim 2, wherein: one side of the supporting rod, which is far away from the top supporting rod, is provided with a stop plate corresponding to the second positioning hole at intervals, and the stop plate is used for being in stop fit with the fastening bolt in the circumferential direction of the fastening bolt.
4. A slope anchor drilling platform according to any one of claims 1 to 3, wherein: the top of bottom plate is close to the position of front side and is provided with first direction subassembly, and first direction subassembly includes the mount of U-shaped and rotates the leading wheel that has the recess that sets up on the mount, be provided with the second direction subassembly on the side slope top surface, the second direction subassembly is the same with first direction subassembly's structure, and first direction subassembly and second direction subassembly are used for providing the direction for wire rope.
5. The slope anchor drilling platform of claim 4, wherein: the end part of the steel wire rope is connected to the position, close to the rear side, of the top of the bottom plate, and the steel wire rope is erected on the guide wheels on the second guide assembly and the first guide assembly.
6. The slope anchor drilling platform of claim 5, wherein: the wire rope is erected on the guide wheel positioned above the second guide assembly and the first guide assembly, the safety rope is wound on the winch, the other end of the safety rope is connected with the position, close to the front side, of the top of the bottom plate, and the guide wheel positioned below the second guide assembly and the first guide assembly is erected on the guide wheel positioned below the second guide assembly and the first guide assembly.
7. The slope anchor drilling platform of claim 4, wherein: and a fixing frame in the second guide assembly is fixedly connected with the winch.
8. A slope anchor drilling platform according to any one of claims 1 to 3, wherein: the two winders are fixedly connected through coaxially arranged connecting shafts.
9. A slope anchor drilling platform according to any one of claims 1 to 3, wherein: guard rails are arranged on the supporting plates.
CN202320707467.4U 2023-04-03 2023-04-03 Slope anchor rod drilling construction platform Active CN220101194U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320707467.4U CN220101194U (en) 2023-04-03 2023-04-03 Slope anchor rod drilling construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320707467.4U CN220101194U (en) 2023-04-03 2023-04-03 Slope anchor rod drilling construction platform

Publications (1)

Publication Number Publication Date
CN220101194U true CN220101194U (en) 2023-11-28

Family

ID=88848818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320707467.4U Active CN220101194U (en) 2023-04-03 2023-04-03 Slope anchor rod drilling construction platform

Country Status (1)

Country Link
CN (1) CN220101194U (en)

Similar Documents

Publication Publication Date Title
CN110952554B (en) Walking lifting disc type pile head cutting mechanism
CN211735428U (en) Rock slope guiding and guiding hole construction platform
CN102587830A (en) Side slope anchoring hole drilling construction equipment and side slope anchoring hole drilling construction method
CN211922618U (en) Walking lifting disc type pile head cutting mechanism
CN209741839U (en) A vibration pile driver for bridge construction
CN220101194U (en) Slope anchor rod drilling construction platform
CN101299520B (en) Machine for lifting earth wire of ultrahigh-tension power transmission line
CN217652674U (en) Adjustable side slope drilling structure device
CN218407360U (en) Drill rod angle adjusting device
KR20000059350A (en) Master drill machine for installation of reinforcing anchor to protect slope
CN103628903B (en) Roadway full-fracture-surface anchoring-rod and anchoring-rope integrated parallel installation method and device
CN106050125B (en) A kind of portable all-hydraulic engineering investigation drilling machine
JP3302303B2 (en) Drilling method and device on slope
CN210763953U (en) Auxiliary frame for hoisting travelling beam and upright column in underground mine chamber
CN218880823U (en) High construction pile foundation structure of intensity stability
CN219157715U (en) Movable construction platform for high and steep side slope
CN220394560U (en) Tool type combined inner support for prestressed fish web girder
CN211039918U (en) Cable support for railway roadbed
CN217267467U (en) Karst collecting space area steel protects a section of thick bamboo follow-up location guider
CN112227212B (en) Assembled bridge construction equipment
CN212773552U (en) Rotatable chute graduated scale device is used in construction of bracing shaped steel roof beam
CN219887990U (en) Drilling pile machine with telescopic drilling support
CN219908405U (en) Track lifting sleeper-changing machine
CN113186918B (en) Piling equipment for constructional engineering
CN214495532U (en) Steel reinforcement cage hoisting accessory of punching bored concrete pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant