CN220082321U CN202321378779.1U CN202321378779U CN220082321U CN 220082321 U CN220082321 U CN 220082321U CN 202321378779 U CN202321378779 U CN 202321378779U CN 220082321 U CN220082321 U CN 220082321U
Authority
CN
China
Prior art keywords
connecting part
rotating shaft
mounting
pipeline
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321378779.1U
Other languages
Chinese (zh)
Inventor
杨锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Leju Comfortable Hvac Engineering Co ltd
Original Assignee
Sichuan Leju Comfortable Hvac Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Leju Comfortable Hvac Engineering Co ltd filed Critical Sichuan Leju Comfortable Hvac Engineering Co ltd
Priority to CN202321378779.1U priority Critical patent/CN220082321U/en
Application granted granted Critical
Publication of CN220082321U publication Critical patent/CN220082321U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a combined hanging bracket for multi-pipeline integrated quick installation, which comprises a combined hanging bracket body, wherein the combined hanging bracket body comprises a first connecting part and a second connecting part, clamping grooves are formed in two ends of the first connecting part, and a first rotating shaft and a second rotating shaft which are in interference fit with the clamping grooves are arranged in two ends of the second connecting part; the first connecting part and the second connecting part are matched to form a through hole for installing a pipeline, and the first rotating shaft can be pulled out from the clamping groove and drives the second connecting part to axially rotate through the second rotating shaft. The beneficial effects are that: the first rotating shaft on the second connecting part can be pulled out from the clamping groove and drives the second connecting part to axially rotate through the second rotating shaft, so that the second connecting part can be rotationally separated from the first connecting part through the second rotating shaft, a pipeline installation opening is formed, the connecting mode of the first connecting part and the second connecting part is simpler, more parts are not needed, and the installation and disassembly efficiency is higher.

Description

Multi-pipeline integrated quick-mounting combined hanging bracket
Technical Field
The utility model relates to the technical field of air conditioner pipe fitting installation, in particular to a combined hanging bracket for multi-pipeline integrated rapid installation.
Background
The existing copper pipe, condensation water pipe and electric wire of the air conditioner are fixed by adopting an iron pipe buckle or a plastic pipe buckle through screws, and when the fixed buckle needs to be disassembled for a long time after being used, a great deal of labor and time are consumed for disassembly, and the assembly and the disassembly are laborious; in addition, the size of the existing fixed buckle installation pipeline cannot be adjusted, the pipeline is difficult to be relatively horizontal and vertical, the appearance is very chaotic, the installation is very tedious, the technical requirements on field installation personnel are very high, and the installation efficiency is low.
Disclosure of Invention
The utility model aims to provide a combined hanging bracket for multi-pipeline integrated quick installation, which is simple and labor-saving in installation and disassembly and high in efficiency; the diameter of the through hole of the installation pipeline can be adjusted, and the pipelines can be installed neatly, so that the appearance is concise.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
the combined hanging bracket comprises a combined hanging bracket body, wherein the combined hanging bracket body comprises a first connecting part and a second connecting part, clamping grooves are formed in two ends of the first connecting part, and a first rotating shaft and a second rotating shaft which are in interference fit with the clamping grooves are arranged in two ends of the second connecting part;
the first connecting part and the second connecting part are matched to form a through hole for installing a pipeline, and the first rotating shaft can be pulled out from the clamping groove and drives the second connecting part to axially rotate through the second rotating shaft.
Further, two axial clamping positions are formed in the clamping groove, and the first rotating shaft and/or the second rotating shaft can slide along the notch direction of the clamping groove.
Furthermore, the first rotating shaft side is provided with an inclined clamping groove along the axial direction of the first rotating shaft side, and the notch of the clamping groove is provided with a flexible clamping plate which is in clamping fit with the inclined clamping groove.
Further, a first bobbin groove is formed at the two ends of the first connecting part at the clamping groove, and a clamping groove axially arranged along the inner wall of the first bobbin groove is formed.
The inner side surface of the second connecting part is provided with a second line pipe groove communicated with the through hole.
Further, the first connecting part is provided with a mounting component for mounting the first connecting part on a wall body.
Preferably, the installation component includes the spout of seting up of first connecting portion side, slip joint has the top sheet in the spout, has seted up the mounting hole on the top sheet.
Preferably, the installation component includes two connection buckles that first connecting portion outer wall was equipped with, the buckle groove has been seted up on the connection buckle.
Further, the openings of the buckling grooves are opposite and located on the same straight line.
Preferably, the mounting assembly comprises a locking hole formed in the center of the side wall of the first connecting portion, and a limiting hole for mounting the screw is formed in the position, located at the locking hole, of the inner side of the first connecting portion.
Preferably, the material of the combined hanger body is PP or ABS.
The beneficial effects of the utility model are as follows: the first rotating shaft on the second connecting part can be pulled out from the clamping groove and drives the second connecting part to axially rotate through the second rotating shaft, so that the second connecting part can be rotationally separated from the first connecting part through the second rotating shaft, a pipeline installation opening is formed, the connecting mode of the first connecting part and the second connecting part is simpler, more parts are not needed, and the installation and disassembly efficiency is higher.
In addition, more mounting modes are provided. The side surface of the first connecting part is slidably clamped with a top sheet through a slotted chute, and the top sheet is arranged at the top of the wall body through an installing hole formed in the top sheet and an expansion screw; in addition, the outer side of the first connecting part is provided with a connecting buckle with opposite opening directions, the connecting buckle is provided with a buckle groove, and the buckle groove is fixed at the top of the wall body through a screw rod and is locked through a nut; in addition, the center of the side wall of the first connecting part is provided with a locking hole, the inner side of the first connecting part is provided with a limiting hole for installing a screw at the locking hole, namely, the first connecting part is driven into the side surface of the wall body through the expansion screw by matching the locking hole and the limiting hole, so that the installation of the first connecting part is completed, the installation is more suitable for installation in different environments, and the applicability is improved;
in addition, the first pipeline groove that first connecting portion both ends were seted up can be through the connection buckle joint cooperation of draw-in groove and its side, realizes the continuous installation of a plurality of first connecting portions, makes each pipeline installation neat, reduces the very big drawback of pipeline system installation occupation space in the past, has reduced the space of installation pipeline system.
Drawings
FIG. 1 is a schematic diagram of a multi-pipeline integrated quick-install composite hanger;
FIG. 2 is a schematic view of a second connection portion;
FIG. 3 is a top view of the mounting top sheet on the first attachment portion;
FIG. 4 is a schematic structural view of a topsheet;
FIG. 5 is a schematic view of a structure of a connecting buckle installed on a first connecting portion;
FIG. 6 is a top view of the mounting connection clip on the first connection portion;
FIG. 7 is a schematic view of a structure in which a locking hole is formed in a first connecting portion;
fig. 8 is a left side view of the first connecting portion with a locking hole.
Reference numerals:
1. a combined hanger body; 1a, a first connection portion; 1b, a second connecting part; 2. a clamping groove; 3. a first rotating shaft; 4. a second rotating shaft; 5. a through hole; 6. axial clamping; 7. an inclined clamping groove; 8. a flexible clamping plate; 9. a first bobbin groove; 10. a clamping groove; 11. a second wire pipe groove; 12. a mounting assembly; 12a, a chute; 12b, a topsheet; 12c, mounting holes; 12d, connecting a buckle; 12e, a clamping groove; 12f, locking holes; 12g, limiting holes.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
In the description of the present utility model, it should be understood that the terms "upper," "lower," "front," "rear," "left," "right," "top," "bottom," "inner," "outer," and the like indicate or are based on the orientation or positional relationship shown in the drawings, merely to facilitate description of the present utility model and to simplify the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present utility model.
Example 1:
referring to fig. 1-2, a multi-pipeline integrated quick-mounting combined hanging bracket according to an embodiment of the utility model comprises a combined hanging bracket body 1, wherein the combined hanging bracket body 1 comprises a first connecting part 1a and a second connecting part 1b, two major arc grooves are formed in the side face of the first connecting part 1a, two minor arc grooves matched with the major arc grooves are formed in the side face of the second connecting part 1b, clamping grooves 2 are formed in two ends of the first connecting part 1a, and a first rotating shaft 3 and a second rotating shaft 4 which are in interference fit with the clamping grooves 2 are arranged in two ends of the second connecting part 1 b.
Specifically, the second connecting portion 1b is clamped in through the opening at the top of the clamping groove 2 until the first rotating shaft 3 and the second rotating shaft 4 are completely clamped in the clamping groove 2 (i.e. two ends of the first rotating shaft 3 and the second rotating shaft 4 are flush with the notches at the top and the bottom of the clamping groove 2), and the major arc groove and the minor arc groove on the first connecting portion 1a and the second connecting portion 1b are matched to form a through hole 5 for installing a pipeline.
It should be noted that, in the installation process, the first rotating shaft 3 can be pulled out from the clamping groove 2 and can drive the second connecting portion 1b to axially rotate through the second rotating shaft 4, so that the second connecting portion 2b can be rotationally separated through the second rotating shaft 4, the rotating angle is 0-90 degrees, the pipeline is conveniently installed in the through hole 5, the connection mode of the first connecting portion 1a and the second connecting portion 1b is simpler, more parts are not needed, and the installation and disassembly efficiency is higher.
As shown in fig. 1, two axial clamping positions 6 are formed in the clamping groove 2, and the first rotating shaft 3 and/or the second rotating shaft 4 can slide along the notch direction of the clamping groove 2, so that the distance between the first connecting part 1a and the second connecting part 1b can be adjusted, the inner diameter of the through hole 5 is changed, pipelines with different apertures can be conveniently installed, and the applicability is improved.
In addition, a first bobbin groove 9 is formed at the clamping groove 2 at both ends of the first connecting part 1a, and a clamping groove 10 arranged along the axial direction of the inner wall of the first bobbin groove 9 is formed; the second wire tube groove 11 communicated with the through hole 5 is formed on the inner side surface of the second connecting part 1b, and the first wire tube groove 9 and the second wire tube groove 11 are arranged in parallel, so that the position and the distance between the pipelines are consistent, the arrangement is attractive and elegant, the arrangement is orderly, the crowding of various fixing parts is reduced, the resource is saved, and the space is saved.
In addition, the inclined clamping groove 7 is formed in the axial direction of the first rotating shaft 3, the flexible clamping plate 8 which is in clamping fit with the inclined clamping groove 7 is arranged at the notch of the clamping groove 2, the flexible clamping plate 8 can prevent the second connecting portion 1b from falling off after being installed, and the stability of connecting the first connecting portion 1a and the second connecting portion 1b is improved.
Example 2:
referring to fig. 1-4, on the basis of embodiment 1, a mounting assembly 12 for mounting the first connecting portion 1a on the top of a wall is provided on the first connecting portion 1a, the mounting assembly 12 includes a chute 12a formed in a side surface of the first connecting portion 1a, a top sheet 12b is slidably engaged in the chute 12a, and a mounting hole 12c is formed in the top sheet 12 b.
Specifically, the top sheet 12b is mounted on the top of the wall body through the mounting hole 12c by an expansion screw, and then the first connecting portion 1a is slidably clamped with the top sheet 12b through a sliding groove 12a formed in the first connecting portion (a convex point matched with a convex point on the inner wall of the sliding groove 12a is arranged on the side surface of the top sheet 12 b). The second connecting part 1b is clamped on the side surface of the first connecting part 1a through the clamping groove 2, the first rotating shaft 3 is pulled out of the clamping groove 2 and drives the second connecting part 1b to axially rotate through the second rotating shaft 4, a pipeline is installed in the through hole 5, and a pipeline pipe is installed at the positions of the first pipeline groove 9 and the second pipeline groove 11.
Example 3:
referring to fig. 1, 2, 5 and 6, on the basis of embodiment 1, a mounting assembly 12 for mounting the first connecting portion 1a on the top of a wall body is provided on the first connecting portion 1a, the mounting assembly 12 includes two connecting buckles 12d provided on the outer wall of the first connecting portion 1a, buckle grooves 12e are provided on the connecting buckles 12d, and the opening directions of the buckle grooves 12e are opposite and are located on the same straight line.
Specifically, the screw rod is connected in the buckling groove 12e with opposite opening directions, the top end of the screw rod is fixed at the top of the wall body and locked through the nut, and the screw rod below the first connecting part 1a is fixed with a condensate water clamp and is used for fixing the condensate water pipe through the condensate water clamp. The second connecting part 1b is clamped on the side surface of the first connecting part 1a through the clamping groove 2, the second connecting part 1b is pulled out of the clamping groove 2 through the first rotating shaft 3 and driven to axially rotate through the second rotating shaft 4, the second connecting part 2b can be separated through the second rotating shaft 4 in a rotating way, a pipeline is installed at the through hole 5, and a pipeline is installed at the positions of the first pipeline groove 9 and the second pipeline groove 11.
The implementation is as follows:
referring to fig. 1, 2, 7 and 8, on the basis of embodiment 1, a mounting assembly 12 for mounting the first connecting portion 1a on the side surface of the wall is provided on the first connecting portion 1a, the mounting assembly 12 includes a locking hole 12f formed at the center of the side wall of the first connecting portion 1a, a limiting hole 12g for mounting a screw is formed at the position of the locking hole 12f inside the first connecting portion 1a, that is, the first connecting portion 1a is driven into the side surface of the wall by the expansion screw through the matching of the locking hole 12f and the limiting hole 12g, the second connecting portion 1b is clamped on the side surface of the first connecting portion 1a by the clamping groove 2, the second connecting portion 1b is pulled out from the clamping groove 2 by the first rotating shaft 3 and is driven to axially rotate by the second rotating shaft 4, the second connecting portion 2b can be rotated and separated by the second rotating shaft 4, the pipeline is mounted at the through hole 5, and the line pipe is mounted at the first line pipe groove 9 and the second line pipe groove 11.
The installation process of the embodiment 2, the embodiment 3 and the embodiment 4 is simpler, the efficiency is higher, the installation mode is more, the installation method is more suitable for installation in different environments, the number of pipe fittings with various specifications can be increased, the defect that the occupied space for installing the traditional pipeline system is large is reduced, the space for installing the pipeline system is reduced, each pipeline can be installed neatly, and the number of accessories is reduced.
The first bobbin slots 9 formed at both ends of the first connection portion 1a can be engaged with the connection buckles 12d on the side surfaces thereof by the engagement slots 10, so that the plurality of first connection portions 1a can be continuously installed, and the continuous installation of the pipelines can be realized, and the pipelines are tidy. The material of the combined hanger body 1 is PP or ABS.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.

Claims (10)

1. The combined hanging bracket is characterized by comprising a combined hanging bracket body (1), wherein the combined hanging bracket body (1) comprises a first connecting part (1 a) and a second connecting part (1 b), clamping grooves (2) are formed in two ends of the first connecting part (1 a), and a first rotating shaft (3) and a second rotating shaft (4) which are in interference fit with the clamping grooves (2) are arranged in two ends of the second connecting part (1 b);
the first connecting part (1 a) and the second connecting part (1 b) are matched to form a through hole (5) for installing a pipeline, and the first rotating shaft (3) can be pulled out from the clamping groove (2) and drives the second connecting part (1 b) to axially rotate through the second rotating shaft (4).
2. The multi-pipeline integrated quick-mounting combined hanging bracket according to claim 1, wherein two axial clamping positions (6) are formed in the clamping groove (2), and the first rotating shaft (3) and/or the second rotating shaft (4) can slide along the notch direction of the clamping groove (2).
3. The multi-pipeline integrated quick-mounting combined hanging bracket according to claim 2, wherein an inclined clamping groove (7) is formed in the side face of the first rotating shaft (3) along the axial direction of the first rotating shaft, and a flexible clamping plate (8) in clamping fit with the inclined clamping groove (7) is arranged at the notch of the clamping groove (2).
4. The multi-pipeline integrated quick-mounting combined hanger according to claim 1, wherein a first pipeline groove (9) is formed at the clamping groove (2) at two ends of the first connecting part (1 a), and a clamping groove (10) axially arranged along the inner wall of the first pipeline groove (9) is formed;
a second wire pipe groove (11) communicated with the through hole (5) is formed on the inner side surface of the second connecting part (1 b).
5. A multi-pipeline integrated quick install composite hanger according to claim 1, wherein the first connection portion (1 a) is provided with a mounting assembly (12) for mounting it to a wall.
6. The multi-pipeline integrated quick-mounting combined hanger according to claim 5, wherein the mounting assembly (12) comprises a sliding groove (12 a) formed in the side face of the first connecting portion (1 a), a top sheet (12 b) is slidably clamped in the sliding groove (12 a), and a mounting hole (12 c) is formed in the top sheet (12 b).
7. The multi-pipeline integrated quick-mounting combined hanging bracket according to claim 5, wherein the mounting assembly (12) comprises two connecting buckles (12 d) arranged on the outer wall of the first connecting part (1 a), and the connecting buckles (12 d) are provided with buckle grooves (12 e).
8. A multi-pipeline integrated quick-install composite hanger according to claim 7, wherein the openings of the snap slots (12 e) are opposed and co-linear.
9. The multi-pipeline integrated quick-mounting combined hanger according to claim 5, wherein the mounting assembly (12) comprises a locking hole (12 f) formed in the center of the side wall of the first connecting portion (1 a), and a limiting hole (12 g) for mounting a screw is formed in the position, located in the locking hole (12 f), of the inner side of the first connecting portion (1 a).
10. A multi-pipeline integrated quick install composite hanger according to any of claims 1-9, wherein the material of the composite hanger body (1) is PP or ABS.
CN202321378779.1U 2023-06-01 2023-06-01 Multi-pipeline integrated quick-mounting combined hanging bracket Active CN220082321U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321378779.1U CN220082321U (en) 2023-06-01 2023-06-01 Multi-pipeline integrated quick-mounting combined hanging bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321378779.1U CN220082321U (en) 2023-06-01 2023-06-01 Multi-pipeline integrated quick-mounting combined hanging bracket

Publications (1)

Publication Number Publication Date
CN220082321U true CN220082321U (en) 2023-11-24

Family

ID=88826975

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321378779.1U Active CN220082321U (en) 2023-06-01 2023-06-01 Multi-pipeline integrated quick-mounting combined hanging bracket

Country Status (1)

Country Link
CN (1) CN220082321U (en)

Similar Documents

Publication Publication Date Title
US8844888B1 (en) Strut clip
US6254040B1 (en) Mounting angle clamp for attaching additional structures to hanging rod
WO2014081782A1 (en) Aerial roller spacer apparatus and associated methods thereof
US20200217459A1 (en) Retrofit kit and methods for conversion of fluorescent light assemblies to led assemblies
CN220082321U (en) Multi-pipeline integrated quick-mounting combined hanging bracket
US20180231220A1 (en) Methods, systems and apparatus for mounting electronic devices to light fixtures
CN210423985U (en) Pipeline hanging weight for household central air-conditioning system
US20090314903A1 (en) Pipe clamps
US10088134B1 (en) Adjustable plate for use with a mount
CN204739319U (en) Pipe fitting pipe clamp
CN2931892Y (en) Pipe connecting fastener
CN209925780U (en) Multi-pipeline integrated quick-mounting combined elevator
CN216751104U (en) Multi-pipeline support hanger
CN219300108U (en) Multi-pipeline fixed pipe code for household central air conditioner
CN220564080U (en) Hanging bracket for installing central air conditioner
CN218005789U (en) PE threading pipe convenient to fixed connection
CN211525693U (en) Special pipe strap of central air conditioning
CN2456444Y (en) Rotary self-locked fixing clip
KR200363128Y1 (en) a Wire Pipe Connector.
CN212360385U (en) Plug-pull piece for pipeline integrated prefabricated fast-assembling keel system
CN219934242U (en) Condensation drain pipe mounting
CN219035136U (en) Hanging rod mounting structure for decorative ceiling fan
CN208268546U (en) A kind of adjustable PVC-U clip of Fast Installation
CN212571999U (en) Spool installation fixed knot who easily dismantles constructs
CN219605787U (en) Easy-to-disassemble flange nut

Legal Events