CN220080849U - Ancient building roofing hanging wire device - Google Patents

Ancient building roofing hanging wire device Download PDF

Info

Publication number
CN220080849U
CN220080849U CN202321402092.7U CN202321402092U CN220080849U CN 220080849 U CN220080849 U CN 220080849U CN 202321402092 U CN202321402092 U CN 202321402092U CN 220080849 U CN220080849 U CN 220080849U
Authority
CN
China
Prior art keywords
guide arm
guide rod
wire device
suspension wire
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321402092.7U
Other languages
Chinese (zh)
Inventor
王慧昕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Xiangshan Landscape Architecture Engineering Co ltd
Original Assignee
Hebei Xiangshan Landscape Architecture Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Xiangshan Landscape Architecture Engineering Co ltd filed Critical Hebei Xiangshan Landscape Architecture Engineering Co ltd
Priority to CN202321402092.7U priority Critical patent/CN220080849U/en
Application granted granted Critical
Publication of CN220080849U publication Critical patent/CN220080849U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a suspension wire device for an ancient building roof, and relates to the field of suspension wire devices. This ancient building roofing suspension wire device includes the guide arm main part, and the bottom of guide arm main part all is provided with multiunit jib, and the bottom of jib is provided with the weight, and the bottom of multiunit weight is connected with flexible rope, and the guide arm main part includes first guide arm and second guide arm, and the spout that runs through has all been seted up to the both sides of first guide arm, and the both sides inner wall fixedly connected with slider of second guide arm, the slider all slides in the inside of spout. This ancient building roofing suspension wire device is through the slider that sets up and mutually supporting of spout, is convenient for slide first guide arm inside the second guide arm, can accomodate and open the guide arm main part as required, and through can fixing the guide arm main part after opening, conveniently accomodate the purpose of being convenient for carry.

Description

Ancient building roofing hanging wire device
Technical Field
The utility model relates to the technical field of hanging wire devices, in particular to an ancient building roof hanging wire device.
Background
In the repair construction of ancient buildings, a link which is very important for the repair of roofs comprises roof hanging tiles, in order to ensure the orderly arrangement of the tiles, hanging wires are needed to be carried out before the hanging of the tiles, and workers lay the tiles along the hanging wires;
the existing ancient building roof hanging wire device is extremely easy to have the problem that the device is inconvenient to store and carry in the using process;
the Chinese patent discloses an ancient building roofing hanging wire device with publication number CN214062425U, which comprises a guide rod, the inboard slider of guide arm bottom installation, slider one end welded connection pull rod, slider bottom welded connection support, support nested installation pivot, the telescopic link is installed in the pivot outside, telescopic link outside nested installation sleeve, telescopic link one end welded connection spring A, sleeve bottom installation couple just passes through welded fixed connection, couple bottom installation weight and detachable connection. According to the roof wire hanging device, the shape of the flexible rope is consistent with that of a roof through the matching between the sliding blocks and the telescopic rods, so that a standard is provided for construction, the construction efficiency is increased, the reworking rate is avoided, the practicability of the wire hanging device is improved, and the guide rod is convenient to store after being used due to the longer transverse distance of the guide rod, so that the difficulty of the device in transportation and carrying is increased.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model provides an ancient building roof hanging wire device, which solves the problem that the existing ancient building roof hanging wire device is very easy to occur in the using process and is inconvenient to store and carry.
Technical proposal
In order to achieve the above purpose, the utility model is realized by the following technical scheme: the utility model provides an ancient building roofing hanging wire device, includes the guide arm main part, the bottom of guide arm main part all is provided with the multiunit jib, the bottom of jib is provided with the weight, the multiunit the bottom of weight is connected with flexible rope, the guide arm main part includes first guide arm and second guide arm, the spout that runs through has all been seted up to the both sides of first guide arm, the both sides inner wall fixedly connected with slider of second guide arm, the slider all slides in the inside of spout to be convenient for accomodate the effect to the guide arm main part, one side surface of guide arm main part is provided with the high pressure sucking disc of being convenient for fix the device.
Preferably, the outer surfaces of the first guide rod and the second guide rod are provided with through fixing grooves, and the inner threads of the fixing grooves are connected with second fixing bolts.
Preferably, the first guide rod and the second guide rod are both provided with a plurality of groups of connecting rods in a sliding mode, and the lower surface of each connecting rod is fixedly connected with a hinge block.
Preferably, an adjusting rod is hinged in the hinge block, and an air cylinder is installed at the bottom end of the adjusting rod.
Preferably, the output end of the cylinder is fixedly connected with the upper surface of the suspender.
Preferably, the bottom ends of the heavy weights are provided with threading holes, and the flexible ropes sequentially penetrate through the threading holes at the bottom ends of the heavy weights.
Preferably, the top end of the connecting rods is fixedly connected with a supporting plate, and the supporting plates slide on the top ends of the guide rod main bodies.
Preferably, the supporting plate is fixedly connected with the guide rod main body through fixing bolts.
The utility model discloses an ancient building roof hanging wire device, which has the following beneficial effects: this ancient building roofing hanging wire device, the slider through setting up and the mutually supporting of spout be convenient for slide first guide arm inside the second guide arm, can accomodate and open the guide arm main part as required, through can fixing the guide arm main part after opening, conveniently accomodate the purpose of being convenient for carry.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of the inner structure of the first guide rod according to the present utility model;
FIG. 3 is a schematic view of the inner structure of a second guide rod according to the present utility model;
fig. 4 is a schematic diagram of a portion a of fig. 2 according to the present utility model.
In the figure: 1. a guide rod main body; 101. a high pressure suction cup; 2. a first guide bar; 201. a chute; 202. an adjusting rod; 203. a hinge block; 204. a connecting rod; 205. a support plate; 3. a second guide bar; 301. a slide block; 302. a fixing groove; 303. a second fixing bolt; 4. a boom; 401. a cylinder; 5. a heavy hammer; 6. a flexible cord.
Description of the embodiments
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present utility model more clear, the technical solutions in the embodiments of the present utility model are clearly and completely described, and it is obvious that the described embodiments are some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The embodiment of the utility model solves the problem that the traditional ancient building roof hanging wire device is inconvenient to store and carry in the using process, and realizes convenient storage and carrying of the guide rod main body.
In order to better understand the above technical solutions, the following description will refer to the drawings and specific embodiments.
The embodiment of the utility model discloses a suspension wire device for an ancient building roof.
According to the drawings 1-4 show, including guide arm main part 1, the bottom of guide arm main part 1 all is provided with multiunit jib 4, the bottom of jib 4 is provided with weight 5, the bottom of multiunit weight 5 is connected with flexible rope 6, during the use, through outwards pulling first guide arm 2, the spout 201 that runs through has all been seted up to the both sides of first guide arm 2, the both sides inner wall fixedly connected with slider 301 of second guide arm 3, slider 301 all slides in the inside of spout 201, through the cooperation of slider 301 and spout 201, be convenient for slide first guide arm 2 in second guide arm 3 inside, can accomodate and open the purpose of guide arm main part 1 as required, thereby be convenient for accomodate the effect of effect to guide arm main part 1, one side surface of guide arm main part 1 is provided with the high pressure sucking disc 101 that is convenient for fix the device, during the use, through outwards pulling first guide arm 2, make slider 301 slide in the inside of spout 201, can drive first guide arm 2 to the side that second guide arm 3 kept away from each other, at this moment, through connecting second fixing bolt 303 screw thread in the inside of fixed slot 302, can accomodate the first guide arm 2 and the high pressure sucking disc 101 is fixed with the device through this high pressure roof.
The fixed slot 302 that runs through has all been seted up to the surface of first guide arm 2 and second guide arm 3, the inside threaded connection of fixed slot 302 has second fixing bolt 303, the inside of first guide arm 2 and second guide arm 3 all slides there is multiunit connecting rod 204, the lower fixed surface of connecting rod 204 is connected with articulated piece 203, slide connecting rod 204 in the inside of guide arm main part 1, can adjust the purpose of bottom weight 5's position as required, after the regulation, through the fixed purpose of fixing the backup pad 205 on top with the top of guide arm main part 1 with fixing bolt, be convenient for use the device.
The inside of the hinging block 203 is hinged with an adjusting rod 202, the bottom end of the adjusting rod 202 is provided with an air cylinder 401, the output end of the air cylinder 401 is fixedly connected with the upper surface of the hanging rod 4, the hanging rod 4 at the bottom end can be driven to move downwards through the air cylinder 401, and the distance between the hanging rod 4 and the guide rod main body 1 is adjusted.
The threading holes are formed in the bottom ends of the heavy weights 5, the flexible ropes 6 sequentially penetrate through the threading holes in the bottom ends of the heavy weights 5, the supporting plates 205 are fixedly connected to the top ends of the connecting rods 204, the supporting plates 205 are all slid on the top ends of the guide rod main bodies 1, the supporting plates 205 are fixedly connected with the guide rod main bodies 1 through fixing bolts, after the use, the fixing bolts rotating the supporting plates 205 are separated from the inside of the supporting plates 205, then the three groups of connecting rods 204 at the first guide rod 2 are slid, the heavy weights 5 driving the bottom ends are slid on the leftmost side of the first guide rod 2, the three groups of connecting rods 204 at the second guide rod 3 are slid on the rightmost side of the second guide rod 3, then the second fixing bolts 303 are separated from the inside of the fixing grooves 302, one side of the first guide rod 2 is pushed, and the first guide rod 2 is slid inside the second guide rod 3 to be stored.
In summary, compared with the prior art, the method has the following beneficial effects: through the mutually supporting of the slider 301 and the spout 201 that set up, be convenient for slide first guide arm 2 inside second guide arm 3, can accomodate and open guide arm main part 1 as required, through can fixing the guide arm main part 1 after opening, conveniently accomodate the purpose of being convenient for carry.
The foregoing has shown and described the basic principles and main features of the present utility model and the advantages of the present utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (8)

1. The utility model provides an ancient building roofing hanging wire device, includes guide arm main part (1), the bottom of guide arm main part (1) all is provided with multiunit jib (4), the bottom of jib (4) is provided with weight (5), multiunit the bottom of weight (5) is connected with flexible rope (6), its characterized in that: the guide rod main body (1) comprises a first guide rod (2) and a second guide rod (3), through sliding grooves (201) are formed in two sides of the first guide rod (2), sliding blocks (301) are fixedly connected to inner walls of two sides of the second guide rod (3), the sliding blocks (301) slide inside the sliding grooves (201), accordingly the guide rod main body (1) can be stored conveniently, and a high-pressure sucker (101) which is convenient to fix the device is arranged on the outer surface of one side of the guide rod main body (1).
2. The historic building roof suspension wire device according to claim 1, characterized in that: the outer surfaces of the first guide rod (2) and the second guide rod (3) are respectively provided with a penetrating fixing groove (302), and the inside of the fixing groove (302) is connected with a second fixing bolt (303) in a threaded manner.
3. The historic building roof suspension wire device according to claim 2, characterized in that: the inside of first guide arm (2) and second guide arm (3) all slides has multiunit connecting rod (204), the lower surface fixedly connected with hinge block (203) of connecting rod (204).
4. The historic building roof suspension wire device according to claim 3, characterized in that: an adjusting rod (202) is hinged in the hinge block (203), and an air cylinder (401) is installed at the bottom end of the adjusting rod (202).
5. The historic building roof suspension wire device according to claim 4, wherein: the output end of the air cylinder (401) is fixedly connected with the upper surface of the suspender (4).
6. The historic building roof suspension wire device according to claim 1, characterized in that: threading holes are formed in the bottom ends of the heavy weights (5), and the flexible ropes (6) sequentially penetrate through the threading holes in the bottom ends of the heavy weights (5).
7. The historic building roof suspension wire device according to claim 3, characterized in that: the top ends of the connecting rods (204) are fixedly connected with supporting plates (205), and the supporting plates (205) slide on the top ends of the guide rod main bodies (1).
8. The historic building roof suspension wire device according to claim 7, characterized in that: the supporting plate (205) is fixedly connected with the guide rod main body (1) through fixing bolts.
CN202321402092.7U 2023-06-05 2023-06-05 Ancient building roofing hanging wire device Active CN220080849U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321402092.7U CN220080849U (en) 2023-06-05 2023-06-05 Ancient building roofing hanging wire device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321402092.7U CN220080849U (en) 2023-06-05 2023-06-05 Ancient building roofing hanging wire device

Publications (1)

Publication Number Publication Date
CN220080849U true CN220080849U (en) 2023-11-24

Family

ID=88817383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321402092.7U Active CN220080849U (en) 2023-06-05 2023-06-05 Ancient building roofing hanging wire device

Country Status (1)

Country Link
CN (1) CN220080849U (en)

Similar Documents

Publication Publication Date Title
CN109823963A (en) A kind of hanging device of assembled architecture prefabricated components
CN212924195U (en) Hoisting accessory of steel reinforcement cage
CN214114656U (en) Hoisting equipment for steel
CN108147273A (en) A kind of adjustable large-scale steel pipe suspender
CN201190443Y (en) Embraced Bar special for tower set
CN115231427A (en) Pipe joint hoisting construction method and equipment
CN210280298U (en) Adjustable angle steel angle opening and closing device
CN220080849U (en) Ancient building roofing hanging wire device
CN210340164U (en) Hoist engine for green building engineering
CN104929542A (en) Power rat hole device applicable to butting strings of well drilling platforms
CN202308909U (en) Clamping device for live line insulator string replacement
CN209383307U (en) A kind of mobile device for water-repellent paint tank
CN213445762U (en) Assembled building element hoist device
CN212475225U (en) Handling device of bobbin
RU80692U1 (en) DEVICE FOR LIFTING OPERATIONS IN A WELL WITH AN INCLINED MOISTURE
CN211414127U (en) Auxiliary welding device for reinforcing plate of steel-concrete wind power generation tower
CN208684218U (en) It is a kind of large size rectangular device in installation of high building without platform handling apparatus
CN113738130A (en) Large-inclined-plane curtain wall keel mounting device and construction method thereof
CN209668611U (en) Hydraulic cylinder cylinder barrel stone tongs
CN117068928B (en) Efficient hoisting device suitable for installation angle of concrete facing block
CN220122577U (en) Portable cable hanging tool
CN220098308U (en) Overhead hoist of H shaped steel
CN219548359U (en) Extension hanging basket for overhauling high-altitude side wall of hydropower station
CN2823226Y (en) Portable crane
CN110125836A (en) A kind of fixed equipment and its application method for studying tower crane mechanical property

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant