CN220072856U - Wind power tower cylinder major diameter flange correcting unit - Google Patents

Wind power tower cylinder major diameter flange correcting unit Download PDF

Info

Publication number
CN220072856U
CN220072856U CN202320640586.2U CN202320640586U CN220072856U CN 220072856 U CN220072856 U CN 220072856U CN 202320640586 U CN202320640586 U CN 202320640586U CN 220072856 U CN220072856 U CN 220072856U
Authority
CN
China
Prior art keywords
wind power
round steel
tower
flange
power tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320640586.2U
Other languages
Chinese (zh)
Inventor
孙阳
俞明波
方璐松
魏利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Ouyang Offshore Wind Power Technology Co ltd
Original Assignee
Shanghai Ouyang Offshore Wind Power Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Ouyang Offshore Wind Power Technology Co ltd filed Critical Shanghai Ouyang Offshore Wind Power Technology Co ltd
Priority to CN202320640586.2U priority Critical patent/CN220072856U/en
Application granted granted Critical
Publication of CN220072856U publication Critical patent/CN220072856U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a wind power tower cylinder large-diameter flange correction device, which belongs to the technical field of flange correction, wherein: the hydraulic cylinder is arranged on the inner wall of the other end of the L plate, the round steel is inserted into a bolt hole on the upper flange of the middle tower, and the hydraulic cylinder is used for abutting against the inner wall of the upper flange of the middle tower to correct the tower barrel flange through hydraulic expansion; the wind power tower correction device is simple to manufacture, convenient to obtain materials, strong in applicability, simple to operate, safe and reliable, and solves the problem that the wind power tower cannot be effectively corrected in place due to large specification and large deformation. Meanwhile, the operation is simple and reliable, and the time consumption is short, so that the wind power installation efficiency can be greatly improved during a limited window period.

Description

Wind power tower cylinder major diameter flange correcting unit
Technical Field
The utility model belongs to the technical field of flange correction, and particularly relates to a large-diameter flange correction device for a wind power tower.
Background
Wind power is diverted from land to sea as national policies change. In recent years, the development of offshore wind power is gradually changed, and the development is further advanced towards the 'deep blue' sea area, and various megawatt machine types are continuously appeared, so that the specifications of wind power towers are also various. In the manufacturing, transferring, passing and installing processes of the wind power tower, some deformation is a normal phenomenon, so that the problem of the deformation of the wind power tower is solved, and the problem of urgent need of the offshore wind power installation is solved.
The existing wind power tower correction method is mainly carried out by adopting a jack and a fire work mode, the jack correction application range is small, and high safety risk exists; the initiating explosive device has high correction requirement, is difficult to master, and can seriously lead to scrapping of the flange at a new deformation position of hard force transfer of a light person. The method needs more staff to participate, and has hidden danger in the aspect of safety, so that the large-diameter flange correction device for the wind power tower is provided.
Disclosure of Invention
The utility model aims to provide a wind power tower cylinder large-diameter flange correction device so as to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
as the preferred scheme of the wind power tower cylinder large-diameter flange correction device, which is disclosed by the utility model, the wind power tower cylinder large-diameter flange correction device comprises the following components: including round steel, L board and pneumatic cylinder, round steel and L board are an whole and round steel is located the tip of L board, install the pneumatic cylinder on the L board other end inner wall, round steel inserts and establishes in the bolt hole on the flange on the middle tower, the pneumatic cylinder is used for contradicting middle tower flange inner wall and carries out tower section of thick bamboo flange correction through hydraulic extension.
Preferably, the end of the hydraulic cylinder is provided with a convex strip, and the inner wall of the L plate is provided with an alignment groove matched with the convex strip.
Preferably, the hydraulic cylinder drives the hydraulic ram to stretch and retract through internal hydraulic pressure.
Preferably, the end part of the round steel is subjected to chamfering and integral polishing treatment, so that the damage of the barbed edges and corners to the flange holes is prevented.
Preferably, the bending part at the inner side of the L plate is arc-shaped, so that the tearing caused by larger correction stress of the flange is effectively avoided.
Preferably, the round steel and the L plate are fixed through welding.
Preferably, the axis of the round steel is partially coincident with the axis of the bolt hole.
Compared with the prior art, the utility model has the beneficial effects that: the wind power tower correction device is simple to manufacture, convenient to obtain materials, strong in applicability, simple to operate, safe and reliable, and solves the problem that the wind power tower cannot be effectively corrected in place due to large specification and large deformation. Meanwhile, the operation is simple and reliable, and the time consumption is short, so that the wind power installation efficiency can be greatly improved during a limited window period.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the drawings that are needed in the description of the embodiments will be briefly described below, it being obvious that the drawings in the following description are only some embodiments of the present utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
Wherein:
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a front view of the present utility model;
FIG. 3 is a schematic diagram of a structure used in the present utility model;
in the figure: 1. round steel; 2. an L plate; 3. a hydraulic cylinder; 301. a hydraulic ram; 302. a convex strip; 303. alignment grooves; 4. a middle tower upper flange; 5. and a flange on the bottom tower.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
Referring to fig. 1-3, the present utility model proposes a technical solution: the utility model provides a wind-powered electricity generation tower section of thick bamboo major diameter flange correcting unit, includes round steel 1, L board 2 and pneumatic cylinder 3, and round steel 1 and L board 2 are an whole and round steel 1 is located the tip of L board 2, and round steel 1's axis and bolt hole axis part coincidence, installs pneumatic cylinder 3 on the other end inner wall of L board 2, and round steel 1 inserts and establishes in the bolt hole on middle tower upper flange 4, and pneumatic cylinder 3 is arranged in contradicting middle tower upper flange 4 inner wall and carries out tower section of thick bamboo flange correction through hydraulic telescoping, solves tower section of thick bamboo flange deformation problem.
The hydraulic cylinder 3 stretches and contracts through the hydraulic driving hydraulic ram 301 inside, and pressure is adjusted according to flange deformation and tower flange specifications, so that the hydraulic cylinder can be suitable for different deformation conditions and tower flange specifications, and the safety coefficient of a hydraulic correction method is larger than that of a traditional correction method, so that the problem that more personnel are needed by the traditional correction method after the tower flange is deformed is solved.
Further, the end of the hydraulic cylinder 3 has a protruding strip 302, and the inner wall of the l plate 2 is provided with a positioning groove 303 matching with the protruding strip 302, and the hydraulic cylinder 3 is mounted and dismounted inside the flange.
The bending part at the inner side of the L plate 2 is arc-shaped, so that the tearing caused by larger correction stress of the flange can be effectively avoided.
The round steel 1 is machined from high strength bolts.
One side of the round steel 1 and the L plate 2 are welded by using a 506 or 507 type welding rod and polished, so that the strength of the correction device is ensured, and the end part of the round steel 1 is subjected to chamfering and integral polishing to prevent the damage of the barb edges and corners to the flange holes.
The working principle and the using flow of the utility model are as follows: round steel 1 is selected according to the bolt aperture and L board 2 is manufactured on site according to the thickness of the flange of the tower barrel, round steel 1 and L steel board 2 are reliably welded to form a correction fixing tool, hydraulic ram 301 and hydraulic cylinder 3 are placed at correction positions during flange correction, upper buckle lower support is formed, hydraulic ram 301 is driven to extend to achieve flange deformation correction by means of hydraulic ram 301, and the correction tool is simple in structure, easy to operate, economical and practical.
The present utility model is not limited to the above-mentioned embodiments, and any person skilled in the art, based on the technical solution of the present utility model and the inventive concept thereof, can be replaced or changed within the scope of the present utility model.

Claims (7)

1. A wind-powered electricity generation tower section of thick bamboo major diameter flange correcting unit, its characterized in that: including round steel (1), L board (2) and pneumatic cylinder (3), round steel (1) and L board (2) are an whole and round steel (1) are located the tip of L board (2), install pneumatic cylinder (3) on the inner wall of L board (2) other end, round steel (1) insert and establish in the bolt hole on middle tower upper flange (4), pneumatic cylinder (3) are used for contradicting middle tower upper flange (4) inner wall and carry out tower section of thick bamboo flange correction through hydraulic telescoping.
2. The wind power tower large-diameter flange correction device according to claim 1, wherein: the end of the hydraulic cylinder (3) is provided with a convex strip (302), and the inner wall of the L plate (2) is provided with an alignment groove (303) which is matched with the convex strip (302).
3. The wind power tower large-diameter flange correction device according to claim 1, wherein: the hydraulic cylinder (3) drives the hydraulic ram (301) to stretch and retract through internal hydraulic pressure.
4. The wind power tower large-diameter flange correction device according to claim 1, wherein: chamfering and integral polishing are carried out on the end part of the round steel (1).
5. The wind power tower large-diameter flange correction device according to claim 1, wherein: the bending part of the inner side of the L plate (2) is arc-shaped.
6. The wind power tower large-diameter flange correction device according to claim 1, wherein: the round steel (1) and the L plate (2) are fixed through welding.
7. The wind power tower large-diameter flange correction device according to claim 1, wherein: the axis of the round steel (1) is partially overlapped with the axis of the bolt hole.
CN202320640586.2U 2023-03-28 2023-03-28 Wind power tower cylinder major diameter flange correcting unit Active CN220072856U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320640586.2U CN220072856U (en) 2023-03-28 2023-03-28 Wind power tower cylinder major diameter flange correcting unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320640586.2U CN220072856U (en) 2023-03-28 2023-03-28 Wind power tower cylinder major diameter flange correcting unit

Publications (1)

Publication Number Publication Date
CN220072856U true CN220072856U (en) 2023-11-24

Family

ID=88816423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320640586.2U Active CN220072856U (en) 2023-03-28 2023-03-28 Wind power tower cylinder major diameter flange correcting unit

Country Status (1)

Country Link
CN (1) CN220072856U (en)

Similar Documents

Publication Publication Date Title
CN209013049U (en) A kind of city illumination lamp street lamp post
CN103912435B (en) A kind of small power station kaplan turbine runner
EP2888473B1 (en) A system and method to provide for accurate alignment when mounting a wind turbine blade
CN106930896A (en) A kind of band connection rod-type fan blade and wind-driven generator
CN204436690U (en) A kind of blade feathering
CN204283729U (en) A kind of wind generator set blade blade pitch device
CN220072856U (en) Wind power tower cylinder major diameter flange correcting unit
CN102704453B (en) Connecting method of spud leg and pile shoe of windmill mounting ship
CN2403757Y (en) Reducing elastic sleeve for reel of decoiler or recoiler
CN206344089U (en) A kind of flange hole guiding mechanism
CN201483449U (en) Device for dismounting and mounting elastic support of wind turbine gearbox
CN104595107A (en) Blade variable-pitch mechanism of wind generating set
CN206329446U (en) A kind of guide flange structure
CN102069363A (en) Method for manufacturing wind wheel and blades of wind driven generator
CN214423399U (en) Quick mounting structure of offshore wind power generation jacket foundation flange
CN214171496U (en) Trenchless pipeline center line deviation correcting device
CN209115882U (en) Fuel gas pipeline, which is not stopped the supple of gas or steam, changes the inicdental bypath connecting tooling of pipe
CN207669223U (en) A kind of pin pulling out device for dismantling the big shaft flange attachment pegs of hydrogenerator
KR101559971B1 (en) Structure of Windmill
CN216759748U (en) Special tool for pulling guide vane crank arm out
CN109323079A (en) Fuel gas pipeline, which is not stopped the supple of gas or steam, changes the inicdental bypath connecting tooling and its construction method of pipe
CN205183328U (en) Restoration type terminal surface tooth roll axle
CN211588607U (en) Tool for drilling holes in inner side of barrel of wind driven generator
CN215715488U (en) Coating protection type fan single pile foundation with transition section
CN217001754U (en) Oil field is pipe expander in pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant