CN220060807U - Detachable ore transportation pipeline - Google Patents

Detachable ore transportation pipeline Download PDF

Info

Publication number
CN220060807U
CN220060807U CN202321659493.0U CN202321659493U CN220060807U CN 220060807 U CN220060807 U CN 220060807U CN 202321659493 U CN202321659493 U CN 202321659493U CN 220060807 U CN220060807 U CN 220060807U
Authority
CN
China
Prior art keywords
pipeline
anterior segment
mounting
back end
detachable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321659493.0U
Other languages
Chinese (zh)
Inventor
敬顺朝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuan'an Xiye Mining Co ltd
Original Assignee
Yuan'an Xiye Mining Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yuan'an Xiye Mining Co ltd filed Critical Yuan'an Xiye Mining Co ltd
Priority to CN202321659493.0U priority Critical patent/CN220060807U/en
Application granted granted Critical
Publication of CN220060807U publication Critical patent/CN220060807U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model provides a detachable ore transportation pipeline, which belongs to the field of ore transportation and comprises a pipeline and a mounting frame, wherein the pipeline is erected on the mounting frame through a fixing assembly, the mounting frame comprises a frame body and wedge-shaped ground parts, and the wedge-shaped ground parts are fixedly arranged at two ends of the frame body; the fixed subassembly is including inserting round pin and mounting groove, the mounting groove includes back end, anterior segment and spacing section, the back end is seted up in the support body inner wall, the anterior segment runs through the pipeline, anterior segment and back end intercommunication, the one end intercommunication of support body is kept away from to spacing section and anterior segment, the cross-section of spacing section is arc strip, the round pin of inserting includes arc piece and inserted bar, arc piece fixed mounting is on the inserted bar top, the inserted bar is inserted and is established in back end and anterior segment, the arc piece card is established in the spacing section. When the pipeline is dismantled, the pipeline can be hung through the hoisting equipment only by taking out the inserted pin, and a large number of people are not required to carry out the dismantling work.

Description

Detachable ore transportation pipeline
Technical Field
The utility model relates to the technical field of ore transportation, in particular to a detachable ore transportation pipeline.
Background
The pipeline transportation is a transportation mode for long-distance material transportation by using a pipeline as a transportation tool, is a transportation mode for transporting materials from a production place to the market, and is a special component of dry line transportation in a unified transportation network. Pipeline transportation is more costly than water transportation, but still cheaper than rail transportation. Most pipelines are used by owners to transport own products, and the pipeline transportation is large in transportation quantity, continuous, rapid, economical, safe, reliable, stable, low in investment, small in occupied area and low in cost, and can realize automatic control. Besides being widely used for long-distance transportation of petroleum and natural gas, the device can also be used for transporting ores, coal, building materials, chemicals, grains and the like. Transport pipelines in which ores are transported are also increasingly used at present.
Chinese patent CN209258909U discloses a steel pipe for ore transportation. The steel pipe for ore transportation comprises a main body mechanism, and the top of the steel pipe main body is provided with the sliding groove; the two ends of the steel pipe main body are fixedly sleeved with the connecting mechanisms; the guide block mechanism is characterized in that the sliding groove is internally clamped and slidably connected with the sliding block, one side of the outer portion of the steel pipe body is fixedly connected with the first sliding block limiting block, the other side of the outer portion of the steel pipe body is fixedly connected with the second sliding block limiting block, and the steel pipe for ore transportation has the advantages of being convenient for removing large ores blocking a transportation pipeline and guaranteeing transportation efficiency.
The existing transportation pipeline is fixed with the installation frame by adopting bolts when being installed, so that a large number of workers are required to be used when the pipeline is detached, and the labor cost is high.
Disclosure of Invention
Aiming at the defects that the prior transportation pipeline in the prior art is generally fixed with a mounting frame by bolts when being installed, so that a large number of workers are needed when the pipeline is detached, and the labor cost is high, the utility model provides a detachable ore transportation pipeline, which solves the problem that a large number of workers are needed in the detachment process in the prior art.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
the utility model provides a detachable ore transportation pipeline, includes pipeline and mounting bracket, the pipeline erects on the mounting bracket through fixed subassembly, the mounting bracket includes support body and wedge spare, wedge spare fixed mounting is at support body both ends, the support body is with pipeline assorted arc;
the fixed subassembly is including inserting round pin and mounting groove, the mounting groove includes back end, anterior segment and spacing section, the back end is seted up in the support body inner wall, the anterior segment runs through the pipeline, anterior segment and back end intercommunication, the one end intercommunication of support body is kept away from to spacing section and anterior segment, the cross-section of spacing section is arc strip, the round pin of inserting includes arc piece and inserted bar, arc piece fixed mounting is on the inserted bar top, the inserted bar is inserted and is established in back end and anterior segment, the arc piece card is established in the spacing section, arc piece top surface and the radian assorted of pipeline inner wall.
And the limiting assembly is fixedly arranged at the bottom end of the rear section and used for limiting the insertion rod.
The limiting assembly comprises an elastic block and a groove, wherein a plurality of elastic blocks are fixedly arranged at the bottom end of the rear section at annular equal intervals, a plurality of grooves are formed at the bottom end of the insertion rod at annular equal intervals, and the elastic blocks are clamped in the grooves.
The wedge part comprises mounting blocks, wedge rods and inserting rods, wherein the two mounting blocks are symmetrically and fixedly mounted at two ends of the frame body, threaded openings are formed in the mounting blocks, threaded rods of the wedge rods are arranged in the threaded openings, and the inserting rods are fixedly mounted at the middle positions of the frame body.
The two ends of the pipeline are coaxially connected with connecting pipes in a threaded manner, and the two ends of the inner wall of each connecting pipe are both in threaded connection with the outer wall of the pipeline.
The arc-shaped sheet is made of elastic and soft materials, and the insertion rod is made of hard materials.
Compared with the prior art, the utility model has the following beneficial effects:
when carrying out the pipeline installation, insert the wedge ground spare in the soil after, erect the pipeline on the mounting bracket, make back end and anterior segment align, when installing, insert the pole and insert and establish in anterior segment and back end in the angle of back adjustment arc piece make the arc piece card go into spacing section, a plurality of mounting groove annular equidistance is offered in the adjacent region of mounting bracket and pipeline, when need demolish the pipeline, only need with inserting the round pin and take out, can hang the pipeline through hoisting equipment, need not a large amount of personnel and dismantle the work.
Drawings
FIG. 1 is a schematic view of a detachable ore transport conduit according to the present utility model;
FIG. 2 is a cross-sectional view of a removable ore delivery conduit securing assembly according to the present utility model;
FIG. 3 is an enlarged view of a portion of FIG. 2A;
fig. 4 is a schematic structural view of an insert pin of a detachable ore transport pipe according to the present utility model.
In the above figures: the pipeline 1, the installation frame 2, the frame body 21, the wedge-shaped member 3, the installation block 31, the wedge-shaped rod 32, the inserted rod 33, the fixing component 4, the insertion pin 5, the arc-shaped sheet 51, the insertion rod 52, the installation groove 6, the rear section 61, the limit section 62, the limit component 7, the elastic block 71 and the groove 72.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
Referring to fig. 1 to 4, a detachable ore transportation pipeline comprises a pipeline 1 and a mounting frame 2, wherein the pipeline 1 is erected on the mounting frame 2 through a fixing assembly 4, the mounting frame 2 comprises a frame body 21 and wedge members 3, the wedge members 3 are fixedly arranged at two ends of the frame body 21, and the frame body 21 is in an arc shape matched with the pipeline 1;
the fixed subassembly 4 includes insert pin 5 and mounting groove 6, mounting groove 6 includes back end 61, anterior segment and spacing section 62, back end 61 is seted up in support body 21 inner wall, the anterior segment runs through pipeline 1, anterior segment and back end 61 intercommunication, spacing section 62 and the anterior segment one end intercommunication of keeping away from support body 21, the cross-section of spacing section 62 is the arc strip, insert pin 5 includes arc piece 51 and insert rod 52, arc piece 51 fixed mounting is on insert rod 52 top, insert rod 52 inserts and establishes in back end 61 and anterior segment, arc piece 51 card is established in spacing section 62, arc piece 51 top surface and the radian assorted of pipeline 1 inner wall.
The bottom end of the rear section 61 is fixedly provided with a limiting assembly 7, the limiting assembly 7 is used for limiting the insertion rod 52, and the limiting assembly 7 enables the insertion rod 52 to be fixed in the rear section 61 when the insertion rod 52 is pulled out by no person;
the limiting component 7 comprises elastic blocks 71 and grooves 72, a plurality of elastic blocks 71 are annularly and equidistantly and fixedly arranged at the bottom end of the rear section 61, a plurality of grooves 72 are annularly and equidistantly arranged at the bottom end of the insertion rod 52, the elastic blocks 71 are clamped in the grooves 72, when the insertion rod 52 is inserted into the rear section 61, the elastic blocks 71 are extruded, when the grooves 72 move to the position of the elastic pieces, the pressure is reduced, the elastic blocks 71 are ejected, and therefore the insertion rod 52 is fixed;
the wedge part 3 comprises mounting blocks 31, a wedging rod 32 and an inserting rod 33, the two mounting blocks 31 are symmetrically and fixedly mounted at two ends of the frame body 21, a threaded opening is formed in the mounting block 31, a threaded rod of the wedging rod 32 is arranged in the threaded opening, the inserting rod 33 is fixedly mounted at the middle position of the frame body 21, and the wedge part 3 can fix the frame body 21 and soil and is convenient to assemble and disassemble;
connecting pipes are coaxially connected with the two ends of the pipeline 1 in a threaded manner, the two ends of the inner wall of the connecting pipe are both in threaded connection with the outer wall of the pipeline 1, the connecting pipes can be rotated to connect the two pipelines 1, and meanwhile, the two pipelines 1 can be conveniently separated when being disassembled;
the arc-shaped piece 51 is made of elastic and soft materials, the insertion rod 52 is made of hard materials, the elastic and soft materials can enable the arc-shaped piece 51 to be conveniently taken out in the disassembling process, the arc-shaped piece 51 is made of rubber materials, and the insertion rod 52 is made of metal materials.
In the utility model, when the pipeline 1 is installed, after the wedge 3 is inserted into the soil, the pipeline 1 is erected on the mounting frame 2, the rear section 61 is aligned with the front section, when the pipeline 1 is installed, the inserting rod 52 is inserted into the front section and the rear section 61, the angle of the arc-shaped sheet 51 is adjusted, the arc-shaped sheet 51 is clamped into the limiting section 62, the plurality of mounting grooves 6 are annularly and equidistantly arranged in the adjacent areas of the mounting frame 2 and the pipeline 1, and when the pipeline 1 is required to be dismantled, the pipeline 1 can be hoisted through hoisting equipment only by taking out the inserting pin 5, and a large number of people are not required to carry out dismantling work.
Overall, for technical problems: the existing transportation pipeline 1 is usually fixed with the pipeline 1 and the installation frame 2 by bolts when being installed, so that a large number of workers are needed when the pipeline 1 is detached, and the labor cost is high.
The technical scheme is adopted: the mounting frame 2 and the pipeline 1 are fixed through the fixing component 4; the implementation process of the technical scheme is as follows: when the pipeline 1 is installed, after the wedge 3 is inserted into soil, the pipeline 1 is erected on the mounting frame 2, the rear section 61 is aligned with the front section, when the pipeline 1 is installed, the insertion rod 52 is inserted into the front section and the rear section 61, the angle of the arc-shaped sheet 51 is adjusted, the arc-shaped sheet 51 is clamped into the limit section 62, and a plurality of mounting grooves 6 are annularly and equidistantly formed in the adjacent areas of the mounting frame 2 and the pipeline 1; to necessarily solve the technical problem, the technical effect achieved is that: when the pipeline 1 needs to be dismantled, the pipeline 1 can be lifted up through the lifting equipment only by taking out the insertion pin 5, and a large number of people are not needed for dismantling.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.

Claims (6)

1. The utility model provides a detachable ore transportation pipeline, includes pipeline (1) and mounting bracket (2), its characterized in that, pipeline (1) erects on mounting bracket (2) through fixed subassembly (4), mounting bracket (2) include support body (21) and wedge piece (3), wedge piece (3) fixed mounting is at support body (21) both ends, support body (21) be with pipeline (1) assorted arc;
the utility model provides a fixed subassembly (4) is including inserting round pin (5) and mounting groove (6), mounting groove (6) are including back end (61), anterior segment and spacing section (62), back end (61) are seted up in support body (21) inner wall, anterior segment runs through pipeline (1), anterior segment and back end (61) intercommunication, spacing section (62) are kept away from the one end intercommunication of support body (21) with the anterior segment, the cross-section of spacing section (62) is the arc strip, insert round pin (5) include arc piece (51) and insert pole (52), arc piece (51) fixed mounting is in insert pole (52) top, insert pole (52) are inserted and are established in back end (61) and anterior segment, arc piece (51) card is established in spacing section (62), arc piece (51) top surface and the radian phase-match of pipeline (1) inner wall.
2. A detachable mineral transportation pipeline according to claim 1, characterized in that the bottom end of the rear section (61) is fixedly provided with a limiting assembly (7), the limiting assembly (7) being used for limiting the insertion rod (52).
3. The detachable ore transportation pipeline according to claim 2, wherein the limiting assembly (7) comprises an elastic block (71) and grooves (72), a plurality of elastic blocks (71) are fixedly installed at the bottom end of the rear section (61) in an annular equidistant mode, a plurality of grooves (72) are formed at the bottom end of the insertion rod (52) in an annular equidistant mode, and the elastic blocks (71) are clamped in the grooves (72).
4. The detachable ore transportation pipeline according to claim 1, wherein the wedge member (3) comprises a mounting block (31), a wedge rod (32) and a plug rod (33), the two mounting blocks (31) are symmetrically and fixedly mounted at two ends of the frame body (21), the mounting blocks (31) are provided with threaded openings, the threaded rod of the wedge rod (32) is arranged in the threaded openings, and the plug rod (33) is fixedly mounted at the middle position of the frame body (21).
5. The detachable ore transportation pipeline according to claim 1, wherein connecting pipes are coaxially connected to two ends of the pipeline (1) through threads, and two ends of the inner wall of each connecting pipe are connected to the outer wall of the pipeline (1) through threads.
6. A removable mineral transportation pipeline as claimed in claim 1, wherein the arcuate segments (51) are formed of a resilient and flexible material and the insert rod (52) is formed of a rigid material.
CN202321659493.0U 2023-06-27 2023-06-27 Detachable ore transportation pipeline Active CN220060807U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321659493.0U CN220060807U (en) 2023-06-27 2023-06-27 Detachable ore transportation pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321659493.0U CN220060807U (en) 2023-06-27 2023-06-27 Detachable ore transportation pipeline

Publications (1)

Publication Number Publication Date
CN220060807U true CN220060807U (en) 2023-11-21

Family

ID=88788645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321659493.0U Active CN220060807U (en) 2023-06-27 2023-06-27 Detachable ore transportation pipeline

Country Status (1)

Country Link
CN (1) CN220060807U (en)

Similar Documents

Publication Publication Date Title
CN2934574Y (en) Comprehensive mechanical work face hydraulic prop retreating device
CN208074267U (en) A kind of hanging bracing means of Urban Underground pipe gallery excavation pit gut line
CN220060807U (en) Detachable ore transportation pipeline
CN213540452U (en) Coal cleaning device behind mining caving coal hydraulic support frame
CN210887239U (en) Municipal administration pipeline slot supporting construction
CN202925918U (en) Assembly-type limb opening protection fence
CN213296381U (en) Building slot supporting construction
CN210527600U (en) Concrete gravel conveyer belt
CN210440685U (en) Liquid supply pipeline laying bracket
CN210887219U (en) Concrete chute that can pour in many places
CN217972234U (en) Hanging bracket for mounting drain pipe
CN210977554U (en) Coal mine ventilation opening reinforcing structure
CN217951632U (en) Separating hydraulic air stopping device
CN218520393U (en) Supporting roller of mining belt conveyor
CN217380636U (en) Gas drainage pipeline linkage and system convenient to readjust in pit
CN216866222U (en) Water conservancy rail guard convenient to maintenance is changed
CN210716283U (en) Special pipeline gallows of trench connecting tube
CN216940379U (en) Pipeline butt joint alignment instrument
CN214942419U (en) Hanging hole centering integrated mechanism for building construction through-floor sleeve
CN217420757U (en) Simple protective guard structure convenient to disassemble and assemble for shear wall opening
CN212563285U (en) Novel remote liquid supply system
CN216009806U (en) Novel design mounting structure of aseptic operating room water pipe
CN216616755U (en) Connecting frame for construction
CN220267188U (en) Steel pipe fastener protective sheath
CN210115190U (en) Valve spraying conveying line convenient to install

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant