CN220057956U - Movable row frame type steel trestle steel pipe pile construction positioning device - Google Patents
Movable row frame type steel trestle steel pipe pile construction positioning device Download PDFInfo
- Publication number
- CN220057956U CN220057956U CN202321302243.1U CN202321302243U CN220057956U CN 220057956 U CN220057956 U CN 220057956U CN 202321302243 U CN202321302243 U CN 202321302243U CN 220057956 U CN220057956 U CN 220057956U
- Authority
- CN
- China
- Prior art keywords
- pipe pile
- steel pipe
- steel
- locking
- beams
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 96
- 239000010959 steel Substances 0.000 title claims abstract description 96
- 238000010276 construction Methods 0.000 title claims abstract description 27
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 11
- 230000000712 assembly Effects 0.000 claims description 9
- 238000000429 assembly Methods 0.000 claims description 9
- 230000007246 mechanism Effects 0.000 claims description 9
- 229910052742 iron Inorganic materials 0.000 claims description 6
- 230000000694 effects Effects 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model discloses a movable row frame type steel pipe pile construction positioning device, which relates to the technical field of steel trestle, and comprises a mounting frame, a plurality of groups of steel pipe pile positioning beam components and two locking components, wherein the mounting frame is arranged between two temporary bailey beams, the steel pipe pile positioning beam components are movably arranged on the mounting frame, the two locking components are used for locking the mounting frame and the two temporary bailey beams, and a positioning cavity for positioning a steel pipe pile is formed by enclosing each group of steel pipe pile positioning beam components and the mounting frame; the steel pipe pile positioning device is designed, a plurality of steel pipe piles can be positioned at one time, the working efficiency is improved, and the steel pipe pile positioning device is convenient and efficient. The steel pipe pile locating beam of this device can remove, has increased the application scope of this device in steel trestle construction, and has improved the accuracy of steel pipe pile construction location.
Description
Technical Field
The utility model relates to the technical field of steel trestle, in particular to the technical field of a movable row frame type steel trestle steel pipe pile construction positioning device.
Background
Along with the high-speed development of domestic bridge technology, the cross-river and cross-sea bridge rapidly develops, and the steel trestle for auxiliary construction is widely applied in China. The steel trestle has a structure form that a steel pipe pile foundation is generally adopted at the lower part, and a bailey beam or a section steel structure is adopted at the upper part. And a certain transverse link is adopted between the steel pipe pile and the upper structure, so that the structure is integrated, and the stability of the steel pipe pile is improved. Therefore, the construction quality of the steel pipe pile directly affects the whole steel trestle, and the prior patent discloses the following technology because the construction placement positioning cannot be carried out in water:
patent publication number CN214940148U, patent name "a quick positioning device for steel pipe pile for steel trestle", discloses the following: the utility model provides a quick positioner of steel-pipe pile for steel trestle, includes the rectangle support body, sliding connection has the locating frame that is used for the location steel-pipe pile on the rectangle support body, be equipped with the gliding drive assembly of drive locating frame on the rectangle support body. The utility model has wide application range, can be used in a plurality of times, and has high flexibility; the device can be adjusted according to the distance of the steel pipe piles, the width of the steel trestle and the number of the bailey pieces, and is simple in structure, can be manufactured for one time and used repeatedly, and saves cost and period.
The pile driving device is complex in structure, the positions of the steel pipe piles cannot be accurately positioned in a short time, the positions of a plurality of steel pipe piles cannot be determined at the same time, and the pile driving quality and the pile driving working efficiency are directly related.
Disclosure of Invention
The utility model aims at: in order to solve the technical problems, the utility model provides a movable row frame type steel trestle steel pipe pile construction positioning device. Steel-pipe pile location in the steel trestle construction of being convenient for solves the steel-pipe pile location problem of stake position in the aquatic, and is high-efficient convenient, has good guarantee to steel-pipe pile construction quality.
The utility model adopts the following technical scheme for realizing the purposes:
the utility model provides a movable steel pipe pile construction positioning device of a steel trestle, which comprises a mounting frame arranged between two temporary bailey beams, a plurality of groups of steel pipe pile positioning beam components movably arranged on the mounting frame, and two locking components for locking the mounting frame and the two temporary bailey beams, wherein each group of steel pipe pile positioning beam components and the mounting frame enclose a positioning cavity for positioning a steel pipe pile.
In one embodiment, the mounting frame comprises two cross beams which are arranged between the two temporary bailey beams and are parallel to each other, connecting beams are fixedly connected between two ends of the two cross beams, and the distance between the two cross beams is larger than the outer diameter of the steel pipe pile.
In one embodiment, the spacing between the two beams is 2-3cm greater than the outer diameter of the steel pipe pile.
Specifically, two beams adopt two 10 type I-steel, and the tie beam that connects between two crossbeams adopts 10 type I-steel to connect, and the interval is greater than steel-pipe pile diameter 2-3cm. See fig. 1.
In one embodiment, the steel pipe pile positioning beam assembly comprises two positioning beam members which are arranged between the two cross beams in a parallel sliding mode, and the two positioning beam members have the same structure.
In one embodiment, two positioning beam members are disposed parallel to each other, each positioning beam member being orthogonal to the cross beam.
In one embodiment, each positioning beam member comprises a positioning plate, two locking bolts, and two limiting mechanisms respectively arranged at two ends of the bottom of the positioning plate, wherein the two limiting mechanisms are respectively locked on the corresponding cross beams through the corresponding locking bolts.
In one embodiment, each limiting mechanism comprises two limiting plates, an accommodating groove for accommodating the corresponding cross beam is formed between the two limiting plates, and locking threaded holes matched with the locking bolts are formed in the bottoms of the two limiting plates.
Specifically, a set of steel pipe pile locating beam assemblies is made of two 10-type I-steel. Two limiting plates are respectively arranged at two ends of the I-steel, and the limiting plates are connected by locking bolts. See fig. 3.
In one embodiment, each locking assembly comprises two sets of U-shaped retainers arranged symmetrically, and the two sets of U-shaped retainers lock the same ends of the two cross beams to the corresponding bailey beams respectively.
In one embodiment, each group of U-shaped retainers comprises two U-shaped screws which are parallel to each other, the two U-shaped screws are downwards clamped on corresponding cross beams, the free ends of the two U-shaped screws positioned on the inner side or the outer side of the cross beams are connected through locking plate assemblies, corresponding temporary bailey beams are positioned between the two U-shaped screws, the two U-shaped screws are parallel to the corresponding temporary bailey beams, and the locking plate assemblies are positioned below the corresponding temporary bailey beams and are orthogonal to the temporary bailey beams.
In one embodiment, each locking plate assembly comprises an iron plate, a backing plate for locking two free ends of the same side of two U-shaped screws, and a nut.
Specifically, the locking plate assembly comprises two U-shaped fixing devices, wherein one U-shaped fixing device consists of 2U-shaped screws, 2 iron plates, four backing plates and four nuts. See fig. 2.
Working principle:
according to a steel trestle design drawing, manufacturing the device in a land area, wherein the distance between two I-steels of a beam is the width of two side lines of a steel trestle bailey system, the middle line of the beam is sprayed with obvious vertical lines for facilitating later installation, a positioning beam is installed on the beam according to the position of a steel pipe pile in the design drawing, then two sections of temporary bailey beams are respectively fixed at the front sides of two sides of a steel trestle Bei Leiti system, the central axes of the steel pipe piles are measured and positioned on the temporary bailey beams, and the obvious vertical lines are sprayed;
the crane hoist this device, two crossbeam peripheral line pairs Ji Linshi are to the peripheral line of bailey beam, and the vertical line alignment of spraying on the crossbeam is measured the vertical line of location on interim bailey beam, adopts U type fixer to fix this device with interim bailey beam, and the space between every group locating beam just is steel-pipe pile stake position department, adopts the vibro hammer to execute to throw the steel-pipe pile, demolishs this device after accomplishing to execute, demolishs interim bailey beam.
The beneficial effects of the utility model are as follows:
the parts used by the device can be processed and manufactured by common materials on the construction site of the steel trestle, are simple to manufacture and can be rapidly put into use. The device can be installed once to position a plurality of steel pipe piles, improves working efficiency, and is convenient and efficient. The steel pipe pile locating beam of this device can remove, has increased the application scope of this device in steel trestle construction, and has improved the accuracy of steel pipe pile construction location.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a perspective view of FIG. 1;
FIG. 3 is a schematic view of the structure of the U-shaped holder;
FIG. 4 is a schematic view of the structure of a retaining beam member;
reference numerals: the device comprises a 1-cross beam, a 2-connecting beam, a 3-U-shaped fixer, a 31-U-shaped screw rod, a 32-iron plate, a 33-backing plate, a 34-nut, a 4-positioning beam component, a 41-positioning plate, a 42-limiting plate and a 43-locking bolt.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present utility model more apparent, the technical solutions of the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model, and it is apparent that the described embodiments are some embodiments of the present utility model, but not all embodiments of the present utility model. The components of the embodiments of the present utility model generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the utility model, as presented in the figures, is not intended to limit the scope of the utility model, as claimed, but is merely representative of selected embodiments of the utility model. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
It should be noted that: like reference numerals and letters denote like items in the following figures, and thus once an item is defined in one figure, no further definition or explanation thereof is necessary in the following figures. Furthermore, the terms "first," "second," and the like, are used merely to distinguish between descriptions and should not be construed as indicating or implying relative importance.
In describing embodiments of the present utility model, it should be noted that the directions or positional relationships indicated by the terms "inner", "outer", "upper", etc. are directions or positional relationships based on those shown in the drawings, or those that are conventionally put in place when the inventive product is used, are merely for convenience of description and simplification of description, and are not indicative or implying that the apparatus or element in question must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as limiting the present utility model.
Example 1
As shown in fig. 1 to 4, this embodiment provides a steel pipe pile construction positioner of portable row's frame steel trestle, including erect the mounting bracket between two interim bailey beams, the multiunit steel pipe pile locating beam subassembly of activity setting on the mounting bracket, and be used for locking the mounting bracket and two locking subassembly of two interim bailey beams, every group steel pipe pile locating beam subassembly encloses into with the mounting bracket and is used for locating the location cavity of steel pipe pile.
The mounting bracket is including setting up two crossbeams 1 that are parallel to each other between two interim bailey girders, all fixedly connected with tie-beam 2 between the both ends of two crossbeams 1, and the interval between two crossbeams 1 is greater than the external diameter of steel-pipe pile.
The distance between the two cross beams 1 is 2-3cm larger than the outer diameter of the steel pipe pile.
Specifically, two beams 1 are made of two 10-type I-steel, and connecting beams 2 connected between the two beams 1 are connected by the 10-type I-steel, and the distance between the two beams is 2-3cm greater than the diameter of the steel pipe pile. See fig. 1.
Example 2
The embodiment is further optimized based on the embodiment 1, specifically:
the steel pipe pile positioning beam assembly comprises two positioning beam members 4 which are arranged between the two cross beams 1 in a parallel sliding mode, and the two positioning beam members 4 have the same structure.
Two positioning beam members 4 are arranged parallel to each other, each positioning beam member 4 being orthogonal to the cross beam 1.
Each positioning beam member 4 comprises a positioning plate 41, two locking bolts 43, and two limiting mechanisms respectively arranged at two ends of the bottom of the positioning plate 41, wherein the two limiting mechanisms are respectively locked on the corresponding cross beam 1 through the corresponding locking bolts 43.
Example 3
This example was further optimized based on example 1 or 2, specifically:
each limiting mechanism comprises two limiting plates 42, an accommodating groove for accommodating the corresponding cross beam 1 is formed between the two limiting plates 42, and locking threaded holes matched with locking bolts 43 are formed in the bottoms of the two limiting plates 42.
Specifically, a set of steel pipe pile locating beam assemblies is made of two 10-type I-steel. Two limiting plates 42 are respectively arranged at two ends of the I-steel, and the limiting plates 42 are connected by locking bolts 43. See fig. 3.
Example 4
This example is further optimized on the basis of any one of examples 1 to 3, in particular:
each locking component comprises two groups of U-shaped fixing devices 3 which are symmetrically arranged, and the two groups of U-shaped fixing devices 3 lock the same end of the two cross beams 1 on the corresponding bailey beams respectively.
Each group of U-shaped retainers 3 comprises two U-shaped screws 31 which are parallel to each other, the openings of the two U-shaped screws 31 are downwards clamped on the corresponding cross beam 1, the free ends of the two U-shaped screws 31 positioned on the inner side or the outer side of the cross beam 1 are connected through locking plate assemblies, the corresponding temporary bailey beams are positioned between the two U-shaped screws 31, the two U-shaped screws 31 are parallel to the corresponding temporary bailey beams, and the locking plate assemblies are positioned below the corresponding temporary bailey beams and are orthogonal to the temporary bailey beams.
Example 5
This example was further optimized on the basis of example 4, and specifically:
each locking plate assembly comprises an iron plate 32, a backing plate 33 for locking two free ends of the same side of the two U-shaped screws 31 and a nut 34.
Specifically, the locking plate assembly comprises two U-shaped retainers 3, wherein one U-shaped retainer 3 comprises 2U-shaped screws 31,2 iron plates 32, four backing plates 33 and four nuts 34. See fig. 2.
Claims (10)
1. The utility model provides a portable steel-pipe pile construction positioner of arranging posture steel trestle, its characterized in that is including setting up the mounting bracket between two interim bailey roof beams, activity setting are in multiunit steel-pipe pile locating beam assembly on the mounting bracket, and be used for locking the mounting bracket with two locking assemblies of interim bailey roof beam, every group steel-pipe pile locating beam assembly with the mounting bracket encloses into the location chamber that is used for locating the steel-pipe pile.
2. The movable row frame type steel trestle steel pipe pile construction positioning device according to claim 1, wherein the mounting frame comprises two cross beams (1) which are erected between two temporary bailey beams and are parallel to each other, connecting beams (2) are fixedly connected between two ends of each cross beam (1), and the distance between the two cross beams (1) is larger than the outer diameter of the steel pipe pile.
3. The movable row-rack steel trestle steel pipe pile construction positioning device according to claim 2, characterized in that the distance between the two cross beams (1) is 2-3cm larger than the outer diameter of the steel pipe pile.
4. The movable row-frame type steel trestle steel pipe pile construction positioning device according to claim 2, wherein the steel pipe pile positioning beam assembly comprises two positioning beam members (4) which are arranged between two cross beams (1) in parallel in a sliding mode, and the two positioning beam members (4) are identical in structure.
5. The movable row-rack steel trestle steel pipe pile construction positioning device according to claim 4, wherein two positioning beam members (4) are arranged in parallel, and each positioning beam member (4) is orthogonal to the cross beam (1).
6. The movable row-rack steel trestle steel pipe pile construction positioning device according to claim 4, wherein each positioning beam member (4) comprises a positioning plate (41), two locking bolts (43), and two limiting mechanisms respectively arranged at two ends of the bottom of the positioning plate (41), and the two limiting mechanisms are respectively locked on the corresponding cross beam (1) through the corresponding locking bolts (43).
7. The movable rack type steel trestle steel pipe pile construction positioning device according to claim 6, wherein each limiting mechanism comprises two limiting plates (42), a containing groove for containing the corresponding cross beam (1) is formed between the two limiting plates (42), and locking threaded holes matched with the locking bolts (43) are formed in the bottoms of the two limiting plates (42).
8. The movable row-frame type steel trestle steel pipe pile construction positioning device according to claim 7, wherein each locking assembly comprises two groups of symmetrically arranged U-shaped fixtures (3), and the two groups of U-shaped fixtures (3) lock the same end of each cross beam (1) on the corresponding bailey beam.
9. The movable steel trestle steel pipe pile construction positioning device according to claim 8, wherein each group of U-shaped fixtures (3) comprises two mutually parallel U-shaped screws (31), the two U-shaped screws (31) are downwards clamped on the corresponding cross beam (1), the free ends of the two U-shaped screws (31) located on the inner side or the outer side of the cross beam (1) are connected through locking plate assemblies, the corresponding temporary bailey beams are located between the two U-shaped screws (31), the two U-shaped screws (31) are mutually parallel to the corresponding temporary bailey beams, and the locking plate assemblies are located below the corresponding temporary bailey beams and are orthogonal to the temporary bailey beams.
10. The movable row-rack steel trestle steel pipe pile construction positioning device according to claim 9, wherein each locking plate assembly comprises an iron plate (32), a backing plate (33) and a screw cap (34) for locking two free ends on the same side of two U-shaped screws (31).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321302243.1U CN220057956U (en) | 2023-05-26 | 2023-05-26 | Movable row frame type steel trestle steel pipe pile construction positioning device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321302243.1U CN220057956U (en) | 2023-05-26 | 2023-05-26 | Movable row frame type steel trestle steel pipe pile construction positioning device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220057956U true CN220057956U (en) | 2023-11-21 |
Family
ID=88785410
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321302243.1U Active CN220057956U (en) | 2023-05-26 | 2023-05-26 | Movable row frame type steel trestle steel pipe pile construction positioning device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220057956U (en) |
-
2023
- 2023-05-26 CN CN202321302243.1U patent/CN220057956U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112012212B (en) | Accurate positioning pile position auxiliary device and installation method | |
CN220057956U (en) | Movable row frame type steel trestle steel pipe pile construction positioning device | |
CN102864746A (en) | Bearing frame for bridge construction | |
CN213269072U (en) | Support column for prefabricated building | |
CN110499826B (en) | Connecting structure between beam column and beam of steel structure factory building | |
CN210002883U (en) | beam bottom template supporting device | |
CN214575756U (en) | But combination formula fine-tuning bed-jig of assembling of steel construction box turn round component | |
CN113309003A (en) | Cable strand adjusting device and method for erecting main cable by suspension bridge aerial spinning method | |
CN113172563A (en) | Plane subsection assembling jig frame and using method thereof | |
CN213233802U (en) | Steel structure supporting beam column for factory building | |
CN217711145U (en) | A assembled steel construction for building | |
CN221546316U (en) | Assembled girder steel welding construction hangs basket | |
CN219908599U (en) | Integral construction platform | |
CN220377933U (en) | Jig frame unit assembly and jig frame | |
CN220178065U (en) | Mounting platform is used in steel reinforcement cage preparation | |
CN220013415U (en) | Bracket for constructing oblique high pier capping beam | |
CN213326416U (en) | Positioning device for improving installation precision of river-crossing gantry crane foundation pile | |
CN220122848U (en) | Photovoltaic support and photovoltaic power generation equipment | |
CN221345537U (en) | Steel-pipe pile foundation reinforcing structure | |
CN218758283U (en) | Lattice type support column for heavy steel workshop | |
CN216765614U (en) | Construction platform for integrally protecting bent cap | |
CN217579789U (en) | Adjustable stiff skeleton assembly jig frame | |
CN216892819U (en) | Beam column node structure with overhanging end plate for H-shaped steel beam | |
CN221855860U (en) | Combined assembly type buckling-restrained double-core energy-dissipation supporting device | |
CN211728947U (en) | Tooling for controlling space size of U-shaped bolt on plateau independent foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |