CN220035199U - Anti-seepage steel structure pier body steel mould - Google Patents

Anti-seepage steel structure pier body steel mould Download PDF

Info

Publication number
CN220035199U
CN220035199U CN202320703084.XU CN202320703084U CN220035199U CN 220035199 U CN220035199 U CN 220035199U CN 202320703084 U CN202320703084 U CN 202320703084U CN 220035199 U CN220035199 U CN 220035199U
Authority
CN
China
Prior art keywords
steel
seepage
steel mould
pier body
sealing ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320703084.XU
Other languages
Chinese (zh)
Inventor
易晗
吴俊�
申海平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Chuangang Template Co ltd
Original Assignee
Chengdu Chuangang Template Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Chuangang Template Co ltd filed Critical Chengdu Chuangang Template Co ltd
Priority to CN202320703084.XU priority Critical patent/CN220035199U/en
Application granted granted Critical
Publication of CN220035199U publication Critical patent/CN220035199U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses an anti-seepage steel structure pier body steel mould, which belongs to the technical field of pier body templates and comprises a bottom plate and connecting bolts, wherein the top of the bottom plate is provided with a steel mould structure, the steel mould structure comprises a frame structure and an anti-seepage structure, the frame structure comprises an annular steel mould, a top plate, reinforcing rods, connecting plates and threaded holes, and the anti-seepage structure comprises anti-seepage gaskets, sealing rings, fixing bolts and sealing rings. The utility model has the beneficial effects that the anti-seepage structure is arranged, the sealing ring and the sealing ring are adopted to seal the joint of the two groups of steel mould structures and are fixed by using the fixing bolts, and the joint of the two groups of steel mould structures is more sealed by matching with the matching installation of the inserting grooves and the inserting convex blocks, so that the internal concrete is not easy to seep outwards, the external rainwater is prevented from seeping, the anti-seepage pad is used to install the joint of the top plate and the connecting plate, the joint of the top plate and the connecting plate is not easy to contain gaps, and the tightness of the pier body mould is better.

Description

Anti-seepage steel structure pier body steel mould
Technical Field
The utility model relates to the technical field of pier body templates, in particular to an anti-seepage steel structure pier body steel mould.
Background
The pier body is the main body of the middle supporting structure of the multi-span bridge, and the main materials are timber, stone, concrete, reinforced concrete and steel.
When the pier body is built, the pier body dies are often installed in a spliced mode due to the fact that the height of the pier body is very high, when the pier body is built, the joints of two adjacent sets of dies are often provided with certain gaps or certain concrete is oozed out due to pressure, and meanwhile certain rainwater can permeate from outside to inside in rainy days, so that the construction and the forming of the pier body are not facilitated.
Disclosure of Invention
To solve the problems set forth in the background art. The utility model provides a steel mould of an anti-seepage steel structure pier body, which is provided with an anti-seepage structure and is used for solving the problems that due to the fact that the height of the pier body is very high, pier body moulds are often installed in a spliced mode, when the pier body is built, the joint of two adjacent groups of moulds often has a certain gap or certain concrete seeps out due to pressure, and meanwhile, certain rainwater seeps from outside to inside in rainy days, so that the building and the forming of the pier body are not facilitated.
The technical scheme of the utility model is as follows: the utility model provides a prevention of seepage steel construction pier shaft steel mould, includes bottom plate and connecting bolt, the top of bottom plate is equipped with the steel mould structure, the steel mould structure includes frame construction and prevention of seepage structure, frame construction includes annular steel mould, roof, stiffening rod, connecting plate and screw hole, the prevention of seepage structure includes prevention of seepage pad, sealing ring, fixing bolt and sealing washer, the junction of connecting plate and roof is opened flutedly, the sealing ring activity sets up inside the recess, both sides sealing ring fracture department is equipped with and adds the cock pad and be located inside the recess, it fills up and sealing ring joint to add the cock pad, the sealing washer cup joints in the outside of sealing ring and is located the inside of recess, the fixing bolt screw thread is pegged graft in the lateral wall of annular steel mould and is run through the inside that the sealing ring extends to the sealing ring.
Further, the roof fixed mounting is at the top of annular steel mould, connecting plate fixed mounting is in the bottom of annular steel mould.
Further, the upper surface of roof is opened there is the grafting recess, the bottom fixed mounting of connecting plate has the grafting lug, two sets of when the steel mould structure concatenation, grafting recess and grafting lug cooperation installation, the junction at connecting plate and roof is installed to the impervious pad.
Further, the connecting bolt is installed in the threaded hole in a threaded mode, and a nut is sleeved on the bottom thread of the connecting bolt.
Further, the top end of the reinforcing rod is fixedly connected with the top plate, and the bottom end of the reinforcing rod is fixedly connected with the connecting plate.
Furthermore, the steel mould structure is provided with a plurality of groups for splicing installation.
Compared with the prior art, the utility model provides the steel mould of the pier body of the anti-seepage steel structure by improvement, which has the following improvement and advantages:
firstly, through being equipped with the prevention of seepage structure, the junction inside adoption sealing ring and the sealing washer of two sets of steel mould structures is sealed and is fixed with the utilization fixing bolt, cooperation grafting recess and grafting lug's cooperation installation simultaneously makes the junction of two sets of steel mould structures more sealed, is difficult for making inside concrete outwards ooze, also prevents external rainwater infiltration simultaneously to utilize the prevention of seepage pad to install in the junction of roof and connecting plate, make the junction of roof and connecting plate be difficult for containing the gap, make pier shaft mould's leakproofness better, excellent in use effect.
Drawings
The utility model is further explained below with reference to the drawings and examples:
FIG. 1 is a schematic perspective view of a steel mold structure of the present utility model;
FIG. 2 is a schematic diagram of a steel form construction installation of the present utility model;
FIG. 3 is a schematic top view of a steel mold structure of the present utility model;
FIG. 4 is a schematic cross-sectional view of the steel form of the present utility model;
FIG. 5 is a schematic diagram of a front view of a steel mold structure according to the present utility model;
reference numerals illustrate: 1. a bottom plate; 2. annular steel mould; 3. a top plate; 4. a reinforcing rod; 5. a connecting bolt; 6. a connecting plate; 7. an impermeable pad; 8. a nut; 9. a fixing bolt; 10. a plug-in groove; 11. a seal ring; 12. a seal ring; 13. inserting a convex block; 14. and (3) a threaded hole.
Detailed Description
The following detailed description of the present utility model will provide clear and complete description of the technical solutions of the embodiments of the present utility model, with reference to fig. 1 to 5, and it is obvious that the described embodiments are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The utility model provides an anti-seepage steel structure pier body steel mould through improvement, as shown in figures 1-5, the anti-seepage steel structure pier body steel mould comprises a bottom plate 1 and a connecting bolt 5, the top of the bottom plate 1 is provided with a steel mould structure, the steel mould structure comprises a frame structure and an anti-seepage structure, the steel mould structure is provided with a plurality of groups for splicing and installation, the frame structure comprises an annular steel mould 2, a top plate 3, a reinforcing rod 4, a connecting plate 6 and a threaded hole 14, the anti-seepage structure comprises an anti-seepage pad 7, a sealing ring 12, a fixing bolt 9 and a sealing ring 11, a groove is arranged at the joint of the connecting plate 6 and the top plate 3, the sealing ring 12 is movably arranged in the groove, a plugging pad is arranged at the broken joint of the sealing rings 12 at two sides and is positioned in the groove, the plugging pad is clamped with the sealing ring 12, the sealing ring 11 is sleeved outside the sealing ring 12 and positioned in the groove, the fixing bolt 9 is in threaded connection with the side wall of the annular steel mould 2 and penetrates through the sealing ring 11 to extend to the inside of the sealing ring 12, the sealing ring 12 and the sealing ring 11 are adopted to seal the joint of the two groups of steel mould structures and are fixed by the fixing bolt 9, meanwhile, the joint of the two groups of steel mould structures is sealed by matching with the matching installation of the inserting groove 10 and the inserting protruding block 13, internal concrete is not easy to seep outwards, external rainwater is prevented from seeping simultaneously, the joint of the top plate 3 and the connecting plate 6 is installed by the anti-seepage pad 7, gaps are not easy to be contained at the joint of the top plate 3 and the connecting plate 6, the tightness of the pier body mould is better, and the use effect is better.
Roof 3 fixed mounting is at the top of annular steel mould 2, connecting plate 6 fixed mounting is in the bottom of annular steel mould 2, the upper surface of roof 3 is opened there is grafting recess 10, the bottom fixed mounting of connecting plate 6 has grafting lug 13, when two sets of steel mould structures splice, grafting recess 10 and grafting lug 13 cooperation installation, the prevention of seepage pad 7 is installed in the junction of connecting plate 6 and roof 3, connecting bolt 5 screw thread installation is to screw hole 14, nut 8 has been cup jointed to connecting bolt 5's bottom screw thread, the top of stiffener 4 and roof 3 fixed connection together, stiffener 4's bottom and connecting plate 6 fixed connection together, stiffener 4 can prevent that annular steel mould 2 from appearing warping, make steel mould structure more stable, during the use, install bottom plate 1 to suitable position, can adopt the bolt to fix bottom plate 1 and ground, install sealing ring 12 and sealing washer 11 into the recess, and utilize fixing bolt 9 to fix, install a set of steel mould structure to the top of bottom steel mould structure, and utilize the cooperation installation of grafting lug 13 and grafting recess 10, and utilize connecting bolt 8 to carry out the fixed mounting mode in proper order with the nut 8, can be installed in the same type with the installation mode in proper order.
Standard parts used in the utility model can be purchased from the market, special-shaped parts can be customized according to the description of the specification and the drawings, the specific connection modes of all parts adopt conventional means such as mature bolts, rivets and welding in the prior art, the machinery, the parts and the equipment adopt conventional modes in the prior art, and the circuit connection adopts conventional connection modes in the prior art, so that details are not described in detail in the specification, and the utility model belongs to the prior art known to the person skilled in the art.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present utility model. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the utility model. Thus, the present utility model is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (6)

1. The utility model provides a prevention of seepage steel construction pier shaft steel mould, includes bottom plate (1) and connecting bolt (5), its characterized in that: the top of bottom plate (1) is equipped with steel mould structure, steel mould structure includes frame construction and prevention of seepage structure, frame construction includes annular steel mould (2), roof (3), stiffening rod (4), connecting plate (6) and screw hole (14), prevention of seepage structure includes prevention of seepage pad (7), sealing ring (12), fixing bolt (9) and sealing washer (11), open flutedly in junction of connecting plate (6) and roof (3), sealing ring (12) activity sets up inside the recess, both sides sealing ring (12) fracture department is equipped with and adds the cock pad and be located inside the recess, it fills up with sealing ring (12) joint to add the cock, sealing washer (11) cup joint in the outside of sealing ring (12) and be located the inside of recess, fixing bolt (9) screw thread grafting is in the lateral wall of annular steel mould (2) and runs through the inside that sealing washer (11) extend to sealing ring (12).
2. The impermeable steel structural pier body steel form of claim 1, wherein: the top plate (3) is fixedly arranged at the top of the annular steel die (2), and the connecting plate (6) is fixedly arranged at the bottom of the annular steel die (2).
3. The impermeable steel structural pier body steel form of claim 1, wherein: the anti-seepage steel die is characterized in that an inserting groove (10) is formed in the upper surface of the top plate (3), inserting protruding blocks (13) are fixedly arranged at the bottom of the connecting plate (6), when two groups of steel die structures are spliced, the inserting groove (10) is matched with the inserting protruding blocks (13), and the anti-seepage pad (7) is arranged at the joint of the connecting plate (6) and the top plate (3).
4. The impermeable steel structural pier body steel form of claim 1, wherein: the connecting bolt (5) is installed in the threaded hole (14) in a threaded mode, and a nut (8) is sleeved on the bottom of the connecting bolt (5) in a threaded mode.
5. The impermeable steel structural pier body steel form of claim 1, wherein: the top end of the reinforcing rod (4) is fixedly connected with the top plate (3), and the bottom end of the reinforcing rod (4) is fixedly connected with the connecting plate (6).
6. The impermeable steel structural pier body steel form of claim 1, wherein: the steel mould structure is provided with a plurality of groups for splicing and installation.
CN202320703084.XU 2023-04-03 2023-04-03 Anti-seepage steel structure pier body steel mould Active CN220035199U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320703084.XU CN220035199U (en) 2023-04-03 2023-04-03 Anti-seepage steel structure pier body steel mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320703084.XU CN220035199U (en) 2023-04-03 2023-04-03 Anti-seepage steel structure pier body steel mould

Publications (1)

Publication Number Publication Date
CN220035199U true CN220035199U (en) 2023-11-17

Family

ID=88734549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320703084.XU Active CN220035199U (en) 2023-04-03 2023-04-03 Anti-seepage steel structure pier body steel mould

Country Status (1)

Country Link
CN (1) CN220035199U (en)

Similar Documents

Publication Publication Date Title
CN109944461B (en) High-rise building connecting beam horizontal hole plugging structure and construction method thereof
CN201376314Y (en) Prefabricated part forming die
CN104196175A (en) Method for constructing sunlight room roof and sunlight room roof
CN220035199U (en) Anti-seepage steel structure pier body steel mould
CN112302685B (en) Tunnel lining vault belt mold grouting system and construction method
CN104594389A (en) Post-cast strip external wall plugging structure with elastic water stoppers
CN110924676A (en) Plugging-free and root-rot-preventing aluminum template inner wall plate
CN210732757U (en) Interior gliding style high leakproofness prefabricated staircase mould
CN211446883U (en) Underground continuous wall antiseep connection structure
CN213330003U (en) Template for preventing mortar leakage caused by staggering of wall body section pouring and connecting position
CN104314047A (en) Water bag concrete engineering deformation joint water stop type cavity die and manufacturing and construction method thereof
CN204959693U (en) Assembled rectangle channel
CN209114506U (en) A kind of assembled exhaust valve pit
CN112663802A (en) Assembly type building outer wall joint sealing waterproof structure and construction method thereof
CN219931060U (en) Novel device for advanced sealing of post-pouring belt
CN111155553A (en) Back-pasting type rubber water stop structure and construction method of pipe gallery deformation joint
CN216892254U (en) Water conservancy construction is waterproof moulds board connecting device
CN207310188U (en) A kind of water channel gool prefabricated-member mould
CN217460464U (en) Arc trapezoidal surface corresponding back-pasting rubber waterstop
CN110409709B (en) Connecting box assembled concrete beam
CN217500333U (en) Brick for basement outer wall post-cast strip mold sealing
CN212241483U (en) PC production line leak protection side forms with joint strip
CN215671072U (en) Integrated cast-in-place concrete outer wall window aluminum alloy template system
CN216290116U (en) Assembled cable pit
CN218969912U (en) Aqueduct joint water stop structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant