CN220024520U - Engineering cost progress management device - Google Patents

Engineering cost progress management device Download PDF

Info

Publication number
CN220024520U
CN220024520U CN202321687887.7U CN202321687887U CN220024520U CN 220024520 U CN220024520 U CN 220024520U CN 202321687887 U CN202321687887 U CN 202321687887U CN 220024520 U CN220024520 U CN 220024520U
Authority
CN
China
Prior art keywords
fixedly connected
storage frame
riser
management device
progress management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321687887.7U
Other languages
Chinese (zh)
Inventor
刘爽
韩毫杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Renxin Engineering Consulting Co ltd
Original Assignee
Renxin Engineering Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Renxin Engineering Consulting Co ltd filed Critical Renxin Engineering Consulting Co ltd
Priority to CN202321687887.7U priority Critical patent/CN220024520U/en
Application granted granted Critical
Publication of CN220024520U publication Critical patent/CN220024520U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Illuminated Signs And Luminous Advertising (AREA)

Abstract

The utility model discloses a project cost progress management device, and particularly relates to the technical field of project cost. According to the utility model, the project cost files are placed on the storage frame, the project cost files are contacted with the transverse plates, the transverse plates start to move downwards under the action of gravity of the project cost files, when two conductive blocks are contacted, one of the indicator lamps lights up to turn on a red light, and the project cost files with different progress are sequentially placed in the storage frame in the same way, so that the structure is simple, the progress of the project cost is convenient to manage, and workers can quickly know the progress of the project cost.

Description

Engineering cost progress management device
Technical Field
The utility model relates to the technical field of engineering cost, in particular to an engineering cost progress management device.
Background
The working processes of predicting, planning, controlling, accounting, analyzing, evaluating and the like the construction cost are called construction cost management by comprehensively utilizing knowledge and skills in the aspects of management, economy, engineering technology and the like. In the construction process of a building, workers need to use a construction project cost progress management device to manage and monitor the construction progress.
The utility model discloses a project cost progress management device with an authorized bulletin number of CN214548223U, which is provided with a storage cabinet, is convenient for workers to place a large number of project cost files, is convenient for the workers to carry and display in time, and is convenient for the workers to adjust the height of an installation frame by sliding a sliding block and a limiting rod, and fix the installation frame by utilizing a limiting device, so that the workers can conveniently install a display board, display cost data and manage construction progress, and a buffer device is arranged, so that the display board has a certain buffer performance in the installation process, the protection of the display board is improved, the display board is convenient to store as a whole, the workers can operate conveniently, and the purpose of meeting use requirements is fulfilled;
when the structure is used, a large number of engineering cost files are stored through the storage cabinet, but the engineering cost files are located in the storage cabinet, so that workers cannot conveniently know the progress of the engineering cost.
Disclosure of Invention
The technical scheme of the utility model aims at solving the technical problem that the prior art is too single, provides a solution which is obviously different from the prior art, and aims at overcoming the defects of the prior art, providing a project cost progress management device and solving the problems in the prior art.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a project cost progress management device, includes the riser, riser top fixedly connected with roof, the riser front side is equipped with the storing subassembly, storing subassembly top is equipped with four pilot lamps, and four the pilot lamps all with riser fixed connection, the storing subassembly includes storing frame, a plurality of conducting blocks, four diaphragm and four springs;
the storage frame is fixedly connected with the front side of the vertical plate, the conductive blocks are fixedly connected with the storage frame and the four transverse plates respectively, the front ends of the transverse plates penetrate through the storage frame, the top ends of the springs are fixedly connected with the storage frame, and the other ends of the springs are fixedly connected with the four transverse plates respectively.
Further, four spacing posts are fixedly connected with the inside of the storage frame, and four the diaphragm and four springs are respectively movably sleeved on the four spacing posts.
Furthermore, the front side and the rear side of the vertical plate are respectively provided with an illuminating lamp, and the two illuminating lamps are fixedly connected with the top plate.
Further, four first storage frames are fixedly connected to the front side of the vertical plate, and a second storage frame is fixedly connected to the rear side of the vertical plate.
Further, riser bottom is equipped with adjusting part, adjusting part includes backup pad, four removal wheels and telescopic link, telescopic link top and riser fixed connection, the telescopic link bottom passes through bearing swing joint with the backup pad, four remove the wheel all with backup pad fixed connection.
Further, two slot boards are fixedly connected to the top end of the supporting plate, two inserting blocks are movably arranged inside the slot boards, and the two inserting blocks are fixedly connected with the bottom ends of the vertical plates.
The utility model has the technical effects and advantages that:
1. according to the utility model, the project cost files are placed on the storage frame, the project cost files are contacted with the transverse plates, the transverse plates start to move downwards under the action of gravity of the project cost files, when two conductive blocks are contacted, one of the indicator lamps lights up to form a red light, and the project cost files with different progress are sequentially placed in the storage frame in the same way, so that the structure is simple, the progress of the project cost is convenient to manage, and workers can quickly know the progress of the project cost;
2. according to the utility model, by arranging the two illuminating lamps, illumination is conveniently carried out at night, the vertical plate is moved upwards, so that the telescopic rod is driven to stretch, the inserting block is further far away from the slot plate, then the vertical plate is rotated to adjust the position of the second object placing frame, the vertical plate is loosened, and the two inserting blocks are respectively extended into the two slot plates, so that the vertical plate is limited, and the device is simple in operation and convenient to use.
Drawings
The structures, proportions, sizes, etc. shown in the present specification are shown only for the purposes of illustration and description, and are not intended to limit the scope of the utility model, which is defined by the claims, so that any structural modifications, changes in proportions, or adjustments of sizes, which do not affect the efficacy or the achievement of the present utility model, should fall within the ambit of the technical disclosure.
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a rear elevational view of the overall structure of the present utility model;
FIG. 3 is a schematic view of the structure of the adjusting assembly of the present utility model;
FIG. 4 is a schematic view of a storage assembly according to the present utility model;
in the figure: 1. a vertical plate; 2. a top plate; 3. a lighting lamp; 4. an indicator light; 5. a storage assembly; 6. an adjustment assembly; 7. a first storage frame; 8. a second storage frame; 501. a storage frame; 502. a conductive block; 503. a cross plate; 504. a spring; 505. a limit column; 601. a support plate; 602. a moving wheel; 603. a telescopic rod; 604. a slot plate; 605. and (5) inserting blocks.
Detailed Description
Other advantages and advantages of the present utility model will become apparent to those skilled in the art from the following detailed description, which, by way of illustration, is to be read in connection with certain specific embodiments, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4 of the drawings, an engineering cost progress management device of the embodiment includes a vertical plate 1, a top plate 2 is fixedly connected to the top end of the vertical plate 1, a storage component 5 is arranged on the front side of the vertical plate 1, four indicator lamps 4 are arranged on the top of the storage component 5, the four indicator lamps 4 are fixedly connected with the vertical plate 1, and the storage component 5 includes a storage frame 501, a plurality of conductive blocks 502, four transverse plates 503 and four springs 504;
the storage frame 501 is fixedly connected with the front side of the vertical plate 1, a plurality of conductive blocks 502 are fixedly connected with the storage frame 501 and four transverse plates 503 respectively, the front ends of the four transverse plates 503 penetrate through the storage frame 501, the top ends of the four springs 504 are fixedly connected with the storage frame 501, the other ends of the four springs 504 are fixedly connected with the four transverse plates 503 respectively, four limiting columns 505 are fixedly connected inside the storage frame 501, and the four transverse plates 503 and the four springs 504 are movably sleeved on the four limiting columns 505 respectively to prevent deflection when the springs 504 deform.
Further, the front side of the vertical plate 1 is fixedly connected with four first storage frames 7, the rear side of the vertical plate 1 is fixedly connected with a second storage frame 8, photos and contact modes of engineering cost responsible persons can be placed in the four first storage frames 7, and a brief introduction table of the engineering can be placed in the second storage frame 8.
Further, both sides all are equipped with light 3 around riser 1, and two lights 3 all with roof 2 fixed connection, riser 1 bottom is equipped with adjusting part 6, adjusting part 6 includes backup pad 601, four remove round 602 and telescopic link 603, telescopic link 603 top and riser 1 fixed connection, telescopic link 603 bottom passes through bearing swing joint with backup pad 601, four remove round 602 all with backup pad 601 fixed connection, backup pad 601 top fixedly connected with two slot boards 604, two slot boards 604 inside all activity are equipped with inserted block 605, and two inserted block 605 all with riser 1 bottom fixed connection.
Wherein, through setting up two lights 3, conveniently throw light on at night, upwards remove riser 1 to drive telescopic link 603 tensile, and then make the inserted block 605 keep away from slot board 604, then rotate riser 1 and adjust the position of second thing frame 8, loosen riser 1 and make two inserted block 605 extend into respectively in two slot boards 604, thereby carry out spacingly to riser 1, easy operation, convenient to use.
The application method of the embodiment is as follows:
when the device is used, a worker places the engineering cost file on the storage frame 501, the engineering cost file is in contact with the transverse plate 503, the transverse plate 503 starts to move downwards under the action of gravity of the engineering cost file, when two of the conductive blocks 502 are in contact, one of the indicator lamps 4 lights a red light, the engineering cost file with different progress is placed in the storage frame 501 in sequence, when the four indicator lamps 4 all light the red light, the engineering cost is finished, and when the engineering cost file is picked up, the spring 504 rebounds to drive the transverse plate 503 to move upwards, so that the two of the conductive blocks 502 are far away from each other, the structure is simple, the progress of the engineering cost is convenient to manage, the worker can quickly know the progress of the engineering cost, and it is worth explaining that the gravity of the engineering cost file can drive the spring 504 to deform.
The foregoing description of the preferred embodiments of the utility model is not intended to be limiting, but rather is intended to cover all modifications, equivalents, and alternatives falling within the spirit and principles of the utility model.

Claims (6)

1. The utility model provides a engineering cost progress management device, includes riser (1), riser (1) top fixedly connected with roof (2), riser (1) front side is equipped with storing subassembly (5), its characterized in that: four indicator lamps (4) are arranged at the top of the storage component (5), the four indicator lamps (4) are fixedly connected with the vertical plate (1), and the storage component (5) comprises a storage frame (501), a plurality of conductive blocks (502), four transverse plates (503) and four springs (504);
the storage frame (501) is fixedly connected with the front side of the vertical plate (1), the conductive blocks (502) are respectively fixedly connected with the storage frame (501) and the four transverse plates (503), the front ends of the four transverse plates (503) penetrate through the storage frame (501), the top ends of the four springs (504) are respectively fixedly connected with the storage frame (501), and the other ends of the four springs (504) are respectively fixedly connected with the four transverse plates (503).
2. A construction cost progress management device according to claim 1, wherein: four spacing posts (505) are fixedly connected with inside storing frame (501), and four diaphragm (503) and four springs (504) are respectively movable sleeve and are established on four spacing posts (505).
3. A construction cost progress management device according to claim 1, wherein: the front side and the rear side of the vertical plate (1) are respectively provided with an illuminating lamp (3), and the two illuminating lamps (3) are fixedly connected with the top plate (2).
4. A construction cost progress management device according to claim 1, wherein: four first storage frames (7) are fixedly connected to the front side of the vertical plate (1), and a second storage frame (8) is fixedly connected to the rear side of the vertical plate (1).
5. A construction cost progress management device according to claim 1, wherein: the utility model discloses a movable support for a floor, including riser (1), riser (1) bottom is equipped with adjusting part (6), adjusting part (6) are including backup pad (601), four remove round (602) and telescopic link (603), telescopic link (603) top and riser (1) fixed connection, telescopic link (603) bottom and backup pad (601) pass through bearing swing joint, four remove round (602) all with backup pad (601) fixed connection.
6. A construction cost progress management apparatus according to claim 5, wherein: two slot boards (604) are fixedly connected to the top end of the supporting board (601), inserting blocks (605) are movably arranged inside the two slot boards (604), and the two inserting blocks (605) are fixedly connected with the bottom end of the vertical board (1).
CN202321687887.7U 2023-06-29 2023-06-29 Engineering cost progress management device Active CN220024520U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321687887.7U CN220024520U (en) 2023-06-29 2023-06-29 Engineering cost progress management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321687887.7U CN220024520U (en) 2023-06-29 2023-06-29 Engineering cost progress management device

Publications (1)

Publication Number Publication Date
CN220024520U true CN220024520U (en) 2023-11-17

Family

ID=88720644

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321687887.7U Active CN220024520U (en) 2023-06-29 2023-06-29 Engineering cost progress management device

Country Status (1)

Country Link
CN (1) CN220024520U (en)

Similar Documents

Publication Publication Date Title
CN111828805A (en) Liftable display equipment for mobile display screen
CN220024520U (en) Engineering cost progress management device
CN206088739U (en) Target installation tool
CN215265292U (en) BIM building model show stand
CN207349578U (en) A kind of pipeline layout stent
CN212024647U (en) High-stability scissor jack for automobile
CN208984319U (en) A kind of lamps and lanterns shock-testing platform being easily installed lamps and lanterns
CN207255636U (en) A kind of automobile rear axle bush press-mounting machine
CN205508308U (en) Art design works show shelf
CN211393729U (en) Crane for maintaining large-scale wind power equipment
CN210687599U (en) Conference screen mounting rack convenient to disassemble
CN109892826B (en) Display stand convenient to install and used for mathematical education and using method thereof
CN107963591B (en) Suspended ceiling type maintenance platform for landing ball for theatre performance
CN214671643U (en) Political affairs publicity column is thought to over-and-under type with artistic effect function
CN221168851U (en) Extensible plate frame for repairing grottoes
CN219883918U (en) Damping device and room construction steel construction handling device who constitutes
CN214947731U (en) Special display for conference
CN215636184U (en) Support frame for construction machinery
CN212218501U (en) Novel ground investigation robot
CN221320727U (en) Construction warning device
CN211647494U (en) DUS test can dismantle removal film studio
CN221777529U (en) Can place extracting tool's climbing frame
CN219871343U (en) Crack detection device for constructional engineering
CN210606241U (en) Physical experiment device for horizontal throwing and inclined throwing
CN221704925U (en) All-round regulation campus surveillance camera head

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant