CN220016360U - Spacing tube bank of support - Google Patents
Spacing tube bank of support Download PDFInfo
- Publication number
- CN220016360U CN220016360U CN202321458577.8U CN202321458577U CN220016360U CN 220016360 U CN220016360 U CN 220016360U CN 202321458577 U CN202321458577 U CN 202321458577U CN 220016360 U CN220016360 U CN 220016360U
- Authority
- CN
- China
- Prior art keywords
- arc
- shaped plate
- bolt
- nut
- screw thread
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 claims abstract description 46
- 230000014759 maintenance of location Effects 0.000 claims 2
- 238000007373 indentation Methods 0.000 abstract description 4
- 101100537937 Caenorhabditis elegans arc-1 gene Proteins 0.000 description 9
- 238000000034 method Methods 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a bracket limiting tube bundle, and relates to the technical field of constructional engineering. The support limiting tube bundle comprises a ring frame, a fixing assembly, a limiting mechanism and an adjusting assembly, wherein the ring frame comprises a first arc-shaped plate and a second arc-shaped plate, the second arc-shaped plate is located below the first arc-shaped plate, the fixing assembly is arranged on the ring frame and comprises a bolt and a nut, the nut is installed on the outer wall of the bolt in a threaded mode, and the limiting mechanism is arranged on the ring frame. This spacing tube bank of support can be convenient installs to the pipeline, still reduces first arc and second arc as far as possible and produces the indentation to the pipeline moreover, improves the integrality of pipeline, can also adjust the length of first arc and second arc, can install the pipeline in constructor appointed position, improves the portability in the installation greatly, can avoid bolt and nut to take place the slope because of vibrations, and further makes things convenient for this support tube bank to install fixedly to the pipeline.
Description
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to a tube bundle.
Background
The pipeline of resident domestic water can be installed in the top of building through the support tube bank generally to avoid the pipeline to produce the influence to the people, the support tube bank in the present market, its length is fixed length, and at the in-process of fixing the pipeline, can't be according to the position that constructor needs to install, adjust the support tube bank to the installation height of pipeline, the support tube bank is because vibrations very easily in the in-process of installing the pipeline in addition, leads to the bolt and nut to take place the slope, makes the support tube bank be difficult to install fixedly to the pipeline, therefore, the spacing tube bank of support of utility model.
Disclosure of Invention
The utility model aims to provide a bracket limiting tube bundle, which can solve the problem that bolts and nuts are inclined easily due to vibration, so that the bracket tube bundle is not easy to install and fix a pipeline.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a spacing tube bank of support, including the link, fixed subassembly, stop gear and adjusting part, the link includes first arc and second arc, the second arc is located the below of first arc, fixed subassembly sets up on the link, fixed subassembly includes bolt and nut, nut screw thread installs in the outer wall of bolt, stop gear sets up on the link, stop gear is used for carrying out the block spacing to fixed subassembly, adjusting part sets up in the top of link, adjusting part is used for adjusting the height of link.
Preferably, the inner side of first arc and the inboard of second arc all are provided with the rubber strip, and the outer wall of two rubber strips is all set up flutedly, and first arc and second arc all block in the recess, can be convenient install the pipeline, still reduce first arc and second arc as far as possible and produce the indentation to the pipeline moreover, improve the integrality of pipeline.
Preferably, the first arc plate is provided with a fixing hole, the second arc plate is provided with a fixing groove, the bolt is positioned in the fixing hole and the fixing groove, and the bottom of the nut is contacted with the top of the first arc plate.
Preferably, stop gear includes installation cover, stopper, curved strip, fixed axle and trip, installation cover fixed mounting is in the top of first arc, the stopper has two equal fixed mounting in the top of first arc, the stopper is located the both sides of installation cover, the both sides block of curved strip is between installation cover and stopper, the nut is located the inboard of installation cover and curved strip, the nut contacts with installation cover and curved strip, fixed axle fixed mounting is in the top of second arc, the trip rotates the outer wall of installing in the fixed axle, the trip is hooked and is taken in the outside of bolt, can carry out spacing fixed to bolt and nut, can avoid bolt and nut to take place the slope because vibrations, further make things convenient for this support tube bank to install fixedly to the pipeline.
Preferably, the first threaded rod of adjusting part, the second threaded rod, the screw thread sleeve, installation piece and spanner, first threaded rod screw thread installation is in screw thread telescopic bottom, second threaded rod screw thread installation is in screw thread telescopic top, the bottom of first threaded rod and the top fixed mounting of first arc, the installation piece has two equal fixed mounting in screw thread telescopic outer wall, the draw-in groove that the size is equal has all been seted up to one side of installation piece and the bottom of bolt, the one end of spanner is opened and shut with the draw-in groove on the installation piece in, can be to the length of adjusting first arc and second arc, can install the pipeline in constructor appointed position, portability in the installation is greatly improved.
Preferably, the inner sides of the rubber strips are provided with pipelines, and the outer walls of the pipelines are contacted with the inner sides of the two rubber strips.
Compared with the prior art, the utility model has the beneficial effects that:
this spacing tube bank of support uses through the cooperation of first arc, the second arc, the rubber strip, bolt and nut, can be convenient install the pipeline, but also reduce first arc and second arc as far as possible and produce the indentation to the pipeline, improve the integrality of pipeline, use through the cooperation of first threaded rod, the second threaded rod, the screw thread sleeve, installation piece and spanner, can adjust the length of first arc and second arc, can install the pipeline in the position that constructor appointed, improve the portability in the installation greatly, use through the cooperation of installation cover, the stopper, the curved strip, fixed axle and trip, can carry out spacing fixed to bolt and nut, can avoid bolt and nut to take place the slope because vibrations, further make things convenient for this support tube bank to install fixedly to the pipeline.
Drawings
The utility model is further illustrated by the following examples in conjunction with the accompanying drawings:
FIG. 1 is a cross-sectional view of the present utility model;
FIG. 2 is a top view of the mounting sleeve of the present utility model;
FIG. 3 is a top view of the hook according to the present utility model;
FIG. 4 is a top view of the rubber strip of the present utility model;
fig. 5 is a top view of a first arcuate plate of the present utility model.
Reference numerals: 1. a first arcuate plate; 2. a second arcuate plate; 3. a rubber strip; 4. a bolt; 5. a nut; 6. a mounting sleeve; 7. a limiting block; 8. bending the strip; 9. a fixed shaft; 10. a hook; 11. a pipe; 12. a first threaded rod; 13. a second threaded rod; 14. a threaded sleeve; 15. a mounting block; 16. and (5) a spanner.
Detailed Description
Reference will now be made in detail to the present embodiments of the present utility model, examples of which are illustrated in the accompanying drawings, wherein the accompanying drawings are used to supplement the description of the written description so that one can intuitively and intuitively understand each technical feature and overall technical scheme of the present utility model, but not to limit the scope of the present utility model.
Referring to fig. 1-5, the present utility model provides a technical solution: the utility model provides a spacing tube bank of support, including the link, fixed subassembly, stop gear and adjusting part, the link includes first arc 1 and second arc 2, second arc 2 is located the below of first arc 1, fixed subassembly sets up on the link, fixed subassembly includes bolt 4 and nut 5, nut 5 screw thread installs in the outer wall of bolt 4, stop gear sets up on the link, take out spanner 16 from installation piece 15, make the draw-in groove block of spanner 16's one end and bolt 4 bottom, through manual torsion spanner 16, can make spanner 16 drive bolt 4 rotate, and then can make second arc 2 rise, make first arc 1 and second arc 2 carry out the clamping fixed to pipeline 11, stop gear is used for carrying out the block spacing to fixed subassembly, adjusting part sets up in the top of link, adjusting part is used for adjusting the height of link.
Further, the inner side of the first arc-shaped plate 1 and the inner side of the second arc-shaped plate 2 are respectively provided with a rubber strip 3, the outer walls of the two rubber strips 3 are respectively provided with a groove, the first arc-shaped plate 1 and the second arc-shaped plate 2 are respectively clamped in the grooves, the pipeline 11 can be conveniently installed, the pipeline 11 is further reduced as much as possible, the indentation of the first arc-shaped plate 1 and the second arc-shaped plate 2 is generated, and the integrity of the pipeline 11 is improved.
Further, a fixing hole is formed in the first arc-shaped plate 1, a fixing groove is formed in the second arc-shaped plate 2, the bolt 4 is located in the fixing hole and the fixing groove, and the bottom of the nut 5 is in contact with the top of the first arc-shaped plate 1.
Still further, stop gear includes installation cover 6, stopper 7, curved strip 8, fixed axle 9 and trip 10, installation cover 6 fixed mounting is in the top of first arc 1, stopper 7 has two equal fixed mounting in the top of first arc 1, stopper 7 is located the both sides of installation cover 6, the both sides block of curved strip 8 is between installation cover 6 and stopper 7, nut 5 is located the inboard of installation cover 6 and curved strip 8, nut 5 contacts with installation cover 6 and curved strip 8, fixed axle 9 fixed mounting is in the top of second arc 2, trip 10 rotates and installs in the outer wall of fixed axle 9, trip 10 hooks up in the outside of bolt 4, can carry out spacing fixed to bolt 4 and nut 5, can avoid bolt 4 and nut 5 to take place the slope because of vibrations, further make things convenient for this support tube bank to install fixedly to pipeline 11, manual trip 10 is stirred, make trip 10 can rotate as the axle center, can make trip 10 hook 4 to carry out the fixed axle 4.
Secondly, first threaded rod 12 of adjusting component, second threaded rod 13, screw thread sleeve 14, installation piece 15 and spanner 16, first threaded rod 12 screw thread is installed in the bottom of screw thread sleeve 14, second threaded rod 13 screw thread is installed in the top of screw thread sleeve 14, the bottom of first threaded rod 12 and the top fixed mounting of first arc 1, installation piece 15 has two equal fixed mounting in the outer wall of screw thread sleeve 14, the draw-in groove that the size is equal is all offered to one side of installation piece 15 and the bottom of bolt 4, in the draw-in groove on spanner 16 one end opening and shutting and the installation piece 15, the spanner 16 of manual torsion makes spanner 16 drive installation piece 15 and screw thread sleeve 14 rotate, the rotation of installation piece 15 can drive screw thread sleeve 14 and first adjusting rod 12 to rise or descend, can install pipeline 11 in the position that constructor appointed, portability in the installation process is improved greatly with the length of adjusting first arc 1 and second arc 2.
And secondly, the inner sides of the rubber strips 3 are provided with pipelines 11, and the outer walls of the pipelines 11 are contacted with the inner sides of the two rubber strips 3.
Working principle: the top of second threaded rod 13 is fixed and the top of building, first arc 1 is held to one hand, the spanner 16 of another manual torsion, make spanner 16 drive installation piece 15 and screw thread sleeve 14 rotate, the rotation of installation piece 15 can drive screw thread sleeve 14 and first threaded rod 12 to rise or descend, can change the height of support tube bank, take out spanner 16 from installation piece 15, make the draw-in groove block of one end and the bolt 4 bottom of spanner 16, through manual torsion spanner 16, can make spanner 16 drive bolt 4 rotate, and then can make second arc 2 rise, make first arc 1 and second arc 2 carry out the clamping fixed to pipeline 11, through manual trip 10, make trip 10 can use fixed axle 9 to rotate as the axle center, can make trip 10 carry out the trip to bolt 4, avoid bolt 4 to drop from second arc 2.
The embodiments of the present utility model have been described in detail with reference to the accompanying drawings, but the present utility model is not limited to the above embodiments, and various changes can be made within the knowledge of one of ordinary skill in the art without departing from the spirit of the present utility model.
Claims (6)
1. A bracket retention tube bundle comprising:
the ring frame comprises a first arc-shaped plate (1) and a second arc-shaped plate (2), and the second arc-shaped plate (2) is positioned below the first arc-shaped plate (1);
the fixing assembly is arranged on the ring frame and comprises a bolt (4) and a nut (5), and the nut (5) is arranged on the outer wall of the bolt (4) in a threaded manner;
the limiting mechanism is arranged on the ring frame and used for clamping and limiting the fixed assembly;
the adjusting component is arranged at the top of the ring frame and is used for adjusting the height of the ring frame.
2. A stent containment tube bundle as set forth in claim 1 wherein: the inner side of the first arc plate (1) and the inner side of the second arc plate (2) are respectively provided with a rubber strip (3), the outer walls of the two rubber strips (3) are respectively provided with a groove, and the first arc plate (1) and the second arc plate (2) are respectively clamped in the grooves.
3. A stent containment tube bundle as claimed in claim 2, wherein: the fixing holes are formed in the first arc-shaped plate (1), the fixing grooves are formed in the second arc-shaped plate (2), the bolts (4) are located in the fixing holes and the fixing grooves, and the bottoms of the nuts (5) are in contact with the tops of the first arc-shaped plate (1).
4. A stent containment tube bundle according to claim 3, wherein: stop gear includes installation cover (6), stopper (7), curved strip (8), fixed axle (9) and trip (10), installation cover (6) fixed mounting is in the top of first arc (1), stopper (7) have two equal fixed mounting in the top of first arc (1), stopper (7) are located the both sides of installation cover (6), both sides block of curved strip (8) are between installation cover (6) and stopper (7), nut (5) are located the inboard of installation cover (6) and curved strip (8), nut (5) are contacted with installation cover (6) and curved strip (8), fixed axle (9) fixed mounting is in the top of second arc (2), trip (10) rotate and install in the outer wall of fixed axle (9), trip (10) are hooked in the outside of bolt (4).
5. The bracket retention tube bundle of claim 4, wherein: first threaded rod (12) of adjusting part, second threaded rod (13), screw thread sleeve (14), installation piece (15) and spanner (16), first threaded rod (12) screw thread installation is in the bottom of screw thread sleeve (14), second threaded rod (13) screw thread installation is in the top of screw thread sleeve (14), the bottom of first threaded rod (12) and the top fixed mounting of first arc (1), installation piece (15) have two equal fixed mounting in the outer wall of screw thread sleeve (14), the draw-in groove that the size is equal has all been seted up to one side of installation piece (15) and the bottom of bolt (4), in the draw-in groove on the one end opening and shutting and installation piece (15) of spanner (16).
6. A stent containment tube bundle as set forth in claim 5 wherein: the inner sides of the rubber strips (3) are provided with pipelines (11), and the outer walls of the pipelines (11) are contacted with the inner sides of the two rubber strips (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321458577.8U CN220016360U (en) | 2023-06-08 | 2023-06-08 | Spacing tube bank of support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321458577.8U CN220016360U (en) | 2023-06-08 | 2023-06-08 | Spacing tube bank of support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220016360U true CN220016360U (en) | 2023-11-14 |
Family
ID=88686553
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321458577.8U Active CN220016360U (en) | 2023-06-08 | 2023-06-08 | Spacing tube bank of support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220016360U (en) |
-
2023
- 2023-06-08 CN CN202321458577.8U patent/CN220016360U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN220016360U (en) | Spacing tube bank of support | |
CN211693788U (en) | Petroleum pipeline installation mechanism | |
CN219571093U (en) | Pipeline fixing structure | |
CN209484142U (en) | A kind of easy-to-dismount expansion joint compensator | |
CN115539728A (en) | From ring flange of taking location installation function | |
CN209795584U (en) | Automobile steering column clamping device | |
CN209802438U (en) | Water meter easy to install | |
CN208634581U (en) | A kind of omnipotent pump external pipe connection component | |
CN216789378U (en) | Connecting plate for fast-assembling type relief valve | |
CN218326745U (en) | Pipeline piece capable of being manually adjusted and having fixed length | |
CN214532096U (en) | U-shaped card fixing component for inner wall door opening | |
CN217951540U (en) | Stable connecting structure for water supply and drainage pipeline | |
CN220083378U (en) | Liquid storage device | |
CN213452357U (en) | Multi-water-pipe combined anti-seismic support | |
CN213209345U (en) | Pressure transmitter with mounting bracket | |
CN221136606U (en) | Waterproof coiled material rapid cooling device with cleaning structure | |
CN218564744U (en) | Lining pipe for repairing drainage pipeline | |
CN220912390U (en) | Gas table support frame | |
CN219035795U (en) | Siphon drainage pipe fixed knot constructs | |
CN211821252U (en) | High-sealing-performance furnace top air duct compensator | |
CN216530420U (en) | Fixing frame for hydroelectric engineering | |
CN212385386U (en) | Automatic screwing and disassembling machine | |
CN209977544U (en) | Air conditioner water pipe internal stress balanced compensator convenient to install | |
CN218441004U (en) | Support for steam pipeline | |
CN218776437U (en) | Fastening structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |