CN220014552U - Building construction edge protection mechanism - Google Patents

Building construction edge protection mechanism Download PDF

Info

Publication number
CN220014552U
CN220014552U CN202321253081.7U CN202321253081U CN220014552U CN 220014552 U CN220014552 U CN 220014552U CN 202321253081 U CN202321253081 U CN 202321253081U CN 220014552 U CN220014552 U CN 220014552U
Authority
CN
China
Prior art keywords
piece
fixedly connected
construction
guard
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321253081.7U
Other languages
Chinese (zh)
Inventor
张敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yibin Xinmei Construction Engineering Co ltd
Original Assignee
Yibin Xinmei Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yibin Xinmei Construction Engineering Co ltd filed Critical Yibin Xinmei Construction Engineering Co ltd
Priority to CN202321253081.7U priority Critical patent/CN220014552U/en
Application granted granted Critical
Publication of CN220014552U publication Critical patent/CN220014552U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The utility model relates to the field of building construction and discloses a building construction edge protection mechanism, which comprises a protection piece, wherein the inner wall of the protection piece is connected with a lifting piece in a sliding manner, the tops of the left end and the right end of the lifting piece are fixedly connected with fixing plates, the inner walls of the fixing plates are respectively and rotatably connected with a screw rod, the bottom end of the protection piece is fixedly connected with a base, the bottoms of the left side and the right side of the rear end of the protection piece are respectively and rotatably connected with a supporting rod, and grooves are respectively arranged at the positions of the left side and the right side of the rear end of the protection piece, which correspond to the supporting rods. According to the utility model, the lifting piece is driven to move up and down by rotating the screw rods at two sides, the lifting piece is adjusted to a proper height according to construction requirements, and then the supporting rod is pulled to rotate downwards, so that the other end of the supporting rod is supported on the ground, the stability of the protective piece is improved, the protective piece can be connected with the water pipe, water is atomized through the spray head, floating ash is adsorbed and falls back to the ground, and pollution is prevented.

Description

Building construction edge protection mechanism
Technical Field
The utility model relates to the field of building construction, in particular to a building construction edge protection mechanism.
Background
The building construction refers to the production activity of engineering construction implementation stage, which is the construction process of various buildings, namely the process of changing various lines on design drawings into real objects at designated places, and comprises the steps of foundation engineering construction, main structure construction, roof engineering construction, decoration engineering construction and the like, wherein the place of construction operation is called a building construction site or a construction site, and is called a construction site, and when the edge of a working surface at a high place is not protected or protected by a facility is lower than 800mm, a continuous edge protection mechanism is arranged according to the regulations.
The current building site edge protection mechanism is usually that the multi-disc guard piece links together, encloses the constitution wall, but its height is usually fixed, can't adjust according to the job site, and the weight of base often can not guarantee the stability of guard piece, and the windy weather often can be scraped off it, and in addition there is a large amount of dust to fly away in the sky when the construction operation, causes air pollution.
Disclosure of Invention
The utility model aims to solve the defects in the prior art and provides a building construction edge protection mechanism.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a construction edge protection mechanism, includes the guard piece, the inner wall sliding connection of guard piece has the lifter, the equal fixedly connected with fixed plate in both ends top about the lifter, the inner wall of fixed plate is all rotated and is connected with the screw rod, the bottom fixedly connected with base of guard piece, the rear end left and right sides bottom of guard piece is all rotated and is connected with the bracing piece, the rear end left and right sides of guard piece corresponds the position department of bracing piece all is provided with the recess, the equal fixedly connected with elastic cord in the top position department that the rear end left and right sides of guard piece corresponds the recess.
As a further description of the above technical solution:
the bottom of screw rod all threaded connection is at the inner wall of guard piece.
As a further description of the above technical solution:
the top fixedly connected with water pipe of lifting part, the middle part of water pipe is provided with a plurality of shower nozzles.
As a further description of the above technical solution:
the left end fixedly connected with connecting pipe of water pipe, the size of connecting pipe agrees with the inner wall of water pipe.
As a further description of the above technical solution:
the right end fixedly connected with first lock sleeve of water pipe, the bottom of first lock sleeve rotates and is connected with the second lock sleeve.
As a further description of the above technical solution:
the first lock sleeve and the second lock sleeve are connected with a second threaded column through threads on the inner walls of the tops of the first lock sleeve and the second lock sleeve.
As a further description of the above technical solution:
the right-hand member fixedly connected with of protector is a plurality of buckles, the inner wall of buckle all is provided with the pothook.
As a further description of the above technical solution:
the inner wall of the clamping hook is connected with a first threaded column in a threaded mode, and the right end of the clamping hook is fixedly connected to the left end of the protection piece.
The utility model has the following beneficial effects:
1. according to the utility model, the lifting piece is driven to move up and down by rotating the screw rods at two sides, the lifting piece is adjusted to a proper height according to construction requirements, the lifting piece can be suitable for a plurality of construction sites, and the elastic band is pulled to take out the supporting rod and rotates downwards, so that the other end of the supporting rod is supported on the ground, and the stability of the protective piece is improved.
2. According to the utility model, the water pipes can be connected, the water is atomized through the spray head, the floating ash is adsorbed and falls back to the ground, pollution is prevented, and the connecting components are detachable between the water pipes and between the protection pieces, so that the installation and the transportation are convenient.
Drawings
FIG. 1 is a front perspective view of a construction edge protection mechanism according to the present utility model;
FIG. 2 is a rear perspective view of a construction edge protection mechanism according to the present utility model;
FIG. 3 is a schematic view of a support structure of an edge protection mechanism for construction according to the present utility model;
FIG. 4 is a schematic diagram of a connection structure of an edge protection mechanism for construction according to the present utility model;
fig. 5 is a schematic view of a water pipe structure of a construction edge protection mechanism according to the present utility model.
Legend description:
1. a lifting member; 2. a screw; 3. a clasp ring; 4. a base; 5. a guard; 6. a water pipe; 7. a spray head; 8. a clamping hook; 9. a support rod; 10. an elastic band; 11. a groove; 12. a first threaded post; 13. a second threaded post; 14. a first sleeve; 15. a connecting pipe; 16. a second lock sleeve; 17. and a fixing plate.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be noted that, directions or positional relationships indicated by terms such as "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., are based on directions or positional relationships shown in the drawings, are merely for convenience of description and simplification of description, and do not indicate or imply that the apparatus or element to be referred to must have a specific direction, be constructed and operated in the specific direction, and thus should not be construed as limiting the present utility model; the terms "first," "second," "third," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless explicitly specified and limited otherwise, the terms "mounted," "connected," "coupled," and the like are to be construed broadly, and may be fixedly coupled, detachably coupled, or integrally coupled, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
Referring to fig. 1-5, one embodiment provided by the present utility model is: the utility model provides a construction edge protection mechanism, including guard 5, guard 5's inner wall sliding connection has lifting part 1, lifting part 1's the equal fixedly connected with fixed plate 17 in both ends top about, fixed plate 17's inner wall all rotates and is connected with screw rod 2, guard 5's bottom fixedly connected with base 4, guard 5's rear end left and right sides bottom all rotates and is connected with bracing piece 9, guard 5's rear end left and right sides corresponds bracing piece 9's position department all is provided with recess 11, guard 5's rear end left and right sides corresponds recess 11's the equal fixedly connected with elastic cord 10 in top position department, during installation construction edge protection mechanism, rotate both sides screw rod 2 earlier and drive lifting part 1 and reciprocate, adjust to suitable height according to the construction demand, pull open elastic cord 10 again and take out bracing piece 9, rotate downwards, make bracing piece 9's the other end support on ground, guard 5's stability is increased.
The bottom of the screw rod 2 is connected with the inner wall of the protecting piece 5 in a threaded manner, the top end of the lifting piece 1 is fixedly connected with a water pipe 6, the middle part of the water pipe 6 is provided with a plurality of spray heads 7, the left end of the water pipe 6 is fixedly connected with a connecting pipe 15, the size of the connecting pipe 15 is matched with that of the inner wall of the water pipe 6, the right end of the water pipe 6 is fixedly connected with a first lock sleeve 14, the bottom of the first lock sleeve 14 is rotationally connected with a second lock sleeve 16, the first lock sleeve 14 and the inner wall of the top of the second lock sleeve 16 are in threaded connection with a second threaded post 13, when the water pipe is connected, the connecting pipe 15 is firstly connected with the inner wall of the other water pipe 6, the second lock sleeve 16 is rotated to be tightly attached to the first lock sleeve 14, so that the inner walls of the first lock sleeve 14 and the second lock sleeve 16 are tightly attached to the outer wall of the water pipe 6, then screw up second screw thread post 13 fixedly, connect firmly, if there is the turn, then change connecting pipe 15, first lock sleeve 14 and second lock sleeve 16 into L shape can, so reciprocal equipment to whole construction site, in the work progress, can let in the clear water in the water pipe 6, spray the water into fog through shower nozzle 7, adsorb the floating dust, fall back to ground, prevent pollution, the right-hand member fixedly connected with of protector 5 is a plurality of buckles 3, the inner wall of buckle 3 all is provided with pothook 8, the equal threaded connection of inner wall of pothook 8 has first screw thread post 12, the equal fixed connection of right-hand member of pothook 8 is at the left end of protector 5, when equipment protector 5, aim at the buckle 3 joint with pothook 8 and go into, rotate the round head portion that first screw thread post 12 reached pothook 8 again, prevent unhook.
Working principle: when the edge protection mechanism is installed, the screws 2 at two sides are rotated to drive the lifting part 1 to move up and down, the lifting part is regulated to a proper height according to construction requirements, the elastic band 10 is pulled to take out the supporting rod 9, the supporting rod 9 is rotated downwards, the other end of the supporting rod 9 is supported on the ground, the stability of the protection part 5 is increased, then the other protection part 5 is taken, the clamping hooks 8 are aligned with the clamping rings 3 to be clamped in, the first threaded columns 12 are rotated to reach the round heads of the clamping hooks 8 to prevent unhooking, when the water is connected, the connecting pipes 15 are connected with the inner walls of the other water through pipes 6 at first, the second lock sleeves 16 are rotated to be tightly attached to the first lock sleeves 14, the inner walls of the first lock sleeves 14 and the second lock sleeves 16 are tightly attached to the outer walls of the water through pipes 6, the second threaded columns 13 are tightly screwed, the connection is stable, if the turning positions exist, the connecting pipes 15, the first lock sleeves 14 and the second lock sleeves 16 are replaced with L shapes, the connecting pipes are assembled to the whole construction site in a reciprocating mode, the water through the spray heads 7 can be filled with clean water in the water through the spraying heads 6, and ash is adsorbed on the ground.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.

Claims (8)

1. Building construction edge protection mechanism, including protector (5), its characterized in that: the inner wall sliding connection of guard piece (5) has lifter (1), equal fixedly connected with fixed plate (17) in both ends top about lifter (1), the inner wall of fixed plate (17) all rotates and is connected with screw rod (2), the bottom fixedly connected with base (4) of guard piece (5), the rear end left and right sides bottom of guard piece (5) all rotates and is connected with bracing piece (9), the rear end left and right sides of guard piece (5) corresponds the position department of bracing piece (9) all is provided with recess (11), the rear end left and right sides of guard piece (5) corresponds the equal fixedly connected with elastic cord (10) in top position department of recess (11).
2. The edge guard mechanism for construction of claim 1, wherein: the bottom of the screw rod (2) is in threaded connection with the inner wall of the protection piece (5).
3. The edge guard mechanism for construction of claim 1, wherein: the top of lifting piece (1) fixedly connected with leads to water pipe (6), the middle part of leading to water pipe (6) is provided with a plurality of shower nozzles (7).
4. A building construction edge protection mechanism according to claim 3, wherein: the left end fixedly connected with connecting pipe (15) of water pipe (6), the size of connecting pipe (15) is fit with the inner wall of water pipe (6).
5. A building construction edge protection mechanism according to claim 3, wherein: the right end of the water pipe (6) is fixedly connected with a first lock sleeve (14), and the bottom of the first lock sleeve (14) is rotationally connected with a second lock sleeve (16).
6. The edge guard mechanism for construction of claim 5, wherein: the top inner walls of the first lock sleeve (14) and the second lock sleeve (16) are in threaded connection with a second threaded column (13).
7. The edge guard mechanism for construction of claim 1, wherein: the right-hand member fixedly connected with a plurality of buckles (3) of guard piece (5), the inner wall of buckle (3) all is provided with pothook (8).
8. The edge guard mechanism for construction of claim 7, wherein: the inner wall of the clamping hook (8) is connected with a first threaded column (12) in a threaded mode, and the right end of the clamping hook (8) is fixedly connected to the left end of the protection piece (5).
CN202321253081.7U 2023-05-23 2023-05-23 Building construction edge protection mechanism Active CN220014552U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321253081.7U CN220014552U (en) 2023-05-23 2023-05-23 Building construction edge protection mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321253081.7U CN220014552U (en) 2023-05-23 2023-05-23 Building construction edge protection mechanism

Publications (1)

Publication Number Publication Date
CN220014552U true CN220014552U (en) 2023-11-14

Family

ID=88693456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321253081.7U Active CN220014552U (en) 2023-05-23 2023-05-23 Building construction edge protection mechanism

Country Status (1)

Country Link
CN (1) CN220014552U (en)

Similar Documents

Publication Publication Date Title
CN220014552U (en) Building construction edge protection mechanism
CN211822955U (en) Windproof ventilating device for urban high-rise building
CN212027392U (en) Garden guardrail
CN211025606U (en) Dust collector for building site
CN114570151A (en) Dust removal area adjustable environment-friendly dust device for building decoration
CN213626995U (en) Safety barrier device for construction
CN214273181U (en) Town road isolating device
CN210976872U (en) Guardrail device
CN210959768U (en) Urban building water storage irrigation equipment
CN113694655A (en) Dust removal device for house building construction
CN216457767U (en) Dust device is used in building engineering construction
CN216008058U (en) Guardrail device is folded to landscape
CN214143910U (en) Bus shelter for municipal works
CN220125809U (en) Dust fall device for construction
CN220736855U (en) Dust fall device for construction
CN218421745U (en) Building engineering construction site sprays dust device
CN214102615U (en) Urban afforestation is with safe type fence
CN215484521U (en) A portable scaffold frame for building engineering
CN109296983A (en) A kind of LED street lamp
CN213101371U (en) Dust device for house construction
CN219993368U (en) Road surface protection body based on highway construction maintenance is used
CN218061782U (en) Face limit protector with spraying system
CN217958132U (en) Landscape sprinkling irrigation lamp
CN218833992U (en) Dust fall cooling system for construction
CN219864207U (en) Construction device for green building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant