CN220014456U - Double-groove steel joist - Google Patents

Double-groove steel joist Download PDF

Info

Publication number
CN220014456U
CN220014456U CN202320951427.4U CN202320951427U CN220014456U CN 220014456 U CN220014456 U CN 220014456U CN 202320951427 U CN202320951427 U CN 202320951427U CN 220014456 U CN220014456 U CN 220014456U
Authority
CN
China
Prior art keywords
sleeve
joist
steel
gap
joists
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320951427.4U
Other languages
Chinese (zh)
Inventor
刘飞龙
余震
曹凯
刘洋
叶静
叶云磊
梁洪博
魏小璐
付汝国
王辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Huanan Construction Investment Group Co ltd
Original Assignee
Zhongtian Huanan Construction Investment Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Huanan Construction Investment Group Co ltd filed Critical Zhongtian Huanan Construction Investment Group Co ltd
Priority to CN202320951427.4U priority Critical patent/CN220014456U/en
Application granted granted Critical
Publication of CN220014456U publication Critical patent/CN220014456U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a double-groove steel joist, which comprises 2 symmetrically parallel joists, wherein a gap is reserved between the 2 joists, a sleeve is adjustably arranged in the gap, the web plate of each joist is provided with a hollow groove, a plurality of fixing bolts for preventing the sleeve from moving are arranged in the hollow groove, and a fixing plate is connected between the 2 joists. The sleeve can slide left and right in the gap to adjust the position, has high stability and flexible arrangement, can be adjusted on the scaffold board in real time by workers, and is convenient to operate.

Description

Double-groove steel joist
Technical Field
The utility model relates to the field of construction building supporting structures, in particular to a double-groove steel joist.
Background
In the house construction engineering, the formwork support system is a very important part in main construction, and is directly related to whether project management targets of the engineering can be realized, wherein beam bottom vertical rod supports are key and difficult content in the formwork support, conventional beam bottom supports are too dense, vertical rod erection is difficult, operation difficulty is high, construction consumption time is long, manpower and material resources are consumed greatly, the problem can be avoided by the beam bottom double-channel steel joist support, the problem that the traditional double-channel steel joist is poor in stability of vertical rods on channel steel and easy to topple is solved, horizontal pull rods are required to be integrally connected with a frame body when the height of the channel steel vertical rods is too high, and the vertical rod positions cannot be adjusted after connection is achieved. It is therefore necessary to provide a double channel steel joist which improves the stability of the uprights and which is capable of moving the position of the uprights after being integrally connected to the frame.
Disclosure of Invention
The utility model provides a double-groove steel joist for solving the problems in the prior art.
In order to solve the problems, the utility model adopts the following technical scheme:
the utility model provides a double flute steel joist, includes 2 symmetrical parallel joists, 2 leave the space between the joist adjustable in the space install the sleeve, each the web position of joist all is equipped with the empty slot, is equipped with a plurality of fixing bolt that are used for preventing sleeve removal in the empty slot, 2 be connected with the fixed plate between the joist. The sleeve can slide left and right in the gap to adjust the position.
Preferably, each sleeve comprises a steel rod sleeve through which a steel pipe passes, limiting plates are sleeved on the upper side and the lower side of the steel rod sleeve, which are exposed out of the gap, and the limiting plates are in contact with the joist. The limiting plate can prevent the steel rod sleeve from swinging in the gap, so that the steel rod sleeve can always keep a vertical state, and meanwhile, horizontal supporting force is provided for the steel rod sleeve, and the stability is improved.
Preferably, an opening is formed in one side, facing the empty groove, of the steel rod sleeve, a nut is arranged on the opening, the nut is in threaded connection with an adjusting bolt, and the adjusting bolt penetrates through the opening to be in contact with a steel pipe in the steel rod sleeve. Through the cooperation of nut and adjusting bolt, adjusting bolt passes trompil and the intraductal steel pipe contact of steel pole sleeve, and then further improves the stability between steel pipe and the joist.
Preferably, connecting holes for fixing the joist board are formed at two ends of each joist. The preset connecting holes are convenient to connect and fix with the scaffold board when the scaffold board is laid later.
Compared with the prior art, the utility model has the following beneficial effects:
according to the utility model, the sleeve is arranged in the gap between the two joists, the sleeve can slide left and right in the gap to adjust the position, the limiting plates are arranged on the upper side and the lower side of the steel rod sleeve, so that horizontal supporting force is provided for the steel rod sleeve, the stability is high, the step of integrally pulling up the steel rod sleeve and the frame body through the horizontal rod is reduced, the arrangement is flexible, when the steel rod sleeve is installed with an external scaffold board, the steel rod sleeve is fixed with the two joists through the connecting holes by using the bolts, a worker can adjust the scaffold board in real time, the operation is convenient, the steel rod sleeve is provided with the holes, and the adjusting bolts are screwed into the nuts at the holes to contact with the steel pipes in the steel rod sleeve, so that the stability of the fixation of the joists and the steel pipes is improved.
Drawings
FIG. 1 is a top view of the present utility model;
FIG. 2 is a front view of the present utility model;
the steel bar support comprises a 1-joist, a 11-gap, a 12-connecting hole, a 13-hollow groove, a 2-sleeve, a 21-steel bar sleeve, a 22-limiting plate, a 23-opening, a 24-adjusting bolt, a 3-fixing plate and a 4-fixing bolt.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-2, a double-groove steel joist 1 includes 2 symmetrical parallel joists 1, a gap 11 is left between 2 joists 1, a sleeve pipe sleeve 2 is adjustably installed in the gap 11, a hollow groove 13 is provided at the web position of each joist 1, a plurality of fixing bolts 4 for preventing the sleeve pipe sleeve 2 from moving are provided in the hollow groove 13, and a fixing plate 3 is connected between 2 joists 1. The sleeve 2 can slide in the gap 11 to adjust the position.
Each sleeve 2 comprises a steel rod sleeve 21 for passing through a steel pipe, limiting plates 22 are sleeved on the upper side and the lower side of the steel rod sleeve 21 exposed out of the gap 11, and 2 limiting plates 22 are contacted with the joist 1. The limiting plate 22 can prevent the steel rod sleeve 21 from swinging in the gap 11, so that the steel rod sleeve 21 can always keep a vertical state, and meanwhile, horizontal supporting force is provided for the steel rod sleeve 21, and stability is improved.
The steel rod sleeve 21 is provided with an opening 23 on one side facing the empty slot 13, a nut is arranged on the opening 23, the nut is in threaded connection with an adjusting bolt 24, and the adjusting bolt 24 passes through the opening 23 to be in contact with a steel pipe in the steel rod sleeve 21. Through the cooperation of the nut and the adjusting bolt 24, the adjusting bolt 24 passes through the opening 23 to be in contact with the steel pipe in the steel rod sleeve 21, so that the stability between the steel pipe and the joist 1 is further improved.
Both ends of each joist 1 are provided with connecting holes 12 for fixing with the scaffold boards. The preset connecting holes 12 are convenient for connecting and fixing the scaffold boards when the scaffold boards are paved later.
When the utility model is used, the fixing bolt 4 is loosened, the position of the sleeve 2 in the gap 11 is adjusted according to the interval between the construction steel pipes, the fixing bolt 4 is fixed again after the position is determined, and the sleeve 2 is prevented from displacement. The steel pipe is passed through the steel rod sleeve 21 and is reinforced by screwing an adjusting bolt 24 into a nut at the opening 23. The scaffold is installed by fixing the scaffold plates to the connection holes 12 at both ends of the joist 1. The worker can adjust the position on the scaffold board in real time through adjusting the fixing bolt 4 and the sleeve 2, and the operation is convenient.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail below, and that the embodiments described in the examples may be combined as appropriate to form other embodiments that will be apparent to those skilled in the art.

Claims (4)

1. Double-groove steel joist, including 2 symmetrical parallel joists (1), its characterized in that: a gap (11) is reserved between the 2 joists (1), a sleeve pipe sleeve (2) is adjustably mounted in the gap (11), empty slots (13) are formed in web positions of the joists (1), a plurality of fixing bolts (4) for preventing the sleeve pipe (2) from moving are arranged in the empty slots (13), and a fixing plate (3) is connected between the 2 joists (1).
2. A dual channel steel joist as claimed in claim 1, wherein: each sleeve (2) comprises a steel rod sleeve (21) for a steel pipe to pass through, limiting plates (22) are sleeved on the upper side and the lower side of the steel rod sleeve (21) exposed out of the gap (11), and 2 limiting plates (22) are contacted with the joist (1).
3. A dual channel steel joist as claimed in claim 2, wherein: one side of the steel rod sleeve (21) facing the empty groove (13) is provided with an opening (23), the opening (23) is provided with a nut, the nut is in threaded connection with an adjusting bolt (24), and the adjusting bolt (24) passes through the opening (23) to be in contact with a steel pipe in the steel rod sleeve (21).
4. A dual channel steel joist as claimed in claim 1, wherein: and connecting holes (12) for fixing the joist boards are formed at two ends of each joist (1).
CN202320951427.4U 2023-04-24 2023-04-24 Double-groove steel joist Active CN220014456U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320951427.4U CN220014456U (en) 2023-04-24 2023-04-24 Double-groove steel joist

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320951427.4U CN220014456U (en) 2023-04-24 2023-04-24 Double-groove steel joist

Publications (1)

Publication Number Publication Date
CN220014456U true CN220014456U (en) 2023-11-14

Family

ID=88674362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320951427.4U Active CN220014456U (en) 2023-04-24 2023-04-24 Double-groove steel joist

Country Status (1)

Country Link
CN (1) CN220014456U (en)

Similar Documents

Publication Publication Date Title
CN220014456U (en) Double-groove steel joist
CN112196156A (en) Unit curtain wall plate anti-drop hanging joint and construction method thereof
CN216640948U (en) Pre-buried subassembly of aluminum plate roofing
CN213389764U (en) Bridge junction reinforcing apparatus
CN211039922U (en) Track traffic combination formula gallows convenient to equipment
CN212644781U (en) Outer quick-witted base device of portable house air conditioner
CN216810248U (en) Quick-mounting type steel structure based on building
CN212957589U (en) Cantilever frame wall fixing base with adjustable equipment
CN220504183U (en) Connecting device for steel beam and special-shaped column of assembled steel structure house
CN218894267U (en) Construction node of steel structure outer enclosure wall comprehensive structure
CN220080325U (en) Adjustable beam column node structure
CN219528366U (en) Support structure for scaffold and channel steel combination
CN220393020U (en) Wall attaching structure of construction elevator for jump layer
CN219653945U (en) Steel beam installation auxiliary equipment
CN211849016U (en) Auxiliary device for bridge maintenance
CN219710388U (en) Subway platform frame beam prefabricated structure
CN219827984U (en) Hydropower installation engineering piping lane mount
CN218117185U (en) Wall connecting piece mechanism convenient to adjust and use
CN220798153U (en) Photovoltaic support
CN210238307U (en) Crossbeam die block fixing system with adjustable height in bridge construction
CN218564566U (en) double-C-shaped purline lower hanging pipeline mounting support and hanger device for steel structure roof
CN218233959U (en) Firm type furred ceiling fossil fragments block device for building decoration
CN216587851U (en) A support frame for installing removable company roof beam
CN220412551U (en) Construction elevator roofing attaches frame structure
CN220889139U (en) Indoor suspended ceiling construction system of building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant