CN220014004U - Cup rim steel column - Google Patents

Cup rim steel column Download PDF

Info

Publication number
CN220014004U
CN220014004U CN202321355241.9U CN202321355241U CN220014004U CN 220014004 U CN220014004 U CN 220014004U CN 202321355241 U CN202321355241 U CN 202321355241U CN 220014004 U CN220014004 U CN 220014004U
Authority
CN
China
Prior art keywords
connecting piece
column
piece
steel column
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321355241.9U
Other languages
Chinese (zh)
Inventor
俞浩
刘苏
张新贺
徐胜伟
季源
陈少晨
潘硕鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science And Industry Co ltd
Original Assignee
China Construction Science And Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Science And Industry Co ltd filed Critical China Construction Science And Industry Co ltd
Priority to CN202321355241.9U priority Critical patent/CN220014004U/en
Application granted granted Critical
Publication of CN220014004U publication Critical patent/CN220014004U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to the technical field of steel column installation assistance, in particular to a cup rim steel column. The utility model provides a cup rim steel column, which comprises: the connecting column, at least one first connecting piece, a second connecting piece and a fixed assembly. Wherein the first connecting piece is arranged on the connecting column; one end of the second connecting piece is suitable for being externally connected with a preset installation position, and the other end of the second connecting piece is connected with the first connecting piece; the fixed component is arranged between the first connecting piece and the second connecting piece and is suitable for fixedly connecting the first connecting piece and the second connecting piece. Installing a second connecting piece at a preset installation position, wherein the second connecting piece is connected with a first connecting piece installed on the connecting column, and the first connecting piece and the second connecting piece are fixed through a fixing assembly, so that the installation of the connecting column is realized; the installation of the connecting column at the preset installation position is realized by fixing the relative positions of the first connecting piece and the second connecting piece, and the device has the advantages of simplicity in installation and high installation efficiency.

Description

Cup rim steel column
Technical Field
The utility model relates to the technical field of steel column installation assistance, in particular to a cup rim steel column.
Background
In the steel construction factory building installation industry, often can involve hoisting the steel column into the preformed hole in the concrete foundation, the operation of alignment location is carried out to the steel column.
The preformed hole on the concrete is also called a cup mouth; the steel column is also called a cup steel column; wherein, the cross-sectional dimension of rim of a cup is greater than the cross-sectional dimension of steel column. And installing the steel column in the cup opening in an embedded manner through hoisting equipment, and then pouring concrete to finish the installation of the steel column at the cup opening.
In the installation process of the cup rim steel column, the cup rim steel column needs to be aligned so as to install the cup rim steel column in a manner of meeting the perpendicularity. In the alignment process, a steel column at the cup opening is generally lifted for lifting, then a measuring person cooperates with the steel column, and an installer commands a crane driver to perform alignment; and the cup rim steel column has large weight and long length, and the center of the cup rim steel column is difficult to be ensured not to deviate in the process of adjusting the cup rim steel column, so that the cup rim steel column is difficult to install and has low efficiency.
Disclosure of Invention
Therefore, the utility model aims to solve the technical problems that the prior art is high in mounting difficulty and low in efficiency of the steel column with the cup mouth, and provides the steel column with the cup mouth.
In order to solve the above problems, the present utility model provides a steel column for a cup mouth, comprising:
a connecting column;
at least one first connector disposed on the connection post;
one end of the second connecting piece is suitable for being externally connected with a preset installation position, and the other end of the second connecting piece is connected with the first connecting piece;
the fixing assembly is arranged between the first connecting piece and the second connecting piece and is suitable for fixedly connecting the first connecting piece and the second connecting piece.
Optionally, the first connecting piece is a first connecting plate, and the first connecting plate is fixedly installed on the connecting column.
Optionally, the first connecting plate is provided with a plurality of, and a plurality of first connecting plates are arranged on the periphery wall of the connecting column at intervals.
Optionally, the second connecting piece is a second connecting plate, one end of the second connecting plate is installed at the preset installation position, and the other end of the second connecting plate is connected with the first connecting plate.
Optionally, the second connecting plates are provided in plurality, and a plurality of the second connecting plates are provided in one-to-one correspondence with a plurality of the first connecting plates.
Optionally, the fixing assembly includes:
the first connecting hole is formed in the first connecting piece;
the second connecting hole is formed in the second connecting piece;
the first connecting hole is communicated with the second connecting hole.
Optionally, the fixing assembly further includes:
the fixing piece is arranged between the first connecting piece and the second connecting piece and is suitable for fixedly connecting the first connecting piece and the second connecting piece.
Alternatively, the fixing member may be a screw member threaded through the first and second connection holes.
Optionally, the first connecting piece protrudes from a surface of the preset installation position; and/or
The first connecting piece is perpendicular to the circumferential tangential direction of the connecting column.
Optionally, the surfaces of the first connecting piece and the second connecting piece are subjected to corrosion-resistant treatment.
The utility model has the following advantages:
1. the utility model provides a cup opening steel column, which comprises: the connecting column, at least one first connecting piece, a second connecting piece and a fixed assembly. Wherein the first connecting piece is arranged on the connecting column; one end of the second connecting piece is suitable for being externally connected with a preset installation position, and the other end of the second connecting piece is connected with the first connecting piece; the fixed component is arranged between the first connecting piece and the second connecting piece and is suitable for fixedly connecting the first connecting piece and the second connecting piece.
According to the cup rim steel column with the structure, the second connecting piece is arranged at the preset installation position, one end of the second connecting piece is embedded and arranged in the preset installation position, the other end of the second connecting piece is connected with the first connecting piece arranged on the connecting column, and the first connecting piece and the second connecting piece are fixed through the fixing assembly, so that the connecting column is installed; through this connected mode can realize the installation of spliced pole at preset mounted position through the relative position of fixed first connecting piece and second connecting piece, has the advantage that the installation is simple and the installation effectiveness is high.
2. The utility model provides a cup rim steel column, wherein a first connecting piece protrudes out of the surface of a preset installation position.
The rim of a cup steel column of this structure sets up the mounted position through the protrusion of first connecting piece in advance and can make things convenient for operating personnel to observe the mounted position of spliced pole to improve the installation effectiveness of spliced pole.
3. The utility model provides a cup rim steel column, wherein a first connecting piece is arranged in the circumferential tangential direction of a vertical connecting column.
The rim of a cup steel column of this structure sets up perpendicularly through first connecting piece and spliced pole and can conveniently carry out vertical positioning to the spliced pole to reduce the emergence of spliced pole slope.
4. The utility model provides a cup opening steel column, wherein the surfaces of a first connecting piece and a second connecting piece are subjected to corrosion prevention treatment.
According to the cup rim steel column with the structure, after the first connecting piece and the second connecting piece are fixed, concrete needs to be poured to fix the connecting column and the preset installation position, the connecting strength between the follow-up connecting column and the preset installation position can be improved through the first connecting piece and the second connecting piece after corrosion resistance treatment, and the follow-up maintenance cost is reduced.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings that are needed in the description of the embodiments or the prior art will be briefly described, and it is obvious that the drawings in the description below are some embodiments of the present utility model, and other drawings can be obtained according to the drawings without inventive effort for a person skilled in the art.
Fig. 1 is a schematic main structure diagram of a steel column with a cup opening according to an embodiment of the present utility model;
reference numerals illustrate:
1-a connecting column;
2-a first connector;
3-a second connector;
4-fixing assembly.
Detailed Description
The following description of the embodiments of the present utility model will be made apparent and fully in view of the accompanying drawings, in which some, but not all embodiments of the utility model are shown. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be noted that the directions or positional relationships indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present utility model. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art according to the specific circumstances.
In addition, the technical features of the different embodiments of the present utility model described below may be combined with each other as long as they do not collide with each other.
Examples
The embodiment provides a rim of a cup steel column, as shown in fig. 1, includes: a connection post 1, at least one first connector 2, a second connector 3 and a securing assembly 4. Wherein the first connecting piece 2 is arranged on the connecting column 1; one end of the second connecting piece 3 is suitable for being externally connected with a preset installation position, and the other end of the second connecting piece 3 is connected with the first connecting piece 2; the fixing assembly 4 is arranged between the first connector 2 and the second connector 3, and the fixing assembly 4 is adapted to fixedly connect the first connector 2 and the second connector 3.
According to the cup rim steel column with the structure, the second connecting piece 3 is arranged at the preset installation position, one end of the second connecting piece 3 is embedded and arranged in the preset installation position, the other end of the second connecting piece 3 is connected with the first connecting piece 2 arranged on the connecting column 1, and the first connecting piece 2 and the second connecting piece 3 are fixed through the fixing component 4, so that the connecting column 1 is installed; through this connected mode can realize the installation of spliced pole 1 at preset mounted position through the relative position of fixed first connecting piece 2 and second connecting piece 3, have the advantage that the installation is simple and the installation effectiveness is high.
As shown in fig. 1, in the present embodiment, the first connector 2 is a first connector plate fixedly mounted on the connection post 1. The first connecting plate is welded and installed on the connecting column 1, and the installation cost can be reduced by welding and connecting the first connecting plate and the connecting column 1; in other embodiments, the first connecting piece 2 and the connecting column 1 are integrally formed, and the connecting strength between the first connecting piece 2 and the connecting column 1 can be improved by processing the first connecting plate and the connecting column 1 by using an integral forming process; specifically, the connection manner between the first connecting piece 2 and the connecting column 1 is not limited, and only needs to be selected according to actual use requirements.
As shown in fig. 1, in the present embodiment, a plurality of first connection plates are provided, and a plurality of first connection plates are provided at intervals on the outer peripheral wall of the connection column 1. The four first connecting plates are arranged at intervals along the peripheral wall of the connecting column 1, and an included angle of 90 degrees is formed between two adjacent first connecting plates; in other embodiments, three first connecting plates are arranged at intervals along the peripheral wall of the connecting column 1, and an included angle of 120 degrees is formed between two adjacent first connecting plates; specifically, the number of the first connection plates is not limited, and the first connection plates can be selected according to actual use requirements.
As shown in fig. 1, in the present embodiment, the second connector 3 is a second connection board, one end of the second connection board is installed at a preset installation position, and the other end of the second connection board is connected to the first connection board. One end of the second connecting plate is poured on a preset installation position through concrete, and the other end of the second connecting plate is connected with the first connecting plate.
As shown in fig. 1, in the present embodiment, a plurality of second connection plates are provided, and the plurality of second connection plates are provided in one-to-one correspondence with the plurality of first connection plates. Four second connecting plates are arranged at intervals along the circumferential direction of a preset mounting position, and an included angle of 90 degrees is formed between two adjacent second connecting plates; in other embodiments, three second connecting plates are arranged at intervals along the circumferential direction of the preset mounting position, and an included angle of 120 degrees is formed between two adjacent second connecting plates; specifically, the number of the second connection plates to be mounted is not limited, and only the number of the second connection plates is guaranteed to be equal to the number of the first connection plates.
As shown in fig. 1, in the present embodiment, the fixing unit 4 includes: a first connection hole and a second connection hole; the first connecting hole is formed in the first connecting piece 2; the second connecting hole is formed in the second connecting piece 3; the first connecting hole and the second connecting hole are communicated. The first connecting hole is internally penetrated along the surface of the first connecting piece 2; the second connecting hole is internally penetrated along the surface of the second connecting piece 3; when the first connecting member 2 is connected with the second connecting member 3, the first connecting hole and the second connecting hole communicate.
As shown in fig. 1, in the present embodiment, the fixing assembly 4 further includes: the fixing piece is arranged between the first connecting piece 2 and the second connecting piece 3 and is suitable for fixedly connecting the first connecting piece 2 and the second connecting piece 3.
As shown in fig. 1, in the present embodiment, the fixing member may be a screw member that is threaded through the first and second connection holes. The screw member may be a bolt, and the bolt sequentially penetrates through the first connecting hole and the second connecting hole and then is in threaded connection with a matched nut, and the first connecting hole and the second connecting hole can be fixed through threaded connection of the bolt and the nut, so that the first connecting member 2 and the second connecting member 3 are fixed.
As shown in fig. 1, in the present embodiment, the first connecting member 2 is provided protruding from the surface of the preset mounting position; the installation position setting can be convenient for operating personnel to observe the installation position of spliced pole 1 in the protrusion of first connecting piece 2 to improve the installation effectiveness of spliced pole 1.
As shown in fig. 1, in the present embodiment, the first connecting member 2 is arranged perpendicularly to the circumferential tangential direction of the connecting column 1. The vertical arrangement of the first connector 2 and the connecting column 1 can facilitate vertical positioning of the connecting column 1, thereby reducing the occurrence of tilting of the connecting column 1.
As shown in fig. 1, in the present embodiment, the surfaces of the first connector 2 and the second connector 3 are subjected to corrosion-preventing treatment. The first connecting piece 2 and the second connecting piece 3 need to be poured with concrete after being fixed so as to fix the connecting column 1 and the preset installation position, and the connecting strength between the subsequent connecting column 1 and the preset installation position can be improved by the first connecting piece 2 and the second connecting piece 3 after corrosion protection treatment, so that the subsequent maintenance cost is reduced.
It is apparent that the above examples are given by way of illustration only and are not limiting of the embodiments. Other variations or modifications of the above teachings will be apparent to those of ordinary skill in the art. It is not necessary here nor is it exhaustive of all embodiments. While still being apparent from variations or modifications that may be made by those skilled in the art are within the scope of the utility model.

Claims (10)

1. A steel column for a cup opening, comprising:
a connecting column (1);
at least one first connection piece (2) arranged on the connection column (1);
one end of the second connecting piece (3) is suitable for being externally connected with a preset installation position, and the other end of the second connecting piece (3) is connected with the first connecting piece (2);
the fixing assembly (4), the fixing assembly (4) is arranged between the first connecting piece (2) and the second connecting piece (3), and the fixing assembly (4) is suitable for fixedly connecting the first connecting piece (2) and the second connecting piece (3).
2. A steel cup opening column according to claim 1, characterised in that the first connecting piece (2) is a first connecting plate fixedly mounted on the connecting column (1).
3. A steel cup opening column according to claim 2, characterized in that the first connecting plates are provided in plurality, and the first connecting plates are arranged on the peripheral wall of the connecting column (1) at intervals.
4. A steel column according to claim 2, characterized in that the second connecting piece (3) is a second connecting plate, one end of the second connecting plate is mounted at the preset mounting position, and the other end of the second connecting plate is connected with the first connecting plate.
5. A steel column according to claim 4, wherein a plurality of second connecting plates are provided, and a plurality of second connecting plates are provided in one-to-one correspondence with a plurality of first connecting plates.
6. A steel rim column according to any one of claims 1-5, wherein the fixing assembly (4) comprises:
the first connecting hole is formed in the first connecting piece (2);
the second connecting hole is formed in the second connecting piece (3);
the first connecting hole is communicated with the second connecting hole.
7. A steel cup opening column according to claim 6, characterized in that the fixing assembly (4) further comprises:
the fixing piece is arranged between the first connecting piece (2) and the second connecting piece (3), and is suitable for fixedly connecting the first connecting piece (2) and the second connecting piece (3).
8. A cup steel column according to claim 7, wherein said fixing member is a threaded member threaded through said first and second connection holes.
9. A steel column according to any one of claims 1-5, characterized in that said first connecting element (2) is arranged protruding from the surface of said preset mounting position; and/or
The first connecting piece (2) is arranged perpendicular to the circumferential tangential direction of the connecting column (1).
10. A steel column according to any one of claims 1-4, characterized in that the surfaces of the first (2) and second (3) connectors are subjected to a corrosion protection treatment.
CN202321355241.9U 2023-05-30 2023-05-30 Cup rim steel column Active CN220014004U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321355241.9U CN220014004U (en) 2023-05-30 2023-05-30 Cup rim steel column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321355241.9U CN220014004U (en) 2023-05-30 2023-05-30 Cup rim steel column

Publications (1)

Publication Number Publication Date
CN220014004U true CN220014004U (en) 2023-11-14

Family

ID=88671690

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321355241.9U Active CN220014004U (en) 2023-05-30 2023-05-30 Cup rim steel column

Country Status (1)

Country Link
CN (1) CN220014004U (en)

Similar Documents

Publication Publication Date Title
CN220014004U (en) Cup rim steel column
CN204983173U (en) Steel construction beam -column connection node
CN219345734U (en) Air pipe installation hanging bracket and installation structure
CN111636574A (en) Steel plate wall and steel frame beam combined construction method
CN210562826U (en) Prefabricated wallboard
CN209339363U (en) Prefabricated assembled energy-consuming shear wall-column horizontal connection structure
CN111591882A (en) Installation method of large crane beam
CN113293923A (en) Lifting point dislocation adjusting structure of keel and mounting method
CN219060361U (en) Assembled connected node
CN212805127U (en) Tool device for mounting electric hoist hung on high-rise building
CN215333770U (en) Curtain wall luminous character steel structure connecting adapter
CN219918330U (en) Novel bridge embedded connection structure
CN212799184U (en) Bidirectional car guide rail bracket
CN220705149U (en) Steel construction hangs mould
CN221346274U (en) Wall connecting structure of outer wall scaffold
CN216143441U (en) Connecting piece and antenna equipment assembly
CN220450871U (en) Device is pour to trade fagging area
CN219268444U (en) Pipeline overhead device suitable for steel structure bridge
CN219833697U (en) Embedded three-phase wall bushing assembly
CN216340298U (en) Rear embedded part for curtain wall system
CN212129732U (en) House stair assembly capable of being conveniently assembled
CN219550204U (en) Shock-resistant bracket connecting piece
CN211257338U (en) Ear seat type bearing attachment device
CN219690727U (en) Assembled building beam column connection structure
CN220909184U (en) Can have enough to meet need post-positioning steel sheet of supplementary PC wall body installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant