CN219971413U - Paying-off device for electric power construction - Google Patents

Paying-off device for electric power construction Download PDF

Info

Publication number
CN219971413U
CN219971413U CN202321022905.XU CN202321022905U CN219971413U CN 219971413 U CN219971413 U CN 219971413U CN 202321022905 U CN202321022905 U CN 202321022905U CN 219971413 U CN219971413 U CN 219971413U
Authority
CN
China
Prior art keywords
wall
gear
paying
pay
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321022905.XU
Other languages
Chinese (zh)
Inventor
崔振东
辛宝林
邵峰
廉恒智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Expressway Group Taiyuan Co ltd
Original Assignee
Shanxi Expressway Group Taiyuan Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Expressway Group Taiyuan Co ltd filed Critical Shanxi Expressway Group Taiyuan Co ltd
Priority to CN202321022905.XU priority Critical patent/CN219971413U/en
Application granted granted Critical
Publication of CN219971413U publication Critical patent/CN219971413U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a pay-off device for electric power construction, comprising: the paying-off device comprises a paying-off device body (1), wherein two groups of supporting ends (101) are arranged at the top of the paying-off device body; the top of the paying-off device body (1) is provided with two groups of electric lifting columns (5); the installation end (2), the inner wall of supporting terminal (101) runs through and installs installation end (2), remove end (201) is installed to the bottom of installation end (2), adjusting structure (3) are installed to the inner wall of pay-off body (1), the inner wall of pay-off body (1) is ann to change has moving structure (4), make the installation of outer wall pay-off roller can be more convenient through installing moving structure and adjusting structure, the installation effectiveness of pay-off roller has been strengthened, simultaneously make pay-off can carry out spacing to the cable of different models through installing adjusting mechanism, avoid it to produce friction with ground and lead to its outer epidermis to damage in the unwrapping wire in-process, make it carry out spacingly to the cable wire of different models, pay-off's practicality has been improved.

Description

Paying-off device for electric power construction
Technical Field
The utility model relates to the technical field of paying-off devices, in particular to a paying-off device for electric power construction.
Background
The electric power construction mainly lays the cable, carries the electric energy to the position of use through the cable, and during the electric power construction, the cable is usually transported to the job site in whole, need utilize pay-off to carry out paying-off operation to the cable at the job site, and need be applied to pay-off in order to improve the unwrapping wire efficiency of cable.
The existing paying-off device has the following defects:
patent document CN212608826U discloses a pay-off for electric power construction, and the claim of protection "includes the device support, the bottom of device support and the top fixed connection of base, the upper right fixedly connected with handle support of base, the top and the handle fixed connection of handle support, the left side of device support and the outer wall fixed connection of bearing, the inner wall and the right side fixed connection of pivot of bearing, the middle part fixedly connected with shelves pole of pivot, the left side swing joint of shelves pole has hydraulic drive, hydraulic drive's left side swing joint has the nut, the nut is threaded connection with the pivot. This a pay-off for electric power construction can adjust the distance between two fan-shaped baffles through hydraulic drive device for this pay-off can adapt to most electric wire commodity in the market, makes the workman no longer hand the electric wire at the in-process of unwrapping wire, labour saving and time saving more.
However, the paying-off device for electric power construction in the above publication mainly considers that the paying-off device can adapt to most electric wire commodities in the market, so that workers do not carry wires in the paying-off process, time and labor are saved more, the fact that the cables are heavy due to coiling is not considered, the paying-off roller can be installed off the ground mostly by adopting hoisting machinery outside the traditional paying-off device, and therefore the paying-off roller is inconvenient to install, and the problem that the installation efficiency of the paying-off roller is affected easily is solved.
Therefore, it is necessary to develop a structure capable of facilitating installation of the paying-off roller, and further, installation of the paying-off roller on the outer wall is more convenient, installation efficiency of the paying-off roller is improved, and practicality of the paying-off device is improved.
Disclosure of Invention
The utility model aims to provide a paying-off device for electric power construction, which aims to solve the technical problem that a paying-off roller on a traditional paying-off device provided in the background art is inconvenient to install.
In order to achieve the above purpose, the present utility model provides the following technical solutions: a pay-off device for electric power construction, comprising:
the pay-off device comprises a pay-off device body, wherein two groups of support ends are arranged at the top of the pay-off device body;
the top of the paying-off device body is provided with two groups of electric lifting columns;
the inner wall of supporting terminal runs through and installs the installation end, the mobile terminal is installed to the bottom of installation end, the inner wall movable run-through of supporting terminal installs first threaded rod, and the one end of first threaded rod installs to the inner wall of mobile terminal and meshes with it, the inner wall of pay-off body is installed and is adjusted the structure, first gear is installed to the bottom of first threaded rod, and first gear is located to the inner wall of adjusting the structure, the inner wall movable mounting who adjusts the structure has the bull stick, the outer wall of bull stick encircles and installs two sets of second gears, and the second gear meshes with first gear, the outer wall of bull stick encircles and installs a gear, the first motor is installed to the interior wall of adjusting the structure, the output of first motor is installed No. two gears, and No. two gears mesh with a gear, the inner wall of pay-off body is installed to the inner wall movable mounting of two sets of threaded sleeves, the outer wall of threaded sleeves encircles and installs gear No. one fixed end, the inner wall motor of moving the structure installs two sets of second gears, the outer wall of second gear is installed through the outer wall of second threaded rod, no. two sets of threaded sleeves, the outer wall of threaded sleeve is installed with the outer wall of second threaded body, and the outer wall of threaded body is installed through the second threaded rod is mutually meshed with the outer wall of second threaded rod.
Preferably, the inner wall of the mounting end is penetrated and movably provided with a rotating shaft.
Preferably, a mounting structure is mounted at the top of the electric lifting column, and a first rotating column is movably mounted on the outer wall of the mounting structure.
Preferably, the inner wall of the mounting structure is provided with a groove body.
Preferably, the inner wall movable mounting of cell body has the movable block, and the outer wall movable mounting of movable block has the second column that rotates, and the inner wall movable mounting of cell body has two sets of lead screws, and the lead screw runs through in the interior table of movable block and meshes with it.
Preferably, an adjusting mechanism is mounted on the inner wall of the mounting structure.
Preferably, a motor is installed to the interior bottom wall of adjustment mechanism, no. three gears are installed to the output of a motor, no. three gears's outer wall is around installing the chain, no. four gears are installed to the bottom of lead screw, and No. four gears are located adjustment mechanism's inner wall, and No. four gears's outer wall is around installing the chain.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the outer wall paying-off roller can be more conveniently installed through the installation of the moving structure and the adjusting structure, the second motor is started, the output end of the second motor drives the threaded sleeve to rotate through the gear II and the gear I meshed with the gear II, the threaded sleeve rotates to enable the second threaded rod which is installed on the inner wall of the threaded sleeve to move, the second threaded rod drives the plate body to move to the outside of the paying-off device through the fixed end, one end of the second threaded rod is contacted with the ground through the fixed end after the plate body is completely moved to the outside of the paying-off device, so that the outer wall paying-off roller can roll onto the paying-off device through the plate body, the first motor is started, the output end of the first motor drives the rotary rod to rotate through the gear II and the gear I meshed with the gear I, the rotary rod rotates to drive the first threaded rod to rotate through the second gear I, the first threaded rod rotates to enable the moving end to move, and the installation end drives the rotary shaft to move along with the movement of the moving end, so that the paying-off device can adjust the position of the rotary shaft, and the paying-off roller can be installed on the paying-off device, so that the outer wall paying-off roller can be more convenient to install after the paying-off device, the paying-off roller is completed, the paying-off device can be more convenient, and practical;
2. according to the utility model, the adjusting mechanism is arranged to limit cables of different types, meanwhile, the outer surface of the paying-off device is prevented from being damaged due to friction with the ground in the paying-off process, the first rotating column and the second rotating column are arranged to limit the cables in paying-off, the electric lifting column is arranged to enable the electric lifting column to adjust the heights of the cables and the ground through the mounting structure, so that the cables can be prevented from sagging to contact with the ground to generate friction, the normal use of the cables is prevented from being influenced due to the damage of the outer surface of the cables, the first motor is started, the output end of the first motor drives the chain to move through the third gear, the chain moves to drive the screw rod to rotate through the fourth gear, the screw rod rotates to enable the moving block meshed with the screw rod to move on the inner wall of the groove body, and the moving block drives the second rotating column to move, so that the spacing between the first rotating column and the second rotating column can be adjusted, the cables of different types can be limited, and the practicability of the paying-off device is improved.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic diagram of a mobile structure according to the present utility model;
FIG. 3 is a schematic diagram of an adjustment structure of the present utility model;
FIG. 4 is a schematic view of an adjustment mechanism of the present utility model;
FIG. 5 is a schematic diagram of a tank structure according to the present utility model.
In the figure: 1. a pay-off body; 101. a support end; 102. a rotating shaft; 2. a mounting end; 201. a moving end; 202. a first threaded rod; 203. a first gear; 3. an adjustment structure; 301. a rotating rod; 302. a second gear; 303. a first gear; 304. a first motor; 305. a second gear; 4. a moving structure; 401. a threaded sleeve; 402. gear number one; 403. a second motor; 404. gear II; 405. a second threaded rod; 406. a fixed end; 407. a plate body; 5. an electric lifting column; 501. a mounting structure; 502. a first rotating column; 6. a tank body; 601. a moving block; 602. a second rotating column; 603. a screw rod; 7. an adjusting mechanism; 701. a fourth gear; 702. a chain; 703. a motor I; 704. and a third gear.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be noted that the directions or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific direction, be configured and operated in the specific direction, and thus should not be construed as limiting the present utility model. Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "provided," "connected," and the like are to be construed broadly, and may be fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
Referring to fig. 1, an paying-off device for electric power construction includes: the pay-off body 1, two sets of supporting ends 101 are installed at the top of pay-off body 1, electric lifting column 5, two sets of electric lifting column 5 are installed at the top of pay-off body 1, and movable mounting has pivot 102 in running through of the inner wall of installation end 2, and pay-off body 1 is the pay-off that is used for electric power construction, and pay-off body 1 installs the wire unwinding roller through supporting ends 101, installation end 2 and pivot 102.
Referring to fig. 1, 2 and 3, the mounting end 2 is mounted on the inner wall of the supporting end 101, the mounting end 2 is mounted on the bottom of the mounting end 2, the moving end 201 is mounted on the inner wall of the supporting end 101, the first threaded rod 202 is movably mounted on the inner wall of the moving end 201, one end of the first threaded rod 202 is mounted on and meshed with the inner wall of the moving end 201, the regulating structure 3 is mounted on the inner wall of the paying-off device body 1, the first gear 203 is mounted on the bottom end of the first threaded rod 202, the first gear 203 is located on the inner wall of the regulating structure 3, the rotating rod 301 is movably mounted on the inner wall of the regulating structure 3, two groups of second gears 302 are mounted on the outer wall of the rotating rod 301 in a surrounding manner, the second gears 302 are meshed with the first gear 203, the first gear 303 is mounted on the outer wall of the rotating rod 301 in a surrounding manner, the first motor 304 is mounted on the inner bottom wall of the regulating structure 3, the second gear 305 is mounted on the output end of the first motor 304, the second gear 305 is meshed with the first gear 303, the inner wall of the pay-off device body 1 is provided with a moving structure 4, the inner wall of the moving structure 4 is movably provided with two groups of threaded sleeves 401, the outer wall of the threaded sleeve 401 is provided with a first gear 402 in a surrounding manner, the inner wall of the moving structure 4 is provided with two groups of second motors 403, the output end of each second motor 403 is provided with a second gear 404, the second gear 404 is meshed with the first gear 402, the inner wall of the threaded sleeve 401 is provided with a second threaded rod 405 in a penetrating and meshing manner, the inner wall of the pay-off device body 1 is provided with a fixed end 406, one end of the second threaded rod 405 is connected with the outer wall of the fixed end 406 through a connecting end, the outer wall of the fixed end 406 is movably provided with a plate 407, the second motor 403 is started, the output end of the second motor 403 drives the threaded sleeve 401 to rotate through the second gear 404 and the first gear 402 meshed with the second motor, the second threaded rod 405 which is arranged in an engaged manner on the inner wall of the threaded sleeve 401 is rotated, the second threaded rod 405 moves to drive the plate body 407 to move to the outside of the paying-off device through the fixed end 406, one end of the second threaded rod 405 is contacted with the ground through the fixed end 406 after the plate body 407 completely moves to the outside of the paying-off device, so that an external paying-off roller can roll onto the paying-off device through the plate body 407, the first motor 304 is started, the output end of the first motor 304 drives the rotating rod 301 to rotate through the second gear 305 and the first gear 203, the rotating rod 301 drives the first threaded rod 202 to rotate through the second gear 302 and the first gear 203, the moving end 201 is driven to move along with the movement of the moving end 201, the rotating shaft 102 is driven to move through the mounting end 2, the paying-off device can adjust the position of the rotating shaft 102, and the paying-off roller can be lifted after the paying-off device is mounted, the mounting efficiency of the paying-off roller on the outer wall paying-off roller can be more convenient, and the practicability of the paying-off device is improved.
Referring to fig. 1, 4 and 5, a mounting structure 501 is mounted on the top of an electric lifting column 5, a first rotating column 502 is movably mounted on the outer wall of the mounting structure 501, a groove 6 is arranged on the inner wall of the mounting structure 501, a moving block 601 is movably mounted on the inner wall of the groove 6, a second rotating column 602 is movably mounted on the outer wall of the moving block 601, two groups of screw rods 603 are movably mounted on the inner wall of the groove 6, the screw rods 603 penetrate through the inner surface of the moving block 601 and are meshed with the inner surface, an adjusting mechanism 7 is mounted on the inner wall of the mounting structure 501, a first motor 703 is mounted on the inner bottom wall of the adjusting mechanism 7, a third gear 704 is mounted on the output end of the first motor 703, a chain 702 is mounted around the outer wall of the third gear 704, a fourth gear 701 is mounted on the bottom end of the screw rod 603, the fourth gear 701 is positioned on the inner wall of the adjusting mechanism 7, a chain 702 is mounted around the outer wall of the fourth gear 701, the installation of first pivoted post 502 and second pivoted post 602 is used for spacing the cable conductor when the unwrapping wire, the installation of electronic elevating column 5 makes it can be through the height of mounting structure 501 adjustment cable conductor and ground, can prevent like this that the cable conductor from sagging and ground contact from producing friction, avoid the cable conductor epidermis damage and influence the normal use of cable conductor, motor 703 starts, its output drives chain 702 through No. three gears 704 and removes, chain 702 removes and drives the lead screw 603 through No. four gears 701 and rotate, the lead screw 603 rotates the movable block 601 that makes engaged with it in the inner wall removal of cell body 6, the removal of movable block 601 drives the second pivoted post 602 and removes, can adjust the interval between first pivoted post 502 and the second pivoted post 602 like this, make it can spacing the cable conductor of different models, pay-off's practicality has been improved.
The working principle is that the paying-off device body 1 is a paying-off device for electric power construction, the paying-off device body 1 is provided with paying-off rollers through a supporting end 101, a mounting end 2 and a rotating shaft 102, a second motor 403 is started, an output end of the paying-off device body is driven to rotate by a gear number two 404 and a gear number one 402 meshed with the paying-off rollers, the threaded sleeve 401 rotates to enable a second threaded rod 405 arranged on the inner wall of the paying-off device to be meshed with the threaded sleeve to move, the second threaded rod 405 moves to drive a plate body 407 to move to the outside of the paying-off device through a fixed end 406, one end of the second threaded rod 405 contacts with the ground through the fixed end 406 after the plate body 407 is completely moved to the outside of the paying-off device, so that the outside paying-off rollers can roll onto the paying-off device through the plate body 407, the first motor 304 is started, and the output end of the second motor 305 is driven to rotate by a gear number two 305 and a gear number one 303 meshed with the first motor 301, the rotation of the rotating rod 301 drives the first threaded rod 202 to rotate through the second gear 302 and the first gear 203, the first threaded rod 202 rotates to enable the moving end 201 to move, the rotating shaft 102 is driven to move through the mounting end 2 along with the movement of the moving end 201, so that the paying-off device can adjust the position of the rotating shaft 102, and further the paying-off roller can be lifted after being mounted on the paying-off device, the mounting of the paying-off roller on the outer wall can be more convenient, the mounting efficiency of the paying-off roller is enhanced, the practicability of the paying-off device is improved, the mounting of the first rotating column 502 and the second rotating column 602 is used for limiting a cable during paying-off, the mounting of the electric lifting column 5 enables the electric lifting column to adjust the height of the cable and the ground through the mounting structure 501, so that the cable sagging and the ground contact can be prevented from generating friction, the cable skin damage to the cable is avoided to influence the normal use of the cable, the motor 703 is started, the output end of the paying-off device drives the chain 702 to move through the gear No. 704, the chain 702 moves to drive the screw rod 603 to rotate through the gear No. 701, the screw rod 603 rotates to enable the moving block 601 meshed with the screw rod 603 to move on the inner wall of the groove body 6, the moving block 601 moves to drive the second rotating column 602, and therefore the distance between the first rotating column 502 and the second rotating column 602 can be adjusted, cables of different types can be limited, and practicality of the paying-off device is improved.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. A pay-off device for electric power construction, comprising:
the paying-off device comprises a paying-off device body (1), wherein two groups of supporting ends (101) are arranged at the top of the paying-off device body (1);
the electric lifting columns (5) are arranged at the top of the paying-off device body (1), and two groups of electric lifting columns (5) are arranged at the top of the paying-off device body;
the installation end (2), the inner wall of supporting end (101) runs through and installs installation end (2), movable end (201) is installed to the bottom of installation end (2), the inner wall activity of supporting end (101) runs through and installs first threaded rod (202), and the inner wall of movable end (201) is installed to one end of first threaded rod (202) and meshes with it, adjusting structure (3) are installed to the inner wall of pay-off body (1), first gear (203) are installed to the bottom of first threaded rod (202), and first gear (203) are located the inner wall to adjusting structure (3), the inner wall movable mounting of adjusting structure (3) has bull stick (301), the outer wall of bull stick (301) encircles and installs two sets of second gears (302), and second gear (302) meshes with first gear (203), the outer wall of bull stick (301) encircles and installs first gear (303), first motor (304) are installed to the inner wall of adjusting structure (3), first motor (3) output end installs first gear (203), and second gear (305) are installed to the inner wall of second motor (3), and the inner wall of two sets of movable sleeve (4) are installed to change the inner wall (401) and move the sleeve structure (4), the outer wall of screw sleeve (401) encircles and installs first (402) of gear, two sets of second motors (403) are installed to the inner wall of mobile structure (4), gear No. two (404) are installed to the output of second motor (403), and gear No. two (404) and first (402) of gear mesh mutually, the inner wall of screw sleeve (401) runs through the meshing and installs second threaded rod (405), stiff end (406) are installed to the inner wall of pay-off body (1), and the one end of second threaded rod (405) links to each other with the outer wall of stiff end (406) through the link, and the outer wall movable mounting of stiff end (406) has plate body (407).
2. A pay-off device for electric power construction according to claim 1, characterized in that: the inner wall of the mounting end (2) is penetrated and movably provided with a rotating shaft (102).
3. A pay-off device for electric power construction according to claim 1, characterized in that: the electric lifting column is characterized in that a mounting structure (501) is mounted at the top of the electric lifting column (5), and a first rotating column (502) is movably mounted on the outer wall of the mounting structure (501).
4. A pay-off device for electric power construction according to claim 3, wherein: the inner wall of the mounting structure (501) is provided with a groove body (6).
5. A pay-off device for electric power construction as claimed in claim 4, wherein: the inner wall movable mounting of cell body (6) has movable block (601), and the outer wall movable mounting of movable block (601) has second pivoted post (602), and the inner wall movable mounting of cell body (6) has two sets of lead screws (603), and lead screws (603) run through in the interior table of movable block (601) and mesh with it.
6. A pay-off device for electric power construction according to claim 3, wherein: an adjusting mechanism (7) is mounted on the inner wall of the mounting structure (501).
7. The pay-off device for electric power construction according to claim 6, wherein: the motor (703) is installed to the interior bottom wall of adjustment mechanism (7), no. three gear (704) are installed to the output of motor (703), no. three gear (704) outer wall is around installing chain (702), and No. four gear (701) are installed to the bottom of lead screw (603), and No. four gear (701) are located the inner wall of adjustment mechanism (7), and No. four gear (701) outer wall is around installing chain (702).
CN202321022905.XU 2023-05-04 2023-05-04 Paying-off device for electric power construction Active CN219971413U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321022905.XU CN219971413U (en) 2023-05-04 2023-05-04 Paying-off device for electric power construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321022905.XU CN219971413U (en) 2023-05-04 2023-05-04 Paying-off device for electric power construction

Publications (1)

Publication Number Publication Date
CN219971413U true CN219971413U (en) 2023-11-07

Family

ID=88594871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321022905.XU Active CN219971413U (en) 2023-05-04 2023-05-04 Paying-off device for electric power construction

Country Status (1)

Country Link
CN (1) CN219971413U (en)

Similar Documents

Publication Publication Date Title
CN206685199U (en) A kind of industrial cable winding cutting integrated apparatus
CN210744603U (en) Cable erecting device for electromechanical installation
CN213833971U (en) Cable winding equipment for power industry
CN219971413U (en) Paying-off device for electric power construction
CN113788358A (en) Cable pay-off for electric power construction
CN215817259U (en) Cable laying device with corner turning function
CN216471581U (en) Can prevent pay-off is used in installation of moving line
CN212822334U (en) Bending device for iron tower grounding down lead
CN215107087U (en) Curtain installation device for assembly type building
CN214087055U (en) Power cable pay-off device
CN209980867U (en) Cable marking device
CN211790443U (en) Building indoor wiring auxiliary device
CN210685317U (en) Construction platform for building
CN216583599U (en) Cable laying device for power engineering
CN214255544U (en) Be used for electric power design cable support
CN218715216U (en) Concrete placement construction prevents discrete device
CN214958360U (en) Wiring device with adjusting function for construction
CN219918224U (en) Portable cable insulation electric stripping and cutting device
CN216390300U (en) Cable traction machine with adjustable traction height
CN219959820U (en) Mounting bracket for distribution box
CN220072827U (en) Continuous fine-drawing production equipment for resistance wire
CN218619881U (en) Hoisting tool for maintaining wind driven generator
CN114920076B (en) Dedicated cable winding equipment is erect in construction of electric power transmission cable
CN217201856U (en) Building engineering material lifting machine
CN220107407U (en) Portable cable device that electric power installation was used

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant