CN219952620U - Scaffold for building installation - Google Patents
Scaffold for building installation Download PDFInfo
- Publication number
- CN219952620U CN219952620U CN202321499750.9U CN202321499750U CN219952620U CN 219952620 U CN219952620 U CN 219952620U CN 202321499750 U CN202321499750 U CN 202321499750U CN 219952620 U CN219952620 U CN 219952620U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- building installation
- fixed connection
- wall
- connecting plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims abstract description 38
- 230000007246 mechanism Effects 0.000 claims abstract description 35
- 230000008878 coupling Effects 0.000 claims description 8
- 238000010168 coupling process Methods 0.000 claims description 8
- 238000005859 coupling reaction Methods 0.000 claims description 8
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 229920002994 synthetic fiber Polymers 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model relates to the technical field of constructional engineering and discloses a scaffold for building installation, which comprises a main body mechanism, a fixing mechanism and a connecting mechanism, wherein the fixing mechanism is positioned at the left end of the main body mechanism, the connecting mechanism is positioned at the rear end of the main body mechanism, the main body mechanism comprises a movable roller, a mounting plate, a supporting rod, a connecting plate, an arc plate, a screwing stud and a workbench, the inner wall of the mounting plate is fixedly connected with the front end and the rear end of the movable roller, the lower end of the supporting rod is fixedly connected with the upper end of the mounting plate, the connecting plate is slidably connected with the outer ring of the supporting rod, the inner wall of the arc plate is contacted with the upper end of the connecting plate, the screwing stud is in threaded connection with the upper end of the arc plate, the lower end of the screwing stud is contacted with the upper end of the connecting plate, and the front end of the workbench is fixedly connected with the rear end of the arc plate.
Description
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to a scaffold for building installation.
Background
The scaffold is a variety of supports erected for workers to operate and solve the problems of vertical and horizontal transportation at construction sites, and is used in places where external walls, interior decoration or high floors cannot be directly constructed, and the construction materials are usually bamboo, wood, steel pipes or synthetic materials.
In order to ensure personal safety of workers, a welding mode is generally adopted when the scaffold is assembled, and the scaffold is relatively large in size, relatively integral in structure, inconvenient to detach and install and relatively troublesome in carrying.
Disclosure of Invention
(one) solving the technical problems
The utility model aims to provide a scaffold for building installation, which solves the problem that the prior art is inconvenient to disassemble and install.
(II) technical scheme
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a scaffold frame for building installation, includes main part mechanism, fixed establishment and coupling mechanism, fixed establishment is located main part mechanism's left end, coupling mechanism is located main part mechanism's rear end, main part mechanism is including removing gyro wheel, mounting panel, bracing piece, connecting plate, arc, screw double-screw bolt and workstation, the inner wall fixed connection of mounting panel is at the front and back both ends of removing the gyro wheel, the lower extreme fixed connection of bracing piece is in the upper end of mounting panel, connecting plate sliding connection is at the outer lane of bracing piece, the inner wall of arc and the upper end contact of connecting plate, screw double-screw bolt threaded connection is in the upper end of arc, the lower extreme of screw bolt and the upper end contact of connecting plate, the front end fixed connection of workstation is at the rear end of arc, and this scaffold frame for building installation through the structure of removing the gyro wheel, the convenience that this scaffold frame for building installation removed when in fact.
Preferably, the fixed establishment includes first fixed block, dead lever, sleeve, spacing groove, stopper, movable column, unable adjustment base, horizontal pole and second fixed block, the inner wall fixed connection of first fixed block is in the outer lane of bracing piece, the right-hand member fixed connection of dead lever is in the left end of first fixed block, and this scaffold for building installation, through the structure of dead lever, the stability of this scaffold for building installation structure of being convenient for when in-service use.
Preferably, the right end fixed connection of telescopic right-hand member is at the left end of dead lever, the fixed seting up in telescopic middle part of spacing groove, this scaffold frame for building installation, through the structure of spacing groove, the fixed of movable column position when in-service use is used to this scaffold frame for building installation of being convenient for.
Preferably, the stopper sliding connection is in the middle part of spacing groove, movable column sliding connection is in telescopic middle part, the inner wall of movable column and the outer lane contact of stopper, unable adjustment base's upper end fixed connection is in the lower extreme of movable column, and this scaffold frame for building installation, through the structure of stopper, the convenience of dismantling when in-service use of this scaffold frame for building installation of being convenient for.
Preferably, the left end fixed connection of horizontal pole is at telescopic right-hand member, the left end fixed connection of second fixed block is at the right-hand member of horizontal pole, the inner wall fixed connection of second fixed block is at the outer lane of bracing piece, and this scaffold frame for building installation, through the structure of second fixed block, the convenience of this scaffold frame for building installation connection when in-service use of being convenient for.
Preferably, the coupling mechanism is including connecting base, dwang, rotor plate and connecting rod, the front end fixed connection of connecting the base is at the rear end of bracing piece, the dwang rotates the middle part of connecting the base, the inner wall of rotor plate and the outer lane contact of dwang, the front end fixed connection of connecting rod is at the rear end of rotor plate, this scaffold frame for building installation, through the structure of dwang, the convenience of this scaffold frame for building installation angle adjustment of being convenient for when in-service use.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the scaffold for building installation, the convenience of moving the scaffold for building installation in actual use is facilitated through the structure of the movable roller, and the stability of the structure of the scaffold for building installation in actual use is facilitated through the structure of the inclined rod, so that the convenience of moving the scaffold for building installation in actual use is greatly improved;
2. according to the scaffold for building installation, through the structure of the limiting groove, the position of the movable column of the scaffold for building installation is fixed in actual use, and through the structure of the limiting block, the convenience of disassembling the scaffold for building installation in actual use is facilitated, and the convenience of disassembling the scaffold for building installation in actual use is greatly improved;
3. this scaffold frame for building installation, through the structure of second fixed block, the convenience of this scaffold frame for building installation connection when in-service use of being convenient for, through the structure of dwang, the convenience of this scaffold frame for building installation angle modulation when in-service use of being convenient for, great improvement the stability of this scaffold frame for building installation structure when in-service use.
Drawings
FIG. 1 is a schematic perspective view of the present utility model;
FIG. 2 is a schematic top view of the present utility model;
FIG. 3 is a schematic diagram of the front structure of the present utility model;
fig. 4 is a right-side schematic view of the present utility model.
In the figure: 1. a main body mechanism; 101. moving the roller; 102. a mounting plate; 103. a support rod; 104. a connecting plate; 105. an arc-shaped plate; 106. screwing the stud; 107. a work table; 2. a fixing mechanism; 201. a first fixed block; 202. a diagonal rod; 203. a sleeve; 204. a limit groove; 205. a limiting block; 206. a movable column; 207. a fixed base; 208. a cross bar; 209. a second fixed block; 3. a connecting mechanism; 301. the base is connected; 302. a rotating lever; 303. a rotating plate; 304. and (5) connecting a rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, the present utility model provides a technical solution: the utility model provides a scaffold frame for building installation, including main body mechanism 1, fixed establishment 2 and coupling mechanism 3, fixed establishment 2 is located the left end of main body mechanism 1, coupling mechanism 3 is located the rear end of main body mechanism 1, main body mechanism 1 includes moving roller 101, mounting panel 102, bracing piece 103, connecting plate 104, arc 105, screw double-screw bolt 106 and workstation 107, the inner wall fixed connection of mounting panel 102 is at the front and back both ends of moving roller 101, the lower extreme fixed connection of bracing piece 103 is in the upper end of mounting panel 102, connecting plate 104 sliding connection is at the outer lane of bracing piece 103, the inner wall of arc 105 and the upper end contact of connecting plate 104, screw double-screw bolt 106 threaded connection is in the upper end of arc 105, screw double-screw bolt 106's lower extreme and the upper end contact of connecting plate 104, the front end fixed connection of workstation 107 is at the rear end of arc 105.
The fixing mechanism 2 comprises a first fixing block 201, an inclined rod 202, a sleeve 203, a limiting groove 204, a limiting block 205, a movable column 206, a fixing base 207, a cross rod 208 and a second fixing block 209, wherein the inner wall of the first fixing block 201 is fixedly connected to the outer ring of the supporting rod 103, the right end of the inclined rod 202 is fixedly connected to the left end of the first fixing block 201, the right end of the sleeve 203 is fixedly connected to the left end of the inclined rod 202, the limiting groove 204 is fixedly arranged in the middle of the sleeve 203, the limiting block 205 is slidably connected to the middle of the limiting groove 204, the movable column 206 is slidably connected to the middle of the sleeve 203, the inner wall of the movable column 206 is in contact with the outer ring of the limiting block 205, the upper end of the fixing base 207 is fixedly connected to the lower end of the movable column 206, the left end of the cross rod 208 is fixedly connected to the right end of the sleeve 203, the left end of the second fixing block 209 is fixedly connected to the right end of the cross rod 208, and the inner wall of the second fixing block 209 is fixedly connected to the outer ring of the supporting rod 103.
The connecting mechanism 3 comprises a connecting base 301, a rotating rod 302, a rotating plate 303 and a connecting rod 304, wherein the front end of the connecting base 301 is fixedly connected with the rear end of the supporting rod 103, the rotating rod 302 is rotatably connected with the middle part of the connecting base 301, the inner wall of the rotating plate 303 is contacted with the outer ring of the rotating rod 302, and the front end of the connecting rod 304 is fixedly connected with the rear end of the rotating plate 303.
Working principle: when the scaffold for building installation needs to be used, the connecting plate 104 is sleeved on the outer ring of the supporting rod 103 and is fixed through screws, the workbench 107 is placed on the connecting plate 104 through the arc plate 105, the screw bolt 106 is rotated to fix the positions of the workbench 107 and the connecting plate 104, the workbench 107 is prevented from sliding during operation of workers, the limiting block 205 is pressed inwards, the rear end of the limiting block 205 is provided with a spring, the limiting block 205 is separated from the limiting groove 204 due to shrinkage of the spring under the action of force, the fixing base 207 is placed on the ground conveniently, the limiting block 205 is clamped into the limiting groove 204 again, meanwhile, the connecting rod 304 with the rotating plate 303 and the connecting base 301 are aligned through holes, the rotating rod 302 can be inserted into the holes to transversely fix the supporting rod 103, so that the safety and reliability of the scaffold are improved, and after the scaffold is used, the rotating rod 302 is pulled out, and the screw bolt 106 is screwed tightly, so that quick disassembly can be realized.
Finally, it should be noted that the above description is only for illustrating the technical solution of the present utility model, and not for limiting the scope of the present utility model, and that the simple modification and equivalent substitution of the technical solution of the present utility model can be made by those skilled in the art without departing from the spirit and scope of the technical solution of the present utility model.
Claims (6)
1. Scaffold frame for building installation, including main part mechanism (1), fixed establishment (2) and coupling mechanism (3), its characterized in that: the utility model discloses a fixing mechanism (2) is located the left end of main part mechanism (1), coupling mechanism (3) are located the rear end of main part mechanism (1), main part mechanism (1) is including removing gyro wheel (101), mounting panel (102), bracing piece (103), connecting plate (104), arc (105), screw double-screw bolt (106) and workstation (107), the inner wall fixed connection of mounting panel (102) is at the front and back both ends of removing gyro wheel (101), the lower extreme fixed connection of bracing piece (103) is at the upper end of mounting panel (102), connecting plate (104) sliding connection is at the outer lane of bracing piece (103), the inner wall of arc (105) and the upper end contact of connecting plate (104), screw double-screw bolt (106) threaded connection is at the upper end of arc (105), the lower extreme of screw bolt (106) and the upper end contact of connecting plate (104), the front end fixed connection of workstation (107) is at the rear end of arc (105).
2. A scaffold for building installation according to claim 1, wherein: the fixing mechanism (2) comprises a first fixing block (201), an inclined rod (202), a sleeve (203), a limiting groove (204), a limiting block (205), a movable column (206), a fixing base (207), a cross rod (208) and a second fixing block (209), wherein the inner wall of the first fixing block (201) is fixedly connected to the outer ring of the supporting rod (103), and the right end of the inclined rod (202) is fixedly connected to the left end of the first fixing block (201).
3. A scaffold for building installation according to claim 2, wherein: the right end of the sleeve (203) is fixedly connected to the left end of the inclined rod (202), and the limiting groove (204) is fixedly formed in the middle of the sleeve (203).
4. A scaffold for building installation according to claim 3, wherein: the limiting block (205) is slidably connected to the middle of the limiting groove (204), the movable column (206) is slidably connected to the middle of the sleeve (203), the inner wall of the movable column (206) is in contact with the outer ring of the limiting block (205), and the upper end of the fixed base (207) is fixedly connected to the lower end of the movable column (206).
5. The scaffold for building installation according to claim 4, wherein: the left end fixed connection of horizontal pole (208) is at the right-hand member of sleeve (203), the left end fixed connection of second fixed block (209) is at the right-hand member of horizontal pole (208), the inner wall fixed connection of second fixed block (209) is at the outer lane of bracing piece (103).
6. The scaffold for building installation according to claim 5, wherein: coupling mechanism (3) are including connecting base (301), dwang (302), pivoted panel (303) and connecting rod (304), the front end fixed connection of connecting base (301) is at the rear end of bracing piece (103), dwang (302) rotate the middle part of connecting base (301) to be connected, the inner wall of pivoted panel (303) and the outer lane contact of pivoted panel (302), the front end fixed connection of connecting rod (304) is at the rear end of pivoted panel (303).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321499750.9U CN219952620U (en) | 2023-06-13 | 2023-06-13 | Scaffold for building installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321499750.9U CN219952620U (en) | 2023-06-13 | 2023-06-13 | Scaffold for building installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219952620U true CN219952620U (en) | 2023-11-03 |
Family
ID=88546582
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321499750.9U Active CN219952620U (en) | 2023-06-13 | 2023-06-13 | Scaffold for building installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219952620U (en) |
-
2023
- 2023-06-13 CN CN202321499750.9U patent/CN219952620U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211541002U (en) | Assembly jig is used in processing of large-scale steel construction | |
CN202338111U (en) | Special supporting frame for building template | |
CN219952620U (en) | Scaffold for building installation | |
CN216974154U (en) | Plate buckle frame support | |
CN217151174U (en) | Construction is with convenient to detach's supplementary installation device of scaffold frame | |
CN214696764U (en) | Flower basket type overhanging scaffold | |
CN213509505U (en) | A remove handling frame for building engineering | |
CN214006440U (en) | Extensible scaffold platform is assisted in engineering construction | |
CN213979829U (en) | Scaffold frame capable of being rapidly disassembled and assembled and scaffold | |
CN216840809U (en) | Floor type construction engineering scaffold capable of adjusting size of top plate | |
CN212802717U (en) | Support device for building templates | |
CN206477567U (en) | Movable building engineering construction builder's jack device | |
CN220348255U (en) | Fixed bolster for building engineering | |
CN213509041U (en) | Building wall board connecting device | |
CN220267193U (en) | Scaffold for building construction | |
CN204546696U (en) | Multifunctional saw stool | |
CN215717047U (en) | Portable building engineering scaffold | |
CN215631449U (en) | A high strength construction support for civil engineering building uses | |
CN216360877U (en) | Scaffold frame that building engineering was set up with being convenient for fast | |
CN212613600U (en) | Scaffold for building engineering | |
CN218779973U (en) | Half grout sleeve clamping device | |
CN220336514U (en) | Building construction safety device | |
CN211473296U (en) | Portable fitment platform frame | |
CN216641379U (en) | Scaffold diagonal bracing structure | |
CN220814865U (en) | Outer frame wall connecting piece connecting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |