CN219952598U - Gate type steel pipe scaffold - Google Patents

Gate type steel pipe scaffold Download PDF

Info

Publication number
CN219952598U
CN219952598U CN202321159181.3U CN202321159181U CN219952598U CN 219952598 U CN219952598 U CN 219952598U CN 202321159181 U CN202321159181 U CN 202321159181U CN 219952598 U CN219952598 U CN 219952598U
Authority
CN
China
Prior art keywords
plate
support plate
steel pipe
bracket
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321159181.3U
Other languages
Chinese (zh)
Inventor
张熙
文梦杰
盛清
王育强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Construction Third Construction Group Second Construction Engineering Co.,Ltd.
Original Assignee
Anhui Sanjian Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Sanjian Engineering Co Ltd filed Critical Anhui Sanjian Engineering Co Ltd
Priority to CN202321159181.3U priority Critical patent/CN219952598U/en
Application granted granted Critical
Publication of CN219952598U publication Critical patent/CN219952598U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

本实用新型公开了一种门式钢管脚手架,包括:竖架,其顶端设有支撑板,所述支撑板上开设有取料口;载物板,其四角栓接有绳索,所述绳索通过卷绳辊进行收放;其中,所述载物板的尺寸与取料口适配设置,所述载物板于取料口正下方竖向移动,用于将物料传送至取料口处;本实用新型中,通过将带动载物板竖向移动的卷绳辊安装于支撑板底部,能够实现将物料快速的传递至脚手架上,且不侵占支撑板上的空间,同时能够避免脚手架重心偏移的问题,提高了安全性,且载物板在未进行物料传送时,可与取料口配合,填补支撑板上的缺口,避免给站在支撑板上的工作人员带来安全隐患的问题。

The utility model discloses a door-type steel pipe scaffolding, which includes: a vertical frame, a support plate is provided at the top, and a material intake port is provided on the support plate; a load-bearing plate has ropes bolted to its four corners, and the ropes pass through The rope-winding roller is retracted and unfolded; wherein, the size of the load-carrying plate is adapted to the material-taking port, and the load-carrying plate moves vertically directly below the material-taking port for transferring materials to the material-taking port; In this utility model, by installing the rope roller that drives the vertical movement of the load plate at the bottom of the support plate, materials can be quickly transferred to the scaffold without occupying the space on the support plate, and at the same time, the center of gravity of the scaffold can be avoided. The problem of shifting is improved, and the safety is improved. When the material is not transferred, the loading plate can cooperate with the material intake port to fill the gap on the support plate and avoid potential safety hazards to the staff standing on the support plate. .

Description

一种门式钢管脚手架A kind of portal steel pipe scaffolding

技术领域Technical field

本实用新型涉及脚手架技术领域,尤其涉及一种门式钢管脚手架。The utility model relates to the technical field of scaffolding, in particular to a portal steel pipe scaffolding.

背景技术Background technique

脚手架是为了保证施工过程顺利进行而搭设的工作平台,具体指建筑工地上用在外墙、内部装修或层高较高无法直接施工处的各种支架。Scaffolding is a working platform erected to ensure the smooth progress of the construction process. It specifically refers to various supports used on construction sites for exterior walls, interior decoration, or in places where direct construction cannot be carried out due to high floor heights.

目前脚手架为了方便将地面的物料输送至脚手架上,有些通过在脚手架一侧添加升降结构,有些在脚手架中心位置添加升降结构,前者若要传送较重物料时,容易导致脚手架的重心偏移的问题,后者的升降结构一般安装于支撑板上,但是会侵占支撑板的空间,影响工作人员于支撑板上移动工作。At present, in order to facilitate the transportation of materials on the ground to the scaffold, some scaffolds add a lifting structure to one side of the scaffold, and some add a lifting structure to the center of the scaffold. When the former wants to transport heavier materials, it is easy to cause the center of gravity of the scaffold to shift. , the latter's lifting structure is generally installed on the support plate, but it will occupy the space of the support plate and affect the movement of workers on the support plate.

实用新型内容Utility model content

本实用新型的主要目的在于提供一种门式钢管脚手架,旨在解决现有的技术问题。The main purpose of this utility model is to provide a portal steel pipe scaffolding, aiming to solve the existing technical problems.

为实现上述目的,本实用新型提供了一种门式钢管脚手架,包括:In order to achieve the above purpose, the utility model provides a portal steel pipe scaffolding, which includes:

竖架,其顶端设有支撑板,所述支撑板上开设有取料口;The vertical frame has a support plate at its top, and a material discharging port is provided on the support plate;

载物板,其四角栓接有绳索,所述绳索通过卷绳辊进行收放;The load board has ropes bolted to its four corners, and the ropes are retracted and unwound through rope rollers;

其中,所述载物板的尺寸与取料口适配设置,所述载物板于取料口正下方竖向移动,用于将物料传送至取料口处。Wherein, the size of the load-carrying plate is adapted to the material-taking port, and the load-carrying plate moves vertically directly below the material-picking port for transferring materials to the material-picking port.

进一步地,位于同侧的绳索与同一卷绳辊连接,所述卷绳辊安装于支架上,所述支架于支撑板底面滑动设置,且所述支架通过气缸控制移动。Further, the ropes located on the same side are connected to the same rope-winding roller. The rope-winding roller is installed on a bracket. The bracket is slidably installed on the bottom surface of the support plate, and the bracket moves controlled by a cylinder.

进一步地,所述载物板底面设有一体成型的弧形凸面,所述弧形凸面的厚度与载物板的厚度相同,所述支撑板底面靠近取料口处设有对称分布的抬杆,所述抬杆可水平转动设置,当绳索收缩至极限状态时,所述抬杆转动与弧形凸面接触,将载物板向上抬升进入至物料口中。Furthermore, the bottom surface of the load-carrying plate is provided with an integrally formed arc-shaped convex surface, the thickness of the arc-shaped convex surface is the same as the thickness of the load-carrying plate, and the bottom surface of the support plate is provided with symmetrically distributed lifting rods near the material intake port. , the lifting rod can be rotated horizontally. When the rope shrinks to the limit state, the lifting rod rotates and contacts the arc-shaped convex surface, lifting the load plate upward into the material port.

进一步地,所述支架上设有安装架,所述安装架上设有导料斜板,所述导料斜板的出料端水平位置与载物板下移的极限位置平齐。Further, the bracket is provided with an installation frame, and the installation frame is provided with a material guide inclined plate. The horizontal position of the discharge end of the material guide inclined plate is flush with the limit position of the downward movement of the load plate.

进一步地,所述支撑板顶面四角设有竖杆,其中三处相邻竖杆之间通过防护板连接,另一处相邻竖杆之间通过栏杆连接,所述栏杆一端与竖杆铰接,另一端与相邻的竖杆卡接。Further, vertical poles are provided at the four corners of the top surface of the support plate. Three adjacent vertical poles are connected by protective plates, and another adjacent vertical pole is connected by a railing. One end of the railing is hinged to the vertical pole. , the other end is clamped with the adjacent vertical rod.

进一步地,其中一个防护板上开设有条形口,所述条形口内设有可滑动的托架,所述托架上设有托板,用于放置工具箱。Further, a strip-shaped opening is provided on one of the protective plates, and a sliding bracket is provided in the strip-shaped opening, and a supporting plate is provided on the bracket for placing the tool box.

本实用新型的有益效果体现在:The beneficial effects of this utility model are reflected in:

本实用新型中,通过将带动载物板竖向移动的卷绳辊安装于支撑板底部,能够实现将物料快速的传递至脚手架上,且不侵占支撑板上的空间,同时能够避免脚手架重心偏移的问题,提高了安全性,且载物板在未进行物料传送时,可与取料口配合,填补支撑板上的缺口,避免给站在支撑板上的工作人员带来安全隐患的问题。In this utility model, by installing the rope roller that drives the vertical movement of the load plate at the bottom of the support plate, materials can be quickly transferred to the scaffold without occupying the space on the support plate, and at the same time, the center of gravity of the scaffold can be avoided. The problem of shifting is improved, and the safety is improved. When the material is not transferred, the loading plate can cooperate with the material intake port to fill the gap on the support plate and avoid potential safety hazards to the staff standing on the support plate. .

附图说明Description of the drawings

图1为本实用新型结构示意图;Figure 1 is a schematic structural diagram of the utility model;

图2为本实用新型图1结构仰视示意图;Figure 2 is a schematic bottom view of the structure of Figure 1 of the present utility model;

图3为本实用新型载物板结构连接示意图;Figure 3 is a schematic diagram of the structural connection of the load plate of the present invention;

图4为本实用新型图1中A处结构放大示意图。Figure 4 is an enlarged schematic diagram of the structure at point A in Figure 1 of the present invention.

附图标记说明:Explanation of reference symbols:

100、竖架;101、支撑板;102、取料口;103、支架;104、卷绳辊;105、绳索;106、电机;107、载物板;108、气缸;109、抬杆;110、弧形凸面;200、导料斜板;201、安装架;300、竖杆;301、防护板;302、栏杆;303、条形口;304、托架;305、托板。100. Vertical frame; 101. Support plate; 102. Feed opening; 103. Bracket; 104. Rope roller; 105. Rope; 106. Motor; 107. Loading plate; 108. Cylinder; 109. Lift rod; 110 , Arc convex surface; 200, guide inclined plate; 201, mounting frame; 300, vertical rod; 301, protective plate; 302, railing; 303, strip opening; 304, bracket; 305, supporting plate.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型的一部分实施例,而不是全部的实施例。在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only some of the embodiments of the present utility model, not all of them. Example. The embodiments and features in the embodiments in this application may be combined with each other without conflict. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without making creative efforts fall within the scope of protection of the present utility model.

需要说明,若本实用新型实施例中有涉及方向性指示(诸如上、下、左、右、前、后……),则该方向性指示仅用于解释在某一特定姿态(如附图所示)下各部件之间的相对位置关系、运动情况等,如果该特定姿态发生改变时,则该方向性指示也相应地随之改变。It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back...), then the directional indications are only used to explain the position of a certain posture (as shown in the accompanying drawings). (shown) relative positional relationship, movement, etc. between the components. If the specific posture changes, the directional indication will also change accordingly.

另外,若本实用新型实施例中有涉及“第一”、“第二”等的描述,则该“第一”、“第二”等的描述仅用于描述目的,而不能理解为指示或暗示其相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括至少一个该特征。另外,全文中出现的“和/或”的含义,包括三个并列的方案,以“A和/或B”为例,包括A方案、或B方案、或A和B同时满足的方案。另外,“多个”指两个以上。另外,各个实施例之间的技术方案可以相互结合,但是必须是以本领域普通技术人员能够实现为基础,当技术方案的结合出现相互矛盾或无法实现时应当认为这种技术方案的结合不存在。In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only for descriptive purposes and cannot be understood as instructions or instructions. implying its relative importance or implicitly specifying the quantity of the technical feature indicated. Therefore, features defined as "first" and "second" may explicitly or implicitly include at least one of these features. In addition, the meaning of "and/or" appearing in the entire text includes three parallel solutions. Taking "A and/or B" as an example, it includes solution A, or solution B, or a solution that satisfies both A and B at the same time. In addition, "plurality" means two or more. In addition, the technical solutions in various embodiments can be combined with each other, but it must be based on the realization by those of ordinary skill in the art. When the combination of technical solutions is contradictory or cannot be realized, it should be considered that such a combination of technical solutions does not exist. .

请参阅图1和2,本实用新型一种门式钢管脚手架,包括:Please refer to Figures 1 and 2. This utility model is a portal steel pipe scaffolding, including:

竖架100,其顶端设有支撑板101,支撑板101上开设有取料口102;The vertical frame 100 has a support plate 101 at its top, and a material intake port 102 is provided on the support plate 101;

载物板107,其四角栓接有绳索105,绳索105通过卷绳辊104进行收放;其中,卷绳辊104通过电机106驱动;The four corners of the loading plate 107 are bolted with ropes 105, and the ropes 105 are retracted and unwound through the rope roller 104; wherein the rope roller 104 is driven by the motor 106;

其中,载物板107的尺寸与取料口102适配设置,载物板107于取料口102正下方竖向移动,用于将物料传送至取料口102处。The size of the loading plate 107 is adapted to the material intake port 102 . The loading plate 107 moves vertically directly below the material intake port 102 for transferring materials to the material intake port 102 .

本申请通过将带动载物板107竖向移动的卷绳辊104安装于支撑板101底部,能够实现将物料快速的传递至脚手架上,且不侵占支撑板101上的空间,同时能够避免脚手架重心偏移的问题,提高了安全性。In this application, by installing the rope roller 104 that drives the load plate 107 to move vertically at the bottom of the support plate 101, materials can be quickly transferred to the scaffold without occupying the space on the support plate 101, and at the same time, the center of gravity of the scaffold can be avoided. Offset issues improve safety.

在一实施例中,请参阅图2和图3,位于同侧的绳索105与同一卷绳辊104连接,卷绳辊104安装于支架103上,支架103于支撑板101底面滑动设置,且支架103通过气缸108控制移动。这样设置,当载物板107被提升至接近取料口102后且绳索105未收缩完全时,可通过气缸108将支架103向外侧拉动,使得载物板107能够更加靠近取料口102,便于工作人员拿取处于载物板107上的物料。In one embodiment, please refer to Figures 2 and 3. The rope 105 on the same side is connected to the same rope roller 104. The rope roller 104 is installed on the bracket 103. The bracket 103 is slidably disposed on the bottom of the support plate 101, and the bracket 103 controls movement via cylinder 108. With this arrangement, when the loading plate 107 is lifted close to the material pickup port 102 and the rope 105 is not completely retracted, the bracket 103 can be pulled outward through the cylinder 108 so that the loading board 107 can be closer to the material pickup port 102 for convenience. The staff takes the materials on the loading plate 107.

在一实施例中,请参阅图3,载物板107底面设有一体成型的弧形凸面110,弧形凸面110的厚度与载物板107的厚度相同,支撑板101底面靠近取料口102处设有对称分布的抬杆109,抬杆109可水平转动设置,当绳索105收缩至极限状态时,抬杆109转动与弧形凸面110接触,将载物板107向上抬升进入至物料口中。其中,抬杆109通过转动电机控制转动;这样设置,在未进行物料传送时,将载物板107通过绳索105上升至极限位置后,通过转动两侧的抬杆109,使得抬杆109端部逐渐与弧形凸面110接触,将载物板107向上顶推至取料口102处,直至使得载物板107顶面与支撑板101顶面平齐,填补支撑板101上的缺口,避免给站在支撑板101上的工作人员带来安全隐患的问题。In one embodiment, please refer to FIG. 3 , the bottom surface of the loading plate 107 is provided with an integrally formed arc-shaped convex surface 110 , the thickness of the arc-shaped convex surface 110 is the same as the thickness of the loading plate 107 , and the bottom surface of the supporting plate 101 is close to the material inlet 102 There are symmetrically distributed lifting rods 109. The lifting rods 109 can be rotated horizontally. When the rope 105 contracts to the limit state, the lifting rods 109 rotate and contact the arc-shaped convex surface 110, lifting the load plate 107 upward into the material port. Among them, the lifting rod 109 is controlled to rotate by a rotating motor; in this way, when the material is not being transferred, after the loading plate 107 is raised to the extreme position through the rope 105, the lifting rods 109 on both sides are rotated so that the end of the lifting rod 109 Gradually come into contact with the arc-shaped convex surface 110, push the loading plate 107 upward to the material intake port 102, until the top surface of the loading plate 107 is flush with the top surface of the supporting plate 101, fill the gap on the supporting plate 101, and avoid feeding Workers standing on the support plate 101 pose safety hazards.

在一实施例中,请参阅图1和图2,支架103上设有安装架201,安装架201上设有导料斜板200,导料斜板200的出料端水平位置与载物板107下移的极限位置平齐。这样设置,工作人员在放置待传送的物料时,可于脚手架一侧将物料放置于导料斜板200上,通过导料斜板200将物料传送至载物板107上,需要注意的是,载物板107四周设有一体成型的挡边;工作人员则不用进入至脚手架下方放置物料,避免造成操作受限,进出不便的问题,为工作人员提供了便捷功能。In one embodiment, please refer to Figures 1 and 2. The bracket 103 is provided with a mounting frame 201. The mounting frame 201 is provided with a material guide ramp 200. The horizontal position of the discharge end of the material guide ramp 200 is in line with the loading plate. The limit position of 107 downward movement is even. With this arrangement, when placing materials to be transported, workers can place the materials on the material guide ramp 200 on one side of the scaffold, and transfer the materials to the loading plate 107 through the material guide ramp 200. It should be noted that, There are integrated ribs around the loading plate 107; workers do not need to go under the scaffolding to place materials, which avoids problems of restricted operation and inconvenient entry and exit, and provides convenient functions for workers.

在一实施例中,请参阅图1,支撑板101顶面四角设有竖杆300,其中三处相邻竖杆300之间通过防护板301连接,另一处相邻竖杆300之间通过栏杆302连接,栏杆302一端与竖杆300铰接,另一端与相邻的竖杆300卡接。这样设置,防护板301能够为在支撑板101上的工作人员提供保护功能,避免工作人员在脚手架上移动时出现掉落的问题,提高了安全性。In one embodiment, please refer to Figure 1. Vertical poles 300 are provided at four corners of the top surface of the support plate 101. Three adjacent vertical poles 300 are connected by a protective plate 301, and another adjacent vertical pole 300 is connected by a protective plate 301. The railing 302 is connected, one end of the railing 302 is hinged with the vertical pole 300, and the other end is snap-connected with the adjacent vertical pole 300. With this arrangement, the protective plate 301 can provide a protective function for the workers on the support plate 101, avoid the problem of workers falling when moving on the scaffold, and improve safety.

在一实施例中,请参阅图4,其中一个防护板301上开设有条形口303,条形口303内设有可滑动的托架304,托架304上设有托板305,用于放置工具箱。这样设置,工作人员可将随身携带的工具箱放置于托板305上,使用时可根据实际需要移动托架304,将其移动至合适的位置,方便工作人员便捷的拿取需要的工具,提高了便捷性。In one embodiment, please refer to Figure 4, one of the protective plates 301 is provided with a strip opening 303, a sliding bracket 304 is provided in the strip opening 303, and a bracket 305 is provided on the bracket 304 for Place the toolbox. With this arrangement, the staff can place the toolbox they carry with them on the pallet 305. During use, the bracket 304 can be moved to a suitable position according to actual needs, so that the staff can conveniently take the required tools and improve the efficiency. for convenience.

以上仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above are only preferred embodiments of the present utility model and are not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model shall be included in the present utility model. Within the scope of new protection.

Claims (6)

1.一种门式钢管脚手架,其特征在于,包括:1. A portal steel pipe scaffolding, characterized by including: 竖架(100),其顶端设有支撑板(101),所述支撑板(101)上开设有取料口(102);The vertical frame (100) is provided with a support plate (101) at the top, and a material discharging port (102) is provided on the support plate (101); 载物板(107),其四角栓接有绳索(105),所述绳索(105)通过卷绳辊(104)进行收放;The load plate (107) has ropes (105) bolted to its four corners, and the ropes (105) are retracted and unwound through the rope roller (104); 其中,所述载物板(107)的尺寸与取料口(102)适配设置,所述载物板(107)于取料口(102)正下方竖向移动,用于将物料传送至取料口(102)处。Among them, the size of the loading plate (107) is adapted to the material intake port (102). The loading plate (107) moves vertically directly below the material intake port (102) for transferring materials to The material intake port (102). 2.如权利要求1所述的一种门式钢管脚手架,其特征在于:位于同侧的绳索(105)与同一卷绳辊(104)连接,所述卷绳辊(104)安装于支架(103)上,所述支架(103)于支撑板(101)底面滑动设置,且所述支架(103)通过气缸(108)控制移动。2. A portal type steel pipe scaffolding according to claim 1, characterized in that: the rope (105) located on the same side is connected to the same rope roller (104), and the rope roller (104) is installed on the bracket (104). 103), the bracket (103) is slidably installed on the bottom surface of the support plate (101), and the bracket (103) is controlled to move by the air cylinder (108). 3.如权利要求1或2所述的一种门式钢管脚手架,其特征在于:所述载物板(107)底面设有一体成型的弧形凸面(110),所述弧形凸面(110)的厚度与载物板(107)的厚度相同,所述支撑板(101)底面靠近取料口(102)处设有对称分布的抬杆(109),所述抬杆(109)可水平转动设置,当绳索(105)收缩至极限状态时,所述抬杆(109)转动与弧形凸面(110)接触,将载物板(107)向上抬升进入至物料口中。3. A door-type steel pipe scaffolding according to claim 1 or 2, characterized in that: the bottom surface of the load plate (107) is provided with an integrally formed arc-shaped convex surface (110), and the arc-shaped convex surface (110) ) is the same as the thickness of the loading plate (107). The bottom surface of the support plate (101) is provided with symmetrically distributed lifting rods (109) near the material intake port (102). The lifting rods (109) can be horizontally Rotation setting, when the rope (105) contracts to the extreme state, the lifting rod (109) rotates and contacts the arc-shaped convex surface (110), and lifts the loading plate (107) upward into the material port. 4.如权利要求2所述的一种门式钢管脚手架,其特征在于:所述支架(103)上设有安装架(201),所述安装架(201)上设有导料斜板(200),所述导料斜板(200)的出料端水平位置与载物板(107)下移的极限位置平齐。4. A portal steel pipe scaffolding as claimed in claim 2, characterized in that: the bracket (103) is provided with a mounting frame (201), and the mounting frame (201) is provided with a material guide inclined plate ( 200), the horizontal position of the discharge end of the material guide inclined plate (200) is flush with the downward limit position of the load plate (107). 5.如权利要求1所述的一种门式钢管脚手架,其特征在于:所述支撑板(101)顶面四角设有竖杆(300),其中三处相邻竖杆(300)之间通过防护板(301)连接,另一处相邻竖杆(300)之间通过栏杆(302)连接,所述栏杆(302)一端与竖杆(300)铰接,另一端与相邻的竖杆(300)卡接。5. A portal type steel pipe scaffolding as claimed in claim 1, characterized in that vertical poles (300) are provided at four corners of the top surface of the support plate (101), and there are three adjacent vertical poles (300) between them. It is connected by a protective plate (301), and another adjacent vertical pole (300) is connected by a railing (302). One end of the railing (302) is hinged with the vertical pole (300), and the other end is connected with the adjacent vertical pole. (300) card connection. 6.如权利要求5所述的一种门式钢管脚手架,其特征在于:其中一个防护板(301)上开设有条形口(303),所述条形口(303)内设有可滑动的托架(304),所述托架(304)上设有托板(305),用于放置工具箱。6. A door-type steel pipe scaffolding as claimed in claim 5, characterized in that: one of the protective plates (301) is provided with a strip-shaped opening (303), and the strip-shaped opening (303) is provided with a sliding The bracket (304) is provided with a supporting plate (305) for placing the tool box.
CN202321159181.3U 2023-05-12 2023-05-12 Gate type steel pipe scaffold Active CN219952598U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321159181.3U CN219952598U (en) 2023-05-12 2023-05-12 Gate type steel pipe scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321159181.3U CN219952598U (en) 2023-05-12 2023-05-12 Gate type steel pipe scaffold

Publications (1)

Publication Number Publication Date
CN219952598U true CN219952598U (en) 2023-11-03

Family

ID=88549491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321159181.3U Active CN219952598U (en) 2023-05-12 2023-05-12 Gate type steel pipe scaffold

Country Status (1)

Country Link
CN (1) CN219952598U (en)

Similar Documents

Publication Publication Date Title
US20110147329A1 (en) Load transportation system
CN118498678A (en) Climbing system and climbing method of construction integrated platform
CN219952598U (en) Gate type steel pipe scaffold
CN107720493A (en) Architectural engineering cargo lift quick discharging method and car
CN107814299A (en) Construction discharging platform fast construction method and car of quickly unloading
CN114955496A (en) Work bin operating system
CN218860210U (en) Lifting equipment for conveying
CN217397739U (en) Work bin operating system
CN118855278A (en) Building demolition operation platform and operation method thereof
CN219864156U (en) A kind of unloading platform
CN109941922B (en) Upturning device
CN114408768A (en) A lifting machine for mechanical engineering
CN111776978A (en) A portable brick lifting machine
CN220281426U (en) A material transport vehicle
CN222348592U (en) A construction material hoist
CN222360988U (en) Material conveying vehicle for constructional engineering
CN218491362U (en) Assembled building externally-hung wallboard lifting device
CN220683919U (en) A feeding machine
CN217051531U (en) A lifting bucket that is convenient for discharging materials
CN223343661U (en) Construction carries on frame is built in room
CN221739696U (en) Gantry lifting bracket
CN214696962U (en) Construction is with platform of unloading
CN220667002U (en) Material discharge apparatus in building flat bed
CN221739786U (en) A construction loading machine
CN219365479U (en) Portable hoist and mount mounting platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 230001 no.329 Wuhu Road, Hefei City, Anhui Province

Patentee after: Anhui Construction Engineering Third Construction Group Co.,Ltd.

Country or region after: China

Address before: 230001 no.329 Wuhu Road, Hefei City, Anhui Province

Patentee before: ANHUI SANJIAN ENGINEERING Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20241108

Address after: 230000 third floor, shop S1, wenyimingyufu, Cuizhu Road, Taohua Town, Feixi County, Hefei City, Anhui Province

Patentee after: Anhui Sanjian Luxi Engineering Co.,Ltd.

Country or region after: China

Address before: 230001 no.329 Wuhu Road, Hefei City, Anhui Province

Patentee before: Anhui Construction Engineering Third Construction Group Co.,Ltd.

Country or region before: China

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 230000 third floor, shop S1, wenyimingyufu, Cuizhu Road, Taohua Town, Feixi County, Hefei City, Anhui Province

Patentee after: Anhui Construction Third Construction Group Second Construction Engineering Co.,Ltd.

Country or region after: China

Address before: 230000 third floor, shop S1, wenyimingyufu, Cuizhu Road, Taohua Town, Feixi County, Hefei City, Anhui Province

Patentee before: Anhui Sanjian Luxi Engineering Co.,Ltd.

Country or region before: China