CN219951947U - Tubular pile construction guide frame - Google Patents

Tubular pile construction guide frame Download PDF

Info

Publication number
CN219951947U
CN219951947U CN202321291354.7U CN202321291354U CN219951947U CN 219951947 U CN219951947 U CN 219951947U CN 202321291354 U CN202321291354 U CN 202321291354U CN 219951947 U CN219951947 U CN 219951947U
Authority
CN
China
Prior art keywords
beams
guide frame
guide
sliding
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321291354.7U
Other languages
Chinese (zh)
Inventor
叶斌
刘烈春
胡德明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Chemical Engineering No7 Construction Co ltd
Original Assignee
China National Chemical Engineering No7 Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Chemical Engineering No7 Construction Co ltd filed Critical China National Chemical Engineering No7 Construction Co ltd
Priority to CN202321291354.7U priority Critical patent/CN219951947U/en
Application granted granted Critical
Publication of CN219951947U publication Critical patent/CN219951947U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model belongs to the technical field of pipe pile construction equipment, in particular to a pipe pile construction guide frame, which comprises two front beams, wherein rear beams are arranged on the rear sides of the front beams, left cross beams are fixedly arranged on the sides, adjacent to the rear beams, of the front beams, right cross beams are fixedly arranged on the sides, adjacent to the rear beams, of the front beams, the right cross beams are positioned on the right sides of the left cross beams, two front vertical beams are fixedly arranged on the sides, adjacent to the two front beams, of the two rear beams, and two rear vertical beams are fixedly arranged on the sides, adjacent to the two rear beams; a guide mechanism is arranged between the left cross beam and the right cross beam. The guide mechanism is reasonable in design, the purpose of more stably guiding and positioning the tubular pile can be achieved through the guide mechanism, the guide frame can be moved back and forth through the pushing mechanism and the sliding mechanism, the purpose of conveniently adjusting the guide frame can be achieved, the purpose of accurately adjusting the position of the guide frame can be achieved, and the purpose of improving the construction efficiency can be achieved.

Description

Tubular pile construction guide frame
Technical Field
The utility model relates to the technical field of pipe pile construction equipment, in particular to a pipe pile construction guide frame.
Background
The tubular pile has the advantages of high bearing capacity, strong transverse force resistance, high design flexibility, easy pile length adjustment and the like, and is widely applied to port engineering, building bridges and underwater engineering.
At present, the chinese patent bulletin of publication No. CN 216041166U-kind steel pipe pile construction leading truck relates to building engineering technical field, and the on-line screen storage device comprises a base, the upper surface of base be equipped with the mounting bracket, the top left and right sides of mounting bracket be equipped with 2 sharp spouts along the trend of mounting bracket respectively, sharp spout sliding connection have sliding support, be equipped with first guiding mechanism between sliding support, the top of mounting bracket open, the below of mounting bracket is equipped with the supporting legs, the upper surface welding of supporting legs and base, base and first guiding mechanism relative department reserve the preformed hole that is used for passing steel pipe pile or pile foundation pile casing, the both sides of preformed hole, and be located the upper surface of base still be equipped with second guiding mechanism, first guiding mechanism and second guiding mechanism cooperation use. The utility model discloses can effectively solve the great problem of stake position error.
In practical use, the problem that the guide frame body is huge, and if the guide frame is not positioned accurately enough after installation, the guide frame needs to be moved and adjusted again, so that great trouble is brought to construction, time and labor are wasted and flexible adjustment is not achieved is found, and therefore the pipe pile construction guide frame is used for solving the problem.
Disclosure of Invention
The utility model aims to solve the problems that the prior art has huge size, and the guide frame needs to be moved and adjusted again if the guide frame is positioned inaccurately after installation, so that great trouble is brought to construction, and the problems of time and labor waste and incapability of flexible adjustment exist.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
the pipe pile construction guide frame comprises two front beams, wherein rear beams are arranged on the rear sides of the front beams, left beams are fixedly arranged on the sides, adjacent to the rear beams, of the front beams, right beams are fixedly arranged on the sides, adjacent to the rear beams, of the front beams, the right beams are positioned on the right sides of the left beams, two front vertical beams are fixedly arranged on the sides, adjacent to the two front beams, of the front beams, and two rear vertical beams are fixedly arranged on the sides, adjacent to the two rear beams; a guiding mechanism is arranged between the left cross beam and the right cross beam, the same protective box is fixedly arranged on the left side of the two front beams, a motor is fixedly arranged on the inner wall of the front side of the protective box, and pushing mechanisms are arranged on the two left cross beams.
Preferably, the guiding mechanism comprises a guiding frame, a guiding seat, a guiding shaft and guiding wheels, wherein the guiding frame is arranged between the left beam and the right beam, the guiding seats are fixedly arranged on the inner walls of the two sides of the guiding frame, the guiding shafts are rotatably arranged on the guiding seats, the guiding wheels are arranged on the guiding shafts, the guiding wheels are matched with the tubular piles, and a sliding mechanism is arranged between the guiding frame and the right beam.
Preferably, the sliding mechanism comprises a second sliding block, a sliding rod and a second sliding groove, the right side of the guide frame is provided with the second sliding block, the right cross beam is provided with the second sliding groove, the inner wall of the front side of the second sliding groove and the inner wall of the rear side of the second sliding groove are fixedly provided with the same sliding rod, and the second sliding block is in sliding connection with the second sliding groove.
Preferably, a sliding hole is formed in the second sliding block, and the sliding rod is in sliding connection with the sliding hole.
Preferably, the pushing mechanism comprises a first sliding block, a first sliding groove and two screw rods, the left side of the guide frame is provided with the first sliding block, the left cross beam is provided with the first sliding groove, one screw rod is fixedly arranged on the motor output shaft, the other screw rod is rotatably arranged on the inner wall of the front side of the protective box, the rear end of the screw rod is rotatably connected with the inner wall of the rear side of the first sliding groove, the first sliding block is slidably connected with the first sliding groove, and a transmission mechanism is arranged between the two screw rods.
Preferably, the first sliding block is provided with a threaded hole, and the screw rod is in threaded connection with the threaded hole.
Preferably, the transmission mechanism comprises two belt pulleys and a belt, the two belt pulleys are respectively and fixedly arranged on the corresponding screw rods, the two belt pulleys are positioned in the protection box, and the belt transmission sleeve is arranged on the two belt pulleys.
The utility model has the beneficial effects that:
1. the guide frame, the guide seat, the guide shaft and the guide wheel are matched, so that the aim of guiding and positioning construction of the tubular pile can be fulfilled, the first sliding block can be driven to move through the matching of the motor, the screw rod and the threaded hole (11), the guide frame can be moved back and forth through the matching of the first sliding block and the guide frame, the aim of conveniently and quickly adjusting the guide frame can be fulfilled, the aim of accurately adjusting the position of the guide frame can be fulfilled, and the aim of improving the construction efficiency can be fulfilled;
2. through the cooperation of second slider, second spout, slide bar and guide frame, can realize that the guide frame carries out stable removal at left crossbeam and right crossbeam, can realize the purpose of accurate regulation to tubular pile position, through the cooperation of two guide frames, can realize that tubular pile carries out more stable direction location construction and obtain the purpose.
Drawings
Fig. 1 is a schematic perspective view of a tubular pile construction guide frame according to the present utility model;
fig. 2 is a schematic top sectional structure of a tubular pile construction guide frame according to the present utility model;
fig. 3 is a schematic side sectional structure of a tubular pile construction guide frame according to the present utility model;
fig. 4 is a schematic structural diagram of a portion a of a tubular pile construction guide frame according to the present utility model.
In the figure: 1. a front beam; 2. a rear beam; 3. a left cross beam; 4. a right cross beam; 5. a front vertical beam; 6. a rear vertical beam; 7. a protective box; 8. a guide frame; 9. a first slider; 10. a first chute; 11. a threaded hole (11); 12. a motor; 13. a screw rod; 14. a belt pulley; 15. a belt; 16. a second slider; 17. a slide hole; 18. a slide bar; 19. a guide seat; 20. a guide shaft; 21. a guide wheel; 22. and a second chute.
Detailed Description
The technical scheme of the present utility model will be clearly and completely described in connection with specific embodiments. It will be apparent that the described embodiments are only some, but not all, embodiments of the utility model. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to fall within the scope of the utility model.
When an element is referred to as being "disposed on" another element, it can be directly on the other element or intervening elements may also be present, the term "disposed" indicating a manner of presence and may be connected, mounted, fixedly connected, operatively connected, or the like. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this utility model belongs. The terminology used herein in the description of the utility model is for the purpose of describing particular embodiments only and is not intended to be limiting of the utility model. The term "and/or" as used herein includes any and all combinations of one or more of the associated listed items.
Referring to fig. 1 to 4, a pipe pile construction guide frame comprises two front beams 1, wherein rear beams 2 are arranged on the rear sides of the front beams 1, left cross beams 3 are fixedly arranged on the sides, adjacent to the rear beams 2, of the front beams 1, right cross beams 4 are fixedly arranged on the sides, adjacent to the rear beams 2, of the front beams 1, the right cross beams 4 are positioned on the right sides of the left cross beams 3, two front vertical beams 5 are fixedly arranged on the sides, adjacent to the two front beams 1, of the two rear beams 2, and two rear vertical beams 6 are fixedly arranged on the sides, adjacent to the two rear beams 2; a guiding mechanism is arranged between the left cross beam 3 and the right cross beam 4, the same protective box 7 is fixedly arranged on the left side of the two front beams 1, a motor 12 is fixedly arranged on the inner wall of the front side of the protective box 7, and pushing mechanisms are arranged on the two left cross beams 3.
In this embodiment, guiding mechanism includes guide frame 8, guide holder 19, guiding axle 20 and leading wheel 21, is provided with guide frame 8 between left crossbeam 3 and the right crossbeam 4, and guide frame 8 both sides inner wall is all fixed mounting has guide holder 19, rotates on the guide holder 19 and installs guiding axle 20, is provided with leading wheel 21 on the guiding axle 20, and leading wheel 21 and tubular pile looks adaptation are provided with slide mechanism between guide frame 8 and the right crossbeam 4, through being provided with guiding mechanism for the tubular pile can carry out positioning construction through leading wheel 21 in the guide frame 8.
In this embodiment, the sliding mechanism includes a second slider 16, a sliding rod 18 and a second sliding groove 22, the right side of the guide frame 8 is provided with the second slider 16, the right cross beam 4 is provided with the second sliding groove 22, the front inner wall and the rear inner wall of the second sliding groove 22 are fixedly provided with the same sliding rod 18, the second slider 16 is slidably connected with the second sliding groove 22, and the guide frame 8 can slide on the right cross beam 4 through being provided with the sliding mechanism.
In this embodiment, the second slider 16 is provided with a sliding hole 17, and the sliding rod 18 is slidably connected with the sliding hole 17, so that the second slider 16 can slide on the sliding rod 18 through the sliding hole, and the purpose of stable movement of the guide frame 8 can be achieved.
In this embodiment, pushing mechanism includes first slider 9, first spout 10 and two lead screws 13, guide frame 8 left side is provided with first slider 9, first spout 10 has been seted up on the left crossbeam 3, a lead screw 13 fixed mounting is on motor 12 output shaft, another lead screw 13 rotates to be installed on the inner wall of the front side of protective housing 7, lead screw 13 rear end and first spout 10 rear side inner wall rotate and are connected, first slider 9 and first spout 10 sliding connection, be provided with drive mechanism between two lead screws 13, through being provided with pushing mechanism, make motor 12 can drive first slider 9 and remove, can realize driving guide frame 8 and carry out the purpose that removes.
In this embodiment, the first slider 9 is provided with the threaded hole 11, and the screw rod 13 is in threaded connection with the threaded hole 11, and through being provided with the threaded hole 11, the screw rod 13 can drive the first slider 9 to move, can realize driving the purpose that the guide frame 8 moved.
In this embodiment, the transmission mechanism includes two belt pulleys 14 and a belt 15, the two belt pulleys 14 are respectively fixedly installed on the corresponding screw rods 13, the two belt pulleys 14 are located in the protection box 7, the belt 15 is in transmission sleeve on the two belt pulleys 14, and the motor 12 can drive the other screw rod 13 to rotate through being provided with the transmission mechanism.
According to the utility model, the front beam 1 and the rear beam 2 are installed at the position where the pipe pile needs to be constructed, the motor 12 is started to drive the screw rod 13 to rotate, the belt pulley 14 is driven to rotate, the belt 15 is used to drive the other belt pulley 14 to rotate, the other screw rod 13 is driven to rotate, the two first sliding blocks 9 can be driven to move simultaneously, the guide frame 8 can be driven to move, the second sliding block 16 can be driven to slide in the second sliding groove 22, the guide seat 19, the guide shaft 20 and the guide wheel 20 can be driven to move to the position where the pipe pile needs to be constructed and installed, the guide frame 8 can be conveniently adjusted, the aim of accurately adjusting the position of the guide frame 8 can be fulfilled, the pipe pile can be guided and positioned by the sliding of the two guide wheels 21 when the pipe pile is placed between the two guide wheels 21, the aim of accurately positioning the pipe pile can be fulfilled, and the construction efficiency can be improved.
The tubular pile construction guide frame provided by the utility model is described in detail above. The principles and embodiments of the present utility model have been described herein with reference to specific examples, which are intended to be merely illustrative of the methods of the present utility model and their core ideas. It should be noted that it will be apparent to those skilled in the art that various modifications and adaptations of the utility model can be made without departing from the principles of the utility model and these modifications and adaptations are intended to be within the scope of the utility model as defined in the following claims.

Claims (7)

1. The pipe pile construction guide frame is characterized by comprising two front beams (1), wherein rear beams (2) are arranged on the rear sides of the front beams (1), left cross beams (3) are fixedly arranged on the sides, adjacent to the rear beams (2), of the front beams (1), right cross beams (4) are fixedly arranged on the sides, adjacent to the rear beams (2), of the front beams (1), the right cross beams (4) are positioned on the right sides of the left cross beams (3), two front vertical beams (5) are fixedly arranged on the sides, adjacent to the front beams (1), of the front beams, and two rear vertical beams (6) are fixedly arranged on the sides, adjacent to the rear beams (2);
be provided with guiding mechanism between left crossbeam (3) and right crossbeam (4), two front beam (1) left side fixed mounting has same protective housing (7), protective housing (7) front side inner wall fixed mounting has motor (12), two all be provided with pushing mechanism on left crossbeam (3).
2. The pipe pile construction guide frame according to claim 1, characterized in that the guide mechanism comprises a guide frame (8), guide seats (19), guide shafts (20) and guide wheels (21), the guide frame (8) is arranged between the left cross beam (3) and the right cross beam (4), the guide seats (19) are fixedly arranged on the inner walls of the two sides of the guide frame (8), the guide shafts (20) are rotatably arranged on the guide seats (19), the guide wheels (21) are arranged on the guide shafts (20), the guide wheels (21) are matched with the pipe pile, and sliding mechanisms are arranged between the guide frame (8) and the right cross beam (4).
3. The pipe pile construction guide frame according to claim 2, wherein the sliding mechanism comprises a second sliding block (16), a sliding rod (18) and a second sliding groove (22), the second sliding block (16) is arranged on the right side of the guide frame (8), the second sliding groove (22) is formed in the right cross beam (4), the same sliding rod (18) is fixedly arranged on the inner wall of the front side and the inner wall of the rear side of the second sliding groove (22), and the second sliding block (16) is in sliding connection with the second sliding groove (22).
4. A tubular pile construction guide according to claim 3, characterized in that the second slider (16) is provided with a sliding hole (17), and the sliding rod (18) is slidably connected with the sliding hole (17).
5. The pipe pile construction guide frame according to claim 2, characterized in that the pushing mechanism comprises a first sliding block (9), a first sliding groove (10) and two screw rods (13), the first sliding block (9) is arranged on the left side of the guide frame (8), the first sliding groove (10) is formed in the left cross beam (3), one screw rod (13) is fixedly mounted on an output shaft of a motor (12), the other screw rod (13) is rotatably mounted on the inner wall of the front side of the protective box (7), the rear end of the screw rod (13) is rotatably connected with the inner wall of the rear side of the first sliding groove (10), the first sliding block (9) is slidably connected with the first sliding groove (10), and a transmission mechanism is arranged between the two screw rods (13).
6. A tubular pile construction guide according to claim 5, characterized in that the first slider (9) is provided with a threaded hole (11), and the screw rod (13) is in threaded connection with the threaded hole (11).
7. A pipe pile construction guide frame according to claim 5, characterized in that the transmission mechanism comprises two belt pulleys (14) and a belt (15), the two belt pulleys (14) are fixedly mounted on corresponding screw rods (13), the two belt pulleys (14) are located in the protective box (7), and the belt (15) is in transmission sleeved on the two belt pulleys (14).
CN202321291354.7U 2023-05-25 2023-05-25 Tubular pile construction guide frame Active CN219951947U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321291354.7U CN219951947U (en) 2023-05-25 2023-05-25 Tubular pile construction guide frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321291354.7U CN219951947U (en) 2023-05-25 2023-05-25 Tubular pile construction guide frame

Publications (1)

Publication Number Publication Date
CN219951947U true CN219951947U (en) 2023-11-03

Family

ID=88551023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321291354.7U Active CN219951947U (en) 2023-05-25 2023-05-25 Tubular pile construction guide frame

Country Status (1)

Country Link
CN (1) CN219951947U (en)

Similar Documents

Publication Publication Date Title
CN219951947U (en) Tubular pile construction guide frame
CN110181182B (en) Blanking machine of laser pipe cutting machine
CN112207389A (en) Machining device for cylindrical steel pipe connecting piece for tower crane
CN218836890U (en) Automobile shoe-shaped gold ingot Liang Zuankong positioning tool
CN114293563B (en) Civil engineering foundation ditch is with safe supporting construction
CN201230146Y (en) Movable special switch trolley
CN111185542B (en) Steel bar bending device
CN211846805U (en) Elevator hauler integral type frame
CN209491201U (en) A kind of veneer reeling machine
CN113697710A (en) Drawer cabinet overhauling device
CN208825241U (en) A kind of bending machine multiaxis rear positioning structure
CN220678969U (en) Wire drawing machine with traction roller group
CN220686059U (en) Construction engineering pile driving device
CN221048243U (en) Equipment turning device for electromechanical maintenance
CN219745874U (en) Uninterrupted coiling device for silicon steel sheet
CN221018003U (en) Guide assembly adjusting device
CN115233759B (en) Electric digging device for pile core of prestressed pipe pile
CN219188833U (en) High-precision hydraulic numerical control gate type plate shearing machine discharging device
CN220302655U (en) Novel electric sliding rail
CN219163897U (en) Low-power laser
CN214136718U (en) Concrete unloader with guiding mechanism
CN216442500U (en) Electric shovel is with maintenance equipment that has location structure
CN220993174U (en) Pipe cutting machine feeding mechanism
CN219821937U (en) Bag moving device for tying machine
CN214235692U (en) Adjustable section steel straightening device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant