CN219931622U - Novel constructional column top closing-up pouring device - Google Patents

Novel constructional column top closing-up pouring device Download PDF

Info

Publication number
CN219931622U
CN219931622U CN202321443637.9U CN202321443637U CN219931622U CN 219931622 U CN219931622 U CN 219931622U CN 202321443637 U CN202321443637 U CN 202321443637U CN 219931622 U CN219931622 U CN 219931622U
Authority
CN
China
Prior art keywords
pouring
brick wall
baffle
constructional column
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321443637.9U
Other languages
Chinese (zh)
Inventor
潘威斌
裘兴龙
陈珍珍
楼晓霞
堵永吉
倪剑斌
詹佳杰
吴斌魁
张建松
许国君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dongxin Build Co ltd
Original Assignee
Zhejiang Dongxin Build Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Dongxin Build Co ltd filed Critical Zhejiang Dongxin Build Co ltd
Priority to CN202321443637.9U priority Critical patent/CN219931622U/en
Application granted granted Critical
Publication of CN219931622U publication Critical patent/CN219931622U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a novel constructional column top closing-up pouring device which comprises a brick wall, wherein a pouring groove is formed in the brick wall, a reinforcement cage is sleeved in the pouring groove, an extension bar is fixedly welded on the side face of the reinforcement cage, a baffle is tightly attached to the side face of the brick wall.

Description

Novel constructional column top closing-up pouring device
Technical Field
The utility model relates to the technical field of pouring devices, in particular to a novel constructional column top closing-in pouring device.
Background
In the constructional column pouring process, when pouring to the top, the blocking of the cross beam or the structural floor slab is caused, so that a certain difficulty is brought to closing in.
At present, the baffle plates are used for forming the constructional column, so that after the pouring device is removed, the surface of the corresponding part of the constructional column is flat, and the construction of the subsequent process is facilitated.
A pouring device for constructional column tops and large section beam column closures as disclosed for example in the grant publication CN203669378U, characterized by comprising a fixed support, a diversion chute and a baffle, wherein the fixed support has a feed opening; the guide chute is connected to the fixed bracket, and an outlet of the guide chute is connected with the feed inlet; the baffle is inserted on the feed inlet of the fixed bracket. However, after pouring concrete from the diversion chute, a large number of parts of the solidified concrete do not meet the pouring requirements, and it is unclear how to prevent the concrete from flowing outwards to cause the upper end of the pouring chute to be hollow, so that the poured concrete is connected with the wall top.
As is clear from the above-mentioned prior art, the casting hollow is easily generated in the upper end of the casting trough, and thus, improvement of the prior art is required.
Disclosure of Invention
The utility model aims to provide a novel constructional column top closing-in pouring device for solving the problem that pouring hollowness is easy to generate in the upper end of a pouring groove.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a novel constructional column post top binding off is pour device, includes the brick wall, the inside of brick wall is provided with pours the groove, the inside of pouring the groove has cup jointed the steel reinforcement cage, the side fixedly welded of steel reinforcement cage has the extension bar, the side of brick wall has closely pasted the baffle, the inside of baffle has cup jointed the cement nail, the upper end fixedly connected with fixing base of baffle, the inside slip of fixing base has cup jointed the catch bar, the one end fixedly connected with push pedal of catch bar, the one end fixedly connected with backup pad of catch bar, the inside grafting of fixing base has the locating pin, the upper end fixedly connected with wall top of brick wall.
Preferably, the inner wall sliding connection push pedal of fixing base, the backup pad is hugged closely to a side of fixing base, through adding to the inside concrete of fixing base, promotes the backup pad and drives the push pedal and squeeze into pouring inslot portion with concrete, inserts the locating pin inside fixed of catch bar, conveniently ends pouring to pouring basin upper end, prevents pouring basin upper end cavity.
Preferably, the upper end of the baffle is tightly attached to the wall top, a positioning pin is inserted into one end of the pushing rod, and the combined design of the pushing rod, the pushing plate and the positioning pin can block concrete, so that the concrete is solidified into the upper end of the pouring tank.
Preferably, extension bar is cup jointed to the inside of brick wall, the upper end fixed connection wall top of steel reinforcement cage, and bearing capacity and the steadiness after steel reinforcement cage and extension bar's design can increase pouring improve building quality.
Preferably, the two sides of the pouring groove are blocked with the baffle plates, one end of the cement nail is inserted into the brick wall, the baffle plates are fixed to the outer side face of the brick wall through the cement nail, the side face of the pouring groove can be blocked, and concrete overflow and leakage during pouring are prevented.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the inner wall of the fixing seat is in sliding connection with the push plate, one side surface of the fixing seat is clung to the supporting plate, the supporting plate is pushed to drive the push plate to squeeze concrete into the pouring groove, the positioning pin is inserted into the pushing rod to be fixed, the upper end of the pouring groove is conveniently subjected to ending pouring, and the upper end of the pouring groove is prevented from being hollow.
2. The upper end of the baffle plate is tightly attached to the wall top, the locating pin is inserted into one end of the pushing rod, and the combined design of the pushing rod, the pushing plate and the locating pin can block concrete, so that the concrete is solidified into the upper end of the pouring tank.
3. According to the brick wall, the extension bar is sleeved in the brick wall, the upper end of the reinforcement cage is fixedly connected with the wall top, and the design of the reinforcement cage and the extension bar can increase the bearing capacity and stability after pouring and improve the building quality.
4. According to the utility model, the two sides of the pouring groove are covered by the baffle plates, one end of the cement nail is inserted into the brick wall, and the baffle plates are fixed to the outer side surface of the brick wall by using the cement nail, so that the side surface of the pouring groove can be covered, and concrete overflow and leakage during pouring can be prevented.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
fig. 2 is a left side view of the reinforcement cage of the present utility model;
FIG. 3 is an enlarged view of the utility model at A.
In the figure: 1 brick wall, 11 pouring groove, 12 steel reinforcement cage, 13 extension bar, 14 baffle, 15 cement nail, 16 fixing base, 17 push rod, 18 push pedal, 19 backup pad, 110 locating pin, 111 wall top.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Example 1
Referring to fig. 1-3, a novel constructional column top closing-up pouring device in the drawing comprises a brick wall 1, wherein a pouring groove 11 is formed in the brick wall 1, a reinforcement cage 12 is sleeved in the pouring groove 11, an extension bar 13 is fixedly welded on the side surface of the reinforcement cage 12, a baffle 14 is tightly attached to the side surface of the brick wall 1, a cement nail 15 is sleeved in the baffle 14, a fixed seat 16 is fixedly connected to the upper end of the baffle 14, a pushing rod 17 is sleeved in the fixed seat 16 in a sliding manner, a pushing plate 18 is fixedly connected to one end of the pushing rod 17, a supporting plate 19 is fixedly connected to one end of the pushing rod 17, a positioning pin 110 is spliced in the fixed seat 16, and a wall top 111 is fixedly connected to the upper end of the brick wall 1.
In order to prevent the upper end of pouring basin 11 from being hollow, the inner wall sliding connection push pedal 18 of fixing base 16, backup pad 19 is hugged closely to one side of fixing base 16, through adding the concrete to the inside of fixing base 16, promote backup pad 19 and drive push pedal 18 to squeeze into pouring basin 11 inside with the concrete, insert the locating pin 110 inside fixed in push rod 17, conveniently carry out the end-to-end pouring to pouring basin 11 upper end, prevent that pouring basin 11 upper end from being hollow, wall top 111 is hugged closely to the upper end of baffle 14, the inside locating pin 110 that alternates of one end of push rod 17, the combined design of push rod 17, push pedal 18 and locating pin 110 can block the concrete for the concrete solidifies to pouring basin 11 upper end inside.
In this embodiment, through adding the concrete to fixing base 16 inside, promote backup pad 19 drive push pedal 18 with the concrete squeeze into pouring groove 11 inside, insert locating pin 110 inside fixed of push rod 17, conveniently carry out the end-to-end pouring to pouring groove 11 upper end, prevent pouring groove 11 upper end cavity, the combined design of push rod 17, push pedal 18 and locating pin 110 can block the concrete for the concrete solidifies to pouring groove 11 upper end inside.
Example 2
Referring to fig. 1-3, this embodiment further illustrates an embodiment 1, which is a novel constructional column top closing-up pouring device in the drawings, and the novel constructional column top closing-up pouring device comprises a brick wall 1, wherein a pouring groove 11 is formed in the brick wall 1, a reinforcement cage 12 is sleeved in the pouring groove 11, an extension bar 13 is fixedly welded on the side surface of the reinforcement cage 12, a baffle 14 is tightly attached to the side surface of the brick wall 1, a cement nail 15 is sleeved in the baffle 14, a fixed seat 16 is fixedly connected to the upper end of the baffle 14, a pushing rod 17 is slidingly sleeved in the fixed seat 16, a pushing plate 18 is fixedly connected to one end of the pushing rod 17, a supporting plate 19 is fixedly connected to the inner portion of the fixed seat 16, a positioning pin 110 is spliced, and a wall top 111 is fixedly connected to the upper end of the brick wall 1.
In order to improve building quality, extension bar 13 is cup jointed to the inside of brick wall 1, and the upper end fixed connection wall top 111 of steel reinforcement cage 12, and bearing capacity and the steadiness after the pouring can be increased to the design of steel reinforcement cage 12 and extension bar 13, improves building quality, and the both sides of pouring groove 11 are sheltered from and are had baffle 14, and the one end of cement nail 15 is pegged graft brick wall 1, through using cement nail 15 to be fixed to brick wall 1 lateral surface with baffle 14, can shelter from pouring groove 11 side, prevents concrete overflow when pouring.
In this embodiment, the design of steel reinforcement cage 12 and extension 13 can increase bearing capacity and steadiness after pouring, improves building quality, through using cement nail 15 to be fixed to brick wall 1 lateral surface with baffle 14, can shelter from pouring spout 11 side, prevents concrete overflow when pouring.
This novel constructional column top binding off is pour device, through adding concrete to fixing base 16 inside, promote backup pad 19 and drive push pedal 18 with the concrete squeeze into pour inslot 11 inside, insert the locating pin 110 inside fixed of push rod 17, conveniently carry out the ending to pouring inslot 11 upper end and pour, prevent pouring inslot 11 upper end cavity, the combined design of push rod 17, push pedal 18 and locating pin 110 can block the concrete, make the concrete solidify to pouring inslot 11 upper end inside, the bearing capacity and the steadiness after steel reinforcement cage 12 and extension bar 13 design can increase pouring, improve building quality, be fixed to brick wall 1 lateral surface with baffle 14 through using cement nail 15, can shelter from pouring inslot 11 side, concrete overflow when preventing to pour.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. Novel constructional column post top binding off is pour device, including brick wall (1), its characterized in that: the inside of brick wall (1) is provided with pouring groove (11), the inside of pouring groove (11) has cup jointed steel reinforcement cage (12), the fixed welding of side of steel reinforcement cage (12) has extension bar (13), the side of brick wall (1) has closely pasted baffle (14), the inside of baffle (14) has cup jointed cement nail (15), the upper end fixedly connected with fixing base (16) of baffle (14), the inside slip of fixing base (16) has cup jointed catch bar (17), the one end fixedly connected with push pedal (18) of catch bar (17), the one end fixedly connected with backup pad (19) of catch bar (17), the inside grafting of fixing base (16) has locating pin (110), the upper end fixedly connected with roof (111) of brick wall (1).
2. The novel constructional column top closing-in pouring device according to claim 1, wherein: the inner wall of the fixed seat (16) is connected with the push plate (18) in a sliding way, and one side surface of the fixed seat (16) is clung to the supporting plate (19).
3. The novel constructional column top closing-in pouring device according to claim 1, wherein: the upper end of the baffle plate (14) is tightly attached to the wall top (111), and a positioning pin (110) is inserted into one end of the pushing rod (17).
4. The novel constructional column top closing-in pouring device according to claim 1, wherein: an extension bar (13) is sleeved in the brick wall (1), and the upper end of the reinforcement cage (12) is fixedly connected with a wall top (111).
5. The novel constructional column top closing-in pouring device according to claim 1, wherein: baffle (14) are shielded on two sides of the pouring groove (11), and one end of the cement nail (15) is inserted into the brick wall (1).
CN202321443637.9U 2023-06-08 2023-06-08 Novel constructional column top closing-up pouring device Active CN219931622U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321443637.9U CN219931622U (en) 2023-06-08 2023-06-08 Novel constructional column top closing-up pouring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321443637.9U CN219931622U (en) 2023-06-08 2023-06-08 Novel constructional column top closing-up pouring device

Publications (1)

Publication Number Publication Date
CN219931622U true CN219931622U (en) 2023-10-31

Family

ID=88488133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321443637.9U Active CN219931622U (en) 2023-06-08 2023-06-08 Novel constructional column top closing-up pouring device

Country Status (1)

Country Link
CN (1) CN219931622U (en)

Similar Documents

Publication Publication Date Title
CN113047457B (en) Assembled energy-conserving building based on BIM
CN107237270A (en) A kind of construction method of girder construction
CN219931622U (en) Novel constructional column top closing-up pouring device
CN2663555Y (en) One-step pouring die of building upright post
CN107419904A (en) The skewed slot mounting structure and its application method poured for concrete column
CN110805274A (en) Steel mould of Y-shaped column and pouring method thereof
CN114319081B (en) Prefabricated UHPC bent cap structure of quick installation
CN2406000Y (en) Overlapped mould for building
CN216787957U (en) Column type inspection pit cast-in-place concrete track stand column
US4872823A (en) Apparatus for forming a columnar reinforcement in a concrete wall panel
CN216689076U (en) A prefabricated apron that is used for hollow mound top to pour construction
CN211447959U (en) Subway column type inspection pit stand concrete pouring diversion funnel
CN109763658A (en) A kind of support device and its construction method for arrangement material distributing machine in elevator
CN213952977U (en) Anti-leakage structure and pouring mold
CN211362837U (en) A prevent concrete overflow template for sewer well lid is pour
CN109025262B (en) Construction method for one-time pouring forming of concrete flanging
CN208563379U (en) A kind of prefabricated pipe gallery casting mold
CN209779461U (en) A slipform device for bridge floor engineering construction
CN211806844U (en) Highway bridge is pour and is used precast concrete forming device
CN216866408U (en) Semi-prefabricated windowsill antiseep pushes up subassembly
CN216516102U (en) Transition section structure of reinforced concrete column and steel pipe concrete column
CN220395170U (en) Convenient simple and easy post-cast strip supports
CN211229721U (en) Prefabricated assembled pond guide wall
CN216641446U (en) Post-cast plate seam leak protection structure
CN217028285U (en) Casting reinforcement formwork for pool type structures

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant