CN219929546U - Pipeline handling device is used in municipal works construction - Google Patents
Pipeline handling device is used in municipal works construction Download PDFInfo
- Publication number
- CN219929546U CN219929546U CN202320586488.5U CN202320586488U CN219929546U CN 219929546 U CN219929546 U CN 219929546U CN 202320586488 U CN202320586488 U CN 202320586488U CN 219929546 U CN219929546 U CN 219929546U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- long base
- pipeline
- engineering construction
- municipal engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- 125000003003 spiro group Chemical group 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009440 infrastructure construction Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000007858 starting material Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Handcart (AREA)
Abstract
The utility model discloses a pipeline carrying device for municipal engineering construction, which belongs to the technical field of pipeline carrying equipment and comprises a long base and a supporting plate, wherein the supporting plate is fixedly connected to the left side of the top of the long base, the top of the supporting plate is fixedly connected with a top plate, the bottom of the top plate is provided with a sliding groove, the rear side wall of the top plate is fixedly connected with a motor, the front end of a power output shaft of the motor is fixedly connected with a screw rod, the front end of the screw rod penetrates through the top plate and extends to the front side wall of an inner cavity of the sliding groove, the outer side wall of the screw rod is in threaded connection with a moving block, and the bottom of the moving block is fixedly connected with an electric telescopic rod.
Description
Technical Field
The utility model relates to the technical field of pipeline handling equipment, in particular to a pipeline handling device for municipal engineering construction.
Background
Municipal engineering refers to municipal infrastructure construction engineering, in China, municipal infrastructure refers to various buildings, structures, equipment and the like which are arranged in urban areas and town planning construction ranges and provide paid or gratuitous public products and services for residents based on government responsibility and obligations, wherein the municipal engineering can frequently use pipelines in the construction process.
The existing pipeline transportation is usually completed by adopting manual transportation, the manual transportation has high working strength, and although the trolley can be used for assisting in transportation, the pipeline still needs to be manually moved up and down from the trolley, and also has high working strength.
Disclosure of Invention
The utility model aims to provide a pipeline conveying device for municipal engineering construction, which solves the problems that when a common trolley is used for conveying pipelines in the background technology, the length of the trolley cannot be adjusted according to the length of the pipeline, the pipeline cannot be moved up and down from the trolley, and the manual work intensity is high.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a pipeline handling device for municipal works construction, includes long base and backup pad, backup pad fixed connection is in the top left side of long base, the top fixedly connected with roof of backup pad, the spout has been seted up to the bottom of roof, the back lateral wall fixedly connected with motor of roof, the power output shaft front end fixedly connected with lead screw of motor, the front end of lead screw runs through the roof and extends to the inner chamber front side wall of spout, the lateral wall spiro union of lead screw has the movable block, the bottom fixedly connected with electric telescopic handle of movable block, the bottom fixedly connected with electric clamp of electric telescopic handle.
As a further description of the above technical solution:
the bottom four corners fixedly connected with first universal wheel of long base.
As a further description of the above technical solution:
the top right side fixedly connected with of long base is placed the platform first, first draw-in groove has been seted up at the top of placing the platform first, and arranges in proper order from front to back.
As a further description of the above technical solution:
the left side wall fixedly connected with hydraulic stem of long base, the left end fixedly connected with short base of hydraulic stem, the bottom fixedly connected with second universal wheel of short base.
As a further description of the above technical solution:
the top fixedly connected with second of short base is placed the platform, the second draw-in groove has been seted up at the top of platform is placed to the second.
As a further description of the above technical solution:
the left and right side walls of backup pad fixedly connected with stiffening rod, the left and right sides of terminal fixedly connected with roof of stiffening rod.
Compared with the prior art, the utility model has the beneficial effects that:
1. this pipeline handling device is used in municipal works construction drives the lead screw through the starter motor and rotates for the lead screw drives the movable block and removes in the spout, removes and drives electric telescopic handle through the movable block, makes electric telescopic handle remove to roof bottom front side, and rethread extension electric telescopic handle makes electric clamp remove to the pipeline top, and makes electric clamp press from both sides tight pipeline, and finally through shrink electric telescopic handle, makes electric clamp drive on the pipeline and place at first placing table and second placing table, thereby makes the device can carry the pipeline voluntarily, reduces workman intensity of labour.
2. This pipeline handling device is used in municipal works construction can directly place shorter pipeline through long base, and rethread starts the hydraulic stem for distance between long base and the short base changes, and is different through long base and short base distance, makes the device can adapt to different pipeline lengths, makes the transportation pipeline that the device can be better then.
Drawings
Fig. 1 is a schematic perspective view of a pipeline handling device for municipal engineering construction;
fig. 2 is a schematic diagram of a front view structure of a pipe handling device for municipal engineering construction according to the utility model;
fig. 3 is a schematic top view of a pipeline handling device for municipal engineering construction according to the utility model;
fig. 4 is a schematic diagram of a right-side cross-sectional enlarged structure of a pipeline handling device for municipal engineering construction.
In the figure: 100. a long base; 110. a first universal wheel; 120. a first placement stage; 130. a first clamping groove; 140. a hydraulic rod; 150. a short base; 160. a second universal wheel; 170. a second placement stage; 180. a second clamping groove; 200. a support plate; 210. a top plate; 220. a chute; 230. a motor; 240. a screw rod; 250. a moving block; 260. an electric telescopic rod; 270. an electric clamp; 280. and a reinforcing rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings are merely for convenience in describing the present utility model and simplifying the description, and do not indicate or imply that the device or element being referred to must have a specific orientation, be configured and operated in a specific orientation, and therefore should not be construed as limiting the present utility model. Furthermore, features defining "first", "second" may include one or more such features, either explicitly or implicitly. In the description of the present utility model, unless otherwise indicated, the meaning of "a plurality" is two or more.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
The utility model provides a pipeline carrying device for municipal engineering construction, which can be adjusted according to the length of a pipeline and can automatically carry the pipeline, and referring to figures 1-4, comprises a long base 100 and a supporting plate 200;
referring again to fig. 1-4, the long base 100 is used to mount a support plate 200;
referring to fig. 1-4 again, a supporting plate 200 is fixedly connected to the left side of the top of the long base 100, the top of the supporting plate 200 is fixedly connected with a top plate 210, the top plate 210 is used for installing a motor 230, a chute 220 is formed in the bottom of the top plate 210, the chute 220 is used for limiting the movement of a moving block 250, a motor 230 is fixedly connected to the rear side wall of the top plate 210, the motor 230 is used for driving a screw rod 240 to move, the front end of the screw rod 240 penetrates through the top plate 210 and extends to the front side wall of an inner cavity of the chute 220, the screw rod 240 is used for driving the moving block 250 to move, the outer side wall of the screw rod 240 is in threaded connection with the moving block 250, the moving block 250 is used for driving an electric telescopic rod 260 to move, the bottom of the moving block 250 is fixedly connected with an electric telescopic rod 260, the electric telescopic rod 260 is used for driving the electric telescopic rod 270 to lift, the bottom end of the electric telescopic rod 260 is fixedly connected with an electric clamp 270, the electric clamp 270 is used for clamping a pipeline, the motor 230 is started to drive the screw rod 240 to move, the moving block 250 is driven to move, and the electric telescopic rod 260 is driven to move to the pipeline and clamp the pipeline is clamped;
in conclusion, the device can automatically carry the pipeline, and labor intensity of workers is reduced.
Referring to fig. 1-2, first universal wheels 110 are fixedly connected to four corners of the bottom of the long base 100, and the long base 100 can be moved by the first universal wheels 110.
Referring to fig. 1-3, a first placing table 120 is fixedly connected to the right side of the top of the long base 100, a first clamping groove 130 is formed in the top of the first placing table 120, and the first clamping grooves 130 are sequentially arranged from front to back, and the first clamping groove 130 is formed through the first placing table 120, so that one end of a pipeline can be placed stably.
Referring to fig. 1-3, a hydraulic rod 140 is fixedly connected to the left side wall of the long base 100, a short base 150 is fixedly connected to the left end of the hydraulic rod 140, a second universal wheel 160 is fixedly connected to the bottom of the short base 150, and the distance between the long base 100 and the short base 150 can be adjusted through the hydraulic rod 140.
Referring to fig. 1 to 4 again, the top of the short base 150 is fixedly connected with a second placing table 170, a second clamping groove 180 is formed in the top of the second placing table 170, and the second clamping groove 180 is formed in the second placing table 170, so that the other end of the pipeline can be placed stably.
Referring to fig. 1 to 4 again, reinforcing rods 280 are fixedly connected to the left and right side walls of the support plate 200, the ends of the reinforcing rods 280 are fixedly connected to the left and right sides of the top plate 210, and stability of the top plate 210 can be enhanced by the reinforcing rods 280.
In summary, the device is enabled to adapt to different pipe lengths, and then the device is enabled to transport pipes better.
When the device is specifically used, a person skilled in the art firstly adjusts the distance between the long base 100 and the short base 150 according to the length of the pipeline, the adjustment mode is to start the hydraulic rod 140, so that the hydraulic rod 140 pushes the short base 150 to move and then changes the length of the device, then the start motor 230 drives the screw rod 240 to rotate, so that the screw rod 240 drives the moving block 250 to move in the sliding groove 220, the moving block 250 moves and drives the electric telescopic rod 260, so that the electric telescopic rod 260 moves to the front side of the bottom of the top plate 210, the electric clamp 270 moves to the upper side of the pipeline, the electric clamp 270 clamps the pipeline, then the electric telescopic rod 260 is contracted, the electric clamp 270 drives the pipeline to move upwards, the motor 230 drives the screw rod 240 to rotate reversely, so that the moving block 250 drives the electric telescopic rod 260 to move backwards, and finally the electric clamp 270 is opened, so that the pipeline is placed on the first placing table 120 and the second placing table 170.
In the description of the present specification, reference to the terms "one embodiment," "some embodiments," "illustrative embodiments," "examples," "specific examples," or "some examples," etc., means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the utility model. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiments or examples. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
While embodiments of the present utility model have been shown and described, it will be understood by those of ordinary skill in the art that: many changes, modifications, substitutions and variations may be made to the embodiments without departing from the spirit and principles of the utility model, the scope of which is defined by the claims and their equivalents.
Claims (6)
1. Pipeline handling device is used in municipal works construction, its characterized in that: including long base (100) and backup pad (200), backup pad (200) fixed connection is in the top left side of long base (100), top fixedly connected with roof (210) of backup pad (200), spout (220) have been seted up to the bottom of roof (210), the back lateral wall fixedly connected with motor (230) of roof (210), the power take off shaft front end fixedly connected with lead screw (240) of motor (230), the front end of lead screw (240) runs through roof (210) and extends to the inner chamber front sidewall of spout (220), the lateral wall spiro union of lead screw (240) has movable block (250), the bottom fixedly connected with electric telescopic handle (260) of movable block (250), the bottom fixedly connected with electric clamp (270) of electric telescopic handle (260).
2. The pipe-handling apparatus for municipal engineering construction according to claim 1, wherein: the four corners of the bottom of the long base (100) are fixedly connected with first universal wheels (110).
3. The pipe-handling apparatus for municipal engineering construction according to claim 1, wherein: the top right side fixedly connected with of long base (100) is placed platform (120) first, first draw-in groove (130) have been seted up at the top of platform (120) is placed to first, and arrange in proper order from front to back.
4. The pipe-handling apparatus for municipal engineering construction according to claim 1, wherein: the left side wall fixedly connected with hydraulic rod (140) of long base (100), the left end fixedly connected with short base (150) of hydraulic rod (140), the bottom fixedly connected with second universal wheel (160) of short base (150).
5. The pipe-handling apparatus for municipal engineering construction according to claim 4, wherein: the top of short base (150) fixedly connected with second place platform (170), second draw-in groove (180) have been seted up at the top of second place platform (170).
6. The pipe-handling apparatus for municipal engineering construction according to claim 1, wherein: the left and right side walls of the support plate (200) are fixedly connected with reinforcing rods (280), and the tail ends of the reinforcing rods (280) are fixedly connected with the left and right sides of the top plate (210).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320586488.5U CN219929546U (en) | 2023-03-23 | 2023-03-23 | Pipeline handling device is used in municipal works construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320586488.5U CN219929546U (en) | 2023-03-23 | 2023-03-23 | Pipeline handling device is used in municipal works construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219929546U true CN219929546U (en) | 2023-10-31 |
Family
ID=88500225
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320586488.5U Active CN219929546U (en) | 2023-03-23 | 2023-03-23 | Pipeline handling device is used in municipal works construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219929546U (en) |
-
2023
- 2023-03-23 CN CN202320586488.5U patent/CN219929546U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211053017U (en) | Accurate automatic welding set of solder joint | |
CN113650549B (en) | Temporary supporting seat for bearing and transferring for box girder hoisting and using method thereof | |
CN114725834B (en) | Electric power engineering line laying, installing and constructing method | |
CN219929546U (en) | Pipeline handling device is used in municipal works construction | |
CN213537017U (en) | Building concrete tubular pile is with transferring shipping unit | |
CN111730250A (en) | Assembly device for wind power generation tower and flange | |
CN221217099U (en) | Well lid installation device | |
CN216443647U (en) | Shallow for construction | |
CN219172468U (en) | Fitment is with material handling device convenient to it is fixed | |
CN220315076U (en) | Pipeline transportation device for hydropower installation | |
CN220970427U (en) | Roundness correction tool for large-diameter thin-wall low-pressure steel pipe | |
CN116397886B (en) | Temporary pouring equipment and pouring construction process for prefabricated wall of fabricated building | |
CN219078970U (en) | Hoisting device | |
CN220741399U (en) | Pipe cutting fixing device | |
CN221290148U (en) | Welding set that pipeline installation was used | |
CN219443339U (en) | Casting mould for manufacturing precision casting sand mould | |
CN221435446U (en) | Tool for welding steel mould | |
CN219863199U (en) | Pipeline supporting and positioning device for municipal construction | |
CN218952738U (en) | Scaffold convenient to use | |
CN219902306U (en) | Fixed-length cutting device with conveying function | |
CN219493322U (en) | Pipeline splice auxiliary assembly | |
CN220375737U (en) | Cement product production finished product unloading transfer device | |
CN216029771U (en) | Stainless steel is upset processing equipment for fixed plate | |
CN212531154U (en) | Tool for transporting transformer tapping line | |
CN220565732U (en) | Construction robot for building reinforcing steel bars |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |