CN219925051U - Steel construction correction installation device - Google Patents

Steel construction correction installation device Download PDF

Info

Publication number
CN219925051U
CN219925051U CN202321135528.0U CN202321135528U CN219925051U CN 219925051 U CN219925051 U CN 219925051U CN 202321135528 U CN202321135528 U CN 202321135528U CN 219925051 U CN219925051 U CN 219925051U
Authority
CN
China
Prior art keywords
plate
steel construction
fixed
rod
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321135528.0U
Other languages
Chinese (zh)
Inventor
邓兴均
骆大兵
秦海洋
吴华均
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Huanheng Steel Structure Co ltd
Original Assignee
Chongqing Huanheng Steel Structure Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Huanheng Steel Structure Co ltd filed Critical Chongqing Huanheng Steel Structure Co ltd
Priority to CN202321135528.0U priority Critical patent/CN219925051U/en
Application granted granted Critical
Publication of CN219925051U publication Critical patent/CN219925051U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a steel structure correction installation device, and relates to the technical field of steel structure installation. This installation device is rectified to steel construction, including fixed plate, lifting unit and supporting component, the front side fixed mounting of fixed plate has the mounting panel, and lifting unit locates on the fixed plate, lifting unit is including installing riser, dwang and driving motor, and the front side fixed mounting of fixed plate has two sets of installation risers, and the dwang is installed in the adjacent lateral wall rotation of two sets of installation risers. This installation device is rectified to steel construction can carry out the lift with the backup pad and handle, can support one of them a set of steel construction like this when welding the steel construction, with it stabilize in two sets of steel construction welded positions, be convenient for follow-up manual work carries out welding treatment, and the intensity of labour that uses when the workman lifted the steel construction can be reduced to such supporting means simultaneously to can also avoid the steel construction to remove the condition that leads to welding failure.

Description

Steel construction correction installation device
Technical Field
The utility model relates to the technical field of steel structure installation, in particular to a steel structure correction installation device.
Background
The utility model discloses a steel construction correction installation device of CN218109782U, through the cooperation of mounting panel, the fixed plate, two-way lead screw, guide bar and grip block is used, can weld the installation in-process with last steel construction under steel construction, carry out the centre gripping with steel construction under with last steel construction, not only can avoid steel construction under and last steel construction to produce the circumstances of skew when the welding like this, can also correct the junction of steel construction under and last steel construction simultaneously, improve the welding effect of steel construction under and last steel construction, increase welded quality, the cooperation of rethread spliced pole, screw sleeve, screw post and deflector is used, can leave sufficient space with the junction of steel construction under and last steel construction when the centre gripping, be convenient for follow-up steel construction under with last steel construction's junction is sheltered from like this, lead to the workman to be difficult to the welded condition under with last steel construction after the centre gripping, and then be convenient for the workman welds, improve workman's welded efficiency.
Above-mentioned installation device is rectified to steel construction when using, though can avoid the steel construction to produce the skew and be convenient for weld it, when using, only can weld to two sets of steel constructions of coplanar, when two sets of steel constructions are 90, the device is difficult to support two sets of steel constructions, and then its application scope of device is less, is inconvenient for promoting and use.
Disclosure of Invention
The utility model aims to provide a steel structure correction installation device, which can solve the problems that when two groups of steel structures are 90 degrees, the two groups of steel structures are difficult to support, and the device has a small application range and is inconvenient to popularize and use.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the steel structure correction mounting device comprises a fixing plate, a lifting assembly and a supporting assembly, wherein a mounting plate is fixedly mounted on the front side of the fixing plate;
the lifting assembly is arranged on the fixed plate and comprises an installation vertical plate, a rotating rod and a driving motor, two groups of installation vertical plates are fixedly arranged on the front side of the fixed plate, the rotating rod is rotatably arranged on the adjacent side walls of the two groups of installation vertical plates, and a rotating shaft of the driving motor is fixedly arranged at one end of the rotating rod;
the supporting component is arranged on the fixed plate and comprises a supporting column and a supporting plate, the supporting plate is fixedly arranged at the top of the supporting column, and the driving motor is used for driving the supporting plate to lift.
Preferably, the lifting assembly further comprises a winding wheel, a rotating rod and a guide wheel, wherein the rotating rod is installed on the front side of the fixed plate in a rotating mode, the guide wheel is fixedly installed on the outer wall of the rotating rod, and the winding wheel is fixedly installed on the outer wall of the rotating rod.
Preferably, the support assembly further comprises a fixed vertical rod, a sliding plate, a supporting side plate, a traction rope, a threaded rod and a clamping plate, wherein the threaded rod is installed on the rear side of the fixed plate in a rotating mode, the clamping plate is installed on the outer wall thread of the threaded rod, the fixed vertical rod is fixedly installed at the top of the mounting plate, the sliding plate is installed on the outer wall of the fixed vertical rod in a sliding mode, the supporting side plate is fixedly installed on two sides of the sliding plate, one end of the traction rope is fixedly installed on the top of the supporting side plate, the other end of the traction rope is fixedly installed on the outer wall of the winding wheel in a driving mode, the traction rope is connected with the guide wheel in a driving mode, and the supporting column is fixedly installed at the top of the sliding plate.
Preferably, an anti-slip pad is stuck and fixed at the top of the supporting plate.
Preferably, the front side of the clamping plate and the rear side of the fixing plate are adhered and fixed with anti-slip pads.
Preferably, a guide rod is fixedly arranged at the rear side of the fixing plate, and the clamping plate and the guide rod are in sliding installation.
Preferably, the number of the fixed vertical rods is two, and the top parts of the two groups of fixed vertical rods are fixedly provided with anti-falling blocks.
Compared with the prior art, the utility model has the beneficial effects that: this installation device is rectified to steel construction uses through the cooperation of installation riser, dwang, driving motor, winding wheel and bull stick, can carry out the lift treatment with the backup pad, like this when welding the steel construction, can support one of them set of steel construction, with it stabilize in two sets of steel construction welded positions, be convenient for follow-up manual work carries out the welding treatment, the intensity of labour that uses when such a supporting means can reduce the workman and lift the steel construction simultaneously, and can also avoid the steel construction to remove the condition that leads to welding failure, use through the cooperation of fixed montant, the sliding plate, support curb plate and haulage rope, can be fixed on one of them set of steel construction with the fixed plate, be convenient for follow-up with another set of steel construction of other, increase the supporting point of device.
Drawings
FIG. 1 is a cross-sectional view of the present utility model;
FIG. 2 is a top view of the mounting riser of the present utility model;
fig. 3 is an enlarged view of the portion a of the present utility model.
In the figure: 1. a fixing plate; 2. a mounting plate; 3. a lifting assembly; 301. installing a vertical plate; 302. a rotating lever; 303. a driving motor; 304. a winding wheel; 305. a rotating rod; 306. a guide wheel; 4. a support assembly; 401. fixing a vertical rod; 402. a sliding plate; 403. supporting the side plates; 404. a traction rope; 405. a support column; 406. a support plate; 407. a threaded rod; 408. and a clamping plate.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, the present utility model provides a technical solution: the utility model provides a steel construction correction installation device, including fixed plate 1, lifting unit 3 and supporting component 4, the front side fixed mounting of fixed plate 1 has mounting panel 2, lifting unit 3 locates on the fixed plate 1, lifting unit 3 is including installing riser 301, dwang 302 and driving motor 303, two sets of installation risers 301 of front side fixed mounting of fixed plate 1, the dwang 302 is installed in the adjacent lateral wall rotation of two sets of installation risers 301, driving motor 303's pivot and the one end fixed mounting of dwang 302, supporting component 4 locates on the fixed plate 1, supporting component 4 includes support column 405 and backup pad 406, the top fixed mounting of support column 405 has backup pad 406, driving motor 303 is used for driving backup pad 406 to go up and down.
Further, the lifting assembly 3 further comprises a winding wheel 304, a rotating rod 305 and a guide wheel 306, the rotating rod 305 is rotatably mounted on the front side of the fixing plate 1, the guide wheel 306 is fixedly mounted on the outer wall of the rotating rod 305, the winding wheel 304 is fixedly mounted on the outer wall of the rotating rod 302, the driving motor 303 is controlled to start, the driving motor 303 starts to drive the rotating rod 302 and the winding wheel 304 to rotate, the winding wheel 304 rotates to drive the supporting column 405 and the supporting plate 406 to lift through the traction rope 404, and therefore when the steel structures are welded, one group of steel structures can be supported and stabilized at the welding positions of the two groups of steel structures, the subsequent manual welding treatment is facilitated, and meanwhile the labor intensity used when workers lift the steel structures can be reduced through the supporting mode, and the situation that the steel structures move to cause welding failure can be avoided.
Still further, the supporting component 4 still includes fixed montant 401, sliding plate 402, support curb plate 403, haulage rope 404, threaded rod 407 and grip block 408, threaded rod 407 is installed in the rear side rotation of fixed plate 1, the grip block 408 is installed to the outer wall screw thread of threaded rod 407, the top fixed mounting of mounting panel 2 has fixed montant 401, the outer wall slidable mounting of fixed montant 401 has sliding plate 402, the equal fixed mounting in both sides of sliding plate 402 has support curb plate 403, one end and the top fixed mounting of support curb plate 403 of haulage rope 404, the other end and the outer wall fixed mounting of winding wheel 304 of haulage rope 404, haulage rope 404 is connected with leading wheel 306 transmission, the top fixed mounting of sliding plate 402 has support column 405, the slipmat is pasted at the top of backup pad 406, the front side of grip block 408 and the rear side of fixed plate 1 all paste and are fixed with the slipmat, the rear side fixed mounting of fixed plate 1 has the guide bar, grip block 408 and guide bar are slidable mounting, the quantity of fixed montant 401 is two sets of, the top of two sets of fixed montant 401 all fixed mounting has the anticreep piece, threaded rod 407 rotates, 407 rotates and drives grip block 408 and moves, can take turns to the fixed plate 408 and moves with the fixed steel supporting point of one of the following one set of structures, the following one of can be fixed with the steel supporting point, and another is convenient for the device.
Working principle: when the steel structure fixing device is used, a group of steel structures are firstly placed between the fixing plate 1 and the clamping plate 408, the threaded rod 407 is rotated, the threaded rod 407 rotates to drive the clamping plate 408 to move, the fixing plate 1 can be installed on one group of steel structures, one end of the other group of steel structures is placed on the supporting plate 406, the driving motor 303 is controlled to start, the driving motor 303 starts to drive the rotating rod 302 and the winding wheel 304 to rotate, the winding wheel 304 rotates to drive the supporting column 405 and the supporting plate 406 to lift through the traction rope 404, and one end of the other group of steel structures can be lifted when the supporting plate 406 ascends, so that the other group of steel structures can be conveniently moved to a welding position.
The embodiments of the present utility model have been described in detail with reference to the accompanying drawings, but the present utility model is not limited to the above embodiments, and various changes can be made within the knowledge of one of ordinary skill in the art without departing from the spirit of the present utility model.

Claims (7)

1. The utility model provides a installation device is rectified to steel construction which characterized in that: comprising the following steps:
the fixing plate (1), the front side of the fixing plate (1) is fixedly provided with a mounting plate (2);
the lifting assembly (3) is arranged on the fixed plate (1), the lifting assembly (3) comprises an installation vertical plate (301), a rotating rod (302) and a driving motor (303), two groups of installation vertical plates (301) are fixedly arranged on the front side of the fixed plate (1), the rotating rod (302) is rotatably arranged on the adjacent side walls of the two groups of installation vertical plates (301), and a rotating shaft of the driving motor (303) is fixedly arranged at one end of the rotating rod (302);
the support assembly (4) is arranged on the fixed plate (1), the support assembly (4) comprises a support column (405) and a support plate (406), the support plate (406) is fixedly arranged at the top of the support column (405), and the driving motor (303) is used for driving the support plate (406) to lift.
2. A steel structure correction mounting device according to claim 1, characterized in that: the lifting assembly (3) further comprises a winding wheel (304), a rotating rod (305) and a guide wheel (306), the rotating rod (305) is rotatably arranged on the front side of the fixed plate (1), the guide wheel (306) is fixedly arranged on the outer wall of the rotating rod (305), and the winding wheel (304) is fixedly arranged on the outer wall of the rotating rod (302).
3. A steel structure correction mounting device according to claim 2, characterized in that: the supporting component (4) further comprises a fixed vertical rod (401), a sliding plate (402), a supporting side plate (403), a traction rope (404), a threaded rod (407) and a clamping plate (408), the threaded rod (407) is installed on the rear side of the fixed plate (1) in a rotating mode, the clamping plate (408) is installed on the outer wall of the threaded rod (407) in a threaded mode, the fixed vertical rod (401) is fixedly installed at the top of the mounting plate (2), the sliding plate (402) is installed on the outer wall of the fixed vertical rod (401) in a sliding mode, the supporting side plate (403) is fixedly installed on two sides of the sliding plate (402), one end of the traction rope (404) is fixedly installed on the top of the supporting side plate (403), the other end of the traction rope (404) is fixedly installed on the outer wall of the winding wheel (304), the traction rope (404) is connected with the guide wheel (306) in a transmission mode, and the supporting column (405) is fixedly installed at the top of the sliding plate (402).
4. A steel structure correction mounting device according to claim 3, characterized in that: and an anti-slip pad is fixedly stuck to the top of the supporting plate (406).
5. The steel structure correction mounting device of claim 4, wherein: anti-slip pads are adhered and fixed on the front side of the clamping plate (408) and the rear side of the fixing plate (1).
6. The steel structure correction mounting device of claim 5, wherein: the rear side of the fixed plate (1) is fixedly provided with a guide rod, and the clamping plate (408) and the guide rod are in sliding installation.
7. The steel structure correction mounting device of claim 6, wherein: the number of the fixed vertical rods (401) is two, and the top parts of the two groups of fixed vertical rods (401) are fixedly provided with anti-falling blocks.
CN202321135528.0U 2023-05-10 2023-05-10 Steel construction correction installation device Active CN219925051U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321135528.0U CN219925051U (en) 2023-05-10 2023-05-10 Steel construction correction installation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321135528.0U CN219925051U (en) 2023-05-10 2023-05-10 Steel construction correction installation device

Publications (1)

Publication Number Publication Date
CN219925051U true CN219925051U (en) 2023-10-31

Family

ID=88498067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321135528.0U Active CN219925051U (en) 2023-05-10 2023-05-10 Steel construction correction installation device

Country Status (1)

Country Link
CN (1) CN219925051U (en)

Similar Documents

Publication Publication Date Title
CN111217266B (en) Working method of assembled wall body hoisting device
CN219925051U (en) Steel construction correction installation device
CN212726260U (en) Cable erecting device for building electromechanical installation
CN112723151B (en) Method for hoisting and installing integral roof of assembled steel structure building
CN219465180U (en) Pipeline welding device
CN210918126U (en) A instrument is paintd to outer wall high security for building real mineral varnish
CN218815314U (en) Steel construction correction installation device
CN211003546U (en) Adjustable hoisting device for hoisting glass
CN114084807A (en) Tubular pile vacuum chuck crane and using method thereof
CN105970827A (en) Device and method for automatically threading pipe
CN113581411B (en) Labor-saving angle-adjusting railing installation auxiliary bracket
CN214780418U (en) Glass hoisting frame
CN111332969A (en) Assembled wall hoist device that stability is good
CN219792213U (en) CIPP pipeline is inspection shaft well head hoist device for repair
CN217713526U (en) Driving device with adjustable tensioning mechanism
CN219733292U (en) Drilling device for supporting anchor rod installation
CN220485152U (en) Simple lifting device for assembled plate wall construction
CN210559157U (en) Trolley tool for moving tensioning jack
CN216686882U (en) Automatic cable paying-off equipment
CN110700770B (en) Electric remote control drilling tool upper and lower drill floor tightening device and application method thereof
CN214744745U (en) Multifunctional device for electromechanical installation of construction engineering
CN221027327U (en) Air conditioner outdoor unit installation overhead hoist
CN215167830U (en) Whole quick transfer system of support
CN218403396U (en) Steel lifting device for assembling steel structure factory building
CN219708704U (en) Paying-off device for cable shaft

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant