CN219912005U - Pipeline layout device for engineering construction - Google Patents

Pipeline layout device for engineering construction Download PDF

Info

Publication number
CN219912005U
CN219912005U CN202321180846.9U CN202321180846U CN219912005U CN 219912005 U CN219912005 U CN 219912005U CN 202321180846 U CN202321180846 U CN 202321180846U CN 219912005 U CN219912005 U CN 219912005U
Authority
CN
China
Prior art keywords
plate
arc
welded
engineering construction
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321180846.9U
Other languages
Chinese (zh)
Inventor
季威
秦小梅
季秀柏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Bestway Construction Co ltd
Original Assignee
Jiangsu Bestway Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Bestway Construction Co ltd filed Critical Jiangsu Bestway Construction Co ltd
Priority to CN202321180846.9U priority Critical patent/CN219912005U/en
Application granted granted Critical
Publication of CN219912005U publication Critical patent/CN219912005U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline layout device for engineering construction, which comprises a base, a lower arc-shaped plate, a top plate, a first servo electric cylinder, a displacement plate and an upper arc-shaped plate, wherein one end of the bottom of the top plate is provided with the first servo electric cylinder through a mounting seat, the power output end of the first servo electric cylinder is connected with the displacement plate, both sides of the bottom of the displacement plate are connected with connecting columns, the bottom of each connecting column is welded with the upper arc-shaped plate, both sides of one end of the top of the base are welded with supporting columns, the top of each supporting column is connected with the lower arc-shaped plate, both ends of the position, close to the lower arc-shaped plate, of the upper arc-shaped plate are welded with transverse plates, and the top of each transverse plate is provided with a second servo electric cylinder through a fixing seat. This novel can press from both sides tightly not equidimension's arc piece when carrying out the centre gripping to the pipeline, possess adjustment mechanism, be convenient for carry out the centre gripping to the pipeline of equidimension not and lay, be fit for extensively using widely.

Description

Pipeline layout device for engineering construction
Technical Field
The utility model relates to the technical field of engineering construction, in particular to a pipeline layout device for engineering construction.
Background
The engineering construction pipeline layout device is equipment for installing, laying and adjusting a pipeline system. These devices are commonly used by professional construction teams to ensure proper installation of the piping system and high quality performance.
Patent number CN215479224U discloses a pipeline lays auxiliary device for municipal construction, including supporting the roof, the bottom corner of supporting the roof is provided with the supporting leg, the downside of supporting leg is provided with removes the wheel, the top surface department of supporting the roof has seted up logical groove in the middle of, the top surface of supporting the roof is provided with the rolling subassembly with being located the front and back both sides of leading to the groove, the downside of rolling subassembly is connected with the connecting plate, the spout has been seted up to the bottom of connecting plate, and when driving the limiting plate and reciprocate through the electric putter of setting, rotates the holder and can be to expanding or closed motion this moment to can grasp and loosen the pipeline to the slider that fixed subassembly can be set up slides in the spout, thereby can adjust the distance between two sets of fixed subassemblies according to the length of pipeline, conveniently grasp fixedly to the pipeline, the rolling subassembly of setting can drive the pipeline and reciprocate, thereby conveniently remove the pipeline and drop the pipeline.
The prior pipeline layout device has the following defects: 1. when the pipeline is clamped, the pipeline is clamped only through the arc-shaped blocks with fixed sizes, and the pipeline clamping device does not have an adjusting mechanism and cannot be clamped and laid conveniently for pipelines with different sizes. Therefore, we propose a pipeline layout device for engineering construction.
Disclosure of Invention
The utility model mainly aims to provide a pipeline layout device for engineering construction, which can effectively solve the problems in the background technology.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows:
the utility model provides a pipeline layout device for engineering construction, includes base, lower arc, roof, first servo electric jar, displacement board and last arc, first servo electric jar is installed through the mount pad to roof bottom one end, the power take off end of first servo electric jar is connected with the displacement board, displacement board bottom both sides all are connected with the spliced pole, the welding of spliced pole bottom has last arc, base top one end both sides department all welds the support column, the support column top is connected with down the arc, go up arc and lower arc and all weld the diaphragm in the department both ends that are close to mutually, the second servo electric jar is installed through the fixing base at the diaphragm top, the power take off end of second servo electric jar is connected with the movable plate, the movable plate top is installed through the screw and is served electric jar, the power take off end of third servo electric jar is connected with the splint, it all runs through and has offered the reservation groove to go up arc bottom both sides and lower arc top both sides department, all be located the reservation groove that corresponds.
Further, a supporting frame is welded at the position, close to the center, of the top of the base, and the top of the supporting frame is connected with a top plate.
Further, the balancing weight is installed through the fixed slot to roof bottom one end.
Further, guide barrels are welded at the top of the displacement plate near the corners, guide rods are sleeved in the guide barrels, the top of each guide rod is welded with the bottom of the top plate, and the stability of the displacement plate in the up-and-down movement process can be effectively improved through the limit guiding function of the guide barrels on the guide rods.
Further, the base bottom is close to the corner and is provided with the braked universal wheel through the screw, and the braked universal wheel at the base bottom is convenient to drive the base to move according to the requirement.
Compared with the prior art, the utility model has the following beneficial effects:
1. according to the pipeline layout device for engineering construction, the pipeline to be laid is placed in the lower arc-shaped plate, the first servo electric cylinder can drive the displacement plate and the upper arc-shaped plate to press down when in operation, the second servo electric cylinder can drive the moving plate to move up and down when in operation, the third servo electric cylinder can drive the clamping plates to move horizontally when in operation, and the space between the clamping plates is adjusted, so that the pipeline layout device is convenient to clamp and layout pipelines with different diameters according to the fact that the upper arc-shaped plate and the displacement plate are clamped.
Drawings
FIG. 1 is a schematic diagram of the overall structure of a pipeline laying device for engineering construction.
FIG. 2 is a schematic diagram of the structure of a second servo cylinder, a moving plate and a third servo cylinder of the pipeline laying device for engineering construction.
FIG. 3 is a schematic side view of a pipeline layout device for engineering construction.
In the figure: 1. a base; 2. a support frame; 3. a support column; 4. a lower arc plate; 5. a top plate; 6. a first servo cylinder; 7. a guide cylinder; 8. a guide rod; 9. a displacement plate; 10. a connecting column; 11. an upper arc plate; 12. a cross plate; 13. a second servo cylinder; 14. a moving plate; 15. a third servo cylinder; 16. a reserved groove; 17. a clamping plate; 18. balancing weight; 19. the universal wheel can be braked.
Detailed Description
The utility model is further described in connection with the following detailed description, in order to make the technical means, the creation characteristics, the achievement of the purpose and the effect of the utility model easy to understand.
As shown in fig. 1-3, a pipeline layout device for engineering construction comprises a base 1, a lower arc plate 4, a top plate 5, a first servo electric cylinder 6, a displacement plate 9 and an upper arc plate 11, wherein the first servo electric cylinder 6 is installed at one end of the bottom of the top plate 5 through an installation seat, the displacement plate 9 is connected with the power output end of the first servo electric cylinder 6, connecting columns 10 are connected to two sides of the bottom of the displacement plate 9, the upper arc plate 11 is welded at the bottom of the connecting columns 10, support columns 3 are welded to two sides of one end of the top of the base 1, the lower arc plate 4 is connected to the top of the support columns 3, transverse plates 12 are welded to two ends of the position, close to the lower arc plate 4, of the upper arc plate 11, the second servo electric cylinder 13 is installed at the top of the transverse plates 12 through a fixing seat, a movable plate 14 is connected to the power output end of the second servo electric cylinder 13, a clamping plate 17 is connected to the power output end of the third servo electric cylinder 15 through screws, two sides of the upper arc plate 11 and the lower arc plate 11 are connected to clamping plates 17, and grooves 16 are reserved in the corresponding arc plates 16.
The top of the base 1 is welded with a supporting frame 2 near the center, and the top of the supporting frame 2 is connected with a top plate 5.
In this embodiment, as shown in fig. 1-3, the top plate 5 is conveniently mounted by the support frame 2.
Wherein, balancing weight 18 is installed through the fixed slot to roof 5 bottom one end.
In this embodiment, as shown in fig. 1-3, the two ends of the bottom of the top plate 5 are conveniently weighted by the balancing weights 18.
The top of the displacement plate 9 is welded with guide cylinders 7 near corners, guide rods 8 are sleeved in the guide cylinders 7, and the top of the guide rods 8 is welded with the bottom of the top plate 5.
In this embodiment, as shown in fig. 1-3, the stability of the displacement plate 9 during up-and-down movement can be effectively improved through the limit guiding function of the guide cylinder 7 on the guide rod 8.
Wherein, the bottom of the base 1 is provided with a braked universal wheel 19 near the corner by screws.
In this embodiment, as shown in fig. 1-3, the base 1 is conveniently driven to move according to the requirement by a braked universal wheel 19 at the bottom of the base 1.
It should be noted that, the utility model is a pipeline layout device for engineering construction, when in operation, after the upper arc plate 11 and the lower arc plate 4 clamp the pipeline, the movement of the brake universal wheel 19 is utilized, thereby facilitating the movement of the pipeline, facilitating the subsequent butt joint, laying the pipeline, placing the pipeline to be laid in the lower arc plate 4, the first servo electric cylinder 6 can drive the displacement plate 9 and the upper arc plate 11 to press down when in operation, the second servo electric cylinder 13 can drive the displacement plate 14 to move up and down when in operation, the third servo electric cylinder 15 can drive the clamping plate 17 to move horizontally when in operation, and the space between the clamping plates 17 is adjusted, thereby facilitating the clamping layout of pipelines with different diameters according to the clamping between the upper arc plate 11 and the displacement plate 9.
The foregoing has shown and described the basic principles and main features of the present utility model and the advantages of the present utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a pipeline layout device for engineering construction, includes base (1), lower arc (4), roof (5), first servo jar (6), displacement board (9) and last arc (11), its characterized in that: the utility model discloses a power take-off device for the automobile, including roof (5) bottom one end is installed first servo jar (6) through the mount pad, the power take-off end of first servo jar (6) is connected with displacement board (9), displacement board (9) bottom both sides all are connected with spliced pole (10), spliced pole (10) bottom welding has arc (11), support column (3) are all welded in base (1) top one end both sides department, support column (3) top is connected with arc (4) down, arc (11) and arc (4) are close to department both ends and all weld diaphragm (12) down mutually, second servo jar (13) are installed through the fixing base at diaphragm (12) top, second servo jar (13) are connected with movable plate (14) through the power take-off end, movable plate (14) top is installed third servo jar (15) through the screw, the power take-off end of third servo jar (15) is connected with splint (17), upward arc (11) bottom both sides and lower arc (4) both sides are close to both sides department all welded with diaphragm (16) and are located and reserve slot (16) all.
2. The pipe laying apparatus for engineering construction according to claim 1, wherein: the support frame (2) is welded at the position, close to the center, of the top of the base (1), and the top of the support frame (2) is connected with the top plate (5).
3. The pipe laying apparatus for engineering construction according to claim 1, wherein: one end of the bottom of the top plate (5) is provided with a balancing weight (18) through a fixed groove.
4. The pipe laying apparatus for engineering construction according to claim 1, wherein: guide cylinders (7) are welded at the top of the displacement plate (9) close to corners, guide rods (8) are sleeved in the guide cylinders (7), and the tops of the guide rods (8) are welded with the bottoms of the top plates (5).
5. The pipe laying apparatus for engineering construction according to claim 1, wherein: the bottom of the base (1) is provided with a braked universal wheel (19) close to the corner through screws.
CN202321180846.9U 2023-05-17 2023-05-17 Pipeline layout device for engineering construction Active CN219912005U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321180846.9U CN219912005U (en) 2023-05-17 2023-05-17 Pipeline layout device for engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321180846.9U CN219912005U (en) 2023-05-17 2023-05-17 Pipeline layout device for engineering construction

Publications (1)

Publication Number Publication Date
CN219912005U true CN219912005U (en) 2023-10-27

Family

ID=88439836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321180846.9U Active CN219912005U (en) 2023-05-17 2023-05-17 Pipeline layout device for engineering construction

Country Status (1)

Country Link
CN (1) CN219912005U (en)

Similar Documents

Publication Publication Date Title
CN219912005U (en) Pipeline layout device for engineering construction
CN218284325U (en) Plate welding equipment
CN210344541U (en) Positioning device for mounting formed calcium silicate forming elbow
CN214570629U (en) Textile auxiliary's filling equipment
CN111571100A (en) Elbow is to mouthful mould
CN217991101U (en) Automatic steel pipe cutting machine of chucking
CN217513047U (en) High-frequency induction welding device for welded pipe
CN219169985U (en) Welding device of corrugated pipe connector
CN214978802U (en) Tool for connecting air chamber support and concave axle
CN220819664U (en) Voltage stabilizer resistance to compression test equipment
CN117324870B (en) Steel structure prefabricated bridge construction welding method
CN211708529U (en) Telescopic clamp for corrugated pipe compensator
CN220575136U (en) Welding device for machining electromechanical assembly
CN219026537U (en) Welding positioning device for round tube column iron tower
CN219037281U (en) Circulating water cooling equipment with quick butt joint structure
CN215658781U (en) Fixing clamp for welding automobile parts
CN220998589U (en) Width-adjustable paper guiding mechanism
CN219465224U (en) Steel sheet is assembled welding and is used panel positioner
CN213393865U (en) Road bridge engineering pipeline bearing structure
CN220782020U (en) Metal straight pipe flaring equipment with two end openings
CN219882452U (en) Positioning tool for liquid level meter production
CN220312312U (en) Communication is with phase shifter vacuum welding pressure riveting self-control frock clamp
CN219253703U (en) Automatic composite coiled plate structure
CN212311302U (en) Elbow is to mouthful mould
CN212885963U (en) Welding tool

Legal Events

Date Code Title Description
GR01 Patent grant