CN219910016U - Construction device for secondary structure concrete pouring - Google Patents

Construction device for secondary structure concrete pouring Download PDF

Info

Publication number
CN219910016U
CN219910016U CN202321364208.2U CN202321364208U CN219910016U CN 219910016 U CN219910016 U CN 219910016U CN 202321364208 U CN202321364208 U CN 202321364208U CN 219910016 U CN219910016 U CN 219910016U
Authority
CN
China
Prior art keywords
fixedly connected
shell
secondary structure
clamping
structure concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321364208.2U
Other languages
Chinese (zh)
Inventor
胡贵川
李超
谌崇国
周航
杨雪波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd, China Construction Fourth Bureau Third Construction Engineering Co Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202321364208.2U priority Critical patent/CN219910016U/en
Application granted granted Critical
Publication of CN219910016U publication Critical patent/CN219910016U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a construction device for secondary structure concrete pouring, and relates to the technical field of construction. Including leading the thick liquid shell, it includes a shell main part to lead the thick liquid shell, the both sides inner wall of shell main part is fixedly connected with guide board respectively, two the slope guide face has been seted up respectively to the opposite side of guide board, and two the opposite side bottom of guide board is a slice of inner shield board of fixedly connected with respectively. According to the utility model, the concrete slurry is poured into the space to be poured through the arrangement of the inclined guide plate, and the bottom end part of the inner shielding plate extends into the space to be poured through the arrangement of the inner shielding plate, so that the concrete is prevented from splashing out of the place to be poured; simultaneously, through the setting of grip block for this construction equipment can be comparatively stable place at the top of waiting to pour the structure, and cooperation traction wheel and ball make the device can be along waiting to pour place smooth movement, thereby adjust and pour the position.

Description

Construction device for secondary structure concrete pouring
Technical Field
The utility model relates to the technical field of construction, in particular to a construction device for secondary structure concrete pouring.
Background
At present, in the house building construction, in order to ensure that the self weight of a main building structure is reduced, a non-bearing wall body is usually considered to be a filling wall or a secondary structure to be poured in the design, and meanwhile, a plurality of relatively narrow positions such as door and window reinforcing frames are used for pouring concrete, so that a small concrete pouring device convenient to carry is needed, and the small concrete pouring device can move among floors and can meet the works such as stirring and pouring.
The utility model discloses a concrete pouring device with a secondary structure for a green building, which is disclosed in China patent publication No. CN216341003U, wherein a tapered opening which is contracted towards the center is arranged at one end of a discharging nozzle, which is far away from a connecting pipe, and a disturbance piece which penetrates into a perforation is arranged in the discharging nozzle, and a driving piece which is used for driving the disturbance piece to axially move along the perforation is arranged outside the peripheral wall of the discharging nozzle, so that the effect that the discharge pipe is easy to be blocked due to excessive discharging in a short time when a small-caliber discharge pipe is selected is improved.
In actual use, in the concrete pouring construction process, the hopper is required to be used for discharging, the sealing door at the bottom of the hopper is opened to discharge concrete to a pouring position, but the sealing at the bottom of the common hopper is fixed through simple hinging and other fixing devices, the sealing performance is extremely poor, part of concrete is easy to leak out during use, and the concrete is wasted, so that the construction device for secondary structure concrete pouring is developed.
Disclosure of Invention
The utility model aims to provide a construction device for secondary structure concrete pouring, which aims to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a construction equipment of secondary structure concrete placement, includes leads thick liquid shell, it includes a shell main part to lead the thick liquid shell, the both sides inner wall of shell main part is fixedly connected with guide board respectively, two the slope guide face has been seted up respectively to the opposite side of guide board, and two the opposite side bottom of guide board is fixedly connected with a slice of inner shield respectively, every the inner shield board all extends to outside the bottom of shell main part, every a plurality of hemisphere grooves have all evenly been seted up to the bottom of guide board, every all rotate the gomphosis between the inner wall in hemisphere groove has a ball, a guide mouth has been seted up to the top side of leading thick liquid shell.
Preferably, two groups of rotating frames are symmetrically and fixedly connected to two sides of the slurry guiding shell, a rotating shaft is fixedly connected between opposite sides of each group of rotating frames, a clamping plate is rotatably connected to the outer side of each rotating shaft, and a limiting strip is fixedly connected to the top side of each clamping plate.
Preferably, two opposite sides of the clamping plates are respectively provided with a telescopic slot, and opposite sides of the two clamping plates are respectively provided with a plurality of sliding ports, each sliding port penetrates through the corresponding telescopic slot, and a sliding rod is respectively connected between the inner walls of the sliding ports in a sliding manner.
Preferably, one end of each sliding rod facing the corresponding telescopic groove is fixedly connected with a blocking piece respectively, the other end of each sliding rod is rotationally connected with a traction wheel respectively, and two sides of each traction wheel are provided with a circle of arc-shaped contact edges respectively.
Preferably, each of the opposite sides of the clamping plates is fixedly connected with a containing shell, each containing shell is matched with a corresponding telescopic groove, the inner wall of each containing shell is fixedly connected with a plurality of springs, and each spring corresponds to one blocking piece and is fixedly connected with the corresponding blocking piece.
Preferably, the top side of the shell main body is fixedly connected with an outer connecting pipe, and the outer wall of the outer connecting pipe is fixedly connected with the inner wall of the material guiding port.
Preferably, the top side of the shell main body is fixedly connected with a circle of inner connecting frame, two bendable clamping pieces are symmetrically and fixedly connected to the inner side of the inner connecting frame, two clamping bolts are respectively and spirally connected to the two sides of the inner connecting frame, and one end of each clamping bolt can be contacted with the outer side of the corresponding clamping piece.
Compared with the prior art, the utility model has the beneficial effects that:
according to the construction device for pouring the concrete with the secondary structure, the concrete slurry is poured into the space to be poured through the inclined guide plate, and the bottom end part of the inner shielding plate stretches into the space to be poured through the arrangement of the inner shielding plate, so that the concrete is prevented from splashing out of the place to be poured;
simultaneously, through the setting of grip block for this construction equipment can be comparatively stable place at the top of waiting to pour the structure, and cooperation traction wheel and ball make the device can be along waiting to pour place smooth movement, thereby adjust and pour the position.
Drawings
FIG. 1 is an isometric view of the present utility model;
FIG. 2 is a schematic view of a slurry guiding shell structure according to the present utility model;
FIG. 3 is a schematic view of a clamping traction device according to the present utility model;
fig. 4 is a schematic structural view of the engagement device of the present utility model.
In the figure: 1. a slurry guiding shell; 101. a housing main body; 102. a guide plate; 103. a ball; 104. an inner shield; 105. a rotating frame; 106. a material guiding port; 2. clamping the traction device; 201. a limit bar; 202. a clamping plate; 203. a traction wheel; 204. a slide bar; 205. a blocking piece; 206. a spring; 207. a housing case; 3. a linking device; 301. a clamping piece; 302. a clamping bolt; 303. an outer connecting pipe; 304. a transition port; 305. and (5) inscribing the frame.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
As shown in fig. 1 to 4, the present utility model provides a technical solution: the utility model provides a construction equipment of secondary structure concrete placement, including leading thick liquid shell 1, lead thick liquid shell 1 includes a shell main part 101, the both sides inner wall of shell main part 101 is fixedly connected with guide board 102 respectively, the slope guide face has been seted up respectively to the opposite side of two guide boards 102, and the opposite side bottom of two guide boards 102 is fixedly connected with a slice of interior sunshade 104 respectively, every interior sunshade 104 all extends to outside the bottom of shell main part 101, a plurality of hemisphere grooves have all evenly been seted up to the bottom of every guide board 102, a ball 103 has all been rotated the gomphosis between the inner wall of every hemisphere groove, a guide mouth 106 has been seted up to the topside of leading thick liquid shell 1. In this embodiment, the concrete grout is injected into the interior of the housing main body 101 through the material guiding opening 106, and is injected into the space to be poured through the bottom opening of the housing main body 101, and the arrangement of the inner shielding plate 104 allows the concrete grout to be completely injected into the space to be poured, so that waste is avoided.
Two groups of rotating frames 105 are symmetrically and fixedly connected to two sides of the slurry guiding shell 1, a rotating shaft is fixedly connected between opposite sides of each group of rotating frames 105, a clamping traction device 2 is rotatably connected to the outer side of each rotating shaft, the slurry guiding shell comprises clamping plates 202, and a limiting strip 201 is fixedly connected to the top side of each clamping plate 202. The opposite sides of the two clamping plates 202 are respectively provided with a telescopic slot, the opposite sides of the two clamping plates 202 are respectively provided with a plurality of sliding ports, each sliding port penetrates into the corresponding telescopic slot, and a sliding rod 204 is respectively connected between the inner walls of the sliding ports in a sliding manner. One end of each sliding rod 204 facing the corresponding telescopic groove is fixedly connected with a blocking sheet 205 respectively, the other end of each sliding rod is rotatably connected with a traction wheel 203 respectively, and two sides of each traction wheel 203 are provided with a circle of arc-shaped contact edges respectively. Each holding plate 202 is fixedly connected with a holding shell 207 on the opposite side, each holding shell 207 is matched with the corresponding telescopic groove, the inner wall of each holding shell 207 is fixedly connected with a plurality of springs 206, and each spring 206 corresponds to one blocking plate 205 and is fixedly connected with the corresponding blocking plate 205. In this embodiment, the clamping plate 202 sags under the action of gravity so that the traction wheel 203 contacts the outside of the place to be poured, and the traction wheel 203 is shaped so as to be capable of forming an angle with the outside of the place to be poured without impeding the rolling of the traction wheel 203, and at the same time, there is a need to provide devices such as traction ropes on both sides of the housing main body 101 so that a worker can pull the devices to move.
The top side of the shell main body 101 is fixedly connected with a connecting device 3, which comprises an external connection pipe 303, and the outer wall of the external connection pipe 303 is fixedly connected with the inner wall of the material guiding port 106. The top side of the shell main body 101 is fixedly connected with a circle of inner connecting frame 305, the inner side of the inner connecting frame 305 is symmetrically and fixedly connected with two bendable clamping pieces 301, two sides of the inner connecting frame 305 are respectively connected with a clamping bolt 302 in a screwed mode, and one end of each clamping bolt 302 can be in contact with the outer side of the corresponding clamping piece 301. In this embodiment, the injection pipe is inserted between the inner frame 305 and the outer pipe 303, and the inner side of the clamping piece 301 is tightly attached by the clamping bolt 302, and meanwhile, an arc-shaped transition port 304 is formed on the inner wall of the outer pipe 303, so that concrete slurry can flow in more thoroughly through the inside of the outer pipe 303.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made hereto without departing from the spirit and scope of the utility model as defined by the appended embodiments and equivalents thereof.

Claims (7)

1. The utility model provides a construction equipment of secondary structure concrete placement, includes guide thick liquid shell (1), its characterized in that: the pulp guiding shell (1) comprises a shell main body (101), two side inner walls of the shell main body (101) are fixedly connected with a guide plate (102) respectively, two opposite sides of the guide plate (102) are provided with inclined guide surfaces respectively, two opposite side bottom ends of the guide plate (102) are fixedly connected with an inner shielding plate (104) respectively, each inner shielding plate (104) extends out of the bottom side of the shell main body (101), a plurality of hemispherical grooves are uniformly formed in the bottom side of each guide plate (102), a ball (103) is rotatably embedded between the inner walls of each hemispherical groove, and a guide opening (106) is formed in the top side of the pulp guiding shell (1).
2. The construction device for secondary structure concrete pouring according to claim 1, wherein: two groups of rotating frames (105) are symmetrically and fixedly connected to two sides of the slurry guiding shell (1), a rotating shaft is fixedly connected between opposite sides of each group of rotating frames (105), a clamping plate (202) is rotatably connected to the outer side of each rotating shaft, and a limiting strip (201) is fixedly connected to the top side of each clamping plate (202).
3. The construction device for secondary structure concrete pouring according to claim 2, wherein: the two clamping plates (202) are respectively provided with a telescopic slot on the opposite sides, a plurality of sliding ports are respectively arranged on the opposite sides of the two clamping plates (202), each sliding port penetrates through the corresponding telescopic slot, and a sliding rod (204) is respectively connected between the inner walls of the sliding ports in a sliding manner.
4. A construction device for secondary structure concrete placement according to claim 3, characterized in that: one end of each sliding rod (204) facing the corresponding telescopic groove is fixedly connected with a blocking piece (205) respectively, the other end of each sliding rod is rotationally connected with a traction wheel (203) respectively, and two sides of each traction wheel (203) are provided with a circle of arc-shaped contact edges respectively.
5. The construction device for secondary structure concrete pouring according to claim 4, wherein: each clamping plate (202) is fixedly connected with a containing shell (207) on the opposite side respectively, each containing shell (207) is matched with a corresponding telescopic groove, a plurality of springs (206) are fixedly connected to the inner wall of each containing shell (207) respectively, and each spring (206) corresponds to one blocking piece (205) and is fixedly connected with the corresponding blocking piece (205).
6. The construction device for secondary structure concrete pouring according to claim 1, wherein: the top side of the shell main body (101) is fixedly connected with an external connection pipe (303), and the outer wall of the external connection pipe (303) is fixedly connected with the inner wall of the material guide opening (106).
7. The construction device for secondary structure concrete pouring according to claim 6, wherein: the shell is characterized in that a circle of inner connecting frame (305) is fixedly connected to the top side of the shell main body (101), two bendable clamping pieces (301) are symmetrically and fixedly connected to the inner side of the inner connecting frame (305), two clamping bolts (302) are respectively screwed to the two sides of the inner connecting frame (305), and one end of each clamping bolt (302) can be contacted with the outer side of the corresponding clamping piece (301).
CN202321364208.2U 2023-05-31 2023-05-31 Construction device for secondary structure concrete pouring Active CN219910016U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321364208.2U CN219910016U (en) 2023-05-31 2023-05-31 Construction device for secondary structure concrete pouring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321364208.2U CN219910016U (en) 2023-05-31 2023-05-31 Construction device for secondary structure concrete pouring

Publications (1)

Publication Number Publication Date
CN219910016U true CN219910016U (en) 2023-10-27

Family

ID=88432743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321364208.2U Active CN219910016U (en) 2023-05-31 2023-05-31 Construction device for secondary structure concrete pouring

Country Status (1)

Country Link
CN (1) CN219910016U (en)

Similar Documents

Publication Publication Date Title
CN216587140U (en) Assembled wall structure
CN219910016U (en) Construction device for secondary structure concrete pouring
CN110106839B (en) Anticorrosive formula gate convenient to open and resistance to compression
CN217001029U (en) Plugging structure for opening of civil air defense engineering wall
CN211993463U (en) Template of casting mold
CN210086649U (en) Box-type assembly building board with prefabricated window
CN108745115A (en) A kind of coating preparation coating material agitator for being convenient for improving stirring efficiency
CN212795414U (en) Building mortar arranges material jar
CN209353718U (en) It is a kind of can be with the concrete hopper of quickly discharging material
CN208576008U (en) A kind of auxiliary funnel for filling concrete in steel-concrete combined structure
CN208618755U (en) A kind of Portable wall surface apparatus of plastering
CN111963102A (en) Automatic grouting device for water burst in drilling
CN215094608U (en) Sand material unloader in ready-mixed mortar production line
CN220084445U (en) Mortar mixing and sampling device
CN111827660A (en) Building foundation is built with pouring template
CN215400651U (en) Anti-sticking mortar concrete discharge door
CN220705202U (en) Novel concrete hopper
CN218437811U (en) Connection structure for assembly type building
CN220538687U (en) House deep foundation pit plugging device
CN220318533U (en) Hole sealing device for pumping concrete inlet
CN218061256U (en) Plastering device for mortar gypsum
CN216887983U (en) Prevent electroplating of leakage and use plating solution storage device
CN209292401U (en) A kind of aluminium sheet quenching sink
CN211389528U (en) Discharging guide mechanism of stirrer
CN219237868U (en) Used sand quantification device for ductile iron finish machining

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant