CN219909875U - Steel construction main part construction bracket - Google Patents

Steel construction main part construction bracket Download PDF

Info

Publication number
CN219909875U
CN219909875U CN202321207724.4U CN202321207724U CN219909875U CN 219909875 U CN219909875 U CN 219909875U CN 202321207724 U CN202321207724 U CN 202321207724U CN 219909875 U CN219909875 U CN 219909875U
Authority
CN
China
Prior art keywords
fixed mounting
plate
seat
movable
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321207724.4U
Other languages
Chinese (zh)
Inventor
冯洪明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yiwu Third Construction Engineering Co ltd
Original Assignee
Yiwu Third Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yiwu Third Construction Engineering Co ltd filed Critical Yiwu Third Construction Engineering Co ltd
Priority to CN202321207724.4U priority Critical patent/CN219909875U/en
Application granted granted Critical
Publication of CN219909875U publication Critical patent/CN219909875U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a steel structure main body building construction bracket which comprises a movable seat, wherein a movable mechanism is arranged on the movable seat, a lifting assembly is arranged on the movable seat, the movable mechanism comprises reinforcing plates fixedly arranged on the left side and the right side of the movable seat, a friction pad is fixedly arranged at the bottom of each reinforcing plate, a limiting rod is fixedly arranged in the movable seat, an electric push rod is fixedly arranged on the inner top wall of the movable seat, a lifting plate in sliding connection with the limiting rod is fixedly arranged at the output end of the electric push rod, and a spring is fixedly arranged on the inner bottom wall of the movable seat. This steel construction main part construction bracket, through the mobile mechanism who sets up, when using construction bracket to construct steel construction main part, through moving the mutually supporting between each structure of seat inside, but convenient and fast removes the bracket to place the use after removing steadily, thereby promote the practicality of bracket, the staff of being convenient for more uses.

Description

Steel construction main part construction bracket
Technical Field
The utility model belongs to the technical field of building construction, and particularly relates to a steel structure main body building construction bracket.
Background
The steel structure is a structure formed by steel materials, is one of main building structure types, mainly comprises steel beams, steel columns, steel trusses and other components made of steel sections, steel plates and the like, adopts the rust removal and rust prevention processes of silanization, pure manganese phosphating, washing and drying, galvanization and the like, and is connected with each component or part by adopting welding seams, bolts or rivets.
Please refer to a steel construction main part construction bracket with bulletin number of CN210289234U, which comprises a rectangular support, the front side bottom left side bolted connection of rectangle support has first gear motor, first gear motor's output is provided with elevating system, elevating system's top is provided with fixture, and this steel construction main part construction bracket realizes the up-and-down motion of diaphragm through structures such as rectangle support, first gear motor, first gear, diagonal bar, diaphragm, push rod, horizontal pole, realizes the regulation of bracket height, realizes supporting the building bracket of equidimension through structures such as second gear motor, worm, support frame, worm wheel, rack, splint, simple structure, and the suitability is strong.
However, the following defects still exist in the above patent, the construction bracket is generally heavy, when the construction bracket is used, a moving structure is not arranged, when the construction bracket is moved, other tools are needed, the bracket is not convenient to move by a worker at will, a little inconvenience is brought to the user, the working efficiency of the worker is easily influenced, and therefore the practicability of the bracket is reduced.
Disclosure of Invention
The utility model aims to provide a steel structure main body building construction bracket, which solves the problems that in the prior art, when the construction bracket is used, a moving structure is not arranged, when the construction bracket is moved, other tools are needed, the bracket is inconvenient to move by a worker at will, a little inconvenience is brought to the user, the working efficiency of the worker is easily influenced, and the practicability of the bracket is reduced.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the steel structure main body building construction bracket comprises a movable seat, wherein a movable mechanism is arranged on the movable seat, and a lifting assembly is arranged on the movable seat;
the utility model discloses a movable seat, including the fixed mounting, the movable seat is fixed on the fixed mounting, the movable mechanism includes fixed mounting in the reinforcing plate of movable seat left and right sides, the bottom fixed mounting of reinforcing plate has the friction pad, the inside fixed mounting who removes the seat has the gag lever post, fixed mounting has electric putter on the interior roof of movable seat, electric putter's output fixed mounting has the lifter plate with gag lever post sliding connection, fixed mounting has the spring on the diapire in the movable seat, the universal wheel is installed to the bottom of lifter plate, the top fixed mounting who removes the seat has the fixed plate.
Preferably, the lifting assembly comprises protection plates which are fixedly arranged at the top of a fixed plate and two in number, a double-shaft servo motor is fixedly arranged at the top of the fixed plate, a screw rod which is rotationally connected with the protection plates is fixedly connected with an output shaft of the double-shaft servo motor, a movable block is connected with the outer side of the screw rod in a threaded manner, a connecting frame is hinged at the top of the movable block, two installation plates are fixedly connected to the inner walls of the protection plates in a sliding manner, positioning blocks hinged with the connecting frame are fixedly arranged at the bottom of the installation plates, a placement box is fixedly arranged at the top of the installation plates, and a baffle is fixedly arranged at one side, opposite to the protection plates, of each installation plate.
Preferably, the friction pad is made of rubber and has a thickness of five centimeters.
Preferably, the inside of lifter plate has seted up the slide hole, the lifter plate passes through slide hole and gag lever post sliding connection.
Preferably, a first through groove is formed in the bottom of the movable seat, and the position of the first through groove corresponds to that of the universal wheel.
Preferably, a threaded hole corresponding to the threaded groove on the screw rod is formed in the movable block, and the movable block is in threaded connection with the screw rod through the corresponding threaded hole.
Preferably, the top of fixed plate has seted up the spacing groove, the movable block passes through spacing groove and fixed plate sliding connection.
Preferably, the inner walls of two opposite sides of the protection plate are provided with sliding grooves, and the mounting plate is in sliding connection with the protection plate through the sliding grooves.
Compared with the prior art, the utility model has the following beneficial effects:
1. this steel construction main part construction bracket, through the mobile mechanism who sets up, when using construction bracket to construct steel construction main part, through moving the mutually supporting between each structure of seat inside, but convenient and fast removes the bracket to place the use after removing steadily, thereby promote the practicality of bracket, the staff of being convenient for more uses.
2. This steel construction main part building construction bracket through the lifting unit who sets up, when lifting construction material, through mutually supporting between each structure on the fixed plate, lift and decline stable to the material to make things convenient for the staff to construct steel construction main part at not co-altitude, help promoting staff's work efficiency.
Drawings
FIG. 1 is a schematic cross-sectional view of the structure of the present utility model;
FIG. 2 is a schematic elevational view of the structure of the present utility model;
fig. 3 is a schematic top view of the structure of the present utility model.
In the figure: 1. a movable seat; 2. a reinforcing plate; 3. a friction pad; 4. a limit rod; 5. an electric push rod; 6. a lifting plate; 7. a spring; 8. a universal wheel; 9. a fixing plate; 10. a protection plate; 11. a biaxial servo motor; 12. a screw rod; 13. a movable block; 14. a connecting frame; 15. a mounting plate; 16. a positioning block; 17. placing a box; 18. and a baffle.
Detailed Description
The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model.
Referring to fig. 1-3, a steel structure main body building construction bracket comprises a movable seat 1, wherein a movable mechanism is arranged on the movable seat 1, and a lifting assembly is arranged on the movable seat 1.
In this embodiment, the mobile mechanism includes fixed mounting in the reinforcing plate 2 of the left and right sides of moving seat 1, and the bottom fixed mounting of reinforcing plate 2 has friction pad 3, and friction pad 3 is made for rubber, and thickness is five centimetres, conveniently when moving seat 1 and ground contact through friction pad 3 further strengthen the frictional force with the ground to make the construction bracket more stable when using, the inside fixed mounting who removes seat 1 has gag lever post 4, fixed mounting has electric putter 5 on the interior roof of moving seat 1.
Wherein, electric putter's 5 output fixed mounting has lifter plate 6 with gag lever post 4 sliding connection, the sliding hole has been seted up to lifter plate 6's inside, lifter plate 6 passes through sliding hole and gag lever post 4 sliding connection, make things convenient for lifter plate 6 to pass through the smooth movement of sliding hole on gag lever post 4 when electric putter 5 promotes, fixed mounting has spring 7 on the diapire in the removal seat 1, universal wheel 8 is installed to lifter plate 6's bottom, first logical groove has been seted up to removal seat 1's bottom, and first logical groove position is corresponding with universal wheel 8 positions, make things convenient for universal wheel 8 to extend to removal seat 1's bottom through first logical groove, thereby be convenient for remove the construction bracket, removal seat 1's top fixed mounting has fixed plate 9.
In this embodiment, lifting unit includes fixed mounting in fixed plate 9 top and the guard plate 10 that quantity is two, and fixed plate 9's top fixed mounting has biax servo motor 11, and the equal fixedly connected with of output shaft of biax servo motor 11 rotates the lead screw 12 of being connected with guard plate 10, and the outside threaded connection of lead screw 12 has movable block 13, and the screw hole corresponding with the screw thread groove on the lead screw 12 has been seted up to the inside of movable block 13, and movable block 13 is through corresponding screw hole and lead screw 12 threaded connection, makes things convenient for movable block 13 to carry out relative or back to back movement on lead screw 12 through the screw hole.
Wherein, the spacing groove has been seted up at the top of fixed plate 9, and limiting groove and fixed plate 9 sliding connection are passed through to movable block 13, and the convenience is spacing to movable block 13 through the spacing groove, makes movable block 13 can be stable remove on lead screw 12, and the top of movable block 13 articulates there is link 14, all sliding connection has mounting panel 15 on the inner wall of two guard plates 10, and the bottom fixed mounting of mounting panel 15 has with link 14 looks articulated locating piece 16.
Wherein, the top fixed mounting of mounting panel 15 has placed case 17, all offered the sliding tray on the inner wall of two guard plates 10 opposite sides, mounting panel 15 passes through sliding tray and guard plate 10 sliding connection, conveniently can be through the stable removal of sliding tray on guard plate 10 when mounting panel 15 goes up and down to make to place the inside material of case 17 steadily and go up and down to the use height, two equal fixed mounting baffle 18 in one side that guard plate 10 is opposite are convenient for shelter from each structure on the fixed plate 9 through baffle 18, thereby reduce the potential safety hazard.
When the construction bracket is used, when the construction bracket needs to be moved, the electric push rod 5 is started to drive the lifting plate 6 to compress the bottom spring 7, the universal wheel 8 is enabled to extend to the bottom of the movable seat 1 stably and slowly, then a worker pushes the bracket to a use position, the universal wheel 8 is enabled to retract to the inside of the movable seat 1 at the use position by utilizing the electric push rod 5, the friction pad 3 at the bottoms of the movable seat 1 and the reinforcing plate 2 is enabled to be in contact with the ground, the friction force with the ground is increased, the stable use of the bracket is facilitated, construction materials can be placed in the placement box 17, then the double-shaft servo motor 11 is started to drive the movable block 13 at the outer side of the screw rod 12 to move relatively, and the movable block 13 is enabled to drive the connecting frame 14 to lift the mounting plate 15 to different height positions, so that the worker can construct a steel structure main body conveniently.
To sum up, this steel construction main part building construction bracket, through the mobile mechanism of setting and through the mobile mechanism of setting, when using construction bracket to construct steel construction main part, through the mutually supporting between each inside structure of movable seat 1, but convenient and fast removes the bracket to place the use after removing steadily, and through the mutually supporting between each structure on the fixed plate 9, lift and decline that the material is stable, thereby make things convenient for the staff to construct steel construction main part at different co-altitude, thereby promote the practicality of bracket, the staff of being convenient for more uses, help promoting staff's work efficiency.

Claims (8)

1. The utility model provides a steel construction main part building construction bracket, includes and removes seat (1), its characterized in that: a moving mechanism is arranged on the moving seat (1), and a lifting assembly is arranged on the moving seat (1);
the utility model provides a movable device, including fixed mounting in reinforcing plate (2) of movable seat (1) left and right sides, the bottom fixed mounting of reinforcing plate (2) has friction pad (3), the inside fixed mounting who removes seat (1) has gag lever post (4), fixed mounting has electric putter (5) on the interior roof of movable seat (1), the output fixed mounting of electric putter (5) has lifter plate (6) with gag lever post (4) sliding connection, fixed mounting has spring (7) on the diapire in removing seat (1), universal wheel (8) are installed to the bottom of lifter plate (6), the top fixed mounting who removes seat (1) has fixed plate (9).
2. A steel construction main body construction bracket according to claim 1, wherein: lifting assembly includes fixed mounting in guard plate (10) that fixed plate (9) top and quantity are two, the top fixed mounting of fixed plate (9) has biax servo motor (11), the equal fixedly connected with of output shaft of biax servo motor (11) rotates lead screw (12) of being connected with guard plate (10), the outside threaded connection of lead screw (12) has movable block (13), the top of movable block (13) articulates there is link (14), equal sliding connection has mounting panel (15) on the inner wall of guard plate (10), the bottom fixed mounting of mounting panel (15) has locating piece (16) with link (14) looks articulated, the top fixed mounting of mounting panel (15) has places case (17), two equal fixed mounting in one side that guard plate (10) are relative baffle (18).
3. A steel construction main body construction bracket according to claim 1, wherein: the friction pad (3) is made of rubber and has a thickness of five centimeters.
4. A steel construction main body construction bracket according to claim 1, wherein: the lifting plate (6) is internally provided with a sliding hole, and the lifting plate (6) is in sliding connection with the limiting rod (4) through the sliding hole.
5. A steel construction main body construction bracket according to claim 1, wherein: the bottom of the movable seat (1) is provided with a first through groove, and the position of the first through groove corresponds to the position of the universal wheel (8).
6. A steel construction main body construction bracket according to claim 2, wherein: screw holes corresponding to the screw grooves on the screw rods (12) are formed in the movable blocks (13), and the movable blocks (13) are in threaded connection with the screw rods (12) through the corresponding screw holes.
7. A steel construction main body construction bracket according to claim 2, wherein: the top of fixed plate (9) has seted up the spacing groove, movable block (13) pass through spacing groove and fixed plate (9) sliding connection.
8. A steel construction main body construction bracket according to claim 2, wherein: the inner walls of two opposite sides of the protection plates (10) are respectively provided with a sliding groove, and the mounting plates (15) are in sliding connection with the protection plates (10) through the sliding grooves.
CN202321207724.4U 2023-05-18 2023-05-18 Steel construction main part construction bracket Active CN219909875U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321207724.4U CN219909875U (en) 2023-05-18 2023-05-18 Steel construction main part construction bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321207724.4U CN219909875U (en) 2023-05-18 2023-05-18 Steel construction main part construction bracket

Publications (1)

Publication Number Publication Date
CN219909875U true CN219909875U (en) 2023-10-27

Family

ID=88440777

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321207724.4U Active CN219909875U (en) 2023-05-18 2023-05-18 Steel construction main part construction bracket

Country Status (1)

Country Link
CN (1) CN219909875U (en)

Similar Documents

Publication Publication Date Title
CN214200028U (en) Steel construction deformation detection device
CN211541002U (en) Assembly jig is used in processing of large-scale steel construction
CN219909875U (en) Steel construction main part construction bracket
CN218612611U (en) Steel construction welding set convenient to upset
CN106882719B (en) Low clearance electric hoist with endless chain
CN115922085A (en) Welding set is used in bridge construction
CN216690280U (en) Intelligent elevator for building engineering construction
CN113735029A (en) Auxiliary lifting device for mounting multifunctional overhead pipeline
CN115326001A (en) Steel structure dynamic deformation measuring device and measuring method thereof
CN117146160A (en) Portable mobile mounting frame for electromechanical equipment
CN219599423U (en) Clamping device for steel structure machining
CN215097952U (en) Electric automobile front suspension sectional fixture
CN218061535U (en) Steel construction lift angle adjusting device for management integrates based on building site
CN110700604A (en) Assembly type laminated slab mounting trolley and using method thereof
CN214218085U (en) Supporting equipment for mounting metal door and window glass
CN217475429U (en) Forklift part clamping tool
CN220446302U (en) Turning device that steel construction processing was used
CN211615521U (en) Auxiliary installation device for glass curtain wall
CN216152231U (en) Scrapped engine assembly disassembling device
CN210029957U (en) Aerial work platform for electric power engineering
CN220117834U (en) Supporting structure for building steel structure
CN219509227U (en) Beam column handling device for municipal house construction
CN214942185U (en) Movable scaffold
CN218643219U (en) Safe construction platform convenient to adjust
CN216419876U (en) Surface coating device for metal combining piece

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant