CN219905910U - An ore conveying device - Google Patents

An ore conveying device Download PDF

Info

Publication number
CN219905910U
CN219905910U CN202321241883.6U CN202321241883U CN219905910U CN 219905910 U CN219905910 U CN 219905910U CN 202321241883 U CN202321241883 U CN 202321241883U CN 219905910 U CN219905910 U CN 219905910U
Authority
CN
China
Prior art keywords
ore
water tank
conveying device
main body
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321241883.6U
Other languages
Chinese (zh)
Inventor
陈洪
严鹏
薛剑
黄磊
余嘉翔
王强
魏烜昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Jinbao Mining Co Ltd
Original Assignee
Fuyun Jinshan Mining And Metallurgy Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuyun Jinshan Mining And Metallurgy Co ltd filed Critical Fuyun Jinshan Mining And Metallurgy Co ltd
Priority to CN202321241883.6U priority Critical patent/CN219905910U/en
Application granted granted Critical
Publication of CN219905910U publication Critical patent/CN219905910U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacture And Refinement Of Metals (AREA)

Abstract

本实用新型提供一种矿石输送装置,涉及矿石加工相关技术领域,包括支撑座主体,所述支撑座主体的下端均匀焊接有支撑柱,所述支撑座主体的内侧设置有清洁机构。该矿石输送装置,通过清洁机构的设置,在较大矿石运输到第二滚筒时,由于多组第二滚筒呈倾斜角度,会因为重力往下运输,在运输过程中,控制盒会控制水泵将水箱中的水运输到管道,控制高压喷头对较大矿石进行清洗,产生的废水会从第二滚筒的缝隙流到废水箱中,再由排水口进行排出,剩余的较小的矿石泥沙可以通过滑轨将废水箱进行整个抽出,从而将内部泥沙矿石倒出,将矿石进行清洗后,提高了矿石的品质,减少了粉尘和有害气体的产生,便于后期矿石的加工储存。

The utility model provides an ore conveying device, which relates to the technical field related to ore processing, and includes a support base body. The lower end of the support base body is evenly welded with support columns, and a cleaning mechanism is provided on the inside of the support base body. This ore conveying device, through the setting of the cleaning mechanism, when the larger ore is transported to the second roller, due to the inclined angle of the multiple sets of second rollers, it will be transported downward due to gravity. During the transportation process, the control box will control the water pump to The water in the water tank is transported to the pipeline, and the high-pressure nozzle is controlled to clean the larger ores. The waste water generated will flow from the gap of the second drum to the waste water tank, and then be discharged from the drainage outlet. The remaining smaller ore and sediment can be The entire waste water tank is pumped out through the slide rail, thereby pouring out the internal sediment ore. After cleaning the ore, the quality of the ore is improved, the generation of dust and harmful gases is reduced, and the later processing and storage of the ore is facilitated.

Description

一种矿石输送装置An ore conveying device

技术领域Technical field

本实用新型涉及矿石加工相关技术领域,尤其涉及一种矿石输送装置。The utility model relates to the technical field related to ore processing, and in particular to an ore conveying device.

背景技术Background technique

矿石加工是指对矿石进行物理、化学手段以及机械力作用来改变其原有性质,并分离提取有用成分的过程。它是矿业发展中必不可少的环节之一,其中破碎是最开始的环节,在对巨大矿石破碎后,需要对矿石进行输送,便于后续的加工,因此,需要提供一种矿石输送装置。Ore processing refers to the process of applying physical, chemical and mechanical forces to ores to change their original properties and separate and extract useful components. It is one of the essential links in the development of mining industry, among which crushing is the first link. After crushing the huge ore, the ore needs to be transported to facilitate subsequent processing. Therefore, it is necessary to provide an ore conveying device.

经检索,专利号为“CN214003401U”提供了“一种矿石输送装置,包括底梁、投料机构、传动机构和导料机构;所述投料机构包括投料支架和投料漏斗,所述投料支架设置于所述底梁的顶部,所述投料漏斗设置于所述投料支架顶部;所述传动机构设置于所述底梁的顶部,并位于所述投料漏斗的底部,所述传动机构位于所述投料漏斗下方的一部分水平设置,另一部分向上倾斜;所述导料机构设置于所述传动机构的顶端,用于将矿石导出所述传动机构。本实用新型采用上述结构的一种矿石输送装置,该装置能够有效避免在矿石提升过程中的矿石下滚问题,提升了提升效率”,矿石在采集时会受到许多污染物的侵蚀,表面会有很多粉尘和杂质颗粒,会使矿石的品质下降,在矿石进行运输时,如若不对矿石进行清洗,可能会产生大量粉尘和有害气体,会对人体的健康和环境造成污染。After searching, the patent number "CN214003401U" provides "an ore conveying device, including a bottom beam, a feeding mechanism, a transmission mechanism and a guiding mechanism; the feeding mechanism includes a feeding bracket and a feeding funnel, and the feeding bracket is arranged on the The top of the bottom beam, the feeding funnel is arranged on the top of the feeding bracket; the transmission mechanism is arranged on the top of the bottom beam and is located at the bottom of the feeding funnel, and the transmission mechanism is located below the feeding funnel One part is set horizontally and the other part is inclined upward; the material guide mechanism is set at the top of the transmission mechanism and is used to guide the ore out of the transmission mechanism. The utility model adopts an ore conveying device with the above structure, which can It effectively avoids the problem of ore rolling down during the ore lifting process and improves the lifting efficiency." The ore will be eroded by many pollutants during collection, and there will be a lot of dust and impurity particles on the surface, which will reduce the quality of the ore. If the ore is not cleaned during transportation, a large amount of dust and harmful gases may be produced, which will cause pollution to human health and the environment.

于是,我们提供了一种矿石输送装置。Therefore, we provide an ore conveying device.

实用新型内容Utility model content

本实用新型的目的在于提供一种矿石输送装置,解决上述背景技术中提出的问题。The purpose of this utility model is to provide an ore conveying device to solve the problems raised in the above background technology.

为实现上述目的,本实用新型提供如下技术方案:一种矿石输送装置,包括支撑座主体和清洁机构,所述支撑座主体的下端均匀焊接有支撑柱,所述支撑座主体的内侧设置有清洁机构,所述支撑座主体的内侧焊接有固定轴,所述固定轴的外侧转动连接有第二滚筒。In order to achieve the above purpose, the present utility model provides the following technical solution: an ore conveying device, including a support body and a cleaning mechanism. The lower end of the support body is evenly welded with support columns, and the inside of the support body is provided with a cleaning mechanism. Mechanism, a fixed shaft is welded to the inner side of the main body of the support seat, and a second roller is rotatably connected to the outer side of the fixed shaft.

优选的,所述支撑座主体的一侧焊接有固定板,所述固定板的上端螺栓连接有第一电机,所述第一电机的一端转动连接有第一滚筒,所述第一滚筒的外侧设置有皮带。Preferably, a fixed plate is welded to one side of the main body of the support base, the upper end of the fixed plate is bolted to a first motor, one end of the first motor is rotatably connected to a first roller, and the outer side of the first roller is Equipped with a belt.

优选的,所述支撑座主体的上端一侧焊接有支撑板,所述支撑板的上端固定连接有进料箱,所述进料箱的一侧固定连接有第二电机,所述第二电机的一端设置有旋转柱,所述旋转柱的外侧设置有锯筒,所述锯筒通过旋转柱与第二电机构成旋转结构。Preferably, a support plate is welded to one side of the upper end of the support base body, a feed box is fixedly connected to the upper end of the support plate, and a second motor is fixedly connected to one side of the feed box. The second motor A rotating column is provided at one end of the rotating column, and a saw barrel is provided on the outside of the rotating column. The saw barrel forms a rotating structure through the rotating column and the second motor.

优选的,所述清洁机构包括固定轴、第二滚筒、挡水板、滑轨、废水箱、排水口、高压喷头、管道、水泵、水箱和控制盒。Preferably, the cleaning mechanism includes a fixed shaft, a second roller, a water baffle, a slide rail, a waste water tank, a drain outlet, a high-pressure nozzle, a pipe, a water pump, a water tank and a control box.

优选的,所述第二滚筒设置有多组,所述支撑座主体的下端焊接有挡水板,所述挡水板的一侧焊接有滑轨,所述滑轨的内侧滑动连接有废水箱,所述废水箱的表面开设有排水口。Preferably, the second roller is provided with multiple groups, a water shield is welded to the lower end of the main body of the support seat, a slide rail is welded to one side of the water shield, and a waste water tank is slidably connected to the inside of the slide rail. , a drainage outlet is provided on the surface of the waste water tank.

优选的,所述支撑座主体的上方设置有高压喷头,所述高压喷头的上端连接有管道,所述高压喷头设置有四组。Preferably, a high-pressure nozzle is provided above the main body of the support seat, the upper end of the high-pressure nozzle is connected to a pipeline, and four groups of the high-pressure nozzle are provided.

优选的,所述管道的一端连接有水泵,所述水泵的外侧设置有水箱,所述水箱的一侧设置有控制盒,所述控制盒与高压喷头之间为电性连接,所述控制盒与水泵之间为电性连接。Preferably, one end of the pipeline is connected to a water pump, a water tank is provided outside the water pump, and a control box is provided on one side of the water tank. There is an electrical connection between the control box and the high-pressure nozzle. The control box It is electrically connected to the water pump.

与现有技术相比,本实用新型的有益效果是:Compared with the existing technology, the beneficial effects of this utility model are:

1、该矿石输送装置,通过固定轴、第二滚筒、挡水板、滑轨、废水箱、排水口、高压喷头、管道、水泵、水箱和控制盒的设置,在较大矿石运输到第二滚筒时,由于多组第二滚筒呈倾斜角度,会因为重力往下运输,在运输过程中,控制盒会控制水泵将水箱中的水运输到管道,控制高压喷头对较大矿石进行清洗,产生的废水会从第二滚筒的缝隙流到废水箱中,再由排水口进行排出。1. The ore conveying device is equipped with a fixed shaft, a second roller, a water deflector, a slide rail, a waste water tank, a drainage outlet, a high-pressure nozzle, a pipeline, a water pump, a water tank and a control box. It transports larger ores to the second During the transportation, the control box will control the water pump to transport the water in the water tank to the pipeline, and control the high-pressure nozzle to clean the larger ore, resulting in The waste water will flow from the gap of the second drum to the waste water tank, and then be discharged from the drain outlet.

2、剩余的较小的矿石泥沙可以通过滑轨将废水箱进行整个抽出,从而将内部泥沙矿石倒出,将矿石进行清洗后,提高了矿石的品质,减少了粉尘和有害气体的产生,便于了后期矿石的加工储存。2. The remaining smaller ore and sediment can be pumped out of the entire waste water tank through the slide rail, thereby pouring out the internal sediment and ore. After cleaning the ore, the quality of the ore is improved and the generation of dust and harmful gases is reduced. , which facilitates the later processing and storage of ores.

附图说明Description of the drawings

图1为本实用新型输送装置外观结构示意图;Figure 1 is a schematic diagram of the appearance and structure of the conveying device of the present utility model;

图2为本实用新型进料箱与锯筒相配合结构示意图;Figure 2 is a schematic diagram of the structure of the feeding box and the saw barrel of the utility model;

图3为本实用新型清洁机构结构示意图;Figure 3 is a schematic structural diagram of the cleaning mechanism of the present utility model;

图4为本实用新型第二滚筒与固定轴相配合结构示意图;Figure 4 is a schematic structural diagram of the second roller and the fixed shaft of the utility model;

图5为本实用新型管道与水箱相配合结构示意图。Figure 5 is a schematic diagram of the structure of the pipe and water tank of the utility model.

图中标号:1、支撑座主体;2、支撑柱;3、固定板;4、第一电机;5、第一滚筒;6、皮带;7、支撑板;8、进料箱;9、第二电机;10、旋转柱;11、锯筒;12、清洁机构;1201、固定轴;1202、第二滚筒;1203、挡水板;1204、滑轨;1205、废水箱;1206、排水口;1207、高压喷头;1208、管道;1209、水泵;1210、水箱;1211、控制盒。Numbers in the figure: 1. Support base body; 2. Support column; 3. Fixed plate; 4. First motor; 5. First roller; 6. Belt; 7. Support plate; 8. Feed box; 9. Two motors; 10. Rotating column; 11. Saw barrel; 12. Cleaning mechanism; 1201. Fixed shaft; 1202. Second roller; 1203. Water retaining plate; 1204. Slide rail; 1205. Waste water tank; 1206. Drainage outlet; 1207. High-pressure nozzle; 1208. Pipeline; 1209. Water pump; 1210. Water tank; 1211. Control box.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present utility model.

请参阅图1-5,本实用新型提供一种技术方案:一种矿石输送装置,包括支撑座主体1和清洁机构12,支撑座主体1的下端均匀焊接有支撑柱2,支撑座主体1的内侧设置有清洁机构12,支撑座主体1的内侧焊接有固定轴1201,固定轴1201的外侧转动连接有第二滚筒1202。Please refer to Figures 1-5. The present utility model provides a technical solution: an ore conveying device, including a support body 1 and a cleaning mechanism 12. The lower end of the support body 1 is evenly welded with support columns 2. A cleaning mechanism 12 is provided on the inner side, a fixed shaft 1201 is welded on the inner side of the support base body 1, and a second roller 1202 is rotatably connected to the outer side of the fixed shaft 1201.

进一步的,支撑座主体1的一侧焊接有固定板3,固定板3的上端螺栓连接有第一电机4,第一电机4的一端转动连接有第一滚筒5,第一滚筒5的外侧紧密贴合有皮带6,第一电机4通电后会带动第一滚筒5进行转动,第一滚筒5带动了皮带6进行转动,实现了矿石在皮带6上的运输。Further, a fixed plate 3 is welded to one side of the support body 1, the upper end of the fixed plate 3 is bolted to a first motor 4, one end of the first motor 4 is rotatably connected to a first roller 5, and the outside of the first roller 5 is tightly There is a belt 6 attached to it. After the first motor 4 is energized, it will drive the first roller 5 to rotate. The first roller 5 drives the belt 6 to rotate, thereby realizing the transportation of the ore on the belt 6.

进一步的,支撑座主体1的上端一侧焊接有支撑板7,支撑板7的上端固定连接有进料箱8,进料箱8的一侧固定连接有第二电机9,第二电机9的一端设置有旋转柱10,旋转柱10的外侧设置有锯筒11,锯筒11通过旋转柱10与第二电机9构成旋转结构,在巨大矿石进入进料箱8中,第二电机9通电后会带动锯筒11进行转动,两组锯筒11朝相反方向进行转动,从而将巨大矿石搅碎成较大矿石,掉落到下方皮带6上进行运输。Further, a support plate 7 is welded to one side of the upper end of the support base body 1, a feed box 8 is fixedly connected to the upper end of the support plate 7, and a second motor 9 is fixedly connected to one side of the feed box 8. The second motor 9 A rotating column 10 is provided at one end, and a saw barrel 11 is provided outside the rotating column 10. The saw barrel 11 forms a rotating structure through the rotating column 10 and the second motor 9. After the huge ore enters the feed box 8, the second motor 9 is powered on. The saw barrel 11 will be driven to rotate, and the two sets of saw barrels 11 will rotate in opposite directions, thereby crushing the huge ore into larger ores, which will be dropped onto the belt 6 below for transportation.

进一步的,清洁机构12包括固定轴1201、第二滚筒1202、挡水板1203、滑轨1204、废水箱1205、排水口1206、高压喷头1207、管道1208、水泵1209、水箱1210和控制盒1211,在较大矿石运输到第二滚筒1202上时,控制盒1211会控制水泵1209将水箱1210中的水运输到管道1208,控制高压喷头1207对较大矿石进行清洗,产生的废水会从第二滚筒1202的缝隙中流到废水箱1205中,再由排水口1206进行排出。Further, the cleaning mechanism 12 includes a fixed shaft 1201, a second roller 1202, a water baffle 1203, a slide rail 1204, a waste water tank 1205, a drainage outlet 1206, a high-pressure nozzle 1207, a pipe 1208, a water pump 1209, a water tank 1210 and a control box 1211. When the larger ore is transported to the second drum 1202, the control box 1211 will control the water pump 1209 to transport the water in the water tank 1210 to the pipeline 1208, and control the high-pressure nozzle 1207 to clean the larger ore, and the generated wastewater will flow from the second drum. 1202, flows into the waste water tank 1205, and then is discharged through the drain port 1206.

进一步的,第二滚筒1202设置有多组,支撑座主体1的下端焊接有挡水板1203,挡水板1203的一侧焊接有滑轨1204,滑轨1204的内侧滑动连接有废水箱1205,废水箱1205的表面开设有排水口1206,在有较大矿石运输到第二滚筒1202时,矿石由于多组第二滚筒1202呈倾斜角度,会因为重力往下运输。在对较大矿石进行清洗时,产生的废水会漏到废水箱1205,废水会从排水口1206排出,剩余的较小矿石泥沙可以通过滑轨1204将废水箱1205进行整个抽出,从而将内部泥沙矿石倒出。Further, there are multiple sets of second rollers 1202. A water baffle 1203 is welded to the lower end of the support body 1, a slide rail 1204 is welded to one side of the water baffle 1203, and a waste water tank 1205 is slidably connected to the inside of the slide rail 1204. A drainage outlet 1206 is provided on the surface of the waste water tank 1205. When larger ore is transported to the second roller 1202, the ore will be transported downward due to gravity due to the inclined angles of the multiple sets of second rollers 1202. When cleaning larger ores, the waste water generated will leak into the waste water tank 1205, and the waste water will be discharged from the drainage outlet 1206. The remaining smaller ore sediment can be completely pumped out of the waste water tank 1205 through the slide rail 1204, thereby draining the inside. Sediment ore is poured out.

进一步的,支撑座主体1的上方设置有高压喷头1207,高压喷头1207的上端连接有管道1208,高压喷头1207设置有四组,管道1208进水后,控制盒1211会控制高压喷头1207对矿石进行清洗,可以去除矿石表面杂质。Further, a high-pressure nozzle 1207 is provided above the main body 1 of the support base. The upper end of the high-pressure nozzle 1207 is connected to a pipe 1208. There are four groups of high-pressure nozzles 1207. After water enters the pipe 1208, the control box 1211 will control the high-pressure nozzle 1207 to spray the ore. Cleaning can remove impurities on the surface of the ore.

进一步的,管道1208的一端连接有水泵1209,水泵1209的外侧设置有水箱1210,水箱1210的一侧设置有控制盒1211,控制盒1211与高压喷头1207之间为电性连接,控制盒1211与水泵1209之间为电性连接,控制盒1211会控制水泵1209将水箱1210中的水输送到管道1208中。Further, one end of the pipe 1208 is connected to a water pump 1209. A water tank 1210 is provided outside the water pump 1209. A control box 1211 is provided on one side of the water tank 1210. The control box 1211 is electrically connected to the high-pressure nozzle 1207. The control box 1211 and the high-pressure nozzle 1207 are electrically connected. The water pumps 1209 are electrically connected, and the control box 1211 controls the water pump 1209 to transport the water in the water tank 1210 to the pipe 1208.

工作原理:首先将一种矿石输送装置移动至工作位置,第一步,将巨大矿石放入至进料箱8,第二电机9通电后会带动锯筒11进行转动,两组锯筒11朝相反方向进行转动,从而将巨大矿石搅碎成较大矿石,掉落到下方皮带6上进行运输,第二步,第一电机4通电后会带动第一滚筒5进行转动,第一滚筒5带动了皮带6进行转动,实现矿石在皮带6上的运输,第三步,在较大矿石运输到第二滚筒1202时,由于多组第二滚筒1202呈倾斜角度,会因为重力往下运输,第四步,在运输过程中,控制盒1211会控制水泵1209将水箱1210中的水运输到管道1208,控制高压喷头1207对较大矿石进行清洗,产生的废水会从第二滚筒1202的缝隙流到废水箱1205中,再由排水口1206进行排出,第五步,剩余的较小矿石泥沙可以通过滑轨1204将废水箱1205进行整个抽出,从而将内部泥沙矿石倒出,这样就完成了一种矿石输送装置的使用过程。Working principle: First, move an ore conveying device to the working position. In the first step, put the huge ore into the feed box 8. After the second motor 9 is powered on, it will drive the saw barrel 11 to rotate, and the two sets of saw barrels 11 face Rotate in the opposite direction, thereby crushing the huge ore into larger ores, and drop them onto the belt 6 below for transportation. In the second step, after the first motor 4 is powered on, it will drive the first roller 5 to rotate. The belt 6 is rotated to realize the transportation of the ore on the belt 6. In the third step, when the larger ore is transported to the second roller 1202, since the multiple sets of second rollers 1202 are at an inclined angle, they will be transported downward due to gravity. Four steps, during the transportation process, the control box 1211 will control the water pump 1209 to transport the water in the water tank 1210 to the pipe 1208, and control the high-pressure nozzle 1207 to clean the larger ore, and the generated wastewater will flow from the gap of the second drum 1202 to The waste water tank 1205 is then discharged through the drainage port 1206. In the fifth step, the remaining smaller ore and sediment can be pumped out of the entire waste water tank 1205 through the slide rail 1204, thereby pouring out the internal sediment and minerals. This is complete. The use process of an ore conveying device.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those of ordinary skill in the art will understand that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention. , substitutions and modifications, the scope of the present invention is defined by the appended claims and their equivalents.

Claims (6)

1. The ore conveying device comprises a supporting seat main body (1) and a cleaning mechanism (12) and is characterized in that a supporting column (2) is uniformly welded at the lower end of the supporting seat main body (1), the cleaning mechanism (12) is arranged on the inner side of the supporting seat main body (1), a fixed shaft (1201) is welded on the inner side of the supporting seat main body (1), a second roller (1202) is rotatably connected on the outer side of the fixed shaft (1201), a fixing plate (3) is welded on one side of the supporting seat main body (1), a first motor (4) is connected to the upper end of the fixing plate (3) through bolts, a first roller (5) is rotatably connected to one end of the first motor (4), and a belt (6) is arranged on the outer side of the first roller (5).
2. The ore conveying device according to claim 1, characterized in that a supporting plate (7) is welded on one side of the upper end of the supporting seat main body (1), a feeding box (8) is fixedly connected to the upper end of the supporting plate (7), a second motor (9) is fixedly connected to one side of the feeding box (8), a rotating column (10) is arranged at one end of the second motor (9), a saw barrel (11) is arranged on the outer side of the rotating column (10), and the saw barrel (11) and the second motor (9) form a rotating structure through the rotating column (10).
3. The ore conveying apparatus of claim 1, wherein the cleaning mechanism (12) includes a stationary shaft (1201), a second drum (1202), a water guard (1203), a slide rail (1204), a waste water tank (1205), a water outlet (1206), a high pressure nozzle (1207), a pipe (1208), a water pump (1209), a water tank (1210), and a control box (1211).
4. The ore conveying device according to claim 1, wherein the second roller (1202) is provided with a plurality of groups, a water baffle (1203) is welded at the lower end of the supporting seat main body (1), a sliding rail (1204) is welded at one side of the water baffle (1203), a waste water tank (1205) is connected to the inner side of the sliding rail (1204) in a sliding manner, and a water outlet (1206) is formed in the surface of the waste water tank (1205).
5. The ore conveying device according to claim 1, wherein a high-pressure spray head (1207) is arranged above the supporting seat main body (1), a pipeline (1208) is connected to the upper end of the high-pressure spray head (1207), and four groups of high-pressure spray heads (1207) are arranged.
6. The ore conveying device according to claim 5, wherein one end of the pipeline (1208) is connected with a water pump (1209), a water tank (1210) is arranged on the outer side of the water pump (1209), a control box (1211) is arranged on one side of the water tank (1210), the control box (1211) is electrically connected with the high-pressure nozzle (1207), and the control box (1211) is electrically connected with the water pump (1209).
CN202321241883.6U 2023-05-22 2023-05-22 An ore conveying device Active CN219905910U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321241883.6U CN219905910U (en) 2023-05-22 2023-05-22 An ore conveying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321241883.6U CN219905910U (en) 2023-05-22 2023-05-22 An ore conveying device

Publications (1)

Publication Number Publication Date
CN219905910U true CN219905910U (en) 2023-10-27

Family

ID=88437388

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321241883.6U Active CN219905910U (en) 2023-05-22 2023-05-22 An ore conveying device

Country Status (1)

Country Link
CN (1) CN219905910U (en)

Similar Documents

Publication Publication Date Title
CN219905910U (en) An ore conveying device
CN216678411U (en) An ore crushing device for iron ore exploitation with dust reduction effect
CN217291644U (en) Processing equipment for traffic signboard
CN211538184U (en) Sand and stone separator with cyclic utilization effluent plant
CN111940021A (en) Coal cinder processing preprocessing device
CN220072558U (en) An ore cleaning device
CN118744031A (en) A high-strength concrete recycled aggregate production equipment and production process
CN207153182U (en) A kind of three-level sedimentation basin
CN211538476U (en) Sand and stone separator
CN114670126A (en) Shot blasting sand removal device and method for slender centrifugal casting pipe suitable for production line
CN209038525U (en) A kind of feeding device effectivelying prevent mechanical damage
CN108436782B (en) Aluminum mould cleaning machine
CN219701242U (en) Water treatment equipment
CN221580785U (en) Biological diatomite processing device for sewage treatment
CN218464781U (en) A conveyor belt dust removal device for mineral processing machinery
CN212669221U (en) Be used for carborundum powder production to use acid dip pickle
CN115536103B (en) A treatment device and treatment method for oxidation ditch scum
CN217746036U (en) Concrete clout recovery water circulation system
CN221657365U (en) A device for cleaning the surface of large-size bolts after thread rolling
CN220633301U (en) Sand cleaning device of sand setting tank
CN216359228U (en) Bubble cleaning machine with blowdown structure
CN222177310U (en) Sand blasting device for treating ore surface layer
CN218115244U (en) A sludge conveying mechanism of a disc dryer
CN206492727U (en) Garbage cleaning machine
CN216261008U (en) Waste treatment device for sponge iron production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20250908

Address after: 836500 Xinjiang Uygur Autonomous Region Aletai Prefecture Fuyun County Kala Bulagen Township Balaeerqisi Village, No. 789-06 (Fuyun Jinshan Metallurgy Co., Ltd. Residential Area)

Patentee after: XINJIANG JINBAO MINING Co.,Ltd.

Country or region after: China

Address before: 836105 No. 106, resource Road, Kurt Township, Fuyun County, Altay Prefecture, Xinjiang Uygur Autonomous Region

Patentee before: Fuyun Jinshan mining and Metallurgy Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right