CN219891872U - Construction progress management device - Google Patents

Construction progress management device Download PDF

Info

Publication number
CN219891872U
CN219891872U CN202321361211.9U CN202321361211U CN219891872U CN 219891872 U CN219891872 U CN 219891872U CN 202321361211 U CN202321361211 U CN 202321361211U CN 219891872 U CN219891872 U CN 219891872U
Authority
CN
China
Prior art keywords
spout
construction progress
slider
groove
progress management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321361211.9U
Other languages
Chinese (zh)
Inventor
赵殿君
孙作林
訾亭亭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321361211.9U priority Critical patent/CN219891872U/en
Application granted granted Critical
Publication of CN219891872U publication Critical patent/CN219891872U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Handcart (AREA)

Abstract

The utility model provides a construction progress management device which comprises a support frame, wherein the top end of the support frame is fixedly connected with a support column, the top end of the support column is vertically provided with a first chute, the interior of the first chute is connected with a first slide block in a sliding manner, the top end of the first slide block is fixedly connected with a lifting rod, the top end of the lifting rod is provided with a rotating groove, a rotating seat is rotationally connected with the rotating groove, the top end of the rotating seat is fixedly connected with a display box, one side of the display box is provided with transparent glass, one side, close to the transparent glass, of the display box is internally provided with a plurality of display grooves, the other side of the display box is provided with a plurality of placing grooves, and a top end shell of the display groove is provided with a second chute. The device is used through the cooperation of supporting seat, truckle and handrail, is convenient for realize the removal of show case, and rethread adjusts handle, worm wheel, first lead screw, rotates the cooperation of groove and rotation seat and uses, can realize the fast adjustment of show case height and angle, is convenient for carry out diversified show.

Description

Construction progress management device
Technical Field
The utility model belongs to the technical field of construction progress management, and particularly relates to a construction progress management device.
Background
The construction project manager part makes a construction progress plan according to the construction period requirement specified by the contract, and takes the construction progress plan as a management target, frequently checks, compares and analyzes the whole construction process, timely discovers deviation in implementation, adopts effective measures, adjusts the engineering construction progress plan, eliminates interference and ensures all activities realized by the construction period target. In the building construction process, in order to be convenient for the management of construction plan, generally need show the progress of construction through management display device, be convenient for personnel to look over, because construction progress plan management display device often need make a round trip the transport at job site and office, however present construction progress plan management display device generally is fixed setting, is difficult to remove, and is inconvenient to carry, and can't adjust height and angle, is unfavorable for carrying out multi-angle show.
Accordingly, in view of the above, research and improvement have been made on the conventional structure and the conventional defects, and a construction progress management device is provided for achieving the purpose of having a higher practical value.
Disclosure of Invention
In order to solve the technical problems, the utility model provides a construction progress management device, which is realized by the following specific technical means:
the utility model provides a construction progress management device, includes the support frame, the top fixedly connected with support column of support frame, first spout has been vertically seted up on the top of support column, the inside sliding connection of first spout has first slider, the top fixedly connected with lifter of first slider, the top of lifter is equipped with the rotation groove, the rotation inslot rotation is connected with the rotation seat, the top fixedly connected with show case of rotation seat, transparent glass is installed to one side of show case, the inside a plurality of show grooves that are equipped with in one side that is close to transparent glass of show case, the inside opposite side of show case is equipped with a plurality of standing grooves, the second spout has been seted up to the top shell of show groove, the inside sliding connection of second spout has the second slider, just the one end fixedly connected with instruction piece of second slider in being close to second spout opening part.
Further, the worm wheel is installed to the bottom of first spout, the top fixedly connected with first lead screw of worm wheel, the top of first lead screw runs through from the bottom of first slider and lifter respectively, and with first slider threaded connection.
Further, a worm is installed on one side of the bottom end of the first sliding groove, the worm is meshed with the worm wheel, an adjusting handle is installed on one side of the bottom end of the supporting column, and one end of the adjusting handle is connected with the worm in a transmission mode.
Further, the internally mounted of second spout has the second lead screw, the second lead screw runs through from the left and right sides of second slider, and with second slider threaded connection, a plurality of rotation handles are installed to one side of show case, just the rotation handle extends to the inside of second spout, and with second lead screw transmission is connected.
Further, the top of show case is equipped with the weather shield, just the top of weather shield is equipped with a plurality of hydrophobic tanks.
Further, the display box is hinged with a side door through a hinge at one side of the placing groove, and a pull groove is formed in the outer side of the side door.
Furthermore, the four corners of the bottom end of the supporting frame are provided with casters, and the casters are universal wheels.
Further, one side of the top end of the supporting frame is provided with a handrail, and the other side of the top end of the supporting frame is provided with a pair of storage boxes.
Compared with the prior art, the utility model has the following beneficial effects:
according to the construction progress management device, the supporting seat, the casters and the armrests are matched for use, so that the movement of the display box is facilitated, the adjusting handle, the worm wheel and the first screw rod are matched for use, the first screw rod can be driven to rotate by rotating the adjusting handle through meshing of the worm and the worm wheel, the first sliding block can drive the lifting rod to lift in the first sliding groove, and meanwhile, the height and the angle of the display box can be quickly adjusted through matching use of the rotating groove and the rotating seat, so that multidirectional display is facilitated;
according to the construction progress management device, the project construction progress planning bar can be placed in the placing groove through the matched use of the display groove and the placing groove, and the indication block is driven to move on one side of the display groove through the matched use of the rotating handle, the second screw rod and the second sliding block, so that the project construction progress bar is marked and displayed through the display groove.
Drawings
Fig. 1 is a schematic perspective view of the present utility model.
Fig. 2 is an enlarged schematic view of the structure a of fig. 1 according to the present utility model.
Fig. 3 is a schematic rear plan view of the display case of the present utility model.
Fig. 4 is a side plan cross-sectional view of the support column of the present utility model.
In the figure, the correspondence between the component names and the drawing numbers is:
1. a support frame; 101. casters; 102. an armrest; 103. a storage box; 2. a support column; 201. a first chute; 202. a first slider; 203. a first screw rod; 204. a worm wheel; 205. a worm; 206. adjusting the handle; 3. a lifting rod; 301. a rotating groove; 302. a rotating seat; 4. a display box; 401. a rain shield; 5. a display slot; 501. a second chute; 502. a second slider; 503. a second screw rod; 504. an indication block; 505. rotating the handle; 6. a placement groove; 601. a side door; 602. and (5) pulling grooves.
Detailed Description
Embodiments of the present utility model are described in further detail below with reference to the accompanying drawings and examples. The following examples are illustrative of the utility model but are not intended to limit the scope of the utility model.
In the description of the present utility model, unless otherwise indicated, the meaning of "a plurality" is two or more; the terms "upper," "lower," "left," "right," "inner," "outer," "front," "rear," "head," "tail," and the like are used as an orientation or positional relationship based on that shown in the drawings, merely to facilitate description of the utility model and to simplify the description, and do not indicate or imply that the devices or elements referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the utility model. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "connected," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
Examples:
as shown in fig. 1, fig. 2, fig. 3 and fig. 4:
the utility model provides a construction progress management device, which comprises a support frame 1, wherein the top end of the support frame 1 is fixedly connected with a support column 2, the top end of the support column 2 is vertically provided with a first chute 201, the inside of the first chute 201 is connected with a first sliding block 202 in a sliding way, the top end of the first sliding block 202 is fixedly connected with a lifting rod 3, the top end of the lifting rod 3 is provided with a rotating groove 301, the rotating groove 301 is rotationally connected with a rotating seat 302, the top end of the rotating seat 302 is fixedly connected with a display box 4, one side of the display box 4 is provided with transparent glass, one side of the display box 4, which is close to the transparent glass, is internally provided with a plurality of display grooves 5, the other side of the inside of the display box 4 is provided with a plurality of placing grooves 6, the top end shell of the display groove 5 is provided with a second chute 501, the inside of the second chute 501 is connected with a second sliding block 502 in a sliding way, and one end, which is close to the opening of the second chute 501, is fixedly connected with an indicating block 504.
The bottom end of the first chute 201 is provided with a worm wheel 204, the top end of the worm wheel 204 is fixedly connected with a first screw rod 203, and the top end of the first screw rod 203 penetrates through the bottom ends of the first slider 202 and the lifting rod 3 respectively and is in threaded connection with the first slider 202.
Wherein, worm 205 is installed to bottom one side of first spout 201, worm 205 and worm wheel 204 intermesh, and adjustment handle 206 is installed to the bottom of support column 2 one side, and the one end and the worm 205 transmission of adjustment handle 206 are connected, use through the cooperation of worm wheel 204 and worm 205, are convenient for realize the rotation of first lead screw 203 to drive the removal of first slider 202 in first spout 201.
Wherein, the internally mounted of second spout 501 has second lead screw 503, second lead screw 503 runs through from the left and right sides of second slider 502 to with second slider 502 threaded connection, a plurality of rotation handles 505 are installed to one side of show case 4, and rotate handles 505 and extend to the inside of second spout 501, and with second lead screw 503 transmission connection, through the cooperation use of rotation handles 505 and second lead screw 503, be convenient for realize the removal of second slider 502 in second spout 501, thereby drive instruction piece 504 and remove.
Wherein, the top of show case 4 is equipped with weather shield 401, and the top of weather shield 401 is equipped with a plurality of hydrophobic tanks, through the setting of weather shield 401, is convenient for keep off the rain to show case 4.
Wherein, show case 4 is located the one side of standing groove 6 and articulates there is side door 601 through the hinge, and the outside of side door 601 is equipped with draws groove 602, through the setting of side door 601, is convenient for realize the change of engineering construction progress plan strip.
The four corners of the bottom end of the supporting frame 1 are provided with casters 101, and the casters 101 are universal wheels.
Wherein, top one side of support frame 1 is equipped with handrail 102, and a pair of containing box 103 is installed to the top opposite side of support frame 1, uses through the cooperation of truckle 101 and handrail 102, is convenient for realize the removal of show case 4.
The working principle of the embodiment is as follows: through the cooperation of supporting seat, truckle 101 and handrail 102, be convenient for realize the removal of show case 4, the cooperation of rethread adjustment handle 206, worm 205, worm wheel 204 and first lead screw 203 is used, utilize the meshing of worm 205 and worm wheel 204, can drive first lead screw 203 rotation through rotating adjustment handle 206, thereby make first slider 202 drive lifter 3 go on going up and down in first spout 201, simultaneously through the cooperation use of rotating groove 301 and rotating seat 302, can realize the fast adjustment of show case 4 height and angle, be convenient for carry out diversified show, finally through the cooperation use of show groove 5 and standing groove 6, can place engineering construction progress plan strip in standing groove 6, and utilize the cooperation use of rotation handle 505, second lead screw 503 and second slider 502, drive the instruction piece 504 and remove in show groove 5 one side, thereby mark engineering construction progress strip, and show through show groove 5.
The embodiments of the utility model have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the utility model in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments were chosen and described in order to best explain the principles of the utility model and the practical application, and to enable others of ordinary skill in the art to understand the utility model for various embodiments with various modifications as are suited to the particular use contemplated.

Claims (8)

1. Construction progress management device, including support frame (1), its characterized in that: the top fixedly connected with support column (2) of support frame (1), first spout (201) have been vertically seted up on the top of support column (2), the inside sliding connection of first spout (201) has first slider (202), the top fixedly connected with lifter (3) of first slider (202), the top of lifter (3) is equipped with rotates groove (301), rotate groove (301) internal rotation and be connected with rotation seat (302), rotate the top fixedly connected with show case (4) of seat (302), transparent glass is installed to one side of show case (4), inside a plurality of show grooves (5) that are equipped with in one side that is close to transparent glass of show case (4), the inside opposite side of show case (4) is equipped with a plurality of standing grooves (6), second spout (501) have been seted up to the top shell of show groove (5), the inside sliding connection of second spout (501) has second slider (502), just second slider (502) indicates in one end that is close to second spout (501) opening part fixedly connected with piece (504).
2. The construction progress management apparatus according to claim 1, wherein: the bottom of first spout (201) is installed worm wheel (204), the top fixedly connected with first lead screw (203) of worm wheel (204), the top of first lead screw (203) runs through from the bottom of first slider (202) and lifter (3) respectively, and with first slider (202) threaded connection.
3. The construction progress management apparatus according to claim 2, wherein: the worm (205) is installed to bottom one side of first spout (201), worm (205) and worm wheel (204) intermeshing, adjust handle (206) is installed to the bottom of support column (2) one side, just the one end and worm (205) transmission of adjusting handle (206) are connected.
4. The construction progress management apparatus according to claim 1, wherein: the inside of second spout (501) is installed second lead screw (503), second lead screw (503) run through from the left and right sides of second slider (502), and with second slider (502) threaded connection, a plurality of rotation handles (505) are installed to one side of show case (4), just rotation handles (505) extend to the inside of second spout (501), and with second lead screw (503) transmission connection.
5. The construction progress management apparatus according to claim 1, wherein: the top of show case (4) is equipped with weather shield (401), just the top of weather shield (401) is equipped with a plurality of hydrophobic tanks.
6. The construction progress management apparatus according to claim 1, wherein: the display box (4) is hinged with a side door (601) on one side of the placing groove (6) through a hinge, and a pull groove (602) is formed in the outer side of the side door (601).
7. The construction progress management apparatus according to claim 1, wherein: the four corners of the bottom end of the supporting frame (1) are respectively provided with a castor (101), and the castor (101) is a universal wheel.
8. The construction progress management apparatus according to claim 1, wherein: an armrest (102) is arranged on one side of the top end of the support frame (1), and a pair of storage boxes (103) are arranged on the other side of the top end of the support frame (1).
CN202321361211.9U 2023-05-31 2023-05-31 Construction progress management device Active CN219891872U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321361211.9U CN219891872U (en) 2023-05-31 2023-05-31 Construction progress management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321361211.9U CN219891872U (en) 2023-05-31 2023-05-31 Construction progress management device

Publications (1)

Publication Number Publication Date
CN219891872U true CN219891872U (en) 2023-10-24

Family

ID=88396533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321361211.9U Active CN219891872U (en) 2023-05-31 2023-05-31 Construction progress management device

Country Status (1)

Country Link
CN (1) CN219891872U (en)

Similar Documents

Publication Publication Date Title
CN219891872U (en) Construction progress management device
CN113803603A (en) Equipment for providing artificial intelligence public technology platform
CN213930226U (en) Commercial economy management information display device
CN210151623U (en) Intelligent parking lot barrier gate based on license plate recognition
CN108157034A (en) A kind of greenhouse lifts structure of rolling
CN210604809U (en) But angle regulation's electric power instrument
CN207315127U (en) Parallel-moving type power window
CN214850404U (en) Lightning protection device of transformer substation
CN213569009U (en) Elevator mounting base
CN209983008U (en) Switch board with accuse temperature function
CN211555036U (en) Outdoor condom dispenser
CN221017130U (en) Auto-parts coating toasts equipment
CN207665628U (en) A kind of greenhouse lifting structure of rolling
CN217420737U (en) Protection frame is used in real estate development
CN216302053U (en) Adjustable mutual inductor handling device
CN220910960U (en) Electronic display screen
CN215076348U (en) Over-and-under type architectural design is with picture grillage
CN219645626U (en) Folding hanging basket of window cleaning machine
CN221119606U (en) Mounting structure
CN215106360U (en) Angle-adjustable curtain wall plate
CN220469687U (en) Lifting sliding glass reinforced plastic door and window
CN214405295U (en) Think political affairs projection arrangement for training
CN218457641U (en) Sliding ceiling vehicle
CN215007179U (en) Economics phenomenon simulation sand table for finance teaching
CN215764077U (en) Modularized enterprise asset assessment equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant