CN219887485U - Mobilizable scaffold frame for construction - Google Patents

Mobilizable scaffold frame for construction Download PDF

Info

Publication number
CN219887485U
CN219887485U CN202320815611.6U CN202320815611U CN219887485U CN 219887485 U CN219887485 U CN 219887485U CN 202320815611 U CN202320815611 U CN 202320815611U CN 219887485 U CN219887485 U CN 219887485U
Authority
CN
China
Prior art keywords
scaffold
rod
extension frame
frame
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320815611.6U
Other languages
Chinese (zh)
Inventor
李广华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Zhenwen Construction Engineering Co ltd
Original Assignee
Guangdong Zhenwen Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Zhenwen Construction Engineering Co ltd filed Critical Guangdong Zhenwen Construction Engineering Co ltd
Priority to CN202320815611.6U priority Critical patent/CN219887485U/en
Application granted granted Critical
Publication of CN219887485U publication Critical patent/CN219887485U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a movable scaffold for building construction, which aims to solve the technical problems that the scaffold assembly structure is complicated and the connection is unstable in the prior art, so that the scaffold collapses and the personal safety of constructors is endangered. The scaffold comprises a scaffold main body, universal wheels, a scaffold extension frame and a standing plate, wherein the universal wheels are arranged at the bottom of the scaffold main body, the scaffold extension frame is arranged at the top of the scaffold main body, the standing plate is arranged at the top of the scaffold extension frame, a butt joint installation mechanism is arranged between the scaffold main body and the scaffold extension frame, and a feeding mechanism is arranged between the scaffold main body and the scaffold extension frame. The scaffold is characterized in that the scaffold extension frame drives the butt joint rod to enter the butt joint groove, then the threaded rod is rotated, the threaded rod is rotated to drive the fixed inserted rod to transversely move through the internal threaded pipe and the longitudinal plate, and the fixed inserted rod transversely moves to the inside of the fixed hole and can fix the position of the scaffold extension frame through the butt joint rod.

Description

Mobilizable scaffold frame for construction
Technical Field
The utility model belongs to the technical field of building construction, and particularly relates to a movable scaffold for building construction.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is carried out smoothly, is convenient for the operation and construction projects of constructors, and can solve the problem of material transportation in the up-down, left-right directions. It is an important working platform that is generally used in concrete construction, brickwork or decoration and equipment installation. In the using process of the existing scaffold, the following problems exist:
in order to meet the height requirement when the existing scaffold is used, two to three scaffolds are required to be installed, so that the height of the scaffold is increased, the existing scaffold assembly structure is complicated, the unstable connection condition exists, and collapse of the scaffold is caused, so that the personal safety of constructors is endangered.
Disclosure of Invention
(1) Technical problem to be solved
Aiming at the defects of the prior art, the utility model aims to provide a movable scaffold for building construction, which aims to solve the technical problems that the scaffold assembly structure is complicated and the connection is unstable in the prior art, so that the scaffold collapses and the personal safety of constructors is endangered.
(2) Technical proposal
In order to solve the technical problems, the utility model provides a movable scaffold for building construction, which comprises a scaffold main body, universal wheels, scaffold extension frames and standing plates, wherein the universal wheels are arranged at the bottom of the scaffold main body, the scaffold extension frames are arranged at the tops of the scaffold main body, the standing plates are arranged at the tops of the scaffold extension frames, a butt joint installation mechanism is arranged between the scaffold main body and the scaffold extension frames, and a feeding mechanism is arranged between the scaffold main body and the scaffold extension frames.
When the scaffold of this technical scheme is used, at first scaffold frame extension frame drives the butt joint pole and gets into the butt joint groove, can rotate the threaded rod afterwards, and threaded rod rotates and can drive internal thread pipe lateral movement, and internal thread pipe lateral movement can drive fixed inserted bar lateral movement through the longitudinal plate, and when fixed inserted bar lateral movement was to the fixed orifices inside, can be with the fixed position of butt joint pole like this to can accomplish the firm equipment between scaffold frame main part and the scaffold frame extension frame.
Preferably, the butt joint installation mechanism comprises a butt joint rod, a fixing hole, a butt joint groove, a bearing, a threaded rod, an internally threaded pipe, a longitudinal plate, a fixed inserting rod and a perforation, wherein the butt joint rod is connected to the bottom of the scaffold extension frame, and the fixing hole is formed in the surface of the butt joint rod.
Further, the bearing is installed to the side surface gomphosis of scaffold main part, the inside of bearing runs through there is the threaded rod, the internal thread pipe has been cup jointed on the surface of threaded rod, can drive internal thread pipe lateral movement through threaded connection relation when the threaded rod rotates.
Furthermore, the surface of the internal thread pipe is connected with a longitudinal plate, the side surface of the longitudinal plate is connected with a fixed inserted link, a through hole is formed in the side surface of the scaffold main body, which is close to the fixed inserted link, the internal thread pipe transversely moves to drive the longitudinal plate to transversely move, and the longitudinal plate transversely moves to drive the fixed inserted link to transversely move.
Furthermore, the butt joint rod is in sliding connection with the butt joint groove, a rotary structure is formed between the threaded rod and the bearing, the threaded rod is in threaded connection with the internal threaded pipe, the fixed inserted rod is in sliding connection with the through hole, and the position of the butt joint rod can be fixed when the fixed inserted rod transversely moves to the inside of the fixed hole.
Still further, feed mechanism includes motor, wind-up roll, steel wire, pulley, material loading hanging basket, direction sliding sleeve and direction slide rail, the surface at the scaffold frame main part is installed to the motor, the wind-up roll is installed to the output of motor, the surface connection of wind-up roll has the steel wire, can drive the wind-up roll and rotate when the motor operates, can wind up the steel wire when the wind-up roll rotates.
Still further, install the pulley between steel wire and the universal wheel, the end connection of steel wire has the material loading to hang the basket, the side surface that the basket was hung to the material loading is connected with the direction sliding sleeve, is close to the direction sliding sleeve scaffold frame main part and scaffold frame extension frame side surface all are connected with the direction slide rail, can hang the basket through pulley pulling material loading when the steel wire rolling, and the material loading is hung the basket and is received the pulling force and can be driven the direction sliding sleeve and carry out the slip at the surface of direction slide rail, can restrict the direction of movement that the basket was hung to the material loading like this.
Furthermore, the guide sliding sleeve and the guide sliding rail are symmetrically arranged relative to the longitudinal central axis of the feeding hanging basket, and the guide sliding sleeve is in sliding connection with the guide sliding rail.
(3) Advantageous effects
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, firstly, the scaffold extension frame drives the docking rod to enter the docking groove, then the threaded rod can be rotated, the threaded rod can be rotated to drive the internal threaded pipe to transversely move, the internal threaded pipe can drive the fixed inserted rod to transversely move through the longitudinal plate, and when the fixed inserted rod transversely moves to the inside of the fixed hole, the position of the docking rod can be fixed, so that the scaffold main body and the scaffold extension frame can be stably assembled;
2. according to the utility model, building materials are placed in the feeding hanging basket, then the motor can be operated, the winding roller can be driven to rotate when the motor is operated, the steel wire can be wound when the winding roller is rotated, the feeding hanging basket can be pulled by the pulley when the steel wire is wound, the feeding hanging basket can drive the guide sliding sleeve to slide on the surface of the guide sliding rail under the tensile force, so that the feeding hanging basket can slide to the top of the scaffold extension frame, and the feeding of the building materials is facilitated.
Drawings
FIG. 1 is a schematic diagram of a front view of an embodiment of the apparatus of the present utility model;
FIG. 2 is a schematic side view of an embodiment of the apparatus of the present utility model;
FIG. 3 is a cross-sectional view of a docking mounting mechanism of one embodiment of the device of the present utility model;
FIG. 4 is an exploded view of a docking mechanism of one embodiment of the device of the present utility model;
fig. 5 is a schematic diagram of a feeding mechanism of an embodiment of the device of the present utility model.
The marks in the drawings are: 1. a scaffold body; 2. a universal wheel; 3. a scaffold extension frame; 4. a standing board; 5. a butt-joint installation mechanism; 501. a butt joint rod; 502. a fixing hole; 503. a butt joint groove; 504. a bearing; 505. a threaded rod; 506. an internally threaded tube; 507. a longitudinal plate; 508. fixing the inserted link; 509. perforating; 6. a motor; 7. a wind-up roll; 8. a steel wire; 9. a pulley; 10. feeding hanging basket; 11. a guide sliding sleeve; 12. and a guide sliding rail.
Detailed Description
The utility model provides a mobilizable scaffold for construction, its structure schematic diagram is as shown in fig. 1-5, this scaffold includes scaffold body 1, universal wheel 2, scaffold extension 3 and standing board 4, universal wheel 2 is installed to the bottom of scaffold body 1, the top of scaffold body 1 is provided with scaffold extension 3, standing board 4 is installed at the top of scaffold extension 3, be provided with butt joint installation mechanism 5 between scaffold body 1 and scaffold extension 3, be provided with feed mechanism between scaffold body 1 and scaffold extension 3.
The bearing 504 is embedded and installed on the side surface of the scaffold main body 1, the threaded rod 505 penetrates through the inside of the bearing 504, the surface of the threaded rod 505 is sleeved with the internal threaded pipe 506, the surface of the internal threaded pipe 506 is connected with the vertical plate 507, the side surface of the vertical plate 507 is connected with the fixed inserted rod 508, the side surface of the scaffold main body 1 close to the fixed inserted rod 508 is provided with the perforation 509, the butt joint rod 501 and the butt joint groove 503 are in sliding connection, a rotating structure is formed between the threaded rod 505 and the bearing 504, the threaded rod 505 and the internal threaded pipe 506 are in threaded connection, and the fixed inserted rod 508 and the perforation 509 are in sliding connection.
In addition, feed mechanism includes motor 6, wind-up roll 7, steel wire 8, pulley 9, material loading hanging basket 10, direction sliding sleeve 11 and direction slide rail 12, motor 6 installs the surface at scaffold frame main part 1, wind-up roll 7 is installed to the output of motor 6, the surface connection of wind-up roll 7 has steel wire 8, install pulley 9 between steel wire 8 and the universal wheel 2, the end connection of steel wire 8 has material loading hanging basket 10, the side surface connection of material loading hanging basket 10 has direction sliding sleeve 11, scaffold frame main part 1 and scaffold frame extension frame 3 side surfaces that are close to direction sliding sleeve 11 all are connected with direction slide rail 12, direction sliding sleeve 11 and direction slide rail 12 are about the longitudinal axis symmetry setting of material loading hanging basket 10, be sliding connection between direction sliding sleeve 11 and the direction slide rail 12.
Working principle: when the device of the technical scheme is used, firstly, the scaffold extension frame 3 drives the docking rod 501 to enter the docking groove 503, then the threaded rod 505 can be rotated, the threaded rod 505 can be rotated to drive the internal threaded pipe 506 to transversely move, the internal threaded pipe 506 can drive the fixed inserted rod 508 to transversely move through the longitudinal plate 507, and when the fixed inserted rod 508 transversely moves to the inside of the fixed hole 502, the position of the docking rod 501 can be fixed, so that the scaffold extension frame 3 and the scaffold main body 1 can be stably assembled, and then constructors can stand on the upper surface of the standing plate 4 to perform building construction;
the building material is placed in the feeding hanging basket 10, then the motor 6 can be operated, the winding roller 7 can be driven to rotate when the motor 6 is operated, the steel wire 8 can be wound when the winding roller 7 is rotated, the feeding hanging basket 10 can be pulled by the pulley 9 when the steel wire 8 is wound, the feeding hanging basket 10 can drive the guide sliding sleeve 11 to slide on the surface of the guide sliding rail 12 under the tensile force, so that the feeding hanging basket 10 can slide towards the top of the scaffold extension frame 3, and the feeding of the building material can be conveniently and rapidly completed in the mode.
All technical features in the embodiment can be freely combined according to actual needs.
The foregoing embodiments are preferred embodiments of the present utility model, and in addition, the present utility model may be implemented in other ways, and any obvious substitution is within the scope of the present utility model without departing from the concept of the present utility model.

Claims (8)

1. The utility model provides a mobilizable scaffold for construction, this scaffold includes scaffold frame main part (1), universal wheel (2), scaffold frame extension frame (3) and standing board (4), its characterized in that, universal wheel (2) are installed to the bottom of scaffold frame main part (1), the top of scaffold frame main part (1) is provided with scaffold frame extension frame (3), standing board (4) are installed at the top of scaffold frame extension frame (3), be provided with butt joint installation mechanism (5) between scaffold frame main part (1) and scaffold frame extension frame (3), be provided with feed mechanism between scaffold frame main part (1) and scaffold frame extension frame (3).
2. The movable scaffold for building construction according to claim 1, wherein the docking installation mechanism (5) comprises a docking rod (501), a fixing hole (502), a docking groove (503), a bearing (504), a threaded rod (505), an internally threaded tube (506), a longitudinal plate (507), a fixing inserted rod (508) and a perforation (509), the docking rod (501) is connected to the bottom of the scaffold extension frame (3), and the fixing hole (502) is formed in the surface of the docking rod (501).
3. The movable scaffold for building construction according to claim 2, wherein a bearing (504) is fitted to a side surface of the scaffold main body (1), a threaded rod (505) is inserted into the bearing (504), and an internally threaded tube (506) is sleeved on a surface of the threaded rod (505).
4. A movable scaffold for building construction according to claim 3, characterized in that the surface of the internal thread pipe (506) is connected with a longitudinal plate (507), the side surface of the longitudinal plate (507) is connected with a fixed inserted bar (508), and the side surface of the scaffold main body (1) close to the fixed inserted bar (508) is provided with a perforation (509).
5. The movable scaffold for building construction according to claim 4, wherein the butt joint rod (501) is in sliding connection with the butt joint groove (503), the threaded rod (505) and the bearing (504) form a rotary structure, the threaded rod (505) is in threaded connection with the internally threaded tube (506), and the fixed insert rod (508) is in sliding connection with the through hole (509).
6. The movable scaffold for building construction according to claim 1, wherein the feeding mechanism comprises a motor (6), a winding roller (7), a steel wire (8), a pulley (9), a feeding hanging basket (10), a guiding sliding sleeve (11) and a guiding sliding rail (12), the motor (6) is arranged on the surface of the scaffold main body (1), the winding roller (7) is arranged at the output end of the motor (6), and the steel wire (8) is connected to the surface of the winding roller (7).
7. The movable scaffold for building construction according to claim 6, wherein a pulley (9) is installed between the steel wire (8) and the universal wheel (2), the end part of the steel wire (8) is connected with a feeding hanging basket (10), the side surface of the feeding hanging basket (10) is connected with a guiding sliding sleeve (11), and the side surfaces of the scaffold main body (1) and the scaffold extension frame (3) which are close to the guiding sliding sleeve (11) are both connected with guiding sliding rails (12).
8. The movable scaffold for building construction according to claim 7, wherein the guide sliding sleeve (11) and the guide sliding rail (12) are symmetrically arranged with respect to the longitudinal central axis of the loading hanging basket (10), and the guide sliding sleeve (11) is in sliding connection with the guide sliding rail (12).
CN202320815611.6U 2023-04-12 2023-04-12 Mobilizable scaffold frame for construction Active CN219887485U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320815611.6U CN219887485U (en) 2023-04-12 2023-04-12 Mobilizable scaffold frame for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320815611.6U CN219887485U (en) 2023-04-12 2023-04-12 Mobilizable scaffold frame for construction

Publications (1)

Publication Number Publication Date
CN219887485U true CN219887485U (en) 2023-10-24

Family

ID=88404193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320815611.6U Active CN219887485U (en) 2023-04-12 2023-04-12 Mobilizable scaffold frame for construction

Country Status (1)

Country Link
CN (1) CN219887485U (en)

Similar Documents

Publication Publication Date Title
JP4796195B1 (en) Work scaffold equipment
CN207695928U (en) A kind of vertical machine of H profile steel group
CN110306776B (en) Lifting platform for high-rise building elevator shaft construction
CN113585965B (en) Roadbed high slope anchor rod frame beam movable drilling platform
CN209703989U (en) A kind of non-perpendicular elevation construction of building hangs blue device
CN219887485U (en) Mobilizable scaffold frame for construction
CN111521095A (en) Novel location muscle detects device
CN210127623U (en) Pulling-up hanging basket for construction of constructional engineering
CN205289841U (en) Water bores tapping machine trompil fixing device
CN113982290A (en) Assembled wall body mounting structure
CN112299249B (en) Auxiliary device for hoisting overhanging steel truss and using method
CN211735386U (en) Concrete pipe pile splicing device
CN215441888U (en) Pile driver with auxiliary positioning function
CN214264004U (en) Building structure post bar planting drilling equipment is built in room
CN115288410A (en) External hanging protection device for construction of exterior wall decorative plate
CN114150858A (en) Eminence construction auxiliary device for building engineering
CN108867388A (en) Multifunction working platform vehicle
CN220101177U (en) Automatic side slope drilling equipment
CN210289061U (en) Positioning device for erecting vertical rods on I-shaped steel of overhanging outer frame
CN219118728U (en) Cantilever scaffold pole setting positioner
CN220432200U (en) Safety construction frame for building construction
CN216239568U (en) Automatic wall plastering machine
CN200940337Y (en) Direct current speed reducing wall whitewashing machine
CN220487041U (en) Construction scaffold with auxiliary feeding function
CN219887479U (en) Adjustable hanging bar construction device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant