CN219886810U - Piling mechanism of hydraulic pile driver - Google Patents

Piling mechanism of hydraulic pile driver Download PDF

Info

Publication number
CN219886810U
CN219886810U CN202321283825.XU CN202321283825U CN219886810U CN 219886810 U CN219886810 U CN 219886810U CN 202321283825 U CN202321283825 U CN 202321283825U CN 219886810 U CN219886810 U CN 219886810U
Authority
CN
China
Prior art keywords
threaded rod
mounting
thread bush
mounting panel
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321283825.XU
Other languages
Chinese (zh)
Inventor
汤彬成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Juhe Engineering Machinery Co ltd
Original Assignee
Guangzhou Juhe Engineering Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Juhe Engineering Machinery Co ltd filed Critical Guangzhou Juhe Engineering Machinery Co ltd
Priority to CN202321283825.XU priority Critical patent/CN219886810U/en
Application granted granted Critical
Publication of CN219886810U publication Critical patent/CN219886810U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a piling mechanism of a hydraulic pile driver, which comprises a base, wherein one end of the top of the base is fixedly connected with a supporting frame, the top end inside the supporting frame is provided with a first mounting plate, and one end of the first mounting plate is fixedly connected with a mounting block. This hydraulic pile driver pile mechanism is through being provided with spacing slide bar, first mounting panel, first thread bush and threaded rod, start servo motor, servo motor drives the threaded rod and rotates, the threaded rod rotates can make first thread bush and first mounting panel drive hydraulic cylinder and tup lift, thereby pile can conveniently pile the stake of different height, first mounting panel is through the outside upper and lower slip of spacing slide bar in the spacing groove, first mounting panel is slided in the outside of spacing groove and can be spacing improvement hydraulic cylinder's stability to first mounting panel, it is inconvenient pile and processing comparatively complicated to pile of different height, the inconvenient problem of use is solved.

Description

Piling mechanism of hydraulic pile driver
Technical Field
The utility model relates to the technical field of pile drivers, in particular to a pile driving mechanism of a hydraulic pile driver.
Background
Piling refers to driving piles into the ground, so that building foundations are firm, wood piles or stone piles and the like are driven into the ground, and the hydraulic pile driver is rapidly applied to the aspects of high-speed railways, highway soft foundation treatment, sea filling and bridge and wharf engineering, deep foundation pit support, foundation treatment of common buildings and the like.
According to the hydraulic pile driver pile driving mechanism that application number CN202222649956.7 provided, including the link, the top surface fixed mounting of link has the ear that draws, and the link is connected with outside excavator through drawing the ear, the inside fixed mounting of link has the multiunit slide bar, and common slidable mounting has the movable block on the multiunit slide bar, fixed mounting has the cylinder on the movable block, the output and the big tup fixed connection of cylinder, the inside of link has the locating sleeve through support column fixed mounting. According to the utility model, when the beam emitted by the infrared sighting device irradiates the pile to shift, the pile and the ground are inclined, and at the moment, the movable cylinder is driven by the movable trolley to move along the chute, so that the movable cylinder drives the small hammer to move to the corresponding position, the side wall surface of the pile is hammered by the small hammer to correct the position of the pile, the pile is kept in a vertical state, the large hammer is convenient to continue piling, and the effect of improving piling efficiency is achieved.
According to the technical scheme, the side wall surface of the pile is hammered through the small hammer head to correct the position of the pile, so that the pile is kept in a vertical state, but the pile with different heights is found to be inconvenient to pile and process when in use, the pile is complex to process, and the pile is inconvenient to use, so that a novel hydraulic pile driver pile driving mechanism is provided for improving the problems.
Disclosure of Invention
The utility model aims to provide a piling mechanism of a hydraulic pile driver, which aims to solve the problems that in the background technology, piles with different heights are inconvenient to pile, the processing is complex and the use is inconvenient.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a hydraulic pile driver pile mechanism, includes the base, the one end fixedly connected with support frame at base top, the inside top of support frame is provided with first mounting panel, the one end fixedly connected with installation piece of first mounting panel, hydraulic cylinder is installed to the one end at installation piece top, hydraulic cylinder's bottom is provided with big tup, servo motor is installed to one side at support frame top, the threaded rod is installed to servo motor's output, the outside top of threaded rod is provided with first thread bush, the outside bottom of threaded rod is provided with the second thread bush, the inside opposite side of support frame is provided with spacing slide bar.
Preferably, the first thread bush and the second thread bush are respectively provided with internal threads, the outer part of the threaded rod is provided with external threads matched with the internal threads, and the first thread bush and the second thread bush are respectively matched with each other in the threaded rod.
Preferably, one side of second thread bush and one side fixedly connected with second mounting panel of spacing slide bar bottom, the spacing groove has been seted up to one side of second mounting panel and first mounting panel inside, the outside both sides of second mounting panel are provided with slider swing joint and have the slider, the one end fixedly connected with spacing hoop of slider, the one end fixedly connected with connecting block of spacing hoop, the mounting hole has been seted up to the inside of connecting block, the inside of mounting hole is provided with stop bolt.
Preferably, the limit hoop is fixed through a limit bolt and a mounting hole, and the limit hoop is provided with two groups.
Preferably, the mounting groove has been seted up to the both sides of the inside other end of base, the inside of mounting groove is provided with the dead lever, the top fixedly connected with fixed plate of dead lever, the fixed orifices has been seted up respectively to the inside other end of base inside and the inside of dead lever, the inside of fixed orifices is provided with the fixed pin.
Preferably, the fixing rods are provided with two groups, and the fixing rods are symmetrically distributed about the vertical center line of the base.
Compared with the prior art, the utility model has the beneficial effects that: the piling mechanism of the hydraulic pile driver not only realizes the convenience of adjusting the height of the large hammer head and limiting the pile, but also improves the stability of the base;
(1) The position of the mounting block and the position of the hydraulic cylinder are required to be adjusted, the servo motor is started, the servo motor drives the threaded rod to rotate, and the first threaded sleeve and the threaded rod are mutually matched and the first mounting plate is fixedly connected to the other side of the first threaded sleeve, so that the first threaded sleeve and the first mounting plate can drive the hydraulic cylinder and the large hammer to lift through rotation of the threaded rod, pile piles of different heights can be conveniently driven, the first mounting plate slides up and down outside the position limiting slide rod through the position limiting groove, and the first mounting plate slides outside the position limiting groove to limit the first mounting plate, so that the stability of the hydraulic cylinder is improved;
(2) Through being provided with second thread bush, spacing hoop, slider, connecting block, spacing bolt and mounting hole, the threaded rod rotates and can make second thread bush drive the second mounting panel and go up and down, makes the second mounting panel go up and down and can carry out spacing to the stake of different height, thereby can improve the flexibility of second mounting panel, then promote the slider, the slider drives spacing hoop and removes the position that can adjust spacing hoop, then screw in spacing bolt and fix spacing hoop in the inside of mounting hole, thereby can carry out spacing to the stake between the spacing hoop and prevent the stake slope;
(3) Through being provided with fixed plate, dead lever, fixed orifices, fixed pin and mounting groove, put suitable position department to the base, then insert the inside of mounting groove to the dead lever, then press the inside decline that the fixed plate made the fixed plate drive mounting groove to make the dead lever inlay the inside at soil fixed the base, prevent that big tup can empty at the during operation, screw in the inside of fixed orifices to the fixed pin after the inside of dead lever embedding soil and fix the dead lever, prevent that the dead lever accident from breaking away from the inside of mounting groove.
Drawings
FIG. 1 is a schematic cross-sectional elevation view of the present utility model;
FIG. 2 is a schematic side view of the support frame of the present utility model;
FIG. 3 is an enlarged schematic top view of the spacing clip of the present utility model;
fig. 4 is an enlarged sectional view of fig. 1 a according to the present utility model.
In the figure: 1. a base; 2. a fixing plate; 3. a support frame; 4. a limit slide bar; 5. a first mounting plate; 6. a limit groove; 7. a mounting block; 8. a hydraulic cylinder; 9. a servo motor; 10. a first threaded sleeve; 11. a large hammer; 12. a second threaded sleeve; 13. a second mounting plate; 14. a fixed rod; 15. a fixing hole; 16. a fixing pin; 17. a mounting groove; 18. a limit hoop; 19. a slide block; 20. a connecting block; 21. a limit bolt; 22. a mounting hole; 23. a threaded rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Example 1: referring to fig. 1-4, a piling mechanism of a hydraulic pile driver comprises a base 1, wherein one end of the top of the base 1 is fixedly connected with a support frame 3, the top end of the interior of the support frame 3 is provided with a first mounting plate 5, one end of the first mounting plate 5 is fixedly connected with a mounting block 7, one end of the top of the mounting block 7 is provided with a hydraulic cylinder 8, the bottom end of the hydraulic cylinder 8 is provided with a large hammer 11, one side of the top end of the support frame 3 is provided with a servo motor 9, the output end of the servo motor 9 is provided with a threaded rod 23, the top end of the exterior of the threaded rod 23 is provided with a first thread bush 10, the bottom end of the exterior of the threaded rod 23 is provided with a second thread bush 12, and the other side of the interior of the support frame 3 is provided with a limit slide bar 4;
the first thread bush 10 and the second thread bush 12 are respectively provided with internal threads, the outer part of the threaded rod 23 is provided with external threads matched with the internal threads, and the first thread bush 10 and the second thread bush 12 are respectively matched with each other on the threaded rod 23;
specifically, as shown in fig. 1 and fig. 4, when the positions of the mounting block 7 and the hydraulic cylinder 8 need to be adjusted, the servo motor 9 drives the threaded rod 23 to rotate, and as the first threaded sleeve 10 and the threaded rod 23 are mutually matched and the first mounting plate 5 is fixedly connected to the other side of the first threaded sleeve 10, the threaded rod 23 rotates to enable the first threaded sleeve 10 and the first mounting plate 5 to drive the hydraulic cylinder 8 and the large hammer 11 to lift, so that piles of different heights can be conveniently driven, the first mounting plate 5 slides up and down outside the limiting slide rod 4 through the limiting groove 6, and the first mounting plate 5 slides outside the limiting groove 6 to limit the first mounting plate 5, so that the stability of the hydraulic cylinder 8 is improved.
Example 2: one side of the second thread bush 12 and one side of the bottom end of the limit sliding rod 4 are fixedly connected with a second mounting plate 13, one side of the inside of the second mounting plate 13 and one side of the inside of the first mounting plate 5 are provided with limit grooves 6, two sides of the outside of the second mounting plate 13 are provided with slide blocks 19 which are movably connected with slide blocks 19, one end of each slide block 19 is fixedly connected with a limit hoop 18, one end of each limit hoop 18 is fixedly connected with a connecting block 20, the inside of each connecting block 20 is provided with a mounting hole 22, the inside of each mounting hole 22 is provided with a limit bolt 21, each limit hoop 18 is fixed with each mounting hole 22 through the corresponding limit bolt 21, and each limit hoop 18 is provided with two groups;
specifically, as shown in fig. 1 and 3, the threaded rod 23 rotates to enable the second threaded sleeve 12 to drive the second mounting plate 13 to lift, so that the second mounting plate 13 can lift to limit piles of different heights, flexibility of the second mounting plate 13 can be improved, then the sliding block 19 is pushed, the sliding block 19 drives the limit clamp 18 to move, the position of the limit clamp 18 can be adjusted, then the limit bolt 21 is screwed into the mounting hole 22 to fix the limit clamp 18, and therefore piles between the limit clamps 18 can be limited to prevent the piles from tilting.
Example 3: mounting grooves 17 are formed in two sides of the other end of the inside of the base 1, a fixing rod 14 is arranged in the mounting grooves 17, a fixing plate 2 is fixedly connected to the top end of the fixing rod 14, fixing holes 15 are formed in the other end of the inside of the base 1 and the inside of the fixing rod 14 respectively, fixing pins 16 are arranged in the fixing holes 15, two groups of fixing rods 14 are arranged, and the fixing rods 14 are symmetrically distributed about the vertical center line of the base 1;
specifically, as shown in fig. 1 and 2, the base 1 is placed at a proper position, then the fixing rod 14 is inserted into the inside of the installation groove 17, and then the fixing plate 2 is pressed to enable the fixing plate 2 to drive the inside of the installation groove 17 to descend, so that the fixing rod 14 is embedded into the inside of soil to fix the base 1, the large hammer 11 is prevented from being toppled during operation, after the fixing rod 14 is embedded into the inside of the soil, the fixing pin 16 is screwed into the inside of the fixing hole 15 to fix the fixing rod 14, and the fixing rod 14 is prevented from being accidentally separated from the inside of the installation groove 17.
Working principle: in use, the utility model places the base 1 in place, then inserts the fixing rod 14 into the mounting groove 17, then pressing the fixed plate 2 to drive the inside of the mounting groove 17 to descend, so that the fixed rod 14 is embedded in the soil to fix the base 1, the large hammer 11 is prevented from tilting during operation, after the fixed rod 14 is embedded in the soil, the fixed pin 16 is screwed into the inside of the fixed hole 15 to fix the fixed rod 14, the fixed rod 14 is prevented from being accidentally separated from the inside of the mounting groove 17, the servo motor 9 is started when the positions of the mounting block 7 and the hydraulic cylinder 8 are required to be adjusted, the servo motor 9 drives the threaded rod 23 to rotate, the threaded rod 23 rotates to enable the first thread bush 10 and the first mounting plate 5 to drive the hydraulic cylinder 8 and the large hammer 11 to ascend and descend, the threaded rod 23 rotates to enable the second thread bush 12 to drive the second mounting plate 13 to ascend and descend, piles of different heights can be limited by the ascending and descending of the second mounting plate 13, and the flexibility of the second mounting plate 13 can be improved, then pushing the slide block 19, the slide block 19 drives the limit clamp 18 to move so as to adjust the position of the limit clamp 18, the spacing bolts 21 are then screwed into the mounting holes 22 to fix the spacing clips 18, thereby can carry out spacing to the stake between the spacing hoop 18 and prevent the stake slope to can conveniently pile to the stake of co-altitude, first mounting panel 5 passes through spacing groove 6 and slides from top to bottom in spacing slide bar 4's outside, and first mounting panel 5 can carry out spacing improvement hydraulic cylinder 8's stability to first mounting panel 5 in spacing groove 6's outside slip, starts hydraulic cylinder 8 when needs pile, and hydraulic cylinder 8 drives big tup 11 and goes up and down, thereby can make big tup 11 pile to the stake.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. A hydraulic pile driver pile driving mechanism comprising a base (1), characterized in that: the utility model discloses a hydraulic support for a motor vehicle, including base (1), support frame (3), threaded rod (23) are installed on one side on support frame (3), support frame (3) inside top is provided with first mounting panel (5), the one end fixedly connected with installation piece (7) of first mounting panel (5), hydraulic cylinder (8) are installed to the one end at installation piece (7) top, the bottom of hydraulic cylinder (8) is provided with big tup (11), servo motor (9) are installed on one side on support frame (3) top, threaded rod (23) are installed to the output of servo motor (9), threaded rod (23) outside top is provided with first thread bush (10), threaded rod (23) outside bottom is provided with second thread bush (12), the opposite side of support frame (3) inside is provided with spacing slide bar (4).
2. A hydraulic pile driver pile driving mechanism according to claim 1, characterised in that: the novel threaded rod is characterized in that internal threads are respectively arranged in the first thread bush (10) and the second thread bush (12), external threads matched with the internal threads are arranged outside the threaded rod (23), and the first thread bush (10) and the second thread bush (12) are respectively matched with each other in the threaded rod (23).
3. A hydraulic pile driver pile driving mechanism according to claim 1, characterised in that: one side of second thread bush (12) and one side fixedly connected with second mounting panel (13) of spacing slide bar (4) bottom, spacing groove (6) have been seted up to one side of second mounting panel (13) and first mounting panel (5) inside, the outside both sides of second mounting panel (13) are provided with slider (19) swing joint and have slider (19), the one end fixedly connected with spacing hoop (18) of slider (19), the one end fixedly connected with connecting block (20) of spacing hoop (18), mounting hole (22) have been seted up to the inside of connecting block (20), the inside of mounting hole (22) is provided with spacing bolt (21).
4. A hydraulic pile driver pile driving mechanism according to claim 3, characterised in that: the limiting hoops (18) are fixed through limiting bolts (21) and mounting holes (22), and the limiting hoops (18) are provided with two groups.
5. A hydraulic pile driver pile driving mechanism according to claim 1, characterised in that: mounting grooves (17) are formed in two sides of the other end of the base (1), fixing rods (14) are arranged in the mounting grooves (17), fixing plates (2) are fixedly connected to the top ends of the fixing rods (14), fixing holes (15) are formed in the other end of the base (1) and the fixing rods (14) respectively, and fixing pins (16) are arranged in the fixing holes (15).
6. A hydraulic pile driver pile driving mechanism according to claim 5, characterised in that: the fixing rods (14) are arranged in two groups, and the fixing rods (14) are symmetrically distributed about the vertical center line of the base (1).
CN202321283825.XU 2023-05-25 2023-05-25 Piling mechanism of hydraulic pile driver Active CN219886810U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321283825.XU CN219886810U (en) 2023-05-25 2023-05-25 Piling mechanism of hydraulic pile driver

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321283825.XU CN219886810U (en) 2023-05-25 2023-05-25 Piling mechanism of hydraulic pile driver

Publications (1)

Publication Number Publication Date
CN219886810U true CN219886810U (en) 2023-10-24

Family

ID=88399672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321283825.XU Active CN219886810U (en) 2023-05-25 2023-05-25 Piling mechanism of hydraulic pile driver

Country Status (1)

Country Link
CN (1) CN219886810U (en)

Similar Documents

Publication Publication Date Title
CN219886810U (en) Piling mechanism of hydraulic pile driver
CN214997691U (en) Automatic sliding form device for mine roadway
CN216130135U (en) Inner supporting structure for foundation pit
CN1594756A (en) Drilling and pressing type pile press and construction technology
CN214169062U (en) Municipal works are with pile device
CN213812284U (en) Positioning device for foundation engineering
CN212388544U (en) Laborsaving pile driver of building site is put
CN210917358U (en) Vibration pile driver is used in construction of building bridge
CN2711238Y (en) Drilling and pressing type pile-pressing machine
CN211773643U (en) Pile driver for civil engineering
CN220813831U (en) Hammering pile driver for soft foundation soil
CN220813834U (en) Water pile driving frame
CN220057949U (en) Bridge pile foundation construction operation platform
CN217419616U (en) A fixed knot constructs for building engineering pile
CN212863911U (en) High-strength prestressed pipe pile anchoring crane
CN219343178U (en) High stability pile construction equipment
CN1036085C (en) Fully hydraulic pile press
CN218437031U (en) Mounting bracket for connecting pile driver
CN219886809U (en) Piling device
CN212743898U (en) Double-slideway multifunctional pile frame
CN218757476U (en) Positioning device for construction pile machine
CN220598425U (en) Pile driver capable of preventing pile foundation from being askew
CN214738040U (en) Pile driver suitable for steep slopes of building bases with different slopes
CN214005677U (en) Positioner of pile extractor
CN218346175U (en) Civil engineering is with pile device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant