CN219864416U CN202321042319.1U CN202321042319U CN219864416U CN 219864416 U CN219864416 U CN 219864416U CN 202321042319 U CN202321042319 U CN 202321042319U CN 219864416 U CN219864416 U CN 219864416U
Authority
CN
China
Prior art keywords
rod
installation pole
mounting
installation
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321042319.1U
Other languages
Chinese (zh)
Inventor
叶平
刘俊
何志凌
何亚森
冯剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Guanneng Engineering Construction Development Co ltd
Original Assignee
Fujian Guanneng Engineering Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Guanneng Engineering Construction Development Co ltd filed Critical Fujian Guanneng Engineering Construction Development Co ltd
Priority to CN202321042319.1U priority Critical patent/CN219864416U/en
Application granted granted Critical
Publication of CN219864416U publication Critical patent/CN219864416U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to the technical field of protective metal railings, and discloses a novel protective metal railing for constructional engineering, which comprises a first installation rod, a second installation rod, a third installation rod and a fourth installation rod, wherein the first installation rod, the second installation rod, the third installation rod and the fourth installation rod are distributed in a rectangular state, a fixing rod is fixedly arranged between the wall surfaces of the first installation rod and the fourth installation rod, a fixing rod is fixedly arranged between the wall surfaces of the second installation rod and the third installation rod, and a hinge is arranged between the first installation rod and the second installation rod. In the use process, the movable wheels are matched, the whole movement of the device is convenient, the device is convenient to carry, in addition, the second mounting rod and the third mounting rod can be rotated leftwards until the rear side wall surfaces of the first mounting rod and the second mounting rod are mutually attached, and finally, the device is fixedly mounted at a place where the device is required to be used through the mounting mechanism, so that the mounting of two groups of guardrails is completed, and the mounting speed is improved.

Description

Novel building engineering protects metal railing
Technical Field
The utility model relates to the technical field of protective metal railings, in particular to a novel protective metal railing for constructional engineering.
Background
In the construction process of building engineering, the building protection metal railing can be frequently used, and the building protection railing plays a role in protecting and protecting personal safety and equipment facilities.
When the guard rail is integrally installed in the construction engineering, a plurality of single metal guard rails are mutually combined to form a whole to realize the protection effect, and when the whole guard rail is installed, a group of metal guard rails are mutually connected, and then the whole guard rail is fixedly installed at a place needing protection, so that the installation mode is more troublesome and is unfavorable for the integral installation speed.
Therefore, we propose a novel construction engineering protection metal railing.
Disclosure of Invention
The utility model mainly solves the technical problems existing in the prior art and provides a novel protective metal railing for construction engineering.
In order to achieve the above purpose, the novel construction engineering protective metal railing comprises a first installation rod, a second installation rod, a third installation rod and a fourth installation rod, wherein the first installation rod, the second installation rod, the third installation rod and the fourth installation rod are distributed in a rectangular state, fixing rods are fixedly installed between the wall surfaces of the first installation rod and the fourth installation rod, fixing rods are fixedly installed between the wall surfaces of the second installation rod and the third installation rod, the two groups of fixing rods are hollow rectangular bodies, a hinge is arranged between the first installation rod and the second installation rod, the first installation rod and the second installation rod are connected together through the hinge in a rotating mode, the two groups of fixing rods penetrate through the front wall surface and the rear wall surface of the third installation rod and the wall surface of the fourth installation rod respectively, moving wheels are movably installed on the bottom wall surfaces of the first installation rod, the second installation rod, the third installation rod and the fourth installation rod, and a mounting mechanism is arranged on the second installation rod.
Preferably, the first connecting rod is clamped into the right side in a movable manner, the first connecting plate is fixedly arranged on the front side wall surface of the first connecting rod, the second connecting rod is clamped into the left side fixing rod in a movable manner, the second connecting rod and the first connecting rod are all arranged in a horizontal state, the second connecting plate is fixedly arranged on the front side wall surface of the second connecting rod, and the second connecting plate and the first connecting plate are all arranged in a vertical state.
Preferably, the bottoms of the first connecting plate and the second connecting plate are movably provided with moving wheels, the upper side wall surfaces of the first connecting rod and the second connecting rod are fixedly provided with guide blocks, and the positions of the two groups of guide blocks corresponding to the upper side wall surfaces of the same group of fixed rods are provided with guide grooves.
Preferably, the two groups of guide blocks and the two groups of guide grooves are mutually matched, the two groups of guide grooves are rectangular, and the two groups of guide blocks are movably clamped into the guide grooves on the same side respectively.
Preferably, the mounting mechanism comprises a mounting plate, a limiting rod, an elastic element, a fixing plate and a fixing groove, wherein the mounting plate is fixedly mounted on the left side wall surface of the second mounting rod, the limiting rod is fixedly mounted on the upper side wall surface of the mounting plate, and the limiting rod is in a state of big top and small bottom.
Preferably, the outer wall of the small side end of the limiting rod is movably provided with a fixing plate, an elastic element is fixedly arranged between the fixing plate and the closed wall surface, which is close to the upper side end of the limiting rod, and the outer wall of the lower side of the limiting rod movably penetrates through the inside of the elastic element.
Preferably, two fixed slots are formed in the horizontal end of the lower side of the fixed plate, the two fixed slots can be matched with each other through screws to fix the device, and the first mounting rod, the third mounting rod, the fourth mounting rod, the first connecting plate and the second connecting plate are all provided with mounting mechanisms.
Advantageous effects
The utility model provides a novel protective metal railing for building engineering. The beneficial effects are as follows:
(1) The novel protective metal railing for the constructional engineering is convenient for the whole movement of the device by the cooperation of the movable wheels in the use process, is convenient for carrying of the device, and can rotate the second mounting rod and the third mounting rod leftwards until the rear side wall surfaces of the first mounting rod and the second mounting rod are mutually attached, and finally, the device is fixedly mounted in a place where the device needs to be used by the mounting mechanism, so that the mounting of two groups of guardrails is completed, and the mounting speed is improved.
(2) The novel building engineering protection metal railing can pull the fixing plate downwards when the novel building engineering protection metal railing is installed in the using process, the elastic element starts to be elongated until the lower side wall surface of the fixing plate is contacted with the ground, then the novel building engineering protection metal railing is fixedly installed on the novel building engineering protection metal railing through the screw rod, the fixing plate is located on the upper side of the movable wheel in the moving process, interference to the novel building engineering protection metal railing during the moving process can be avoided, in addition, under the mutual cooperation of the first connecting rod, the first connecting plate, the second connecting rod and the second connecting plate, four groups of protection railings can be installed at the same time, and the installation speed is further improved.
Drawings
FIG. 1 is a perspective view of the whole of the present utility model;
fig. 2 is an enlarged view of fig. 1 a.
Legend description: 1. a first mounting bar; 2. a second mounting bar; 3. a third mounting bar; 4. a fourth mounting bar; 5. a fixed rod; 6. a hinge; 7. a moving wheel; 8. a first connecting rod; 9. a first connection plate; 10. a second connecting rod; 11. a second connecting plate; 12. a guide block; 13. a guide groove; 14. a mounting plate; 15. a limit rod; 16. an elastic element; 17. a fixing plate; 18. a fixing groove.
Detailed Description
Embodiment one: the utility model provides a novel building engineering protection metal railing, as shown in fig. 1, including first installation pole 1, second installation pole 2, third installation pole 3 and fourth installation pole 4, first installation pole 1, second installation pole 2, third installation pole 3 and fourth installation pole 4 are the rectangle, first installation pole 1, second installation pole 2, third installation pole 3 and fourth installation pole 4 are rectangle state distribution, fixed mounting has dead lever 5 between the wall that first installation pole 1 and fourth installation pole 4 are close to mutually, fixed mounting has dead lever 5 between the wall that second installation pole 2 and third installation pole 3 are close to mutually, two sets of dead levers 5 all are hollow cuboid, be provided with hinge 6 between first installation pole 1 and the second installation pole 2, first installation pole 1 and second installation pole 2 are in the same place through hinge 6 rotation, the front and back wall that two sets of dead levers 5 run through third installation pole 3 and fourth installation pole 4 respectively, first installation pole 1, second installation pole 2, the bottom of third installation pole 3 and fourth installation pole 4 have movable mounting wheel mechanism on the wall 7 all is installed to the movable mounting wheel 2.
In the use process, the movable wheels 7 are matched, so that the whole movement of the device is facilitated, the device is convenient to carry, in addition, the second mounting rod 2 and the third mounting rod 3 can be rotated leftwards until the rear side wall surfaces of the first mounting rod 1 and the second mounting rod 2 are mutually attached, and finally, the device is fixedly mounted at a place where the device is required to be used through a mounting mechanism, so that the mounting of two groups of guardrails is completed.
Embodiment two: on the basis of the first embodiment, as shown in fig. 1 and 2, the first connecting rod 8 is movably clamped in the right side fixing rod 5, the first connecting plate 9 is fixedly mounted on the front side wall surface of the first connecting rod 8, the first connecting plate 9 is rectangular, the second connecting rod 10 is movably clamped in the left side fixing rod 5, the second connecting rod 10 and the first connecting rod 8 are both arranged in a horizontal state, the second connecting plate 11 is fixedly mounted on the front side wall surface of the second connecting rod 10, the second connecting plate 11 is rectangular, and the second connecting plate 11 and the first connecting plate 9 are both arranged in a vertical state.
The bottoms of the first connecting plate 9 and the second connecting plate 11 are movably provided with the movable wheel 7, the upper side wall surfaces of the first connecting rod 8 and the second connecting rod 10 are fixedly provided with the guide blocks 12, the two groups of guide blocks 12 are rectangular, and the positions of the two groups of guide blocks 12 corresponding to the upper side wall surfaces of the same groups of fixed rods 5 are provided with the guide grooves 13.
The two groups of guide blocks 12 and the two groups of guide grooves 13 are mutually matched, the two groups of guide grooves 13 are rectangular, and the two groups of guide blocks 12 are respectively movably clamped into the guide grooves 13 on the same side.
The mounting mechanism comprises a mounting plate 14, a limiting rod 15, an elastic element 16, a fixing plate 17 and a fixing groove 18, wherein the mounting plate 14 is fixedly mounted on the left side wall surface of the second mounting rod 2, the mounting plate 14 is rectangular, the limiting rod 15 is fixedly mounted on the upper side wall surface of the mounting plate 14, and the limiting rod 15 is in a state of big top and small bottom.
The outer wall of the small side end of the limiting rod 15 is movably provided with a fixing plate 17, an elastic element 16 is fixedly arranged between the fixing plate 17 and the closed wall surface of the upper side end of the limiting rod 15, which is close to the upper side end of the limiting rod 15, and the outer wall of the lower side of the limiting rod 15 movably passes through the inside of the elastic element 16.
Two fixed slots 18 are formed in the lower horizontal end of the fixed plate 17, the two fixed slots 18 can be matched with each other through screws to fix the device, and mounting mechanisms are arranged on the first mounting rod 1, the third mounting rod 3, the fourth mounting rod 4, the first connecting plate 9 and the second connecting plate 11.
In the use process, when the device is installed, the fixed plate 17 can be pulled downwards, the elastic element 16 starts to be elongated until the lower side wall surface of the fixed plate 17 is contacted with the ground, then the device is fixedly installed through the screw rod, the fixed plate 17 is positioned on the upper side of the moving wheel 7 in the moving process, thus interference to the device in the moving process can be avoided, and in addition, four groups of protective barriers can be installed simultaneously under the mutual cooperation of the first connecting rod 8, the first connecting rod 9, the second connecting rod 10 and the second connecting rod 11.
The foregoing has shown and described the basic principles and main features of the present utility model and the advantages of the present utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (7)

1. Novel building engineering protects metal railing, including first installation pole (1), second installation pole (2), third installation pole (3) and fourth installation pole (4), first installation pole (1), second installation pole (2), third installation pole (3) and fourth installation pole (4) are rectangle state and distribute, its characterized in that: fixed mounting has dead lever (5) between the wall that first installation pole (1) and fourth installation pole (4) are close to, fixed mounting has dead lever (5) between the wall that second installation pole (2) and third installation pole (3) are close to, two sets of dead levers (5) all are hollow cuboid, be provided with hinge (6) between first installation pole (1) and second installation pole (2), first installation pole (1) and second installation pole (2) link together through hinge (6) rotation, the wall around third installation pole (3) and fourth installation pole (4) is run through respectively to two sets of dead levers (5), the bottom wall of first installation pole (1), second installation pole (2), third installation pole (3) and fourth installation pole (4) all movable mounting has movable wheel (7), be provided with installation mechanism on second installation pole (2).
2. The novel construction protection metal rail according to claim 1, wherein: the inside activity card of dead lever (5) on the right side goes into head rod (8), and the preceding lateral wall face fixed mounting of head rod (8) has first connecting plate (9), and the inside activity card of left side dead lever (5) has gone into second connecting rod (10), and second connecting rod (10) and head rod (8) all are the horizontality setting, and the preceding lateral wall face fixed mounting of second connecting rod (10) has second connecting plate (11), and second connecting plate (11) and first connecting plate (9) all are vertical state setting.
3. The novel construction protection metal rail according to claim 2, wherein: the bottoms of the first connecting plate (9) and the second connecting plate (11) are movably provided with moving wheels (7), the upper side wall surfaces of the first connecting rod (8) and the second connecting rod (10) are fixedly provided with guide blocks (12), and the positions of the two groups of guide blocks (12) corresponding to the upper side wall surfaces of the same group of fixed rods (5) are provided with guide grooves (13).
4. A new construction protection metal balustrade according to claim 3, characterized in that: the two groups of guide blocks (12) and the two groups of guide grooves (13) are mutually matched, the two groups of guide grooves (13) are rectangular, and the two groups of guide blocks (12) are movably clamped into the guide grooves (13) on the same side respectively.
5. The novel construction protection metal rail according to claim 1, wherein: the mounting mechanism comprises a mounting plate (14), a limiting rod (15), an elastic element (16), a fixing plate (17) and a fixing groove (18), wherein the mounting plate (14) is fixedly mounted on the left side wall surface of the second mounting rod (2), the limiting rod (15) is fixedly mounted on the upper side wall surface of the mounting plate (14), and the limiting rod (15) is in a state of being big in top and small in bottom.
6. The novel construction protection metal rail according to claim 5, wherein: the outer wall of the small side end of the limiting rod (15) is movably provided with a fixing plate (17), an elastic element (16) is fixedly arranged between the fixing plate (17) and a closed wall surface, which is close to the upper side end of the limiting rod (15), of the limiting rod, and the outer wall of the lower side of the limiting rod (15) movably penetrates through the inside of the elastic element (16).
7. The novel construction protection metal rail according to claim 6, wherein: two fixed slots (18) are formed in the lower horizontal end of the fixed plate (17), the two fixed slots (18) can be matched with each other through screws to fix the device, and mounting mechanisms are arranged on the first mounting rod (1), the third mounting rod (3), the fourth mounting rod (4), the first connecting plate (9) and the second connecting plate (11).
CN202321042319.1U 2023-05-05 2023-05-05 Novel building engineering protects metal railing Active CN219864416U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321042319.1U CN219864416U (en) 2023-05-05 2023-05-05 Novel building engineering protects metal railing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321042319.1U CN219864416U (en) 2023-05-05 2023-05-05 Novel building engineering protects metal railing

Publications (1)

Publication Number Publication Date
CN219864416U true CN219864416U (en) 2023-10-20

Family

ID=88337279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321042319.1U Active CN219864416U (en) 2023-05-05 2023-05-05 Novel building engineering protects metal railing

Country Status (1)

Country Link
CN (1) CN219864416U (en)

Similar Documents

Publication Publication Date Title
CN219864416U (en) Novel building engineering protects metal railing
CN203200681U (en) Lift type motor-driven height-limiting portal
CN206680923U (en) Adjustable for height guardrail
CN210529571U (en) Road and bridge rail guard
CN213269236U (en) Construction site guardrail
CN205314666U (en) Novel protection guardrail with adjustable width
CN109487683B (en) Municipal bridge with liftable guardrails
CN216197148U (en) Portable guardrail
CN218932864U (en) Protection device for road and bridge pavement
CN219910311U (en) Fence convenient to use
CN220621414U (en) Prefabricated combined temporary building enclosing wall
CN216341394U (en) Novel construction rail guard is built in room
CN216517278U (en) Warning railing is used at building engineering job site
CN215331898U (en) Safety device for building engineering
CN214168754U (en) Bridge maintenance work platform with protective structure
CN220849114U (en) Movable protective fence for constructional engineering
CN214362879U (en) Bridge protective fence
CN214697230U (en) Rail guard is used in railway lines construction
CN220849117U (en) Guardrail for construction
CN214062593U (en) A novel protection network device for engineering construction
CN212295400U (en) Prefabricated stair rail guard that building engineering used
CN112647424A (en) Safety device is used in bridge construction
CN219381965U (en) Position-adjustable code spraying machine for cables
CN219910317U (en) Fitting-up type protector for fitment
CN216194094U (en) High-pier continuous steel structure bridge bracket for construction in alpine region

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant