CN219862802U - Pile foundation measuring construction auxiliary device - Google Patents

Pile foundation measuring construction auxiliary device Download PDF

Info

Publication number
CN219862802U
CN219862802U CN202321085290.5U CN202321085290U CN219862802U CN 219862802 U CN219862802 U CN 219862802U CN 202321085290 U CN202321085290 U CN 202321085290U CN 219862802 U CN219862802 U CN 219862802U
Authority
CN
China
Prior art keywords
inserted link
positioning
rod
pile
auxiliary device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321085290.5U
Other languages
Chinese (zh)
Inventor
李佳伟
杜爱明
韦颖丽
巴志军
范栋航
郝治丞
曹俊
武春艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Henan Engineering Co Ltd
Original Assignee
PowerChina Henan Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Henan Engineering Co Ltd filed Critical PowerChina Henan Engineering Co Ltd
Priority to CN202321085290.5U priority Critical patent/CN219862802U/en
Application granted granted Critical
Publication of CN219862802U publication Critical patent/CN219862802U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a pile foundation measurement construction auxiliary device which comprises two positioning sleeves, two brackets and a displacement rod, wherein the two positioning sleeves are symmetrically distributed on two sides of the outside of a foundation pit; the positioning sleeve is internally inserted with a displacement rod, the upper part of the displacement rod is penetrated with an inserting rod, and the top of the displacement rod is provided with a concave hole. According to the utility model, the inserted link is arranged, and the second nut is arranged in the middle of the inserted link, so that the pile and the device can be fixed together, a certain height is maintained, the situation that the pile is deviated during pouring concrete or later vibration is avoided, the working quality is ensured, and the construction difficulty is reduced.

Description

Pile foundation measuring construction auxiliary device
Technical Field
The utility model relates to a positioning pile positioning device, in particular to a pile foundation measuring and constructing auxiliary device, and belongs to the technical field of pile foundation construction.
Background
When pouring the bored concrete pile foundation, often need two staff to cooperate the construction, first step: pouring concrete into the foundation pit by one worker, and holding the foundation pile by the other worker; and a second step of: after the concrete is poured, the height of the pile from the ground is required to be adjusted according to construction requirements; and a third step of: vibrating with a vibrating rod; fourth step: adjusting whether the piles and the piles on two sides are on the same straight line; fifth step: covering the plastic film. In the pouring process, whether the piles and other piles are on the same straight line is a construction key point and a construction difficulty; because the mode that adopts artifical pile to hold up is firm during earlier stage construction, exists certain instability to when exhausting concrete vibration, the circumstances of skew appears probably to the stake, can't guarantee the quality of construction.
Disclosure of Invention
The technical problems to be solved by the utility model are as follows: overcomes the defects of the prior art, provides a pile foundation measuring construction auxiliary device, ensures the stability and the accuracy of the position of a pile in construction, improves the working efficiency, ensures the working quality, is convenient to use and is simple to operate.
The technical scheme adopted by the utility model for solving the technical problems is as follows:
the pile foundation measurement construction auxiliary device comprises two positioning sleeves, two brackets and a displacement rod, wherein the two positioning sleeves are symmetrically distributed on two sides of the outside of a foundation pit, the brackets are arranged on the outer wall of each positioning sleeve, the support plates are arranged at the bottoms of the brackets, and the support plates are fixedly connected with the ground through positioning drills; the locating sleeve is internally inserted with a displacement rod, the upper part of the displacement rod is penetrated with an inserting rod, and the top of the displacement rod is provided with a concave hole.
The three brackets are uniformly distributed outside the positioning sleeve, the brackets and the support plate form an included angle of 120 degrees, a through hole is dug in the bottom of the support plate, and a positioning drill rod is inserted in the through hole.
The locating sleeve is connected with the displacement rod through a bolt, and the bolt is positioned outside the locating sleeve.
The inserted link penetrates through the upper parts of the two displacement links, a first nut matched with the inserted link is screwed at the end part of the inserted link, a second nut matched with the inserted link is screwed in the middle of the inserted link, and the number of the second nuts is two.
The utility model has the positive beneficial effects that:
1. according to the utility model, the support is arranged outside the positioning sleeve and is fixed with the ground through the positioning drill rod, so that the refitting device and the ground can be fixed together; through setting up the inserted bar, can fix stake and the device to keep certain height, avoid pouring concrete or later stage when vibrating, the circumstances that the stake takes place the skew has guaranteed work quality, has reduced the construction degree of difficulty.
2. According to the utility model, the two matched second nuts are screwed in the middle of the inserted link, so that the pile can be fixed, the pile is positioned in the center of the foundation pit, the construction accuracy of the pile is ensured, the use is convenient, the operation is simple, and the popularization is easy.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of a part of the structure of FIG. 1;
FIG. 3 is a construction site diagram;
wherein: the device comprises a 1-positioning sleeve, a 2-support, a 3-support plate, a 4-positioning drill rod, a 5-displacement rod, a 6-concave hole, a 7-inserted rod, an 8-first nut, a 9-second nut, an A-foundation pit, a B-pile and a C-perforation.
Detailed Description
The utility model is further explained and illustrated below with reference to the drawings:
1-3, the pile foundation measuring construction auxiliary device comprises two positioning sleeves 1, two brackets 2 and two displacement rods 5, wherein the two positioning sleeves 1 are symmetrically distributed on two sides outside a foundation pit A, the brackets 2 are arranged on the outer wall of the positioning sleeve 1, the bottom of each bracket 2 is provided with a support plate 3, and the support plates 3 are fixedly connected with the ground through positioning rods 4; the positioning sleeve 1 is internally provided with a displacement rod 5, the upper part of the displacement rod 5 is penetrated with an inserting rod 7, and the top of the displacement rod 5 is provided with a concave hole 6.
The three brackets 2 are uniformly distributed outside the positioning sleeve 1, the brackets 2 and the support plate 3 form an included angle of 120 degrees, the bottom of the support plate 3 is provided with through holes in a digging mode, and positioning rods 4 are inserted into the through holes.
The positioning sleeve 1 and the displacement rod 5 are connected together through bolts, and the bolts are positioned outside the positioning sleeve 1.
The inserted link 7 penetrates through the upper parts of the two displacement links 5, and a matched first nut 8 is screwed at the end part of the inserted link 7, and a matched second nut 9 is screwed at the middle part of the inserted link 7, wherein the number of the second nuts 9 is two.
In the above description, the length of the displacement rod is sufficient to fix the pile at a desired height.
In the above description, the bottom of the positioning drill rod is pointed cone, and the positioning drill rod is hit by a hammer, so that the positioning drill rod is inserted into the soil.
Working principle:
firstly, arranging the devices on two sides of the outer part of a foundation pit, then placing piles in the foundation pit, and adjusting the position of a displacement rod according to the height of the piles exposed out of the ground; sequentially penetrating the inserted link through the displacement link and the perforation at the top of the pile, and screwing a matched first nut at the bottom of the inserted link to fix;
according to the center position of the foundation pit, the pile is moved to the center position along the inserted link, and second nuts at two sides of the pile are moved, so that the pile is fixed at the middle position of the pile;
finally, the stay wire is measured, so that after the wires above the whole row of piles are respectively positioned in the concave holes, the extending heights of the displacement rods are consistent, and then the heights of the piles are the same; at this time, casting construction can be performed.
According to the utility model, the inserted link is arranged, and the second nut is arranged in the middle of the inserted link, so that the pile and the device can be fixed together, a certain height is maintained, the situation that the pile is deviated during pouring concrete or later vibration is avoided, the working quality is ensured, and the construction difficulty is reduced.

Claims (4)

1. The utility model provides a pile foundation measurement construction auxiliary device, includes locating sleeve (1), support (2) and displacement pole (5), its characterized in that: the two positioning sleeves (1) are symmetrically distributed on two sides of the outside of the foundation pit (A), a support (2) is arranged on the outer wall of the positioning sleeve (1), a support plate (3) is arranged at the bottom of the support (2), and the support plate (3) is fixedly connected with the ground through positioning drills (4); the positioning sleeve (1) is internally provided with a displacement rod (5), the upper part of the displacement rod (5) is penetrated with an inserting rod (7), and the top of the displacement rod (5) is provided with a concave hole (6).
2. The pile foundation measuring construction auxiliary device according to claim 1, wherein: the three brackets (2) are uniformly distributed outside the positioning sleeve (1), the brackets (2) and the support plate (3) form an included angle of 120 degrees, a through hole is dug at the bottom of the support plate (3), and a positioning drill rod (4) is inserted in the through hole.
3. The pile foundation measuring construction auxiliary device according to claim 1, wherein: the positioning sleeve (1) is connected with the displacement rod (5) through a bolt, and the bolt is positioned outside the positioning sleeve (1).
4. The pile foundation measuring construction auxiliary device according to claim 1, wherein: the two-way type hydraulic jack is characterized in that the inserted link (7) penetrates through the upper parts of the two displacement rods (5), a first nut (8) matched with the inserted link is screwed at the end part of the inserted link (7), a second nut (9) matched with the inserted link (7) is screwed at the middle part of the inserted link (7), and the number of the second nuts (9) is two.
CN202321085290.5U 2023-05-08 2023-05-08 Pile foundation measuring construction auxiliary device Active CN219862802U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321085290.5U CN219862802U (en) 2023-05-08 2023-05-08 Pile foundation measuring construction auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321085290.5U CN219862802U (en) 2023-05-08 2023-05-08 Pile foundation measuring construction auxiliary device

Publications (1)

Publication Number Publication Date
CN219862802U true CN219862802U (en) 2023-10-20

Family

ID=88320373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321085290.5U Active CN219862802U (en) 2023-05-08 2023-05-08 Pile foundation measuring construction auxiliary device

Country Status (1)

Country Link
CN (1) CN219862802U (en)

Similar Documents

Publication Publication Date Title
WO2019128155A1 (en) Open caisson construction structure and method
CN105887811A (en) Ultra-deep soft soil pile integral construction method based on high-precision information monitoring
CN110847177A (en) Fixed verticality adjusting and upward floating preventing device and method with steel pipe supporting column serving as structural column
CN110016938B (en) Positioning and verticality adjusting device for rectangular lattice column of reverse construction method foundation pit
CN211898386U (en) Tubular pile perpendicularity adjusting device
CN219862802U (en) Pile foundation measuring construction auxiliary device
CN112265919A (en) Self-balancing static drilling root planting pile hoisting threading device and construction method thereof
CN111335317A (en) Tubular pile perpendicularity adjusting device
CN116575451A (en) Pile sinking method and device for prefabricated U-shaped concrete sheet pile hole guiding
CN108661301B (en) Modular assembly platform for vertical frames of well frames and use method
CN217518226U (en) Turbo generator base direct-burried sleeve adjusting device
CN215107496U (en) Transition joint for hoisting lattice column and adjusting verticality
CN214116620U (en) Adjustable support for accurate positioning of permanent double-steel-pipe column
CN215053064U (en) Lattice column verticality correction device
CN115059071A (en) Pile sinking construction method for precast pile
CN109138010B (en) Pile body fixing device for indoor pile soil model test
CN214530755U (en) Connecting structure of steel pipe column and concrete precast tubular pile
CN214883714U (en) Lattice column positioning device
CN106759558B (en) A kind of control is buried in the earth the construction method of stand column pile direction and verticality
CN206346201U (en) A kind of sand control alignment system for being used to lay lattice column
CN219547809U (en) Filling pile positioning grouting frame
CN219604680U (en) Novel four-limb steel tube lattice column
CN213142671U (en) Road bridge is built and is repaired construction and use road bed supporting pile
CN214091741U (en) Tunnel inner tube canopy support hole construction equipment
CN221030223U (en) Supporting structure for foundation pit support