CN219843373U - Building electric cable bridge - Google Patents
Building electric cable bridge Download PDFInfo
- Publication number
- CN219843373U CN219843373U CN202320827880.4U CN202320827880U CN219843373U CN 219843373 U CN219843373 U CN 219843373U CN 202320827880 U CN202320827880 U CN 202320827880U CN 219843373 U CN219843373 U CN 219843373U
- Authority
- CN
- China
- Prior art keywords
- bridge
- springs
- fixedly connected
- supporting screw
- partition plates
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model belongs to the technical field of building electrical cable bridges, in particular to a building electrical cable bridge, which comprises two C-shaped steels, supporting screws, bridge frames and bridge covers, wherein opposite sides of the two supporting screws are fixedly installed with the C-shaped steels through nuts, the bridge frames are fixedly connected to the tops of the C-shaped steels, the bridge covers are arranged at the tops of the bridge frames, a plurality of partition plates are arranged in the bridge frames, a plurality of wire grooves are formed between the partition plates, a plurality of springs are fixedly connected to the tops of the bridge covers, rubber pads are arranged on the springs, the springs are matched with the wire grooves, limit grooves are respectively formed in two sides of the partition plates and the inner walls of the bridge frames, the limit grooves are correspondingly placed in the springs, and by arranging the springs, the partition plates and the rubber pads, cables can be orderly placed in the wire grooves, and workers can quickly find corresponding circuits during maintenance and replacement, the working time is greatly shortened, the working strength is greatly reduced, and the working efficiency is improved.
Description
Technical Field
The utility model mainly relates to the field of building electrical cable bridges, in particular to a building electrical cable bridge.
Background
The cable bridge frame is divided into a groove type structure, a tray type structure, a ladder frame type structure, a grid type structure and the like, and is composed of a bracket, a bracket arm, a mounting accessory and the like, the bridge frame in a building can be independently erected, and can be laid on various building and pipe gallery brackets, the cable bridge frame has the characteristics of simple structure, attractive appearance, flexible configuration, convenience in maintenance and the like, all parts are required to be galvanized, the cable bridge frame is mounted on an outdoor bridge frame of the building, and the cable bridge frame is divided into the groove type structure, the tray type structure, the ladder frame type structure, the grid type structure and the like, and is composed of the bracket, the bracket arm, the mounting accessory and the like.
When the existing cable bridge for the building is used, cables are placed in the bridge frame in disorder, time and labor are consumed when workers find corresponding lines during maintenance and replacement, working strength is increased, working efficiency is greatly affected, and therefore the building electric cable bridge is necessary to be developed to solve the problems.
Disclosure of Invention
In order to solve the defects of the prior art, the utility model provides the building electric cable bridge, and the device solves the problems that the cables are placed in the bridge in disorder, time and labor are wasted when workers find corresponding lines during maintenance and replacement, the working strength is increased, and the working efficiency is greatly influenced.
The technical scheme adopted for solving the technical problems is as follows:
the utility model provides a building electric cable bridge, which comprises C-shaped steel, supporting screws, a bridge frame and a bridge cover, wherein the number of the supporting screws is two, one opposite sides of the two supporting screws are fixedly installed with the C-shaped steel through nuts, the top of the C-shaped steel is fixedly connected with the bridge frame, the bridge cover is arranged at the top of the bridge frame, a plurality of partition plates are arranged in the bridge frame, a plurality of wire grooves are formed among the partition plates, the top of the bridge cover is fixedly connected with a plurality of springs, rubber pads are arranged on the springs, the springs are matched with the wire grooves, and limit grooves are respectively formed in two sides of the partition plates and the inner wall of the bridge frame.
Further, the top of the supporting screw is fixedly connected with the fixing plate.
Further, a rubber sleeve is arranged at the bottom of the supporting screw, a screw hole is formed in the rubber sleeve, and the rubber sleeve is detachably connected with the supporting screw.
Further, the bridge frame is detachably connected with the C-shaped steel through the fixing block.
The utility model has the technical effects that: compared with the prior art, the utility model provides the building electric cable bridge, and the cables can be orderly placed in the wire slots by arranging the springs, the partition plates and the rubber pads, so that workers can quickly find corresponding lines during maintenance and replacement, the working time is greatly saved, the working intensity is reduced, and the working efficiency is improved.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is an enlarged view of a partial structure of the present utility model;
fig. 3 is a top view of a partial structure of the present utility model.
In the figure, steel in the shape of 1 and C; 2. a support screw; 3. a nut; 4. a rubber sleeve; 5. a fixing plate; 6. a bridge frame; 7. a bridge cover; 8. a spring; 9. a rubber pad; 10. a cable; 11. a partition plate; 12. a fixed block; 13. a screw hole; 14. and a limit groove.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present utility model more clear, the technical solutions of the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the present utility model.
Examples
Referring to fig. 1-3, the utility model provides a building electric cable bridge, which comprises a C-shaped steel 1, two supporting screws 2, a bridge frame 6 and a bridge cover 7, wherein the two supporting screws 2 are fixedly installed on opposite sides of the two supporting screws 2 through nuts 3, the bridge frame 6 is fixedly connected to the top of the C-shaped steel 1, the bridge cover 7 is arranged at the top of the bridge frame 6, a plurality of partition plates 11 are arranged in the bridge frame 6, a plurality of wire grooves are formed between the partition plates 11, a plurality of springs 8 are fixedly connected to the top of the bridge cover 7, rubber pads 9 are arranged on the springs 8, the springs 8 are matched with the wire grooves, limit grooves 14 are respectively formed in two sides of the partition plates 11 and the inner wall 6 of the bridge frame, the position of the bridge can be adjusted by self by arranging the nuts 3 and the screws, the flexibility of the device is improved, the cables 10 can be orderly arranged in the wire grooves by arranging the springs 8, the limit grooves 14, the partition plates 11 and the rubber pads 9, the springs 8 cannot be displaced by arranging the limit grooves 14, when in maintenance and replacement, a worker can quickly find corresponding wire grooves, the working time is greatly shortened, the working time is further, the working efficiency is improved, and the practical damage to the cable is further improved, and the working efficiency is improved.
The top of the supporting screw rod 2 is fixedly connected with the fixed plate 5, and the bridge frame 6 is detachably connected with the C-shaped steel 1 through the fixed block 12, so that the stability of the device is improved.
The bottom of the supporting screw 2 is provided with a rubber sleeve 4, a screw hole 13 is formed in the rubber sleeve 4, the rubber sleeve 4 is detachably connected with the supporting screw 2, and the rubber sleeve 4 is arranged to be convenient to replace when the rubber sleeve ages.
When the product is used, the bridge frame is firstly adjusted to a proper position through the nut 3, then the cables 10 are sequentially placed in the wire slots, finally the springs 8 are aligned with the limit slots 14, and the bridge frame cover 7 is covered and fixed.
The foregoing embodiments are merely examples of the present utility model, and the scope of the present utility model includes, but is not limited to, the forms and styles of the foregoing embodiments, and any suitable changes or modifications made by those skilled in the art, which are consistent with the claims of the present utility model, shall fall within the scope of the present utility model.
Claims (4)
1. The utility model provides a building electric cable testing bridge, includes C word steel (1), supporting screw (2), nut (3) crane span structure frame (6) and crane span structure lid (7), the quantity of supporting screw (2) is two, two opposite one side of supporting screw (2) all passes through nut (3) fixed mounting with C word steel (1), C word steel (1) top fixedly connected with crane span structure frame (6), crane span structure frame (6) top is equipped with crane span structure lid (7), its characterized in that: the novel cable bridge is characterized in that a plurality of clapboards (11) are arranged inside the bridge frame (6), a plurality of slots are formed between the clapboards (11), a plurality of springs (8) are fixedly connected to the top of the bridge cover (7), rubber pads (9) are arranged on the springs (8), the springs (8) are matched with the slots, limit slots (14) are respectively formed in two sides of the clapboards (11) and the inner wall of the bridge frame (6), and the springs (8) are arranged in the limit slots (14).
2. A building electrical cable bridge according to claim 1, wherein: the top of the supporting screw rod (2) is provided with a fixing plate (5) which is fixedly connected with the supporting screw rod.
3. A building electrical cable bridge according to claim 1, wherein: the bottom of the supporting screw (2) is provided with a rubber sleeve (4), a screw hole (13) is formed in the rubber sleeve (4), and the rubber sleeve (4) is detachably connected with the supporting screw (2).
4. A building electrical cable bridge according to claim 1, wherein: the bridge frame (6) is fixedly connected with the C-shaped steel (1) through a fixed block (12).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320827880.4U CN219843373U (en) | 2023-04-10 | 2023-04-10 | Building electric cable bridge |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320827880.4U CN219843373U (en) | 2023-04-10 | 2023-04-10 | Building electric cable bridge |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219843373U true CN219843373U (en) | 2023-10-17 |
Family
ID=88304037
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320827880.4U Active CN219843373U (en) | 2023-04-10 | 2023-04-10 | Building electric cable bridge |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219843373U (en) |
-
2023
- 2023-04-10 CN CN202320827880.4U patent/CN219843373U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201323409Y (en) | Tool for live line replacing of high voltage transmission line V-shaped insulator chain | |
| CN217087394U (en) | Layered simply-supported beam type ultrahigh-voltage cable bridge | |
| CN219843373U (en) | Building electric cable bridge | |
| CN210867062U (en) | Mounting and supporting structure for cable bridge | |
| CN108879524B (en) | Stepped cable bridge | |
| CN215817334U (en) | Groove type cable bridge convenient to assemble | |
| CN211225995U (en) | Special hook for cover plate of indoor cable trench of transformer substation | |
| CN214314444U (en) | Temperature rise low clamping type small current lighting power supply bus duct | |
| CN209328332U (en) | A kind of distribution experiment operation platform device | |
| CN218102437U (en) | Cable bridge | |
| CN221380331U (en) | Hot galvanizing bridge | |
| CN217934888U (en) | Auxiliary positioning structure for cable bridge | |
| CN219801748U (en) | Cable bridge connection structure | |
| CN221842261U (en) | A cable tray convenient for lifting | |
| CN220770361U (en) | Water and electricity installation positioning equipment | |
| CN211236680U (en) | Efficient temperature controller testing arrangement | |
| CN219677996U (en) | Corrosion-resistant galvanized bridge rack hanger | |
| CN215009439U (en) | Cable bridge with adjustable wiring assembly | |
| CN211342116U (en) | Steel construction environmental protection division wall for construction | |
| CN212231666U (en) | Antenna mounting bracket for optical fiber repeater | |
| CN223039539U (en) | A galvanized trough type bridge suspension fixing structure | |
| CN215580143U (en) | Cable lapping bridge | |
| CN222107545U (en) | A cable fixing device for a transmission line terminal tower | |
| CN220086925U (en) | Bridge busbar connection structure | |
| CN208483761U (en) | A kind of electrical engineering positioning and fixing device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |