CN219830645U - Fire control pipeline pressure testing device - Google Patents

Fire control pipeline pressure testing device Download PDF

Info

Publication number
CN219830645U
CN219830645U CN202321149157.1U CN202321149157U CN219830645U CN 219830645 U CN219830645 U CN 219830645U CN 202321149157 U CN202321149157 U CN 202321149157U CN 219830645 U CN219830645 U CN 219830645U
Authority
CN
China
Prior art keywords
plate
water
fire
fixedly arranged
testing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321149157.1U
Other languages
Chinese (zh)
Inventor
芦苇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Zhongxiao Fire Technology Co ltd
Original Assignee
Nanjing Zhongxiao Fire Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Zhongxiao Fire Technology Co ltd filed Critical Nanjing Zhongxiao Fire Technology Co ltd
Priority to CN202321149157.1U priority Critical patent/CN219830645U/en
Application granted granted Critical
Publication of CN219830645U publication Critical patent/CN219830645U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The utility model discloses a fire-fighting pipeline pressure testing device which comprises a workbench, wherein a supporting plate is fixedly arranged on one side of the workbench, a water tank is arranged on one side of the workbench, a water pump is fixedly arranged on one end of the water tank, a hose is fixedly connected to the output end of the water pump, the hose is led into a water channel, an air cylinder is arranged on one side of the supporting plate, and an extrusion plate is fixedly arranged at the output end of the air cylinder. The utility model relates to a water tank and an extrusion plate, wherein the extrusion plate continuously extrudes a fire-fighting pipeline, a pressure value generated by extrusion is transmitted to a controller by a pressure sensor, the pressure value is transmitted to a display by the controller for a user to read specific parameters, after the test is finished, a water pump is started, the water pump pumps water from a hose to enter a water channel, then the water pump enters the fire-fighting pipeline from the water channel, after standing for half an hour, whether water leakage exists or not is observed, and whether the fire-fighting pipeline is cracked is detected.

Description

Fire control pipeline pressure testing device
Technical Field
The utility model relates to the technical field of fire-fighting pipelines, in particular to a fire-fighting pipeline pressure testing device.
Background
Along with the development of science and technology, the utilization degree of water resources is higher and higher, the laying of the water pipe is a serious problem, the water pipe can generate pressure when in use, and the water pipe with poor quality can burst after the water pressure reaches a certain degree, so that hidden danger is brought to the use, and the pressure test of the fire-fighting pipeline is also indispensable.
Through retrieving, the patent of the publication number CN218297866U, a pipeline pressure testing device for fire-fighting equipment engineering construction is disclosed, which comprises a base and an installation rack, the rear side of base top is provided with the installation rack, the below of installation rack front end is provided with the arc, the inboard of going up the arc is provided with the pressure piece, the below of going up the arc is provided with down the arc, the four corners of lower arc bottom is provided with pressure sensor.
The above patent suffers from the following disadvantages: the device utilizes the clamp test can detect the pressure value that the pipeline received, but can't specifically detect whether the pipeline has born the pressure that the pressure piece brought, and the pressure piece is after the pipeline extrusion, and the pipeline probably has the micro-deformation to lead to the condition of fracture, and can't observe the concrete damage condition of pipeline by naked eyes.
Disclosure of Invention
The utility model aims to solve the defects in the prior art, and provides a fire-fighting pipeline pressure testing device.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
the utility model provides a fire control pipeline pressure testing device, includes the workstation, workstation one side fixed mounting has the backup pad, workstation one side is provided with the water tank, rectangular channel has been seted up to workstation one side, rotate between the rectangular channel inner wall and install two-way lead screw, workstation one side fixed mounting has first motor, first motor output and two-way lead screw fixed connection, two symmetrical first lead screw nuts of spiral installation on the two-way lead screw, equal fixed mounting has the movable plate on one side on the first lead screw nut, movable plate one side is provided with two bracing pieces, two fixed mounting has the fixed plate between the bracing piece, the fixed slot has been seted up to fixed plate one side, one of them the water channel has been seted up to fixed plate one side, the fixed slot is linked together with the water channel, water tank one end fixed mounting has the water pump, water pump output fixedly connected with hose, the hose lets in inside the water channel, backup pad one side is provided with the cylinder, cylinder output fixed mounting has the stripper plate.
Further, a second motor is fixedly arranged on one side of the supporting plate, two connecting blocks are fixedly arranged on one side of the supporting plate, a screw rod is rotatably arranged between the two connecting blocks, one end of the screw rod is fixedly connected with the output end of the second motor, a second screw rod nut is spirally arranged on the screw rod, a mounting plate is fixedly arranged on one side of the second screw rod nut, and the mounting plate is fixedly connected with the air cylinder.
Further, two symmetrical sliding rails are fixedly arranged on one side of the supporting plate, sliding blocks are slidably arranged on the sliding rails, a connecting rod is fixedly arranged at one end of each sliding block, and the connecting rod is fixedly connected with the mounting plate.
Furthermore, a pressure sensor is fixedly arranged on one side of the extrusion plate, a controller is fixedly arranged on one side of the extrusion plate, and the controller is fixedly connected with the pressure sensor through a wire.
Further, a water pressure gauge is fixedly arranged on the hose, a display is fixedly arranged on one side of the supporting plate, and the display is fixedly connected with the controller through a wire.
Further, a thread groove is formed in the supporting rod, two nuts are installed on the thread groove in a screwed mode, and the supporting rod is fixedly connected with the moving plate through the nuts.
The beneficial effects of the utility model are as follows:
1. according to the utility model, the water tank and the extrusion plate are arranged, the fire-fighting pipeline is aligned and placed in the fixed groove, the first motor is started, the first motor drives the two-way screw rods to rotate, the two first screw rod nuts can move oppositely or reversely, the first screw rod nuts drive the movable plate to move, the movable plate drives the fixed plate to move until the fire-fighting pipeline is clamped in the fixed groove, the air cylinder is started at the moment, the air cylinder pushes the extrusion plate to move downwards, the extrusion plate continuously extrudes the fire-fighting pipeline, the pressure value generated by extrusion is transmitted to the controller by the pressure sensor, the controller is transmitted to the display for a user to read specific parameters, after the test is finished, the water pump is started, the water pump pumps water from the hose to enter the water through groove, then enters the fire-fighting pipeline by the water through groove, and after the fire-fighting pipeline is stood for half an hour, whether the fire-fighting pipeline is cracked or not is observed.
2. According to the utility model, the second motor is arranged, the second motor drives the screw rod to rotate, the second screw rod nut moves along the axis of the screw rod, the second screw rod nut drives the mounting plate to move, the mounting plate stably moves under the support and guide of the sliding rail and the sliding block, and the extruding plate can test different positions of the fire-fighting pipeline.
Drawings
FIG. 1 is a schematic diagram of the overall structure of a fire-fighting pipeline pressure testing device according to the present utility model;
FIG. 2 is a schematic top view of a fire fighting pipeline pressure testing device according to the present utility model;
FIG. 3 is a schematic side view of a fire fighting pipeline pressure testing device according to the present utility model;
FIG. 4 is a schematic diagram showing connection between a support rod and a fixing plate of a fire-fighting pipeline pressure testing device according to the present utility model;
FIG. 5 is a schematic diagram showing the installation of a cylinder of a fire pipeline pressure testing device on an installation plate;
FIG. 6 is a schematic view of a structure of a fixing plate of a fire-fighting pipeline pressure testing device according to the present utility model;
fig. 7 is a schematic structural diagram of a support rod of the fire-fighting pipeline pressure testing device according to the present utility model.
In the figure: 1. a work table; 2. a support plate; 3. a water tank; 4. rectangular grooves; 5. a two-way screw rod; 6. a first motor; 7. a first lead screw nut; 8. a moving plate; 9. a support rod; 10. a fixing plate; 11. a fixing groove; 12. a water passage groove; 13. a water pump; 14. a hose; 15. a cylinder; 16. an extrusion plate; 17. a second motor; 18. a connecting block; 19. a screw rod; 20. a second lead screw nut; 21. a mounting plate; 22. a slide rail; 23. a slide block; 24. a connecting rod; 25. a pressure sensor; 26. a controller; 27. a water pressure gauge; 28. a display; 29. a thread groove; 30. and (5) a screw cap.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
Referring to fig. 1-7, a fire-fighting pipeline pressure testing device comprises a workbench 1, a supporting plate 2 is fixedly arranged on one side of the workbench 1, a water tank 3 is arranged on one side of the workbench 1, a rectangular groove 4 is formed on one side of the workbench 1, a bidirectional screw rod 5 is rotatably arranged between inner walls of the rectangular groove 4, a first motor 6 is fixedly arranged on one side of the workbench 1, an output end of the first motor 6 is fixedly connected with the bidirectional screw rod 5, two symmetrical first screw nuts 7 are spirally arranged on the bidirectional screw rod 5, a movable plate 8 is fixedly arranged on one side of the first screw nuts 7, two supporting rods 9 are arranged on one side of the movable plate 8, a fixing plate 10 is fixedly arranged between the two supporting rods 9, a fixing groove 11 is formed on one side of the fixing plate 10, a water through groove 12 is formed on one side of the fixing plate 10, the fixed groove 11 is communicated with the water through groove 12, a water pump 13 is fixedly arranged at one end of the water tank 3, a hose 14 is fixedly connected to the output end of the water pump 13, the hose 14 is led into the water through groove 12, after the test is finished, the water pump 13 is started, the water pump 13 pumps water to enter the water through groove 12 from the hose 14, then enters a fire-fighting pipeline from the water through groove 12, after standing for half an hour, whether water leakage exists or not is observed, whether the fire-fighting pipeline is cracked or not is detected, an air cylinder 15 is arranged at one side of the supporting plate 2, an extrusion plate 16 is fixedly arranged at the output end of the air cylinder 15, the fire-fighting pipeline is aligned and placed in the fixed groove 11, a first motor 6 is started, the first motor 6 drives a bidirectional screw rod 5 to rotate, two first screw nuts 7 can move in opposite directions or away from each other, the first screw nuts 7 drive a moving plate 8 to move, the moving plate 8 drives the fixed plate 10 to move, until the fire pipe is clamped in the fixed groove 11, the cylinder 15 is started, the cylinder 15 pushes the extrusion plate 16 to move downwards, and the extrusion plate 16 continuously extrudes the fire pipe.
Referring to fig. 1 to 5, the present utility model is specifically: a second motor 17 is fixedly arranged on one side of the supporting plate 2, two connecting blocks 18 are fixedly arranged on one side of the supporting plate 2, a screw rod 19 is rotatably arranged between the two connecting blocks 18, one end of the screw rod 19 is fixedly connected with the output end of the second motor 17, a second screw nut 20 is spirally arranged on the screw rod 19, one side of the second screw nut 20 is fixedly provided with a mounting plate 21, the mounting plate 21 is fixedly connected with the air cylinder 15, the second motor 17 is started, the second motor 17 drives the screw rod 19 to rotate, the second screw nut 20 moves along the axis of the screw rod 19, and the second screw nut 20 drives the mounting plate 21 to move.
Referring to fig. 1 to 5, the present utility model is specifically: two symmetrical slide rails 22 are fixedly arranged on one side of the supporting plate 2, sliding blocks 23 are slidably arranged on the slide rails 22, a connecting rod 24 is fixedly arranged at one end of each slide block 23, the connecting rod 24 is fixedly connected with the mounting plate 21, the mounting plate 21 stably moves under the supporting and guiding of the slide rails 22 and the sliding blocks 23, and the extruding plate 16 can test different positions of a fire-fighting pipeline.
Referring to fig. 5, the present utility model is specifically: the pressure sensor 25 is fixedly arranged on one side of the extrusion plate 16, the controller 26 is fixedly arranged on one side of the extrusion plate 16, and the controller 26 is fixedly connected with the pressure sensor 25 through a wire.
Referring to fig. 3-5, the present utility model is specifically: the hose 14 is fixedly provided with a water pressure gauge 27, one side of the supporting plate 2 is fixedly provided with a display 28, the display 28 is fixedly connected with the controller 26 through a wire, the pressure value generated by extrusion is transmitted to the controller 26 through the pressure sensor 25, and then the pressure value is transmitted to the display 28 through the controller 26 for a user to read specific parameters.
Referring to fig. 1-7, the present utility model is specifically: the support rod 9 is provided with a thread groove 29, two nuts 30 are arranged on the thread groove 29 in a screwed mode, and the support rod 9 is fixedly connected with the movable plate 8 through the nuts 30.
Working principle: the fire-fighting pipeline is aligned and placed in the fixed groove 11, the first motor 6 is started, the first motor 6 drives the two-way screw rod 5 to rotate, the two first screw nuts 7 can move in opposite directions or in opposite directions, the first screw nuts 7 drive the movable plate 8 to move, the movable plate 8 drives the fixed plate 10 to move until the fire-fighting pipeline is clamped in the fixed groove 11, the cylinder 15 is started at the moment, the cylinder 15 pushes the extrusion plate 16 to move downwards, the extrusion plate 16 continuously extrudes the fire-fighting pipeline, the pressure value generated by extrusion is transmitted to the controller 26 by the pressure sensor 25, the controller 26 is transmitted to the display 28 for a user to read specific parameters, after the test is finished, the water pump 13 is started, the water pump 13 pumps water into the water through groove 12 from the hose 14, then enters the fire-fighting pipeline by the water through groove 12, after the fire-fighting pipeline is stood for half an hour, whether water leakage exists or not is observed, so that whether the fire-fighting pipeline is detected, when bearing pressures at different positions of the fire-fighting pipeline are required to be tested, the second motor 17 is started, the second motor 17 drives the screw rod 19 to move downwards, the second screw nut 20 moves along the axis of the screw rod 19, the second screw nut 20 drives the second screw nut 20 to drive the second motor 21 and the mounting plate 21 to move the mounting plate 22 to move stably and the mounting plate 23 to be positioned below the mounting plate 16, and the mounting plate can not be stably and the mounting plate to be tested, and the slide along the slide rail.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.
In the description of this patent, it should be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like indicate orientations or positional relationships based on the orientation or positional relationships shown in the drawings, merely to facilitate describing the patent and simplify the description, and do not indicate or imply that the devices or elements being referred to must have a particular orientation, be configured and operated in a particular orientation, and are therefore not to be construed as limiting the patent.

Claims (6)

1. The utility model provides a fire control pipeline pressure testing device, its characterized in that includes workstation (1), workstation (1) one side fixed mounting has backup pad (2), workstation (1) one side is provided with water tank (3), rectangular channel (4) have been seted up to workstation (1) one side, rotate between rectangular channel (4) inner wall and install two-way lead screw (5), workstation (1) one side fixed mounting has first motor (6), first motor (6) output and two-way lead screw (5) fixed connection, two symmetrical first lead screw nut (7) are installed to spiral on two-way lead screw (5), one side on first lead screw nut (7) is all fixed mounting has movable plate (8), movable plate (8) one side is provided with two bracing pieces (9), two fixed mounting has fixed plate (10) between bracing piece (9), fixed plate (10) one side is seted up fixed slot (11), one side of fixed plate (10) is seted up and is equipped with water through groove (12), fixed slot (11) are linked together with water through groove (12) and water through (13) fixed hose (13), water through (14) one end is connected to hose (13), an air cylinder (15) is arranged on one side of the supporting plate (2), and an extrusion plate (16) is fixedly arranged at the output end of the air cylinder (15).
2. The fire control pipeline pressure testing device according to claim 1, wherein a second motor (17) is fixedly installed on one side of the supporting plate (2), two connecting blocks (18) are fixedly installed on one side of the supporting plate (2), a screw rod (19) is rotatably installed between the two connecting blocks (18), one end of the screw rod (19) is fixedly connected with the output end of the second motor (17), a second screw rod nut (20) is spirally installed on the screw rod (19), a mounting plate (21) is fixedly installed on one side of the second screw rod nut (20), and the mounting plate (21) is fixedly connected with the air cylinder (15).
3. The fire pipeline pressure testing device according to claim 2, wherein two symmetrical sliding rails (22) are fixedly arranged on one side of the supporting plate (2), sliding blocks (23) are slidably arranged on the sliding rails (22), a connecting rod (24) is fixedly arranged at one end of each sliding block (23), and the connecting rod (24) is fixedly connected with the mounting plate (21).
4. The fire pipeline pressure testing device according to claim 1, wherein a pressure sensor (25) is fixedly arranged on one side of the extrusion plate (16), a controller (26) is fixedly arranged on one side of the extrusion plate (16), and the controller (26) is fixedly connected with the pressure sensor (25) through a wire.
5. The fire pipeline pressure testing device according to claim 4, wherein a water pressure gauge (27) is fixedly arranged on the hose (14), a display (28) is fixedly arranged on one side of the supporting plate (2), and the display (28) is fixedly connected with the controller (26) through a wire.
6. The fire pipeline pressure testing device according to claim 1, wherein the supporting rod (9) is provided with a threaded groove (29), two nuts (30) are spirally arranged on the threaded groove (29), and the supporting rod (9) is fixedly connected with the movable plate (8) through the nuts (30).
CN202321149157.1U 2023-05-15 2023-05-15 Fire control pipeline pressure testing device Active CN219830645U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321149157.1U CN219830645U (en) 2023-05-15 2023-05-15 Fire control pipeline pressure testing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321149157.1U CN219830645U (en) 2023-05-15 2023-05-15 Fire control pipeline pressure testing device

Publications (1)

Publication Number Publication Date
CN219830645U true CN219830645U (en) 2023-10-13

Family

ID=88274369

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321149157.1U Active CN219830645U (en) 2023-05-15 2023-05-15 Fire control pipeline pressure testing device

Country Status (1)

Country Link
CN (1) CN219830645U (en)

Similar Documents

Publication Publication Date Title
CN109765122A (en) A kind of auto parts and components bending resistance cubing and its application method
CN219830645U (en) Fire control pipeline pressure testing device
CN108188788A (en) A kind of boring clamping force adjustable type fixture of irregular part
CN109944789A (en) A kind of small pump quality inspection device
CN219038253U (en) Pressure detector for fire control detection
CN219054135U (en) Special fixture of tubular product hydrostatic testing machine
CN210690244U (en) Withstand voltage testing mechanism of plastic pipe
CN114623894A (en) Chemical instrumentation measures detection device
CN215812116U (en) Detection apparatus is used in plastics PC pipeline production with prevent structure that sideslips
CN220581866U (en) Support frame of basement fire control pipeline
CN219573708U (en) Test bed for detecting impact performance of gypsum board
CN212363143U (en) Pipeline inspection tool and air tightness testing device thereof
CN213331817U (en) Testing device of large-pressure hydraulic cylinder
CN212568280U (en) Pipeline under pressure intensity verifying attachment of stable fixed anticreep
CN220961160U (en) Fixed subassembly and pipeline nondestructive test equipment
CN218865415U (en) Air tightness detection workbench
CN219957470U (en) Engineering detection device
CN219417003U (en) Mechanical detection device
CN214621632U (en) Pressure measuring device for water meter
CN215866207U (en) Test bed for measuring fatigue of flexible pipe or hinged pipe
CN209599027U (en) Temporary fasteners are used in a kind of processing of novel mechanical
CN212539940U (en) High-pressure rubber tube assembly pressure test bed fixing clamp
CN216669521U (en) Practical fixture for mechanical property test of connecting component of anti-seismic support and hanger
CN219588620U (en) Adjustable bracket for slope monitoring equipment
CN221224428U (en) Filter box pressure testing device of plate filter

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant