CN219813488U - Analysis equipment for electric power energy-saving system - Google Patents

Analysis equipment for electric power energy-saving system Download PDF

Info

Publication number
CN219813488U
CN219813488U CN202321370843.1U CN202321370843U CN219813488U CN 219813488 U CN219813488 U CN 219813488U CN 202321370843 U CN202321370843 U CN 202321370843U CN 219813488 U CN219813488 U CN 219813488U
Authority
CN
China
Prior art keywords
fixedly connected
power
saving system
display
wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321370843.1U
Other languages
Chinese (zh)
Inventor
闫美玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Yuanshen Qinglin Energy Conservation And Environmental Protection Co ltd
Original Assignee
Beijing Yuanshen Qinglin Energy Conservation And Environmental Protection Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Yuanshen Qinglin Energy Conservation And Environmental Protection Co ltd filed Critical Beijing Yuanshen Qinglin Energy Conservation And Environmental Protection Co ltd
Priority to CN202321370843.1U priority Critical patent/CN219813488U/en
Application granted granted Critical
Publication of CN219813488U publication Critical patent/CN219813488U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The utility model belongs to the technical field of analysis equipment, and particularly relates to analysis equipment for an electric power energy-saving system, which comprises a plurality of intelligent electric meters and a mounting table, wherein a display is arranged above the mounting table, a support seat for driving the display to rotate is arranged at the top end of the mounting table, a butt joint part is arranged at the bottom of the support seat, a connecting part is arranged at the top end of the inner side of the intelligent electric meters, and the butt joint part is in contact connection with the connecting part. According to the utility model, a technician performs electric power analysis through data, the display is rotatably arranged on the mounting table through the support, so that the worker can conveniently perform collaborative analysis on the data, the working efficiency is improved, the first power line and the first signal line are connected with the second power line and the second signal line through the connecting part and the butting part, the electric wires are not twisted during rotation, the screen can be further conveniently rotated, and the screen can be rotated in an omnibearing manner without being limited by the electric wires.

Description

Analysis equipment for electric power energy-saving system
Technical Field
The utility model belongs to the technical field of analysis equipment, and particularly relates to analysis equipment for an electric power energy-saving system.
Background
The electric power system is a unified whole formed by secondary facilities such as power generation, power supply, power utilization facilities, regulation control and relay protection and safety automatic devices, metering devices, dispatching automation, power communication and the like which are required for guaranteeing the normal operation of the electric power system, and is an electric energy production and consumption system formed by links such as a power plant, a power transmission and transformation line, a power supply and distribution station, power utilization and the like.
When the power system energy-saving analysis is performed, the power information uploaded by the ammeter is analyzed by the computer, and when the analysis is performed, a plurality of persons are often required to cooperate, when the plurality of persons face the computer screen during the analysis research, the screen is required to be rotated from time to time for conveniently displaying the power information, and because the base of the computer screen is directly placed on the office desk and the screen is connected with the host by the electric wire, the screen is inconvenient to rotate when the power energy-saving system is analyzed, and therefore the power energy saving analysis by the plurality of persons is inconvenient.
Disclosure of Invention
The utility model aims to provide analysis equipment for an electric power energy-saving system, wherein a display of the analysis equipment can be rotatably arranged on an installation table through a support, so that workers can conveniently carry out collaborative analysis on data, the working efficiency is improved, and the problems in the background technology are solved.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides an electric power economizer system analytical equipment, includes smart electric meter and mount table, smart electric meter has a plurality of, the top of mount table is provided with the display, the top of mount table sets up and is used for driving display pivoted support, the bottom of support is provided with docking component, the inboard top of smart electric meter is provided with adapting unit, docking component is connected with adapting unit contact.
Further, the support is including rotating the drain pan of connection on smart electric meter top, the top fixedly connected with internal gear of drain pan, the top fixedly connected with top cap of smart electric meter, the outside of gear is established to the top cap cover, the top fixedly connected with positive and negative motor of top cap, the fixed cover of output shaft of positive and negative motor is equipped with drive gear, drive gear and internal gear meshing are connected.
Further, the middle part of drain pan fixedly communicates there is the stay tube, the stay tube runs through the top cap, the top fixedly connected with butt joint of stay tube, display fixed connection is in one side of butt joint, the inside of stay tube is provided with first power cord and first signal line.
Further, the butt joint part comprises an insulating disc fixedly connected inside the bottom shell, and a plurality of concentrically arranged metal rings are embedded inside the insulating disc.
Further, the core wire of the first power line and the core wire of the first signal line are respectively welded with the top ends of the metal rings.
Further, the connecting component comprises a bottom cover fixedly connected to the top end of the inner wall of the intelligent electric meter, a cross rod is fixedly connected to the inside of the bottom cover, a graphite contact is fixedly connected to the side wall of the cross rod, a circular tube is fixedly communicated with the middle of the bottom cover, and a second signal wire and a second power wire are arranged inside the circular tube.
Further, the graphite contacts are in a plurality, the top ends of the graphite contacts are respectively in contact connection with the bottom ends of the metal rings, and the core wire of the second power wire and the core wire of the second signal wire are respectively and fixedly connected with the bottom ends of the graphite contacts.
Compared with the prior art, the utility model has the beneficial effects that: the technical staff carries out electric power analysis through the data, and the display passes through the support can be rotatory to be installed on the mount table, makes things convenient for the staff to carry out collaborative analysis data, improves work efficiency to first power cord and first signal line are connected with docking component and second power cord and second signal line through adapting unit, and when rotatory screen, the electric wire does not warp, not only further is convenient for rotate the screen, but also can the omnidirectional rotate the screen and do not receive the restriction of electric wire.
Drawings
FIG. 1 is a front view of the present utility model;
FIG. 2 is a schematic perspective view of the present utility model;
FIG. 3 is a left cross-sectional view of the present utility model;
fig. 4 is an enlarged view of the portion a of fig. 3 according to the present utility model.
In the drawings, the list of components represented by the various numbers is as follows:
1. a smart meter; 2. a mounting table; 3. a display; 4. a support; 41. a bottom case; 42. an internal gear; 43. a top cover; 44. a forward and reverse motor; 45. a drive gear; 46. a support tube; 47. a first power line; 48. a first signal line; 49. butt joint; 5. a connecting member; 51. a bottom cover; 52. a cross bar; 53. a round tube; 54. a graphite contact; 55. a second signal line; 56. a second power line; 6. a docking member; 61. an insulating disk; 62. a metal ring.
Detailed Description
The present utility model will be specifically described with reference to examples below in order to make the objects and advantages of the present utility model more apparent. It should be understood that the following text is intended to describe only one or more specific embodiments of the utility model and does not limit the scope of the utility model strictly as claimed.
As shown in fig. 1-4, an analysis device for an electric power energy-saving system comprises a plurality of intelligent electric meters 1 and a plurality of installation tables 2, wherein a display 3 is arranged above each installation table 2, a support 4 for driving the display 3 to rotate is arranged at the top end of each installation table 2, a butt joint part 6 is arranged at the bottom of each support 4, a connecting part 5 is arranged at the top end of the inner side of each intelligent electric meter 1, and the butt joint parts 6 are in contact connection with the connecting parts 5.
According to the structure, when the intelligent ammeter 1 is used, the intelligent ammeter 1 detects the power consumption in the power system and uploads the power consumption to the Internet, then the computer host receives data and displays the data through the display 3, a technician performs power analysis through the data, the display 3 can be rotatably installed on the installation table 2 through the support 4, the workers can conveniently perform collaborative analysis on the data, and the working efficiency is improved.
As shown in fig. 3 and 4, the support 4 includes a bottom shell 41 rotatably connected to the top end of the smart meter 1, an inner gear 42 is fixedly connected to the top end of the bottom shell 41, a top cover 43 is fixedly connected to the top end of the smart meter 1, the top cover 43 is covered outside the inner gear 42, a positive and negative motor 44 is fixedly connected to the top end of the top cover 43, a driving gear 45 is fixedly sleeved on an output shaft of the positive and negative motor 44, the driving gear 45 is meshed with the inner gear 42, a supporting tube 46 is fixedly connected to the middle of the bottom shell 41, the supporting tube 46 penetrates through the top cover 43, an abutting joint 49 is fixedly connected to the top end of the supporting tube 46, the display 3 is fixedly connected to one side of the abutting joint 49, and a first power line 47 and a first signal line 48 are arranged inside the supporting tube 46.
According to the above structure, when in use, the forward and reverse motor 44 is controlled to forward and reverse, the driving gear 45 is driven to forward and reverse, the driving gear 45 is meshed with the internal gear 42, so as to drive the internal gear 42 and the bottom shell 41 below the internal gear 42 to rotate, and the bottom shell 41 rotates to drive the support tube 46 to rotate, so that the display 3 arranged at the top end of the support tube 46 is driven to rotate.
As shown in fig. 4, the docking member 6 includes an insulating disc 61 fixedly connected to the inside of the bottom case 41, and a plurality of metal rings 62 concentrically arranged are embedded in the insulating disc 61, and the core wire of the first power line 47 and the core wire of the first signal line 48 are welded to the top ends of the metal rings 62, respectively.
According to the above structure, when the display 3 rotates, the insulating disk 61 rotates in synchronization with the bottom chassis 41, and thus, twisting of the wires does not occur.
As shown in fig. 4, the connection part 5 includes a bottom cover 51 fixedly connected to the top end of the inner wall of the smart meter 1, a cross rod 52 is fixedly connected to the inside of the bottom cover 51, a graphite contact 54 is fixedly connected to the side wall of the cross rod 52, a circular tube 53 is fixedly connected to the middle of the bottom cover 51, a second signal wire 55 and a second power wire 56 are arranged in the circular tube 53, a plurality of graphite contacts 54 are arranged, the top ends of the plurality of graphite contacts 54 are respectively connected with the bottom ends of a plurality of metal rings 62 in a contact manner, and a core wire of the second power wire 56 and a core wire of the second signal wire 55 are respectively connected with the bottom ends of the plurality of graphite contacts 54 in a fixed manner.
According to the above structure, the second signal wire 55 is electrically connected with the corresponding metal ring 62 through the graphite contact 54, so as to be electrically connected with the first signal wire 48, the second power wire 56 is electrically connected with the corresponding metal ring 62 through the graphite contact 54, so as to be electrically connected with the first power wire 47, after the support 4 drives the display 3 to rotate, the metal ring 62 contacts with the corresponding graphite contact 54 and slides relatively, the electrical connection of the second signal wire 55 and the first signal wire 48, the second power wire 56 and the first power wire 47 is not affected, the distortion of the second signal wire 55 and the second power wire 56 is not caused, and the second signal wire 55 and the second power wire 56 are respectively connected with an external host and a power supply, so that signals and electric energy are passed through the display 3.
The working principle of the utility model is as follows: during the use, smart electric meter 1 detects the power consumption in the electric power system, and upload the power consumption to the internet, then computer host accepts data and demonstrates data through display 3, technical personnel carries out electric analysis through data, the display 3 passes through support 4 can rotatory install on mount table 2, the convenience staff carries out collaborative analysis data, improve work efficiency, when drive display 3 rotates, through controlling positive and negative motor 44 forward and backward, drive gear 45 positive and backward, drive gear 45 and internal gear 42 meshing are connected, thereby drive the drain pan 41 rotation of internal gear 42 and internal gear 42 below, drain pan 41 rotates the back drive stay tube 46, thereby drive the display 3 of installing on the stay tube 46 top rotates, when display 3 rotates, insulating disc 61 rotates along with drain pan 41 synchronization, therefore can not produce the distortion of wire, second signal line 55 passes through graphite contact 54 and corresponding metal loop 62 electric connection, and then realize with first signal line 48 electric connection, second power line 56 and first power line 47 electric connection through graphite contact 54 and corresponding metal loop 62 electric connection and then realize second power line 56, drive support 4 electric connection, drive line and second power line 55 and second power line 47 electric connection are not contacted with the corresponding signal line 55, thereby the second signal line 55 and the relative signal line of second power line 55 and the second power line 47 are the signal line electric connection.
The foregoing is merely a preferred embodiment of the present utility model and it should be noted that modifications and adaptations to those skilled in the art may be made without departing from the principles of the present utility model, which are intended to be comprehended within the scope of the present utility model. Structures, devices and methods of operation not specifically described and illustrated herein, unless otherwise indicated and limited, are implemented according to conventional means in the art.

Claims (7)

1. The utility model provides an electric power economizer system analytical equipment, includes smart electric meter (1) and mount table (2), its characterized in that: the intelligent ammeter (1) has a plurality of, the top of mount table (2) is provided with display (3), the top of mount table (2) sets up and is used for driving display (3) pivoted support (4), the bottom of support (4) is provided with docking component (6), the inboard top of intelligent ammeter (1) is provided with connecting component (5), docking component (6) are connected with connecting component (5) contact.
2. An electricity saving system analysis apparatus according to claim 1, wherein: the support (4) is including rotating drain pan (41) of connection on smart electric meter (1) top, the top fixedly connected with internal gear (42) of drain pan (41), the top fixedly connected with top cap (43) of smart electric meter (1), the outside of gear (42) is established in top cap (43) cover, the top fixedly connected with positive and negative motor (44) of top cap (43), the fixed cover of output shaft of positive and negative motor (44) is equipped with drive gear (45), drive gear (45) and internal gear (42) meshing are connected.
3. An electricity saving system analysis apparatus according to claim 2, wherein: the middle part of drain pan (41) is fixed to be linked together and is had stay tube (46), stay tube (46) run through top cap (43), the top fixedly connected with butt joint (49) of stay tube (46), display (3) fixed connection is in one side of butt joint (49), the inside of stay tube (46) is provided with first power cord (47) and first signal line (48).
4. A power saving system analysis apparatus according to claim 3, wherein: the butt joint part (6) comprises an insulating disc (61) fixedly connected inside the bottom shell (41), and a plurality of concentrically arranged metal rings (62) are embedded inside the insulating disc (61).
5. An electric power saving system analysis apparatus as claimed in claim 4, wherein: the core wire of the first power wire (47) and the core wire of the first signal wire (48) are respectively welded with the top ends of the metal rings (62).
6. An electric power saving system analysis apparatus as claimed in claim 4, wherein: the connecting component (5) comprises a bottom cover (51) fixedly connected to the top end of the inner wall of the intelligent electric meter (1), a cross rod (52) is fixedly connected to the inside of the bottom cover (51), a graphite contact (54) is fixedly connected to the side wall of the cross rod (52), a circular tube (53) is fixedly communicated with the middle of the bottom cover (51), and a second signal wire (55) and a second power wire (56) are arranged inside the circular tube (53).
7. An electric power saving system analysis apparatus as claimed in claim 6, wherein: the graphite contacts (54) are in contact connection with the bottom ends of the metal rings (62) respectively, and the core wires of the second power wires (56) and the core wires of the second signal wires (55) are fixedly connected with the bottom ends of the graphite contacts (54) respectively.
CN202321370843.1U 2023-05-31 2023-05-31 Analysis equipment for electric power energy-saving system Active CN219813488U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321370843.1U CN219813488U (en) 2023-05-31 2023-05-31 Analysis equipment for electric power energy-saving system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321370843.1U CN219813488U (en) 2023-05-31 2023-05-31 Analysis equipment for electric power energy-saving system

Publications (1)

Publication Number Publication Date
CN219813488U true CN219813488U (en) 2023-10-13

Family

ID=88283469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321370843.1U Active CN219813488U (en) 2023-05-31 2023-05-31 Analysis equipment for electric power energy-saving system

Country Status (1)

Country Link
CN (1) CN219813488U (en)

Similar Documents

Publication Publication Date Title
CN112986639B (en) Mobile intelligent low-power consumption electric energy meter capable of being used in extreme environment
CN219813488U (en) Analysis equipment for electric power energy-saving system
CN111535648B (en) Communication base station antenna angle remote intelligent adjusting equipment
CN208825975U (en) A kind of production radiator high efficient full automatic individual chip package machine
CN212845651U (en) Power equipment detects and uses troubleshooting device
CN2899588Y (en) Automatic rotary dining table for preventing electric appliance wire from twisting
CN208394544U (en) A kind of cable reel installation of easy disassembly
CN112165289A (en) Comprehensive on-line monitoring device on overhead transmission line ground wire
CN211348380U (en) Wall-hanging electric power monitoring device
CN213481628U (en) Waterproof testing arrangement is used in sensor production
CN201495428U (en) Electric hoisting clothes airing device for balcony
CN219434944U (en) Enterprise production energy consumption monitoring system
CN211958932U (en) Direct current has brush gear motor and pyrocondensation pipe erection equipment
CN219919413U (en) New energy electricity-saving device
CN216432906U (en) Integrated displacement monitoring equipment for steel chimney
CN220400170U (en) Supplementary display device of official working in coordination
CN216489909U (en) Distribution network intelligent station terminal easy to overhaul
CN114630544B (en) Data transmission acquisition device
CN216561888U (en) Electric power intelligence inspection device
CN218275826U (en) Novel building electrical installation lead device
CN221151505U (en) CAT 1-based wired remote water meter concentrator
CN211021916U (en) Show shelf for exhibition and sale of computer network science and technology products
CN217008033U (en) Computer monitoring system for hydropower station
CN209065214U (en) Energized state shows drum on the spot for a kind of band
CN213879721U (en) Marine photovoltaic board base

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant