CN219794613U - Building construction protection network of quick assembly - Google Patents

Building construction protection network of quick assembly Download PDF

Info

Publication number
CN219794613U
CN219794613U CN202321305666.9U CN202321305666U CN219794613U CN 219794613 U CN219794613 U CN 219794613U CN 202321305666 U CN202321305666 U CN 202321305666U CN 219794613 U CN219794613 U CN 219794613U
Authority
CN
China
Prior art keywords
mounting
limit
building construction
arc
lantern ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321305666.9U
Other languages
Chinese (zh)
Inventor
刘�英
张平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 9 Co Ltd
Original Assignee
Sinohydro Bureau 9 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 9 Co Ltd filed Critical Sinohydro Bureau 9 Co Ltd
Priority to CN202321305666.9U priority Critical patent/CN219794613U/en
Application granted granted Critical
Publication of CN219794613U publication Critical patent/CN219794613U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a rapid-assembly building construction protective net, which relates to the technical field of protective nets and comprises a protective net, wherein a reinforcing edge is arranged on the outer side of the protective net and is formed by overlapping and sewing the side edges of the protective net, a plurality of first mounting holes are formed in the reinforcing edge, a hooking mechanism is arranged in each first mounting hole and comprises a mounting seat, a pin shaft, a lantern ring and a hook, the mounting seats are movably mounted in the corresponding first mounting holes, and the pin shafts are movably mounted in the mounting seats. A plurality of first mounting holes are formed in the reinforcing edge on the outer side of the protective screen, the first mounting holes are formed by mounting seats, pin shafts, lantern rings and hooks, on one hand, the mounting seats can be quickly mounted in the first mounting holes through arc-shaped limit flanges and limit rings, on the other hand, the hooks are connected with the lantern rings through tension springs, the hooks can be quickly hooked on steel pipes of the scaffold by utilizing acting forces of the tension springs, quick assembly and disassembly of the protective screen are facilitated, and the protective screen can be repeatedly utilized.

Description

Building construction protection network of quick assembly
Technical Field
The utility model relates to the technical field of protective nets, in particular to a rapid-assembly building construction protective net.
Background
The construction protection net is a temporary guardrail net for safety protection of construction sites, is generally made of steel wire ropes, steel pipes, plastics and other materials, has the advantages of preventing personnel and objects from falling, isolating dangerous areas, facilitating the movement of operators, stacking materials and the like, and is generally arranged in dangerous areas such as holes, stair openings, platforms, roofs and the like of buildings so as to ensure construction safety;
and the protection network is when the installation, generally can select to utilize iron wire or ribbon to install on the steel pipe of scaffold frame, and this kind of mode, when installing the protection network, need pass the mounting hole of protection network side and make its protection network and scaffold frame steel pipe in proper order through many iron wires or ribbon and be connected, this kind of mounting means complex operation, and when dismantling the protection network, need uncovering iron wire or ribbon in proper order again, can't realize the rapid Assembly and the dismantlement of protection network.
Disclosure of Invention
The utility model aims to provide a building construction protection net capable of being assembled quickly, and the problems in the background technology can be effectively solved.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows:
the utility model provides a construction protection network of quick assembly, includes the protection network, the protection network outside is equipped with strengthens the limit, just strengthen the limit and make up for the protection network side coincide and form, a plurality of first mounting holes have been seted up in the strengthening limit, be equipped with the hook mechanism in the first mounting hole, the hook mechanism includes mount pad, round pin axle and lantern ring, couple, mount pad movable mounting is in the first mounting hole that corresponds, round pin axle movable mounting is in the mount pad, lantern ring movable mounting is in the round pin axle outside, the couple then passes through tension spring and lantern ring swing joint.
As a further preferable scheme of the utility model, an arc-shaped limit flange is fixedly arranged at the lower position outside the mounting seat, a limit ring is fixedly arranged on the mounting seat positioned above the arc-shaped limit flange, a second mounting hole is formed in the center position inside the mounting seat, and the mounting seat is installed in the corresponding first mounting hole in a penetrating manner through the arc-shaped limit flange and the limit ring.
As a further preferable scheme of the utility model, a limiting block is fixedly arranged at the upper end of the pin shaft, a screw groove is formed at the lower end of the pin shaft, the pin shaft is installed in the second installation hole in a penetrating mode, a connecting screw is connected in the screw groove in a threaded mode, and the end portion of the connecting screw is arranged in an annular groove at the lower end of the installation seat.
As a further preferable scheme of the utility model, a first fixed shaft is fixedly arranged on one side of the lantern ring, a first slot is formed in the first fixed shaft, and the lantern ring is installed on a pin shaft at the upper end position of the installation seat in a penetrating manner.
As a further preferable scheme of the utility model, a second fixing shaft is fixedly arranged on one side of the hook, a second slot is formed in the second fixing shaft, arc hooks at two ends of the tension spring are respectively hooked in the first slot and the second slot, and the hooks are hooked on the mounting frame.
Compared with the prior art, the utility model has the following beneficial effects:
according to the rapid-assembly building construction protective net, the plurality of first mounting holes are formed in the reinforcing edge at the outer side of the protective net, the first mounting holes are formed by the mounting seats, the pin shafts, the lantern rings and the hooks, on one hand, the mounting seats can be rapidly arranged in the first mounting holes through the arc-shaped limit flanges and the limit rings, on the other hand, the hooks are connected with the lantern rings through the tension springs, the hooks can be rapidly hooked on steel pipes of the scaffold by utilizing the acting force of the tension springs, rapid assembly and disassembly of the protective net are facilitated, and the rapid-assembly building construction protective net can be recycled.
Drawings
FIG. 1 is a schematic diagram of the main structure of the present utility model;
fig. 2 is a structural exploded view of the hooking mechanism of the present utility model;
fig. 3 is a schematic view of a pin structure according to the present utility model.
In the figure: 1. a protective net; 2. reinforcing edges; 3. a first mounting hole; 4. a hooking mechanism; 5. a mounting base; 6. a pin shaft; 7. a collar; 8. a hook; 9. a tension spring; 10. an arc-shaped limit flange; 11. a limiting ring; 12. a second mounting hole; 13. a limiting block; 14. a screw groove; 15. a connecting screw; 16. a first fixed shaft; 17. a first slot; 18. a second fixed shaft; 19. and a second slot.
Detailed Description
The utility model is further described in connection with the following detailed description, in order to make the technical means, the creation characteristics, the achievement of the purpose and the effect of the utility model easy to understand.
As shown in fig. 1-3, the rapid-assembly building construction protection net provided by the utility model comprises a protection net 1, wherein a reinforcing edge 2 is arranged on the outer side of the protection net 1, the reinforcing edge 2 is formed by overlapping and sewing the side edges of the protection net 1, a plurality of first mounting holes 3 are formed in the reinforcing edge 2, a hooking mechanism 4 is arranged in the first mounting holes 3, the hooking mechanism 4 comprises a mounting seat 5, a pin shaft 6, a lantern ring 7 and a hook 8, the mounting seat 5 is movably mounted in the corresponding first mounting hole 3, the pin shaft 6 is movably mounted in the mounting seat 5, the lantern ring 7 is movably mounted on the outer side of the pin shaft 6, and the hook 8 is movably connected with the lantern ring 7 through a tension spring 9.
An arc-shaped limit flange 10 is fixedly arranged at the lower position outside the mounting seat 5, a limit ring 11 is fixedly arranged on the mounting seat 5 positioned above the arc-shaped limit flange 10, a second mounting hole 12 is formed in the center position inside the mounting seat 5, the mounting seat 5 is installed in a corresponding first mounting hole 3 in a penetrating manner through the arc-shaped limit flange 10 and the limit ring 11, a limit block 13 is fixedly arranged at the upper end of a pin shaft 6, a screw groove 14 is formed in the lower end of the pin shaft 6, the pin shaft 6 is installed in the second mounting hole 12 in a penetrating manner, a connecting screw 15 is connected in the screw groove 14 in a threaded manner, the end part of the connecting screw 15 is arranged in an annular groove at the lower end of the mounting seat 5, and the mounting seat 5 is installed in the corresponding first mounting hole 3 in a penetrating manner by virtue of the arc-shaped limit flange 10 and the limit ring 11, so that the installation of the whole hooking mechanism 4 is conveniently completed;
the first fixed shaft 16 is fixedly arranged on one side of the lantern ring 7, the first slot 17 is formed in the first fixed shaft 16, the lantern ring 7 is installed on the pin shaft 6 at the upper end position of the installation seat 5 in a penetrating mode, the second fixed shaft 18 is fixedly arranged on one side of the hook 8, the second slot 19 is formed in the second fixed shaft 18, arc hooks at two ends of the tension spring 9 are respectively hooked in the first slot 17 and the second slot 19, the hook 8 is hooked on the installation frame, the hook 8 can be rotatably installed on the pin shaft 6 through the tension spring 9 and the lantern ring 7, after the hook 8 is hooked on a scaffold steel pipe, the reinforcing edge 2 at one side can be pulled by the acting force of the tension spring 9, and then the protection net 1 is tightly installed among a plurality of scaffold steel pipes.
It should be noted that, the present utility model is a construction protection net capable of being assembled quickly, before the protection net 1 is installed on a steel pipe of a scaffold, the installation seat 5 can be installed in the corresponding first installation hole 3 in advance, that is, the installation seat 5 is pinched by hand, and the installation seat 5 is obliquely inserted into the first installation hole 3 toward one side where the arc-shaped limit flange 10 is installed, then, by utilizing the material characteristics of the reinforced edge 2, the installation seat 5 can pass the arc-shaped limit flange 10 through the first installation hole 3 and be placed at the lower end of the reinforced edge 2, then, the installation seat 5 can be installed in the first installation hole 3 through the arc-shaped limit flange 10 and the limit ring 11 in a penetrating way, then, the rest installation seat 5 can be operated in the same way as above, when the protection net 1 is required to be hung on the steel pipe of the scaffold, the hook 8 and the second fixed shaft 18 and the tension spring 9, the first fixed shaft 16 drive the collar 7 to rotate on the pin 6 for adjusting the hook direction of the hook 8, then, the hook 8 is held and the hook 8 is pulled toward the second fixed shaft 8, then, the hook 8 is pulled toward the steel pipe 8 is pulled toward the other side, and the other sides of the scaffold is hung on the steel pipe through the tension spring 8, thereby, the hook 8 can be hung between the two sides of the scaffold is realized, and the other sides of the hook 8 is stretched, and the hook 8 is hung on the steel pipe is stretched on the steel pipe, and the other side of the steel pipe, thereby, the hook 8 is stretched, and the side is stretched on the side of the steel pipe is stretched, and the ring is stretched.
The foregoing has shown and described the basic principles and main features of the present utility model and the advantages of the present utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a construction protection network of quick assembly, includes protection network (1), the protection network (1) outside is equipped with strengthens limit (2), just strengthen limit (2) and form its characterized in that for protection network (1) side coincide is made up: a plurality of first mounting holes (3) have been seted up in strengthening limit (2), be equipped with hook mechanism (4) in first mounting hole (3), hook mechanism (4) are including mount pad (5), round pin axle (6) and lantern ring (7), couple (8), mount pad (5) movable mounting is in corresponding first mounting hole (3), round pin axle (6) movable mounting is in mount pad (5), lantern ring (7) movable mounting is in the outside of round pin axle (6), couple (8) then pass through tension spring (9) and lantern ring (7) swing joint.
2. A rapid-assembly building construction protection net according to claim 1, wherein: the mounting seat is characterized in that an arc-shaped limit flange (10) is fixedly arranged at the lower position of the outer side of the mounting seat (5), a limit ring (11) is fixedly arranged at the mounting seat (5) at the upper position of the arc-shaped limit flange (10), a second mounting hole (12) is formed in the central position in the mounting seat (5), and the mounting seat (5) is installed in the corresponding first mounting hole (3) in a penetrating mode through the arc-shaped limit flange (10) and the limit ring (11).
3. A rapid-assembly building construction protection net according to claim 2, wherein: the limiting block (13) is fixedly arranged at the upper end of the pin shaft (6), the screw groove (14) is formed in the lower end of the pin shaft (6), the pin shaft (6) is installed in the second installation hole (12) in a penetrating mode, the screw groove (14) is internally connected with the connecting screw (15) in a threaded mode, and the end portion of the connecting screw (15) is arranged in the annular groove at the lower end of the installation seat (5).
4. A rapid-assembly building construction protection net according to claim 3, wherein: a first fixed shaft (16) is fixedly arranged on one side of the lantern ring (7), a first slot (17) is formed in the first fixed shaft (16), and the lantern ring (7) is installed on the pin shaft (6) at the upper end position of the installation seat (5) in a penetrating mode.
5. The rapid-assembly building construction protection net according to claim 4, wherein: the utility model discloses a couple, couple (8) one side fixed mounting has second fixed axle (18), second slot (19) have been seted up in second fixed axle (18), just the arc hook at tension spring (9) both ends is hooked in first slot (17) and second slot (19) respectively, and couple (8) then are hooked on the mounting bracket.
CN202321305666.9U 2023-05-26 2023-05-26 Building construction protection network of quick assembly Active CN219794613U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321305666.9U CN219794613U (en) 2023-05-26 2023-05-26 Building construction protection network of quick assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321305666.9U CN219794613U (en) 2023-05-26 2023-05-26 Building construction protection network of quick assembly

Publications (1)

Publication Number Publication Date
CN219794613U true CN219794613U (en) 2023-10-03

Family

ID=88151391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321305666.9U Active CN219794613U (en) 2023-05-26 2023-05-26 Building construction protection network of quick assembly

Country Status (1)

Country Link
CN (1) CN219794613U (en)

Similar Documents

Publication Publication Date Title
WO2012083831A1 (en) Guiding rail suite for assembling power transmission line iron tower via helicopter
CN219794613U (en) Building construction protection network of quick assembly
CN208777751U (en) A kind of safe rope support for steel structural roof installation
CN112027886B (en) Buffer connecting device for building hoisting and hoisting method
JP5589183B2 (en) Cylindrical structure scaffolding apparatus and moving method thereof
CN112408229A (en) Dust screen lifting mechanism suitable for building foundation pit
CN109678067B (en) A supplementary device of demolising for tower crane
CN206675841U (en) A kind of pin hook steps on bar process protection rope
CN210714047U (en) Hydraulic lifting and assembling hoop for chimney fiber reinforced plastic smoke exhaust inner barrel
CN110145168B (en) Green building construction device
CN112479073A (en) General hoisting machine of bill-board constructs convenient to carry and equipment
CN206205768U (en) Combined type hangs cat ladder
CN221165772U (en) Portable B-shaped hanging clamp suspension device
CN1328143C (en) Special moving equipment used for elevator installing
CN204873611U (en) Segmentation is exempted from foldable rope of dismouting and is kept off device and have cantilever crane system that this rope kept off device
CN219060837U (en) Safety net deployment device adapting to different shapes
CN117877392A (en) Steel structure building
CN115149483B (en) Dual-installation anti-drop damper and installation method thereof
CN218912340U (en) Building construction protector
CN214059714U (en) General hoisting machine of bill-board constructs convenient to carry and equipment
CN210561795U (en) Flexible blocking net upright post
CN217448879U (en) Extend trainer
CN213745604U (en) Large-span aerial installation equipment platform for high-rise building
CN214532738U (en) Tool type self-lifting building site gate
CN216141160U (en) Assembled tower crane operation platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant