CN219773490U - Building construction plastering plate - Google Patents

Building construction plastering plate Download PDF

Info

Publication number
CN219773490U
CN219773490U CN202321269582.4U CN202321269582U CN219773490U CN 219773490 U CN219773490 U CN 219773490U CN 202321269582 U CN202321269582 U CN 202321269582U CN 219773490 U CN219773490 U CN 219773490U
Authority
CN
China
Prior art keywords
plastering
fixed
wall
plate
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321269582.4U
Other languages
Chinese (zh)
Inventor
李敏
张琳琳
郝永康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202321269582.4U priority Critical patent/CN219773490U/en
Application granted granted Critical
Publication of CN219773490U publication Critical patent/CN219773490U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a construction plastering plate which comprises a plastering fixed plate, wherein the lower end of the plastering fixed plate is detachably connected with a plastering plate mechanism, the middle part of the upper end of the plastering fixed plate is fixedly connected with a connecting mechanism, the inner wall of the connecting mechanism is detachably connected with a handle connecting block, the middle part of the upper end of the handle connecting block is fixedly connected with a supporting connecting column, and the upper end of the supporting connecting column is fixedly connected with an anti-skid handle. According to the plastering plate for construction, the plastering plate mechanism can replace the required plastering scraping plates according to different working requirements, the connecting mechanism can facilitate the disassembly and the connection between the handle connecting block and the connecting mechanism, and when the plastering fixing plate or the anti-skid handle is damaged and needs to be maintained or replaced after long-term use, the plastering fixing plate or the anti-skid handle can be quickly disassembled or installed by using the connecting mechanism, so that the handle connecting block and the fixing connecting block can be quickly positioned.

Description

Building construction plastering plate
Technical Field
The utility model relates to the technical field of building construction, in particular to a plastering plate for building construction.
Background
The plastering facing is a decoration technology for coating various mortars on the surfaces of walls, ceilings, floors and the like of building construction, and has the effects of flattening and smoothing the walls, ceilings and floors of the building, increasing the beauty, enabling the interior to be bright, improving the decoration effect, improving the indoor living conditions, plastering in rooms which are easy to be wet or corroded by acid and alkali such as washrooms, laboratories, X-ray rooms, refrigerators and chemical workshops and the like, protecting wall bodies and floors, plastering on outdoor walls, protecting the wall bodies from being corroded by wind, rain and the atmosphere, improving the durability of the wall bodies, improving the dampproof and heat-insulating performances of the wall bodies, and making up and improving the functional defects of the wall bodies.
Before the operation is pasted to wall or ground, the operator needs to smear cement comparatively coarse, can increase the fastness of pasting like this, but common plastered board bottom is comparatively smooth, inconvenient operation to plaster and connect through welded connection between fixed plate and the handle connecting block, the live time has been prolonged and has been inevitably led to the fact the damage, is inconvenient to dismantle it and change or maintain, has brought certain adverse effect for people's use, and for this reason, we propose a construction plastered board.
Disclosure of Invention
The technical problems to be solved are as follows: aiming at the defects of the prior art, the utility model provides a plastering plate for building construction, which has the advantages that a plastering scraper plate required by the plastering plate mechanism can be replaced according to different working requirements, a connecting mechanism is convenient for rapidly positioning a handle connecting block and the connecting mechanism, and the like, and can effectively solve the problems in the background art.
The technical scheme is as follows: in order to achieve the above purpose, the technical scheme adopted by the utility model is as follows: the utility model provides a construction plaster board, includes plaster fixed plate, plaster fixed plate's lower extreme can be dismantled and be connected with plaster plate mechanism, plaster fixed plate's upper end middle part fixedly connected with coupling mechanism, coupling mechanism's inner wall can be dismantled and be connected with the handle connecting block, the middle part fixedly connected with of handle connecting block upper end supports the spliced pole, the upper end fixedly connected with anti-skidding handle of supporting the spliced pole.
Preferably, the plastering plate mechanism comprises a first threaded hole, a connecting plate, a second threaded hole, a supporting connecting rod, a plastering scraper and a fixing threaded bolt, wherein the first threaded hole is formed in the outer surfaces of the upper ends of four corners of the plastering fixing plate.
Preferably, the four corners of connecting plate upper end surface have all been seted up No. two screw holes, the four corners of connecting plate lower extreme surface all with support the upper end surface fixed connection of connecting rod, support the lower extreme surface of connecting rod all with the four corners fixed connection of scraper blade upper end surface of plastering, the outer wall of fixed thread bolt has run through the inner wall of No. one screw hole and the inner wall detachable connection of No. two screw holes through the screw thread.
Preferably, the connecting mechanism comprises a fixed connecting block, an anti-falling fixing hole, an anti-falling fixing block, a limiting sliding block, a damper and an elastic piece, wherein the middle part of the outer surface of the upper end of the plastering fixing plate is fixedly connected with the outer surface of the lower end of the fixed connecting block, and the inner walls of the two sides of the handle connecting block are movably connected with the outer walls of the anti-falling fixing block.
Preferably, the anti-drop fixed orifices have all been seted up to the both sides surface of fixed connection block, the equal fixedly connected with spacing slider of upper and lower both ends surface of anti-drop fixed block, the outer wall of spacing slider and the inner wall swing joint of handle connecting block, the outer wall cover of attenuator is equipped with the elastic component, the both ends of attenuator all are connected with the rear end surface fixed of anti-drop fixed block, attenuator, elastic component and spacing slider all are located the inner wall of handle connecting block.
Preferably, the outer wall of the anti-falling fixing block is detachably connected with the inner wall of the anti-falling fixing hole, and the outer wall of the handle connecting block is detachably connected with the inner wall of the fixing connecting block.
The beneficial effects are that: compared with the prior art, the utility model provides a construction plastering plate, which has the following beneficial effects:
1. this construction is smeared grey board, can remove the required scraper blade of plastering according to the work needs of difference through the structure of smearing the grey board that sets up, the operator can rotate the fixed thread bolt, breaks away from fixed thread bolt from screw hole No. one and No. two screw holes, alright with the connecting plate with plaster and separate between the fixed plate, the scraper blade of plastering of changing different materials is needed according to the work of different smearing, reaches better work effect.
2. This ash board is smeared in construction, be convenient for quick dismantlement and connection between handle connecting block and the coupling mechanism through the coupling mechanism that sets up, operating personnel live time has for a long time can not cause plaster fixed plate or anti-skidding handle to have damage when needing maintenance or change, can utilize coupling mechanism with its quick split or installation, and also can insert fixed connecting block inner wall with the handle connecting block after, utilize the anticreep fixed block card to go into the anticreep fixed orifices in, the rear end of anticreep fixed block has fixed attenuator and elastic component, the elastic component has certain tension, can outwards push out the anticreep fixed block, firm to block the anticreep fixed orifices, the break away from has been prevented, quick will handle connecting block and fixed connecting block between fix a position.
Drawings
Fig. 1 is a schematic view of the overall structure of a plastering plate for building construction.
Fig. 2 is a schematic exploded view of a construction plastering plate mechanism of the plastering plate for construction.
Fig. 3 is a schematic exploded view of a connection mechanism of a plastering plate for construction according to the utility model.
Fig. 4 is a schematic plan view of a part of the structure of a connection mechanism of a plastering plate for construction according to the utility model.
In the figure: 1. plastering a fixed plate; 2. a plastering plate mechanism; 3. a connecting mechanism; 4. a handle connecting block; 5. supporting the connecting column; 6. an anti-slip handle; 201. a first threaded hole; 202. a connecting plate; 203. a second threaded hole; 204. a support connecting rod; 205. a plastering scraper; 206. a fixed threaded bolt; 301. fixing the connecting block; 302. an anti-falling fixing hole; 303. an anti-falling fixed block; 304. a limit sliding block; 305. a damper; 306. and an elastic piece.
Detailed Description
The utility model is further described in connection with the following detailed description, in order to make the technical means, the creation characteristics, the achievement of the purpose and the effect of the utility model easy to understand.
As shown in fig. 1-4, a construction plastering plate comprises a plastering fixed plate 1, wherein a plastering plate mechanism 2 is detachably connected to the lower end of the plastering fixed plate 1, a connecting mechanism 3 is fixedly connected to the middle part of the upper end of the plastering fixed plate 1, a handle connecting block 4 is detachably connected to the inner wall of the connecting mechanism 3, a supporting connecting column 5 is fixedly connected to the middle part of the upper end of the handle connecting block 4, and an anti-slip handle 6 is fixedly connected to the upper end of the supporting connecting column 5, so that the anti-slip performance is improved.
Further, the plastering plate mechanism 2 comprises a first threaded hole 201, a connecting plate 202, a second threaded hole 203, a supporting connecting rod 204, a plastering scraping plate 205 and a fixing threaded bolt 206, wherein the first threaded hole 201 is formed in the outer surfaces of the upper ends of the four corners of the plastering fixing plate 1, and the outer wall of the fixing threaded bolt 206 penetrates through the first threaded hole 201 and is connected with the inner wall of the second threaded hole 203.
Further, no. two screw holes 203 are all seted up at the four corners of connecting plate 202 upper end surface, and the four corners of connecting plate 202 lower extreme surface all with support connecting rod 204's upper end surface fixed connection, support connecting rod 204's lower extreme surface all with plaster scraper blade 205 upper end surface's four corners fixed connection, the outer wall of fixed screw bolt 206 is through the inner wall that the screw thread has run through No. one screw hole 201 with No. two screw hole 203's inner wall detachable connection, be convenient for dismantle.
Further, the connecting mechanism 3 comprises a fixed connecting block 301, an anti-falling fixing hole 302, an anti-falling fixing block 303, a limit sliding block 304, a damper 305 and an elastic piece 306, wherein the middle part of the outer surface of the upper end of the plastering fixing plate 1 is fixedly connected with the outer surface of the lower end of the fixed connecting block 301, the inner walls of the two sides of the handle connecting block 4 are movably connected with the outer walls of the anti-falling fixing block 303, and one end outer wall of the anti-falling fixing block 303 is positioned on the inner wall of the handle connecting block 4.
Further, the anti-drop fixed orifices 302 have all been seted up to the both sides surface of fixed connecting block 301, the equal fixedly connected with spacing slider 304 of upper and lower both ends surface of anti-drop fixed block 303, the outer wall of spacing slider 304 and the inner wall swing joint of handle connecting block 4, the outer wall cover of attenuator 305 is equipped with elastic component 306, the both ends of attenuator 305 all are connected with the rear end surface fixed of anti-drop fixed block 303, attenuator 305, elastic component 306 and spacing slider 304 all are located the inner wall of handle connecting block 4, elastic component 306 has certain tension, can outwards push out anti-drop fixed block 303, but in order to prevent the breaking away from of anti-drop fixed block 303, the upper and lower both ends of anti-drop fixed block 303 have all set up spacing slider 304.
Further, the outer wall of the anti-falling fixing block 303 is detachably connected with the inner wall of the anti-falling fixing hole 302, and the outer wall of the handle connecting block 4 is detachably connected with the inner wall of the fixing connecting block 301, so that the disassembly is facilitated.
Working principle: before the operator needs to paste the wall or the ground, the cement needs to be smeared to be rough, so that the pasting firmness can be improved, the required plastering scraper 205 can be replaced according to different working requirements by utilizing the plastering plate mechanism 2, the operator can rotate the fixing threaded bolt 206 to separate the fixing threaded bolt 206 from the first threaded hole 201 and the second threaded hole 203, the connecting plate 202 and the plastering fixing plate 1 can be separated, the plastering scraper 205 with different materials can be replaced according to different smearing working requirements, the better working effect can be achieved, the plastering fixing plate 1 or the anti-slip handle 6 can be quickly detached or installed by utilizing the connecting mechanism 3 when being damaged or replaced, the operator manually presses the anti-drop fixing block 303 inwards, the anti-drop fixing block 303 is separated from the anti-drop fixing hole 302, the fixing connecting block 301 and the handle connecting block 4 can be separated, timely replacement or maintenance can be carried out, and in addition, when the handle connecting block 4 is inserted into the inner wall of the fixing connecting block 301 during installation, when the anti-drop fixing block 303 is clamped into the anti-drop fixing hole 302, the rear end of the anti-drop fixing block 303 is fixed with the damper 305 and the elastic piece 306, the elastic piece 306 has certain tension, the anti-drop fixing block 303 can be outwards ejected out of the inner wall of the handle connecting block 4, but in order to prevent the anti-drop fixing block 303 from being separated, the upper end and the lower end of the anti-drop fixing block 303 are respectively provided with the limit sliding blocks 304, the limit sliding blocks 304 are positioned on the inner wall of the handle connecting block 4, the limit effect is achieved, the anti-drop fixing block 303 is prevented from being separated, the anti-drop fixing hole 302 is firmly clamped by the anti-drop fixing block 303, the handle connecting block 4 and the fixed connecting block 301 are quickly positioned.
It should be noted that in this document, relational terms such as first and second (first and second), and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one … …" does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises the element.
The foregoing has shown and described the basic principles and main features of the present utility model and the advantages of the present utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (4)

1. The utility model provides a construction plastering plate, includes plastering fixed plate (1), its characterized in that: the lower end of the plastering fixed plate (1) is detachably connected with a plastering plate mechanism (2), the middle part of the upper end of the plastering fixed plate (1) is fixedly connected with a connecting mechanism (3), the inner wall of the connecting mechanism (3) is detachably connected with a handle connecting block (4), the middle part of the upper end of the handle connecting block (4) is fixedly connected with a supporting connecting column (5), and the upper end of the supporting connecting column (5) is fixedly connected with an anti-skid handle (6);
the plastering plate mechanism (2) comprises a first threaded hole (201), a connecting plate (202), a second threaded hole (203), a supporting connecting rod (204), a plastering scraper (205) and a fixing threaded bolt (206), wherein the first threaded holes (201) are formed in the outer surfaces of the upper ends of the four corners of the plastering fixing plate (1);
the four corners of connecting plate (202) upper end surface have all been seted up No. two screw holes (203), the four corners of connecting plate (202) lower extreme surface all with support the upper end surface fixed connection of connecting rod (204), the lower extreme surface of support connecting rod (204) all with the four corners fixed connection of scraper blade (205) upper end surface of plastering, the inner wall that the outer wall of fixed thread bolt (206) has run through No. one screw hole (201) through the screw thread can dismantle with the inner wall of No. two screw holes (203) and be connected.
2. A construction plasterboard according to claim 1, wherein: the connecting mechanism (3) comprises a fixed connecting block (301), an anti-falling fixing hole (302), an anti-falling fixing block (303), a limiting sliding block (304), a damper (305) and an elastic piece (306), wherein the middle part of the outer surface of the upper end of the plastering fixing plate (1) is fixedly connected with the outer surface of the lower end of the fixed connecting block (301), and the inner walls of the two sides of the handle connecting block (4) are movably connected with the outer walls of the anti-falling fixing block (303).
3. A construction plasterboard according to claim 2, wherein: the anti-drop fixed orifices (302) have all been seted up to the both sides surface of fixed connection piece (301), the equal fixedly connected with spacing slider (304) of the upper and lower both ends surface of anti-drop fixed block (303), the outer wall of spacing slider (304) and the inner wall swing joint of handle connecting block (4), the outer wall cover of attenuator (305) is equipped with elastic component (306), the both ends of attenuator (305) all are connected with the rear end surface fixed of anti-drop fixed block (303), attenuator (305), elastic component (306) and spacing slider (304) all are located the inner wall of handle connecting block (4).
4. A construction plasterboard according to claim 3, wherein: the outer wall of the anti-falling fixed block (303) is detachably connected with the inner wall of the anti-falling fixed hole (302), and the outer wall of the handle connecting block (4) is detachably connected with the inner wall of the fixed connecting block (301).
CN202321269582.4U 2023-05-24 2023-05-24 Building construction plastering plate Active CN219773490U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321269582.4U CN219773490U (en) 2023-05-24 2023-05-24 Building construction plastering plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321269582.4U CN219773490U (en) 2023-05-24 2023-05-24 Building construction plastering plate

Publications (1)

Publication Number Publication Date
CN219773490U true CN219773490U (en) 2023-09-29

Family

ID=88138973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321269582.4U Active CN219773490U (en) 2023-05-24 2023-05-24 Building construction plastering plate

Country Status (1)

Country Link
CN (1) CN219773490U (en)

Similar Documents

Publication Publication Date Title
CN101725185B (en) Compound heat preservation die plate and concrete one-off construction outer wall heat preservation system and construction technology thereof
CN214034055U (en) Ready-package steel construction
CN104533046A (en) Dry-hanging and wet-adhering combined mounting method of cement-based artificial flat stone
CN219773490U (en) Building construction plastering plate
CN104018650B (en) Wall plastering plane rushes muscle bar and using method thereof
CN208293976U (en) Bright frame wall brick system in a kind of assembled room
CN214062093U (en) Can dismantle aluminium veneer furred ceiling fixed connection device
CN214034626U (en) Novel construction putty scraper blade
CN215331123U (en) Mounting structure of interior wall tile
CN203905416U (en) Wall tile plaster applying mold
CN213234108U (en) A novel mounting structure for building side fascia
CN211308092U (en) Building wall paper clearing device of convenient equipment
CN219280954U (en) Building steel structure wall body with heat preservation function
CN214473136U (en) Indoor outer decoration and finishing engineering environmental protection monitoring devices
CN213296962U (en) Assembled indoor dry-hanging wall brick system
CN212927068U (en) Concrete construction joint pouring device
CN218053339U (en) Edge cutting device for glass magnesium board production line
CN219411897U (en) Auxiliary fixing device for installation of heat-insulating wall
CN219343783U (en) Color steel tile with high stability
CN108360784B (en) Assembled indoor dry-hanging wall brick and construction method thereof
CN220521617U (en) Waterproof construction of building expansion joint
CN212644783U (en) Ventilation air conditioner mounting structure of building engineering
CN218438061U (en) Wall body trowelling tool for decoration engineering
CN214117427U (en) Adjustable spatula capable of smearing right angles
CN116290637B (en) Anti-falling system for outer wall body and construction process